APWRA Repowering Final PEIR 21 October 2014 ICF 00323.08 Chapter 2 Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills of eastern Alameda County near the San Joaquin County line, north and south of I‐580 and approximately 56 miles east of San Francisco. The Altamont Hills are at the geographical interface between the coastal mountains and the Central Valley (Figure 1‐1). As defined in the Alameda and Contra Costa County general plans, the APWRA encompasses approximately 49,202 acres: 36,870 acres in Alameda County and 12,332 acres in Contra Costa County. During early development of the APWRA NCCP/HCP, a new boundary for the APWRA was developed using the 70‐meter wind speed data produced by CEC. The purpose of this revised boundary was to capture the extent of the area within which repowered wind turbines could be constructed. In Contra Costa County, the line was defined to match the boundary in the County of Contra Costa general plan. In Alameda County, the boundary was defined to encompass all of the County‐designated APWRA, as well as those lands in the Altamont Hills with a mean wind speed of 12 miles per hour or greater, measured 70 meters (about 230 feet) above ground. Because it is anticipated that repowered wind turbines may be constructed anywhere within this revised boundary, the NCCP/HCP boundary in Alameda County (43,358 acres) is used to define the program area for this environmental analysis (Figures 1‐2 and 1‐3). 2.2 Program Overview and Objectives 2.2.1 Overview This Draft PEIR evaluates repowering wind energy projects in the Alameda County portion of the APWRA. The program does not reflect any formal ordinance or adopted plan of the County, but is rather the overarching process by which the County will receive and review CUP applications. Accordingly, the program as considered in this PEIR comprises the anticipated approval by the County of a series of new CUPs to allow new windfarm uses in the APWRA, as permitted by both the ECAP and the County Zoning Ordinance. The program is the result of a combination of formal and informal agreements between the County, the windfarm operators, state and federal resource agencies, nongovernmental organizations, and property owners to initiate repowering activities in 2014 in anticipation of expiration of the existing CUPs. Windfarm uses are conditionally permitted in the “A” (Agriculture) zone district, which encompasses the entire program area. Windfarm uses have been permitted in the APWRA since the early 1980s with such CUPs, and the terms of the currently active CUPs (last approved in 2005 for continued operation of the windfarms, and amended in 2007) are in effect through September 2018. EBZA is the appointed body with the responsibility for taking action to approve or deny each CUP application, based on findings that the use (a) is required by the public need; (b) will be properly related to other land uses and transportation and service facilities in the vicinity; (c) will, under its

Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

  • Upload
    others

  • View
    22

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

 

APWRA Repowering Final PEIR 2‐1 

October 2014ICF 00323.08

 

Chapter 2  Program Description 

2.1 Program Location and Program Area TheprogramareaislocatedintheAltamontHillsofeasternAlamedaCountyneartheSanJoaquinCountyline,northandsouthofI‐580andapproximately56mileseastofSanFrancisco.TheAltamontHillsareatthegeographicalinterfacebetweenthecoastalmountainsandtheCentralValley(Figure1‐1).

AsdefinedintheAlamedaandContraCostaCountygeneralplans,theAPWRAencompassesapproximately49,202acres:36,870acresinAlamedaCountyand12,332acresinContraCostaCounty.DuringearlydevelopmentoftheAPWRANCCP/HCP,anewboundaryfortheAPWRAwasdevelopedusingthe70‐meterwindspeeddataproducedbyCEC.Thepurposeofthisrevisedboundarywastocapturetheextentoftheareawithinwhichrepoweredwindturbinescouldbeconstructed.InContraCostaCounty,thelinewasdefinedtomatchtheboundaryintheCountyofContraCostageneralplan.InAlamedaCounty,theboundarywasdefinedtoencompassalloftheCounty‐designatedAPWRA,aswellasthoselandsintheAltamontHillswithameanwindspeedof12milesperhourorgreater,measured70meters(about230feet)aboveground.Becauseitisanticipatedthatrepoweredwindturbinesmaybeconstructedanywherewithinthisrevisedboundary,theNCCP/HCPboundaryinAlamedaCounty(43,358acres)isusedtodefinetheprogramareaforthisenvironmentalanalysis(Figures1‐2and1‐3).

2.2 Program Overview and Objectives 

2.2.1 Overview 

ThisDraftPEIRevaluatesrepoweringwindenergyprojectsintheAlamedaCountyportionoftheAPWRA.TheprogramdoesnotreflectanyformalordinanceoradoptedplanoftheCounty,butisrathertheoverarchingprocessbywhichtheCountywillreceiveandreviewCUPapplications.Accordingly,theprogramasconsideredinthisPEIRcomprisestheanticipatedapprovalbytheCountyofaseriesofnewCUPstoallownewwindfarmusesintheAPWRA,aspermittedbyboththeECAPandtheCountyZoningOrdinance.TheprogramistheresultofacombinationofformalandinformalagreementsbetweentheCounty,thewindfarmoperators,stateandfederalresourceagencies,nongovernmentalorganizations,andpropertyownerstoinitiaterepoweringactivitiesin2014inanticipationofexpirationoftheexistingCUPs.

Windfarmusesareconditionallypermittedinthe“A”(Agriculture)zonedistrict,whichencompassestheentireprogramarea.WindfarmuseshavebeenpermittedintheAPWRAsincetheearly1980swithsuchCUPs,andthetermsofthecurrentlyactiveCUPs(lastapprovedin2005forcontinuedoperationofthewindfarms,andamendedin2007)areineffectthroughSeptember2018.

EBZAistheappointedbodywiththeresponsibilityfortakingactiontoapproveordenyeachCUPapplication,basedonfindingsthattheuse(a)isrequiredbythepublicneed;(b)willbeproperlyrelatedtootherlandusesandtransportationandservicefacilitiesinthevicinity;(c)will,underits

Page 2: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐2 

October 2014ICF 00323.08

 

particularcircumstancesandconditions,havenomaterialadverseeffectonthehealthorsafetyofpersonsresidingorworkinginthevicinity,orbemateriallydetrimentaltothepublicwelfareorinjurioustopropertyorimprovementsinthevicinity;and(d)willnotbecontrarytothespecificintentclausesorperformancestandardsestablishedfortheAgriculturezonedistrict.Inaddition,becauseissuanceoftheCUPsqualifyasprojectssubjecttoCEQA,EBZAmustmakerequiredfindingsforeachCUPthatchangestotheprojectshavebeenrequiredorincorporatedintotheirdesign(i.e.,mitigationmeasures)thatwouldavoidorsubstantiallylessentheirenvironmentaleffects,alongwithotherrequiredfindingsregardingresponsibleagencies,thefeasibilityofothermitigationmeasures,oralternativestotheprojects.

TheoriginalCUPs(1980sand1990s)wereissuedtowindfarmoperatorsonspecificparcelsunderspecificowners,insomecasesallowingtwoorthreeoperatorsonasingleparcel.IndividualCUPsrenewedin2005wereissuedtooperatorsaccordingtopropertyowner,andanoperatingentity(AltamontInfrastructureCompany)waspermittedtomanageturbinesownedbydifferentoperatorsonsingleparcelsandalsotoholdsingleCUPsformultipleoperatorsonindividualparcels.

