CHAPTER 4
PROTECTION REQUIREMENTS
4.1
CHAPTER 4
PROTECTION REQUIREMENTS
4.1 General Means of protection for automatic disconnection against phase and earth faults
shall be provided on the customer main switch. The type and settings of protective devices shall be so selected that they can grade properly with HK Electric infeed protection.
The customer shall provide Time-Current curve showing that the proposed
protection scheme for the main switch can grade properly with HK Electric system under both phase fault and earth fault conditions.
4.2 Customer HV Main Switch 1. Anticipated maximum 11-kV fault level:- Phase fault: 18.4 kA (350 MVA) Earth fault: 2.0 kA
To grade with HK Electric 11-kV feeder protection, the protective relays of customer 11-kV main switch shall have an operating time not exceeding the maximum allowable time-current curves for phase fault and earth fault as shown in Drg. Nos. GCS/4/01 and 02 respectively.
2. Anticipated maximum 22-kV fault level:-
Phase fault: 25 kA (952 MVA) Earth fault: 2.5 kA
To grade with HK Electric 22-kV feeder protection, the protective relays of customer 22-kV main switch shall have an operating time not exceeding the maximum allowable time-current curves for phase fault and earth fault as shown in Drg. Nos. GCS/4/03 and 04 respectively.
3. Protection C.T.s shall have adequate output to prevent C.T. saturation.
The customer shall provide document/calculation sheet to show that the proposed C.T.s have adequate output for the application under both phase and earth fault conditions.
4.2
4.3 Customer LV Main Switch 1. The anticipated maximum LV (380 V) fault level is 40 kA (26 MVA). The
overcurrent protection of customer LV main switch shall grade with HK Electric's transformer overcurrent protection and has an operating time not exceeding the maximum allowable time-current curves for various ratings of LV main switches as shown in Drg. No. GCS/4/05.
2. The customer protective devices shall be set so that disconnection is
achieved within 5 seconds during an earth fault. 3. Bonding Between HK Electric and Customer's Earthing Systems a. Under the current regulations, the customer's earthing system shall
be bonded to that of the HK Electric’s earthing system for transformer supplies. This will cause a significant increase in LV earth fault current, the magnitude of which can be as high as phase fault current.
b. If the customer LV overcurrent and earth fault protections share the
same set of C.T.s, high output C.T.s and low burden type earth fault relay shall be used to prevent C.T. saturation. The customer shall provide document/calculation sheet to show that the proposed protection C.T.s have adequate output for the application under earth fault condition.
c. As an alternative to the use of high output C.T.s and low burden type
earth fault relay, separate sets of C.T.s can be used for overcurrent and earth fault protections as shown in Drg. No. GCS/4/06.
4.4 Protection Scheme For Main Switch The customer is advised to provide a summary sheet as shown in Drg. No.
GCS/4/07 and GCS/4/08 for LV and HV main switch protection scheme respectively to HK Electric for consideration.
4.5 Auxiliary Supply for Protection Scheme and Relay If the customer protection scheme or relay requires an auxiliary supply, the
auxiliary supply shall be reliable and not be interrupted during LV or HV faults on the customer equipment to ensure that the customer protection scheme and relay perform the protection function properly.
4.3
4.6 Schedule of Drawings - Protection Requirements Drawing No. Drawing Title GCS/4/01 Maximum Allowable Time-Current Curve of
Overcurrent Protection at Customer 11-kV Main Switch
GCS/4/02 Maximum Allowable Time-Current Curve of Earth
Fault Protection at Customer 11-kV Main Switch GCS/4/03 Maximum Allowable Time-Current Curve of
Overcurrent Protection at Customer 22-kV Main Switch
GCS/4/04 Maximum Allowable Time-Current Curve of Earth
Fault Protection at Customer 22-kV Main Switch GCS/4/05 Maximum Allowable Time-Current Curves of
Overcurrent Protection at Customer LV Main Switch GCS/4/06 Recommended C.T. Arrangement for Customer's
Protective Device at LV Main Switch GCS/4/07 LV Main Switch Protection Scheme Summary Sheet GCS/4/08 HV Main Switch Protection Scheme Summary Sheet
80000
60000
40000
20000
200
400
600
800
2000
4000
6000
8000
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3 0.2
9.0
8.0
7.0
6.0
5.0
4.0 3.0
2.0 0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
0.1
1.0
10.0
100
1000
10000
100000
0.1
1.0
10.0
Drg
. No.