Undertheprogram,CUPswouldbeissueddirectlytowindfarmoperatorsonlyfortheiroperationsthroughouttheprogramarea—insomecases,onmultipleproperties.Accordingly,suchoperationsmaybeseparatedchronologically(i.e.,byphasesofdevelopment)orgeographically(e.g.,byphysicalboundariessuchasInterstate[I‐]580orbyinterveningproperties)andwouldwarrantissuanceofseparateCUPs.Insomecircumstances,althoughtwoormoreoperatorscouldmanageturbinesonthesameproperty,individualCUPswouldbeissuedtoonlyoneoperatoratatime.

2.2.2 Program Objectives 

Thetwoprimaryobjectivesofrepoweringaretofacilitateefficientwindenergyproductionthroughrepoweringandtoavoidandminimizeimpactsonterrestrialandavianwildlifecausedbyrepoweredwindturbineconstruction,operation,andmaintenance.Specificobjectivesarelistedbelow.

AllowforappropriateandcompatiblerepoweringandoperationofwindturbinesconsistentwithexistingrepoweringtimelinerequirementssetforthintheexistingCUPs,relatedagreements,andproject‐specificpowerpurchaseagreements.

Reduceavianmortalitycausedbywindenergygenerationintheprogramareathroughrepowering.

MeettheCounty’sgoalstoprovideenvironmentallysensitive,clean‐renewablewindenergyforthetwenty‐firstcenturyasidentifiedintheECAP(Policies168–175andPrograms73–76).

HelpmeettheGovernor’sExecutiveOrderS‐14‐08inmeetingtheRenewablesPortfolioStandard(RPS)targetthatallretailsellersofelectricityserve33%oftheirloadwithrenewableenergyby2020.

Contributetostateprogresstowardairqualityimprovementandgreenhousegasemissionreductiongoals,assetforthinAssemblyBill32.

Improvehabitatqualityintheprogramareathroughremovalofroadsandexistingwindturbinesandtheirsupportinginfrastructure,resultinginloweroveralloperationalfootprint,andprovidingawiderangeofhabitatbenefitstosensitiveterrestrialandavianspecies.

Page 3: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐3 

October 2014ICF 00323.08

 

AdditionalobjectivesassociatedwithspecificrepoweringprojectsarediscussedinSection2.6.TheobjectivesofthePEIRareidentifiedinChapter1,Introduction.

2.3 Wind Turbine Technology Becauseofthespecializednatureofwindenergyprojects,itisimportantforthereadertobecomefamiliarwithterminologyusedindescribingandanalyzingsuchprojects.

2.3.1 Turbine Nomenclature 

Windturbinegenerator,windturbine,orturbinereferstotheentirestructurethatgenerateselectricity.Theprimarystructurecomprisestherotor,nacelle,andtoweranchoredtoaconcretefoundation.Otherturbinecomponentsincludeacontroller;transformer;brakingsystem;vibration,temperature,andfiredetectionsystems;anemometer;safetylighting;andlightningprotection.AllturbinesintheAPWRAarehorizontalaxisturbines.Ahorizontalaxisturbinehasapropeller‐typerotor,whichrotatesonahorizontalaxis.

Awindfarmisagroupingofwindturbinesandsupportinginfrastructure.Awindfarmcompriseswindturbines,acollectionsystemformovingelectricityproducedbytheturbinesontothelocalpowergrid,roadstoaccessturbines,andstagingareas.TheprimarycomponentsofawindturbineanditssupportinginfrastructurearedefinedbelowandshowninFigures2‐1and2‐2.AsummaryofexistinginfrastructureintheprogramareaisprovidedinTable2‐1.

Table 2‐1. Summary of Existing Infrastructure in the APWRA 

InfrastructureorFacility Quantity

Windturbines 4,210

Meteorologicaltowers 75

Roads 236miles

Turbine Types 

MostoftheturbinesnowoperatingintheAPWRAwereinstalledinthe1980sandrepresentfirst‐andsecond‐generationutility‐gradecommercialwindturbinetechnology,nowconsideredoldtechnology.Thetermsfirst‐generation,second‐generation,third‐generation,andfourth‐generationareusedtogroupwindturbinetypeswithsimilartechnologiescurrentlyinstalledortobeinstalledintheprogramarea.Inthiscontext,first‐generationwindturbinesarethosedesignedandinstalledduringthe1980s.Second‐generationturbinesarethosedesignedandinstalledinthe1990s.Third‐generationturbinesarethoseinstalledinpreviousrepoweringprojectsthatusesimilardesigntoturbinesproposedfortheprogram,butthatareofsmallersize(i.e.,upto1MW).Fourth‐generationturbines—thosegenerallyproposedforinstallationundertheprogram,arelarge,1.6–3MWturbines.Additionally,experimentalturbinesmaybeinstalledonalimitedbasisintheprogramarea.

Empiricalevidence(ICFJones&Stokes2009;SmallwoodandKaras2009)suggeststhatwindfarmsutilizingthird‐andfourth‐generationturbinesmayhavesignificantlylessimpactonavianspeciesthanthoseusingfirst‐andsecond‐generationtechnology(65–70%reduction)(Insignia

Page 4: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐4 

October 2014ICF 00323.08

 

Environmental2009;SmallwoodandKaras2009;Brownetal.2013).Thispotentialreductionisattributedtothemuchlargerdistancebetweenthegroundandthelowestpointoftheturbineblade,placingtherotor‐sweptareaabovethezonemostusedbyresidentbirds,includingsmallraptors.Theseturbinesalsorotatemoreslowly(intermsofrevolutionsperminute),potentiallyallowingbirdstimetomaneuverawayfromtheblades.However,becauseofthemuchlongerbladelength,thetipspeedisusuallygreaterontheseturbinesthanonfirst‐andsecond‐generationturbines.Incontrast,evaluationofmortalitydatacollectedatwindfarmsaroundthecountry(includingintheAPWRA)havesuggestedthatcurrent‐generationturbinesmayleadtoanincreaseinbatmortality(Barclayetal.2007).Moreover,becauseofthescarcityofvalidcomparativedata,uncertaintyremainsregardingtheeffectsofrepoweringonavianandbatmortality.

AppendixAprovidesasummaryoftheturbinesinstalledAPWRA‐wideasofOctober2011.

First‐ and Second‐Generation   

Thehubheightoffirst‐andsecond‐generationturbinesrangesfrom18to55meters(60to180feet).Theseturbineshaveanapproximate20‐yearoperatinglife(thelengthoftimethatanindividualwindturbineisdesignedtoremaininoperation)with40‐to500‐kilowatt(kW)ratedcapacitiesand20–25%capacityfactors.

Therearetwotypesoffirst‐andsecond‐generationtowersintheAPWRA:latticeandtubular.Latticetowersaresupportedonthreeorfourfootingsandhaveanexternalaccessladderandcontrolcabinet.Tubulartowersconstituteasinglecylindricalsupport.Dependingontheturbinemodel,tubulartowersmayhouseinternalaccessladdersandelectronicequipmentsuchascontrols,electriccables,groundsupportequipment,andinterconnectionequipment;however,sometubulartowershaveexternalladdersanddowntowercabinets.

Third‐Generation 

Third‐generationturbinesresemblefourth‐generationturbines:thatis,theyarelargerthanthefirst‐andsecond‐generationturbinesandhavethree‐bladerotorsontubulartowers.OnlytwowindfarmsintheAPWRAhaveinstalledthird‐generationturbines:DiabloWindsrepoweringproject(DiabloWinds)(locatedintheprogramareaandoperationalsince2004)andBuenaVistarepoweringproject(BuenaVista)(locatedinContraCostaCountyandoperationalsince2006).Theseturbineshavenameplatecapacitiesof0.7–1.0MW,withhubheightsof41–68meters(134–223feet)androtordiametersof47–61meters(154–200feet).

Fourth‐Generation 

Fourth‐generationwindturbinesanticipatedtobeinstalledbytheprojectapplicantshaveanapproximate25‐to30‐yearoperatinglifeanda1.6–3MWratedcapacity.Thehubheightsareapproximately80–96meters(262–315feet),therotordiametersare82.5–125meters(271–410feet),andtherotor‐sweptareasare5,356–12,259squaremeters(57,652–131,955squarefeet,orapproximately1–3acres).Thetotalturbineheightsfromthegroundtothetipofthebladeatthe12o’clockpositionare121–153meters(397–502feet).OnerepoweringprojectintheAPWRAhasbeeninstalledwiththiscategoryofturbine:theVascoWindsrepoweringproject(VascoWinds)(inContraCostaCounty,outsidetheprogramarea),whichwascompletedinMay2012.

Page 5: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐5 

October 2014ICF 00323.08

 

Experimental Designs 

SeveraltypesofturbineshaveproventobelessefficientorimpracticalintheAPWRA.Forexample,aDarrieuswindturbine,commonlycalledan“eggbeater,”isaverticalaxiswindturbine(VAWT),whichdoesnotneedtobeorientedintothewindtobeeffectiveandcanusewindfromalldirections.WhiletheeggbeaterdesignisgenerallymoreefficientthanothertypesofVAWTs,itsdrawbacksarethatitisnotveryreliable,islessefficientthanthemorecommonlyusedhorizontalaxiswindturbines,andismorecostlytoconstruct.Additionally,itrequiresanexternalpowersourcetostartturningandcannotbeactivatedsolelybywind.

Thoughotherexperimentaltechnologiesareindevelopment,onlyoneisthesubjectofacurrentapplicationwiththeCountyforinstallationintheAPWRA:ashroudedturbinedesignproposedbyOgin,Inc.,forinstallation—initiallyonatrialbasis—intheSandHillsWindProject.Theshroudedturbineischaracterizedbytwoconcentricshroudssurroundingtheturbinefaceandrotor:aninnerandanoutershroudwithanaerodynamicdesignintendedtoimproveenergyproductioncomparedtoconventionalturbinedesigns,aswellastoreduceavianandbatfatalities.Theseturbineswouldbeplacedon37‐meter(121‐foot)monopoletowers,withthetopoftheoutershroudat58meters(198feet).

Energy Output 

Thewindturbineenergyoutputisquantifiedintermsofratedcapacity,capacityfactor,andinstalledcapacity.

Ratedcapacity.Thetheoreticalmeasureofmaximumpoweroutputofanindividualwindturbinewhenoperatingatitsratedwindspeed(e.g.,1.6MWat11meterspersecond).Alsoknownasthenameplatecapacity.

Capacityfactor.Theratioofactualenergyoutputtotheratedcapacityoveraspecifictimeperiod,usually1year.

Installedcapacity.Thesummedratedcapacityofallturbinesinstalledinagivenlocation(e.g.,theprogramarea).

Wind Energy Nomenclature 

Thefollowingisalistoftermspertainingtowindturbinesandassociatedfacilities(inalphabeticalorderforeaseofreference).AsummaryofwindfarminfrastructureintheprogramareaisprovidedinTable2‐1.

Address.TheaddressisauniquesiteidentificationforeachturbineinstalledintheAPWRA.

Collectionsystem.Thecollectionsystemmoveselectricitygeneratedbywindturbinestoanelectricalsubstation.Acollectionsystemiscomposedofoverheadandundergroundlowandmediumvoltagelines(collectionlines),transformers,andasubstation(Figure2‐3).

Downtowercabinet.Thedowntowercabinethousestheequipmentthatcontrolshowthewindturbineworks(Figure2‐4).Itiseitherplacedonthepadbeneathoradjacenttothetowerorishousedwithinthetower.Downtowercabinetsforexistingturbinesareapproximately0.6–2meterstallby1meterwideby0.3meterdeep.Downtowercabinetsforcurrent‐generationturbinesinstalledduringrepoweringwillbewithinthetowers.

Page 6: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐6 

October 2014ICF 00323.08

 

Powerpoles.Agenerictermforpolesthatholdoverheadlinesorotherdevicesnecessaryforthecollectionofelectricityfromwindturbines.Theseincluderiserpoles,linepoles,cornerpoles,andpoleswithpole‐toptransformers,capacitorbanks,ormeteringsets.

Foundation.Thetowerisboltedtoareinforcedconcretefoundationthatanchorsthewindturbinetotheground.Foundationtypesanddimensionsvarydependingontheturbinecapacity,towertype,soilsubstrate,andtopography.Ingeneral,foundationsfallintotwodifferenttypes:spreadfootingorpier(Figure2‐4).

Aspreadfootingfoundationisareinforcedconcretepadplacedatgroundlevel.Theweightofthefoundationanchorsthewindturbineinplace.Foralatticetower,eitherasinglepadsecuresallfootings,oreachfootinghasitsownpad.Insomecases,acombinationofaspreadfootingandpierfoundationmaybeused.

Apierfoundationisacylindricalreinforcedconcretetubeburiedunderground.Unlikeaspreadfootingfoundation,frictionhelpstoholdthewindturbineinplace,ratherthanweightalone.Foralatticetowerwithapierfoundation,eachofthefootingshasitsownfoundation.Foratubulartower,asinglepierfoundationisinstalledbeneaththetowerbase.

Guywires.Guywiresarewirecablesthatsecuremeteorologicaltowerstotheground(Figure2‐5).

Low‐voltagelines.Low‐voltagelinesareundergroundcollectionlinesoflessthan600voltsthatconnecteachwindturbinetoatransformerthatsupportsoneorseveralwindturbines.Inrepoweringprojects,allcollectionlineswillbeconstructedunderground.