GC
S/4/
01M
AX
IMU
M A
LLO
WA
BLE
TIM
E-C
UR
REN
T C
UR
VE
OF
OV
ERC
UR
REN
T PR
OTE
CTI
ON
AT
CU
STO
MER
11-
kV M
AIN
SW
ITC
H
4.4
8000
6000
4000
2000
200
400
600
800
20
40
60
80
9.0
8.0
7.0
6.0
5.0
4.0 3.0
2.0
0.9
0.8
0.7
0.6
0.5
0.4
0.3
0.2
9.0
8.0
7.0
6.0
5.0
4.0
3.0
2.0 0.9
0.8
0.7
0.6
0.5
0.4 0.3
0.2
0.1
1.0
10.0
10
100
1000
10000
0.1
1.0
10.0
Drg
. No.
GC
S/4/
02M
AX
IMU
M A
LLO
WA
BLE
TIM
E-C
UR
REN
T C
UR
VE
OF
EAR
TH F
AU
LT P
RO
TEC
TIO
NA
T C
UST
OM
ER 1
1-kV
MA
IN S
WIT
CH
4.5
8000
6000
4000
2000
800
600
400
200
20000
40000
60000
80000
0.2
0.3
0.40.5
0.6
0.7
0.80.9
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.2
0.3
0.40.5
0.6
0.7
0.8
0.92.0
3.0
4.0
5.0
6.0
7.08.0
9.0
0.1
1.0
10.0
100
1000
10000
100000
0.1
1.0
10.0
Drg
. No.
GC
S/4/
03M
AX
IMU
M A
LLO
WA
BLE
TIM
E-C
UR
REN
T C
UR
VE
OF
OV
ERC
UR
REN
T PR
OTE
CTI
ON
AT
CU
STO
MER
22-
kV M
AIN
SW
ITC
H
4.6
800
600
400
200
2000
4000
6000
8000
20
40
60
80
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.2
0.3
0.40.5
0.6
0.7
0.8
0.92.0
3.0
4.0
5.0
6.0
7.08.0
9.0
0.1
1.0
10.0
10
100
1000
10000
0.1
1.0
10.0
Drg
. No.
GC
S/4/
04M
AX
IMU
M A
LLO
WA
BLE
TIM
E-C
UR
REN
T C
UR
VE
OF
EAR
TH F
AU
LT P
RO
TEC
TIO
N A
T C
UST
OM
ER 2
2-kV
MA
IN S
WIT
CH
4.7
8000
6000
4000
2000
20000
40000
60000
80000
0.2
0.3
0.40.5
0.6
0.7
0.8
0.9
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.92.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
0.09
0.08
0.05
0.04
0.06
0.07
0.03
0.02
0.03
0.02
0.04
0.06
0.08
0.09
0.05
0.07
0.01
0.10
1.00
10.0
0
1000
10000
100000
0.01
0.10
1.00
10.0
0
Drg
. No.
GC
S/4/
05M
AX
IMU
M A
LLO
WA
BLE
TIM
E-C
UR
REN
T C
UR
VES
OF
OV
ERC
UR
REN
T P
RO
TEC
TIO
NA
T C
UST
OM
ER L
V M
AIN
SW
ITC
H
4.8
Drg
. No.
GC
S/4/
06R
ECO
MM
END
ED C
.T. A
RR
AN
GEM
ENT
FOR
CU
STO
MER
'S P
RO
TEC
TIV
E D
EVIC
E A
T LV
MA
IN S
WIT
CH
4.9
1. C
ircu
it B
reak
er I
nfor
mat
ion
: (M
ain
Sw
itch
No.
:
)
Mai
n S
wit
ch R
atin
g A
ny B
uilt
-in
Pro
tect
ive
Dev
ice
?In
stan
tane
ous
Tri
p C
urre
nt S
ettin
g (k
A)
and
Max
. Set
ting
Err
or
Set
ting
Det
ails
Yes
No
2.