Medium‐voltagelines.Medium‐voltagelinesarecollectionlinesbetween601voltsand35kilovolts(kV)thatconnectsingleormultipletransformerstoasubstationorutilityconnectionpoint.Medium‐voltagelinesmaybeburiedorcarriedonoverheadpoles.Ifthelinesareburied,atleastoneriserpoleisrequiredtolinkthelineswiththesubstation.Inrepoweringprojects,allcollectionlineswillbeconstructedundergroundwheneverpossible.Anymedium‐voltagelinesconstructedabove‐groundwillconformtoAvianPowerLineInteractionCommittee(APLIC)standards.

Meteorologicaltowers.Meteorologicaltowers(Figures2‐5and2‐6)areusedtomeasurewindspeedsandsometimeswinddirection.Meteorologicaltowersintheprogramareaare18.3–42.7meters(60–180feet)forfirst‐andsecond‐generationprojectsand50.3–54.9meters(165–180feet)fortheDiabloWindsrepoweringproject.Itisassumedthattheheightofmeteorologicaltowersforotherrepoweringprojectswouldbeapproximatelythehubheightofthenewturbines(80–96meters[262–315feet]).Somemeteorologicaltowersarefreestanding,whereasothersarestabilizedusingguywires.Permanentmeteorologicaltowersintheprogramareaareusuallysitedjustupwindofoneormoreturbines,approximately4.6–9.2meters(15–30feet)infrontoftheturbines.Meteorologicaltowersforrepoweringprojectsaretypicallyusedforreferenceanddonotneedtobeplacedsoclosetotheturbines.Temporarymeteorologicaltowersaretypicallyinstalledatapotentialrepoweringsitetomeasurewindspeedandestimatesiteproductioncapacity.

Nacelle.Thenacelleisthehousingforthemainshaft,gearbox,generator,brakingsystem,andvariouscontrolequipment.Itprotectstheturbinemechanicsandelectronicsfromenvironmentalexposure,comesinavarietyofshapes,andistypicallylocatedbehindtherotor.Mostcurrentwindturbinesuseanupwindturbinedesign,inwhichayawsystemismountedbetweenthenacelleandthetopofthetower.Thisfunctionstokeeptheturbinerotorpointed

Page 7: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐7 

October 2014ICF 00323.08

 

intothewind(infrontofthetower;Figure2‐7).Intheprogramarea,mostoftheold‐generationlatticetowerturbinesuseadownwinddesignwithnoyawmotor,wherethenacelleactsasawindvaneandtherotoroperatesbehindthetower.Themainshaftconnectsthebladestothegearbox.Thegearboxhousesthegearsthatconnectthelow‐speedshafttothehigh‐speedshaft.Itisherethattherotationalspeedoftherotorisincreasedtoallowelectricitytobeproducedbythegenerator.Thebrakingsystemincludesadiskbrakethatcanbeappliedmechanically,electrically,orhydraulicallytostoptherotor.

Pad.Thepadisthedisturbedarea,typicallygravelordirt,thatencompassesthefoundation,downtowercabinet,tower,andflataccessareasforservicetrucksandmobilecranework(Figure2‐8).

Permanentstagingareas.Permanentstagingareas(alsocalledlay‐downareas)arepermanentonsitestorageandworkareasadjacenttoexistingroads.Theseareasservetostoreequipmentusedforoperationandmaintenanceofexistingwindturbines(e.g.,bladesandnacelles)ortotemporarilystorepartsthathavebeenremoved.

Riserpole.Riserpolesarewoodenpolesthatconnectundergroundmedium‐voltagelinestothecentraloverheadcollectionlinesenroutetothesubstation.

Roads.Intheprogramareaandontheprivatepropertiesthatcontainthewindfarms,therearethreetypesofroads:mainroads,serviceroads,andfingerroads(Figure2‐8).Mainroadsareaccessedfrompublicpavedroadsthroughgatedentrancestothewindfarms.Ateachgatedentrance,anasphaltapronextendsapproximately6meters(20feet)tothegateonthemainroadfromthepublicpavedroad.Asidefromthisasphaltapron,themainroadsaregravel.Mainroadsarewideenoughtoaccommodatetwo‐waytraffic.Serviceroadsarenarrower,gravelroadsthatbranchofffromthemainroadsandrunthelengthofaturbinestring.Theseroadsallowforsinglevehicletravel.Fingerroadsaremostlyshortspurroadsthatbranchofffromtheserviceroadstoaccesseachwindturbinenotaccesseddirectlyfromtheserviceroad.Roadnetworksassociatedwithrepoweringprojectsmaynotcontainfingerroads.

Mainroadstypicallyconsistofa5.5‐meter‐wide(18‐foot‐wide)gravelbedwitha1.2‐meter(4‐foot)shoulderoneitherside.Serviceroadstypicallyconsistofa4.9‐meter‐wide(16‐foot‐wide)gravelbedwitha1.2‐meter(4‐foot)shoulderoneitherside.Fingerroadsaregraveledordirttracksthewidthofatruck,approximately2.4meters(8feet)wide,withnoshoulder.

Rotor.Therotoristheportionofthewindturbineactedonbythewind.Itconsistsofbladesandthehubtowhichthebladesareattached(Figure2‐7).Thehubistheconnectionpointbetweenthebladesandthemainshaft,whichishousedwithinthenacelle.Theturbineheightreferstothedistancefromthebladetipat12o’clocktotheground(Figure2‐2).Third‐andfourth‐generationturbinesincludebladepitchcontrolsthatregulatetheangleoftherotorbladeintothewind;thisfeatureisusedtocontrolrotorspeedandshutdownorslowdowninresponsetoexcessivewindspeed,toreduceriskofavianmortality,andtoincreaseturbinespeedtoimproveefficiencyinconditionsoflightwinds.

String.Astringisoneormorewindturbinesinarow(Figure2‐8).First‐andsecond‐generationwindturbinesaretypicallygroupedinstringstomaximizetheenergygenerationwherewindcomespredominantlyfromonedirection.Third‐andfourth‐generationturbinesarenottypicallyplacedinstringsbecauseoftheirlargesize,requiredsetbacks,andconstraintsassociatedwithtopographyandpropertyboundaries.

Page 8: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐8 

October 2014ICF 00323.08

 

Substation.Asubstationisthefacilitywherethevoltagelevelofthecollectionsystemissteppedup,bymeansoftransformers,tothatofthepowergrid.

Tower.Thetowerelevatesandsupportstherotorandnacelle.Towersareeitheroflatticeortubulardesign(Figure2‐1).

2.4 Operation of Existing Turbine Facilities  The2005CUPs(includingthe2007CUPamendments)requiredthatthisPEIRaddressthe“continuedoperationofexistingturbinefacilities(andprogressiveremovalundertherepoweringprogram).”Existingturbinefacilitieswillcontinuetobeoperatedconsistentwiththe2005CUPs(andthe2007CUPAmendments)untilsuchtimeaseachsiteisrepoweredordecommissioned(underthe2007CUPAmendments,theSettlingPartyWindCompaniesarenotsubjecttotheremovalscheduleoriginallyimposedbythe2005CUPconditions).Thissectiondescribesallactivitiesassociatedwiththe2005CUPsthatareongoingforthelifeofeach2005CUP—operationofturbines,operationofassociatedfacilities,maintenanceofturbinefacilities,andsitereclamationasrequiredbythe2005CUPs.

2.4.1 Turbine Operation 

AsofOctober2011,therewereapproximately3,490windturbinesof11differenttypesintheAPWRAacrossbothAlamedaandContraCostaCounties.Thistotalcomprisesfirst‐,second‐,andthird‐generationwindturbines(AppendixA).

Theoperationofturbinesissubjecttoseveralvariables:windconditions,maintenanceneeds,andoperationalrequirementsforseasonalshutdownanddecommissioningasdescribedinthe2005CUPs.Theminimumspeedrequiredforawindturbinetostartiscalledthecut‐inspeed.Acommandtostartuptheturbinecanbeinitiatedautomaticallybyasensorontheturbine,orthecommandcanbesentmanuallyfromacentrallocation(i.e.,windpowercompanyoffice).Forfirst‐generationturbinesintheAPWRA,theminimumcut‐inspeedis4–6meterspersecond.

Thecut‐outspeedisthemaximumspeedatwhichaturbineoperates.Windsexceedingthecut‐outspeed—oraninternalfault—shouldcauseawindturbinetoturnoff.Thecut‐outspeedoffirst‐generationwindturbinesintheAPWRAis20–25meterspersecond.Awindturbineisconsideredarunawaywhenitisinanuncontrolledstate.Anywindturbinecanbemanuallyturnedonandoffunlessitisinarunawaystate.Maintenanceisconductedonrunawaystobringthembackintoacontrolledstate,ortheturbineismonitoreduntilfailureorthebladesstopmoving(whenwindstops).

SinceapprovaloftheCUPsin2005,thewindfarmshaveoperatedunderanAvianWildlifeProtectionProgram&Schedule(AWPPS,ExhibitGoftheCUPs)thatrequiredthewindfarmstoceaseoperationsduringthepeakwintertimeavianmigrationperiods,beginningwith2‐monthshiftsofone‐halfoftheturbinesatatime.Thisscheduleincreasedtothecurrentrequirementforanarea‐wide3.5‐monthshutdownfromNovemberthroughmid‐February.TheAWPPSalsorequiredshutdownandremoval(decommissioning)orrelocationofhigh‐riskturbines,andprogressiveremovaloffirst‐andsecond‐generationturbinesinadvanceofanticipatedrepowering.

Page 9: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐9 

October 2014ICF 00323.08

 

2.4.2 Other Turbine Facility Operations 

Otherturbinefacilityoperationsincludesoperationand/oruseofpermanentandtemporarystagingandlaydownareas;useofpermanentandtemporarymeteorologicaltowers;anduseofsubstations,above‐andbelowgroundcollectionlines,powerpoles,androads.

2.4.3 Wind Turbine Removal and Relocation 

Thisactivityonlyappliestofirst‐andsecond‐generationwindturbines.Reasonsforwindturbineremovalandrelocationarevaried.Somewindturbinesmaybeinlocationsidentifiedasriskareas.High‐riskareasarethoseareasidentifiedashavingdemonstratedpotentialhighavianmortalitybytheAlamedaCountyScientificReviewCommittee(SRC)inaseriesofreports(AlamedaCountyScientificReviewCommittee2007,2008a,2008b,2008c;Smallwood2008).Relocationisalsoundertakentoallowwindcompaniestomaintainorincreasethenumberofhigh‐outputsites.High‐outputsitesaresiteswithhigherwindspeedsand/orlongwinddurationwheremorewindenergycanbegenerated.Forexample,anexistingwindturbinemayberelocatedfromalow‐outputsitetoahigh‐outputsiteforusethroughtheendofthepermitterm(2018).

Thisactivitycanentaileitherpartialorfullremovalofthenacelle(includingbladesandrotor),andinstallationand/orreplacementofthenacellecomponentsonanexistingtower.Alternatively,itcanentailremovalofawindturbine(tower,nacelle,androtor)fromoneaddressanditsrelocationtoanotherwhereawindturbinehasbeenremoved.Nonewmeteorologicaltowers,newroads,orroadinfrastructureupgradesarerequiredforremovalorrelocationoffirst‐orsecond‐generationturbines.Existinglaydownareasareusedforthemainstagingarea;existingcollectionandcommunicationsystemsmaybeused.

2.4.4 Maintenance 

Windcompaniesoperatingintheprogramareaconductregularmaintenanceonturbinestoensureproperoperation.Theseactivitiesaredescribedbelow.

Scheduled and Unscheduled Maintenance 

Turbinesandotherstructuresrequireroutinescheduledandunscheduledmaintenance.Turbinemanufacturers’guidelinesdictatethatregularlyscheduledmaintenanceofwindfarmfacilitiesoccurtwiceyearly.Scheduledmaintenancetypicallyoccursaccordingtotheserequirements.Unscheduledmaintenanceisestimatedtooccurtwotimesannuallyforeachfirst‐andsecond‐generationturbine.Asingleturbinemaybeservicedasmanyasfourtimesperyear.

Routinemaintenanceactivitiesincludeturbinelubrication,partreplacement,turbinetorquechecks,makingrecordsoffailures,sweepsofturbines(e.g.,maintenanceassessments,check‐ups)thathavereachedacertainage,andothermaintenanceprocedures.Turbineaddressesareaccessedbytheexistingnetworkofmain,service,andfingerroadsintheprogramarea.Maintenancevehiclesusuallystayondesignatedroads.Offroadtravelisinfrequent,limitedtomaintenanceofpowerpoles,collectionlines,andtransformers.Ifabladeislostonafirst‐generationwindturbine,offroadtravelisoccasionallyrequiredtoretrievetheblade.

Page 10: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐10 

October 2014ICF 00323.08

 

Scheduledmaintenanceoccursyear‐round,mostlyfromNovember1toMarch31duringthewinterlow‐windseason.Unscheduledmaintenanceoccursyear‐round,mostlyApril1toOctober31duringthesummerwindseason.

Collection Lines 

Mostcollectionlinesforfirst‐andsecond‐generationturbinesareundergroundalongturbinestringroadstoaturbinestringtransformerandthentoanoverheadcollectionline;theoverheadcollectionlineconveyspowertotheprojectsubstation.Abovegroundlinesnotaccessiblebyvehicleareaccessedbyfootwhennecessary.Abovegroundcollectionlinesarevisuallyinspectedannually.Duringthisannualinspection,wildlifebootsandotheravianelectrocutionprotectiondevicesarechecked,andmissingordamageddevicesarereplaced.Somegrounddisturbancemayresultfromvehicularandfootaccess.

Infraredscansareusedannuallytoinspectoverheadcollectionlinesduringonlineproduction(i.e.,summerwindseason).Replacementofundergroundlinesoccursinfrequentlyandislimitedtothelocationwhererepairisrequired.Theundergroundcablesaretrenchedandreplaced.Thelengthoftrenchrequiredforthisactivityrangesfrom20to200feet.

OccasionallywindcompaniesarealsoresponsibleformaintainingashortsegmentoftransmissionlinebetweenaprojectapplicantsubstationandaPacificGasandElectricCompany(PG&E)substation.