Cur
rent
Tra
nsfo
rmer
: F
unct
ion
Mak
e M
odel
N
umbe
rR
atio
VA
and
Cla
ssA
ny C
.T. M
agne
tisat
ion
Cur
ve P
rovi
ded
to H
K E
lect
ric
?C
.T. R
esis
tanc
e (o
hm)
Con
nect
ion
Lea
d R
esis
tanc
e (o
hm)
Ove
rcur
rent
P
rote
ctio
n C
.T.
Y
es
No,
to b
e su
bmit
ted
late
r E
arth
Fau
lt P
rote
ctio
n C
.T.
Y
es
No,
to b
e su
bmit
ted
late
r
Wil
l the
ove
rcur
rent
pro
tect
ion
and
eart
h fa
ult p
rote
ctio
n sh
are
the
sam
e se
t of
C.T
.s ?
Y
es
No
3. R
elay
Inf
orm
atio
n :
Fun
ctio
n M
ake
Mod
el
Num
ber
Rat
ed
Cur
rent
(A)
Bur
den
at
Rat
ed C
urre
nt
(VA
)
Aux
ilia
ry S
uppl
y#
(A.C
., D
.C. o
r
N.A
.)
* C
hara
cter
isti
cs e
.g.
EI,
VI,
NI
(1.3
s),
NI
(3 s
)
Plu
g S
ettin
g
Ran
ge
Plu
g
Set
ting
Tim
e M
ulti
plie
r
Set
ting
Rel
ay I
mpe
danc
e
at P
lug
Set
ting
(ohm
)
Ove
rcur
rent
Rel
ay
Ear
th F
ault
Rel
ay
(*
: E
I =
Ext
rem
ely
Inve
rse,
VI
= V
ery
Inve
rse,
NI=
Nor
mal
Inv
erse
) # If
the
cust
omer
pro
tect
ion
sche
me
or r
elay
req
uire
s an
aux
ilia
ry s
uppl
y, th
e au
xili
ary
supp
ly s
hall
be
reli
able
and
not
be
inte
rrup
ted
duri
ng L
V o
r H
V f
aults
on
the
cust
omer
eq
uipm
ent t
o en
sure
that
the
cust
omer
pro
tect
ion
sche
me
and
rela
y pe
rfor
m th
e pr
otec
tion
func
tion
prop
erly
.
4. M
axim
um E
arth
Fau
lt L
oop
Impe
danc
e, if
ava
ilabl
e at
the
time
of s
ubm
issi
on :
____
____
__ o
hm
Not
es :
Fo
llow
ing
info
rmat
ion
shal
l be
prov
ided
:
1.
Cat
alog
ues
for
mai
n sw
itch
(w
ith
deta
ils
of b
uilt
-in
prot
ecti
ve d
evic
e, if
any
), C
.T.s
(in
clud
ing
C.T
. mag
neti
sati
on c
urve
) an
d re
lays
.
2.
A.C
. con
nect
ion
diag
ram
of
over
curr
ent a
nd e
arth
fau
lt p
rote
ctio
n fo
r th
e m
ain
swit
ch.
3. C
alcu
lati
on s
heet
sho
win
g th
at th
e pr
opos
ed C
.T.s
hav
e ad
equa
te o
utpu
t for
the
appl
icat
ion
unde
r bo
th p
hase
and
ear
th f
ault
con
diti
ons.
4.
Tim
e-cu
rren
t cha
ract
eris
tic
curv
e of
ove
rcur
rent
pro
tect
ion
at th
e pr
opos
ed s
etti
ngs
plot
ted
at th
e D
rg. N
o. G
CS
/4/0
5.
D
rg. N
o. G
CS
/4/0
7 L
V M
AIN
SW
ITC
H P
RO
TE
CT
ION
SC
HE
ME
SU
MM
AR
Y S
HE
ET
4.10
1. C
ircu
it B
reak
er I
nfor
mat
ion
: (M
ain
Sw
itch
No.