Road Maintenance 

Alltheroadsmaintainedbythewindcompaniesintheprogramarea—mainroadsandserviceroads—aregravel.Fingerroadsarenotregularlymaintained,buttheymaybeclearedofgrassannuallyforfireprevention.Pavementislimitedtoaconcreteapronextending75–100feetfromthepublicroadtothemainroadateachgatedentrance.

Roadmaintenancetypicallyconsistsofpatchingpotholes,placingrocks(i.e.,spotrocking),andminorregrading.Spotrockingisdonetostrengthenandprotectdrainageoutletsandinletsforculvertsandotherdrainagestructures(e.g.,ditches,berms).Gradingmaybeconductedforaslittleas6meterstoseveralkilometersatatime.

Roadmaintenanceisperformedwithagrader,adumptrucktodisperseroadbaserock,andarollertocompactit.Whenneeded,abulldozerisusedtoclearroadswhereagradercannotgainaccessorwherethenecessaryroadmaintenanceexceedsthegrader’scapability(e.g.,duetoalandslide).Ingeneral,roadsidemaintenanceactivitiesmayinvolvesoildisturbanceinastripalongtheroadwithanaveragewidthof4feetoneithersideoftheroad(i.e.,gradedshoulder).Roadsinsteepareasmayrequiremaintenanceactivitiesthatextendfartherfromtheroad—uptoamaximumof26feetinareasofslopesgreaterthan25%.Inmostcases,theroadsaremaintainedtobanktotheinsidetoreducepotentialerosionproblems.

Roadmaintenancealsoincludescleaning(manuallyandmechanically),repairing,andreplacingculvertsasneeded.Culvertsintheprogramarearangefrom1.5to6feetindiameter.Handlaborandbackhoesareusedtomaintainculverts.Culvertrepairandmaintenancemayaffectareasasfaras8metersfromtheedgeoftheroad.Newculvertsmaybeinstalledaspartofnewroadconstructionortoenhanceroaddrainageforreducingerosion.Wingedinletstructures,consisting

Page 11: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐11 

October 2014ICF 00323.08

 

ofcementorrockwingsflankingaditchorculvertinlet,mayalsoberepairedorinstalledtopreventerosionandimprovepassageofwoodydebristhroughdrainageinlets.

Repairsareconductedasneededthroughouttheyear,butgenerallyoccurbetweenAprilandOctober,afterthespringrainsandbeforethewinterwetseason.Roadmaintenanceactivitiestypicallyoccurthroughouttheentireroadsystemonceevery2years,althoughsomeportionsofthesystemrarely,ifever,requiremaintenancewhileotherportionsrequiremaintenanceoneormoretimeseachyear.

Fire Prevention  

ExhibitCofthe2005CUPsdescribestheAltamontPassWindFarmsFireRequirements.FirepreventionisrequiredaspartoftheCounty’sCUPs.Themainmechanismforfirepreventionisthemaintenanceofa30‐foot‐widefirebreakaroundbuildingsandstructures,includingturbines,riserpoles,andsubstations.Firebreaksaroundturbinesmaysurroundaturbinestringratherthanindividualturbines.Electricallinesrequirea20‐footclearanceofflammablevegetation.IntheAPWRA,vegetationmanagementisaccomplishedbyapplicationofherbicideinOctoberorNovember.Provisionofayawdamperorotherapprovedmethodtopreventtheover‐twistingofpendentcableshelpspreventturbinefires.

Existingfirebreakrequirementsarebasedonfirst‐andsecond‐generationturbines,whichpresentgreaterriskoffireignitionthandocurrent‐generationturbines.

2.4.5 Site Reclamation 

The2005CUPsrequiredthatwindcompaniesremoveallfacilitiesandrestorepropertiestopreinstallationconditionsifwindfarmoperationscease,orifwindcompaniesfailtoimplementthetermsandconditionsofthe2005CUPs,includingrequirementstorepower,unlessanexceptionismadebytheCountyPlanningDepartment,orunlesstheresourceagencies(USFWSorCDFW)requirethatsuchfacilitiesbeleftinplace.

Ifarepoweringprojectisimplemented,sitereclamationistypicallyundertakenaftertherepoweredturbinesareinstalledandalltemporaryequipmentandinfrastructureisremovedfromthatarea.Ifarepoweringprojectisnotimplemented,sitereclamationwouldbeundertakenafterallturbineshavebeendecommissionedandremoved.Roadsthatarenolongerrequiredbecauseturbineshavebeenremovedandthatarenotwantedbylandownerswouldalsobereclaimedunlessaresourceagency(e.g.,U.S.FishandWildlifeService[USFWS],CaliforniaDepartmentofFishandWildlife[CDFW])requirethattheynotbereclaimed.Neworwidenedroadsthatwereinstalledtoaccommodateconstructionofnewturbinesmayberestoredtoanarrowerwidthafterturbineinstallationiscomplete.

Reclamationactivitiesentailreturninglandsdisturbedbyinfrastructureinstallationorremovaltopreprojectconditions.Somefacilities(e.g.,roadways,turbinefootings)maybeleftinplaceifdoingsoisdeemedtobemoreprotectiveofnaturalresourcesthanremoval.Ateachreclamationsite,theentiresiteiscontourgraded(ifnecessary)toconformwiththenaturalsurroundingtopographyandreseededwithanappropriateseedmixture,unlesstheresourceagenciesrequestthatcontouringnotbeundertaken.Nosoilisremovedfromthesite.Figure2‐9showsreclamationofaturbinepadsite.Exceptionstoreturningasitetopreinstallationconditionsmaybemade,uponapprovaloftheCountyPlanningDepartment,ifsuchreclamationactivitieswouldorcouldcreatewaterqualityissues(e.g.,erosion)oriftheactivitiesmayadverselyaffectspecial‐statusspecies(e.g.,burrowing

Page 12: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐12 

October 2014ICF 00323.08

 

owlburrowcomplexes,uplandhabitatforCaliforniared‐leggedfrogorCaliforniatigersalamander).Moreover,CDFWandUSFWShavesuggestedthatitmaysometimesbepreferabletoavoidregradingroadsorremovingfoundationstoavoiddisruptionofsuchhabitats.Insuchcases,theCountyPlanningDepartmentcouldchangereclamationrequirementsaccordingly.

2.5 Proposed Repowering  AsmentionedinChapter1,Introduction,tworepoweringalternativeshavebeenidentifiedforanalysis:Alternative1,withamaximumcapacityof417MW;andAlternative2,withamaximumcapacityof450MW.Withtheexceptionofthenameplatecapacityandtheresultanttotalnumberofturbines(i.e.,approximately260turbinesunderAlternative1and281underAlternative2),thetwoalternativesareidenticalinthecontextofthedescriptionpresentedbelow.

Thedescriptionoftheproposedprogramaddressesthecomponentslistedbelow.

Repoweringtimeline.

Sitingconditions.

Repoweringactivities.

Operationsandmaintenance(O&M)activities.