:
)
Mai
n S
wit
ch R
atin
g A
ny B
uilt
-in
Pro
tect
ive
Dev
ice
?In
stan
tane
ous
Tri
p C
urre
nt S
ettin
g (k
A)
and
Max
. Set
ting
Err
or
Set
ting
Det
ails
Yes
No
2.
Cur
rent
Tra
nsfo
rmer
: F
unct
ion
Mak
e M
odel
N
umbe
rR
atio
VA
and
Cla
ssA
ny C
.T. M
agne
tisat
ion
Cur
ve P
rovi
ded
to H
K E
lect
ric
?C
.T. R
esis
tanc
e (o
hm)
Con
nect
ion
Lea
d R
esis
tanc
e (o
hm)
Ove
rcur
rent
P
rote
ctio
n C
.T.
Y
es
No,
to b
e su
bmit
ted
late
r E
arth
Fau
lt P
rote
ctio
n C
.T.
Y
es
No,
to b
e su
bmit
ted
late
r
Wil
l the
ove
rcur
rent
pro
tect
ion
and
eart
h fa
ult p
rote
ctio
n sh
are
the
sam
e se
t of
C.T
.s ?
Y
es
No
3. R
elay
Inf
orm
atio
n :
Fun
ctio
n M
ake
Mod
el
Num
ber
Rat
ed
Cur
rent
(A)
Bur
den
at
Rat
ed C
urre
nt
(VA
)
Aux
ilia
ry S
uppl
y#
(A.C
., D
.C. o
r
N.A
.)
* C
hara
cter
isti
cs e
.g.
EI,
VI,
NI
(1.3
s),
NI
(3 s
)
Plu
g S
ettin
g
Ran
ge
Plu
g
Set
ting
Tim
e M
ulti
plie
r
Set
ting
Rel
ay I
mpe
danc
e
at P
lug
Set
ting
(ohm
)
Ove
rcur
rent
Rel
ay
Ear
th F
ault
Rel
ay
(*
: E
I =
Ext
rem
ely
Inve
rse,
VI
= V
ery
Inve
rse,
NI=
Nor
mal
Inv
erse
) # If
the
cust
omer
pro
tect
ion
sche
me
or r
elay
req
uire
s an
aux
ilia
ry s
uppl
y, th
e au
xili
ary
supp
ly s
hall
be
reli
able
and
not
be
inte
rrup
ted
duri
ng L
V o
r H
V f
aults
on
the
cust
omer
eq
uipm
ent t
o en
sure
that
the
cust
omer
pro
tect
ion
sche
me
and
rela
y pe
rfor
m th
e pr
otec
tion
func
tion
prop
erly
. N
otes
:
Foll
owin
g in
form
atio
n sh
all b
e pr
ovid
ed :
1.
C
atal
ogue
s fo
r m
ain
swit
ch (
wit
h de
tail
s of
bui
lt-i
n pr
otec
tive
dev
ice,
if a
ny),
C.T
.s (
incl
udin
g C
.T. m
agne
tisa
tion
cur
ve)
and
rela
ys.
2.
A.C
. con
nect
ion
diag
ram
of
over
curr
ent a
nd e
arth
fau
lt p
rote
ctio
n fo
r th
e m
ain
swit
ch.
3.
Cal
cula
tion
she
et s
how
ing
that
the
prop
osed
C.T
.s h
ave
adeq
uate
out
put f
or th
e ap
plic
atio
n un
der
both
pha
se a
nd e
arth
fau
lt c
ondi
tion
s.
4.
Tim
e-cu
rren
t cha
ract
eris
tic
curv
es o
f ov
ercu
rren
t pro
tect
ion
and
eart
h fa
ult p
rote
ctio
n at
the
prop
osed
set
ting
s pl
otte
d at
the
Drg
. No.
GC
S/4/
01 &
GC
S/4
/02
(for
11-
kV m
ain
swit
ch)
or D
rg. N
o. G
CS/
4/03
& G
CS
/4/0
4 (f
or 2
2-kV
mai
n sw
itch
) re
spec
tive
ly.
Drg
. No.
GC
S/4
/08
HV
MA
IN S
WIT
CH
PR
OT
EC
TIO
N S
CH
EM
E S
UM
MA
RY
SH
EE
T
4.11