ThisPEIRisintendedtofacilitatethepermittingofrepoweringprojectsintheprogramarea.

2.5.1 Repowering Timeline 

OnceCEQAcomplianceiscompletedandnewCUPsareapproved,buildoutofrepoweredwindfarmsisexpectedtotakeplaceovera4‐yearperiod(endingonSeptember22,2018,whenall2005CUPsexpire).Thisschedulewouldallowtimeforcompletionofotherdesignandpermittingactivities(1–2years);windturbineprocurementandotherlong‐leaditems(12–18months,butoverlappingwiththelastyearofpermittingactivities);andconstruction(8–12months).Thedurationofrepoweringprojectconstructiondependsonthenumberofturbinesrepoweredandtheeaseofaccesstothesite.ConstructiontimeencompassesalltheactivitiesdescribedinSection2.5.3withtheexceptionoftemporarymeteorologicaltowerinstallation.Notallrepoweringprojectswouldbeinitiatedsimultaneously,butmostwouldbeexpectedtobeunderconstructionbytheendofyear4.

CUPswillbeissuedforaperiodof30years.Thispermittermisbasedontheexpectedoperatinglifeofcurrent‐generationturbines,landownerleases,andpowersalesagreements.Reviewperiodswilloccuratyears4,13,and23consistentwithfinalizationofreportingassociatedwithpostconstructionmonitoringconductedforthefirst3yearsofoperation,andthenfor2yearsbeginningatyears10and20ofoperation.Duringreviewperiods,theCountymayexaminethemostcurrentmortalitydataandrequireadaptivemanagementmeasuresassetforthinSection3.4,BiologicalResources.

2.5.2 Siting Conditions 

Turbinesitingdependsonanumberoffactors.Perhapsthetwomostimportantfactorsarepotentialenergyproductioncapacity(basedonwindspeedanddirection)andavoidanceofhigh‐riskareasforavianspecies.Setbackrequirementsareoftendefinedforhumansafety,specifyingminimum

Page 13: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐13 

October 2014ICF 00323.08

 

distancesfromresidences,roadsandhighways,utilities,otherwindfarms,propertyboundaries,andrailroads.Potentialvisualimpacts,includingflickereffects,arealsoconsidered.Noexistingresidenceswouldbedemolishedtomakeroomfornewturbines.Countysetbackandtechnologicalrequirementsarediscussedbelow.

County Requirements 

SetbackrequirementswereoriginallydevelopedforAlamedaCountywindfarmsinthe1980sand1990sinconsiderationofavarietyoffactors,suchasappropriatedistancebetweenupwindanddownwindturbinesforeffectivewindproduction,noiseeffectsonsensitivelanduses,visualimpactsresultingfromproximitytoresidencesandpossibleshadowflicker,concernswithtowercollapse,andbladethrowhazard(whereallorpartofarotorblademaybreakloosefromthenacelleandstrikeanoccupiedareaorinfrastructure).WhilethereisnoordinancedictatingsetbackconditionsinAlamedaCounty,setbackshavehistoricallybeendeterminedonaproject‐by‐projectbasisinaccordancewiththestandardconditionsofapprovalforaCUP.However,whilethestandardconditionsappliedinthe1980sand1990swereappropriatefortheoldergenerationturbines,theymaynotbesoforthefourth‐generationturbinesproposedforrepowering.Accordingly,theCountyhasdevelopedasetofupdatedstandardstobeusedforproposedrepoweringprojects.TheseareshowninTable2‐2.

Table 2‐2. Updated Alameda County Turbine Setback Requirements 

AffectedLandUseorCorridor

GeneralSetback

SetbackAdjustmentforTurbineElevationAboveorBelowAffectedUsea AlternativeMinimumb

AdjacentparcelwithapprovedwindenergyCUPc

1.1timesrotorlength

1%TTHaddedorsubtractedper10ft.ofturbineelevation,respectively,aboveorbelowaffectedparcel

50%ofgeneralsetback

AdjacentparcelwithoutapprovedwindenergyCUP

1.25timesTTH

1%TTHper10ftaboveorbelowaffectedparcel

1.1timesrotorlength

Adjacentdwellingunit 3timesTTH

1%TTHper10ftaboveorbelowaffectedunit

50%ofgeneralorelevationdifferentialsetback

Publicroad(includingI‐580),trail,commercialorresidentialzoning

2.5timesTTH

1%TTHper10ftaboveorbelowaffectedright‐of‐way

50%ofgeneralsetbackwithreportbyqualifiedprofessional,approvedbyPlanningDirector

Recreationareaorproperty

1.25timesTTH

1%TTHper10ftaboveorbelowaffectedproperty

TTH

Transmissionlined 2timesTTH

1%TTHper10ftaboveorbelowpathofconductorlineatgroundlevel

50%ofgeneralsetbackwithreportbyqualifiedprofessional,approvedbyPlanningDirector

Page 14: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐14 

October 2014ICF 00323.08

 

AffectedLandUseorCorridor

GeneralSetback

SetbackAdjustmentforTurbineElevationAboveorBelowAffectedUsea AlternativeMinimumb

Note: TTH=totalturbineheight:theheighttothetopoftherotorat12:00position.Setbackdistancetobemeasuredhorizontallyfromcenteroftoweratgroundlevel.

a TheGeneralSetbackbasedonTTHwillbeincreasedorreduced,respectively,basedonwhole10‐ftincrementsinthegroundelevationoftheturbineaboveorbelowanaffectedparcel,dwellingunit,roadright‐of‐way,ortransmissioncorridorconductorline.Anyportionofa10‐ftincrementingroundelevationwillbedisregarded(orroundeddowntothenearest10‐ftinterval).

bAlternativeMinimumreferstoareducedsetbackstandard,includinganyadjustmentforelevation,allowedwithanotarizedagreementoraneasementontheaffectedproperty,subjecttoapprovalofthePlanningDirector.

c NosetbackfromparcellinesisrequiredwithinthesamewindenergyCUPboundary.KnowledgeofproposedwindenergyCUPsonadjacentparcelstobebasedonbestavailableinformationatthetimeofthesubjectapplication.

d Measuredfromthecenteroftheconductorlinenearesttheturbine.

Turbine and Wind Resource Requirements 

Foravarietyofreasons,repoweredwindturbineswillbeinstalledatnewaddressesindifferentlocationsthantheexistingwindturbines.Spacingrequirements,topography,andthenecessitytoavoidhigh‐risk(foravianmortality)sitesalsoguidewhererepoweredturbineswouldbesited.Detailedturbinesitingisdeterminedbywindresourceavailability,turbinetype,topography,setbackrequirements,andlocationofsensitiveresources.Newturbineswouldbespacedmorewidelyandindividuallythanunderthecurrentapproachofarrangingturbinesinstrings.Threefactorscontributetothisspatialapproach.

Current‐generationturbinesarevastlymoreefficientandproductivethanfirst‐andsecond‐generationturbines,necessitatingfarfewerturbinestoachievethesameinstalledcapacity.

Current‐generationturbinesrequireconsiderablespacetoavoidwindturbulenceaffectingdownwindturbines

Thenewlargerturbinesmayrequiregreaterdistancesfromtheprogramareaperimeterthanexistingturbines.

Distancesbetweenturbinesaresite/projectspecificandarestipulatedbytheturbinemanufacturer.Forexample,aturbinemanufacturermayrecommendspecificturbinespacingtoachievetheinstalledcapacity.Minimumlateralspacingbetweenturbinetowersistypicallythreetimestherotordiameter.Downwindspacingistypically8–12rotordiameters.Accordingly,repoweredturbinesareexpectedtohave141‐to277.5‐meterlateralspacingand376‐to1,110‐meterdownwindspacing.

2.5.3 Repowering Activities 

Arepoweringprojecttypicallyincludesthefollowingmajorsteps.

Temporarymeteorologicaltowerinstallation.

Temporarystagingareaset‐up.

Existingwindturbineremoval.

Page 15: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐15 

October 2014ICF 00323.08

 

Temporarymeteorologicaltowerremoval.

Roadinfrastructureupgrades.

Windturbineconstruction.

Finalsiteselectionandpreparation.

Batchplantconstruction.

Foundationexcavationandconstruction.

Cranepadconstruction.

Towerassembly.

Installationofturbinenacelle.

Attachmentofrotors.

Collectionsystemupgradesandinstallation.

Communicationsysteminstallation.

Permanentmeteorologicaltowerinstallation.

Reclamationoflandscape.

Eachofthesestepsisdescribedindetailinthefollowingsections.Equipmentusedforconstructionofallrepoweringactivitiesoftenincludesthoselistedbelow.

Cranes.

Lowboys/trucks/trailers.

Flatbedtrucks.

Servicetrucks(e.g.,pickuptrucks).

Backhoes.

Bulldozers.

Excavators.

Graders.

Dumptrucks.

Tracktypedozers.

Rockcrushers.

Watertrucks.

Compactors.

Loaders.

Rollers.

Drillrigs.

Trenchingcable‐layingvehicles.

Page 16: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐16 

October 2014ICF 00323.08

 

Cementtrucks.

Concretetrucksandpumps.

Smallhydrauliccranes.

Heavyandintermediatecranes.

Forklifts.

Generators.

Forindividualprojects,constructionactivitieswouldtypicallybecarriedoutinthesevenphaseslistedbelow.Therewouldbesomeoverlapbetweenmostofthesephases;inotherwords,theestimateddurationsshouldnotbeconsideredtobeadditive;rather,theentireconstructionperiodfromdecommissioningthroughcleanupandrestorationisanticipatedtorequireapproximately9monthsforatypical80MWproject.Althoughthepreciseschedulesofindividualprojectsareanticipatedtovary,thedurationslistedbelowareusedtoestimateimpactsintheprogram‐levelanalyses.

Phase1—Decommissioningofexistingplant:12weeks.

Phase2—Laydownareas:12weeks.

Phase3—Roadconstruction:8weeks.

Phase4—Foundations/batchplant:16weeks.

Phase5—Turbinedeliveryandinstallation:12weeks.

Phase6—Electricaltrenching:12weeks.

Phase7—Cleanup:8weeks.

Temporary Meteorological Tower Installation 

Asystemoftemporarymeteorologicaltowerswouldbeinstalledinstrategiclocationsinadvanceofrepoweredwindturbinesitingandconstruction.Thesystemofmeteorologicaltowerswouldtypicallybeinstalledforaminimumof1yeartomeasurewindspeedanddirectiontodeterminewhetherasite’spotentialproductioncapacitymakesitsuitableforwindturbineplacement.Meteorologicaltowerheightistypicallyequivalenttothehubheightofrepoweredturbines.Thetowerconsistsofa15‐to30‐centimeter‐diameterpoleonasquarepierfoundation107–152centimetersonaside.Somemeteorologicaltowersarefreestanding;othersareanchoredtothegroundwithguywires.

Meteorologicaltowersaretypicallyplacedinareaswheregradingisnotrequiredforinstallation.Becausethedatacollectionsystemissolar‐powered,wireless,orbattery‐powered,nodataorpowerconnectionsarenecessary.Installationrequiresastagingareaaccommodatingthetowersite,cranesite,andpullingsite.Installationoccursoverthecourseof1–2dayswithnoseasonalrestrictions.

Oncethemeteorologicaltowershavecollectedadequateinformation,theyareremovedandthesiteisreclaimed(seethediscussionofreclamationactivitiesbelow).

Page 17: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description

APWRA Repowering Final PEIR 2‐17 

October 2014ICF 00323.08

Contractor Yards and Staging Areas 

Duringconstructionofindividualrepoweringprojects,amaincontractoryardandothertemporarystagingareaswouldtypicallybeneeded.Themaincontractoryardwouldtypicallyencompass5–10acres,accommodatingonsiteconstructiontrailer(s),parkingforprojectworkers,machinerymaintenanceandservicingarea,andatake‐downandset‐upareawhereboththesalvageandscrapmaterialsofremovedturbinesandthecomponentsofrepoweredwindturbinesarebroughtandstoreduntiltheiruseordisposal.Twotofouradditionalstagingareas(5–10acres)wouldalsobenecessary,typicallysitedadjacenttoexistingroadsandnearturbinesites.Onceconstructioniscompleted,themaincontractoryardandstagingareasarefullyreclaimedorreducedinnumberorsize.Itmaybenecessarytomaintainaportionofthecontractoryardorotherstagingareastoaccommodatefuturewindturbinemaintenance.Eachspecificprojectwillhaveitsownlaydownandstagingarearequirements.

Existing Wind Turbine Removal 

Theprogramassumesthatallfirst‐andsecond‐generationturbineswillberemovedfromtheprogramareaby2018.Windturbineremovalentailsremovalofthewindturbine(rotor,nacelle,andtower)anddowntowercabinet.Removalofthecollectionsystem,includingtheassociatedtransformer,isdiscussedinCollectionSystemUpgradesandInstallation.

Existingwindturbinefoundationsmaybefullyorpartiallyremoved.Trenchingandbackfillingistypicallyusedtoburyfoundations.Forexample,abackhoeisusedtodigatrencharoundeachfoundation.Thetop2–3feetofthefoundation,includingthedowntowercabinetfoundationatturbineswithpierfoundations,isbrokenupandeitherspreadintheexcavatedareaordisposedofoffsite.Theexcavatedareaisthenbackfilledtogradewiththematerialthatwasremovedduringtrenching,withtheoriginaltopsoilplacedontop.Areasofsteeperslopesmayrequiredeepercoverage.Asnotedabove,someburiedfeaturesmaybeleftinplaceifdoingsoisdeemedtobemoreprotectiveofnaturalresourcesthanremoval.Wherefeaturesareleftinplace,steelandelectricalconnectionswouldbeleveledandmadesafe.

Gradingwillbeavoidedwhereappropriatetominimizeandavoiddisturbanceofwildlifeburrowsthathaveadaptedtoexistinggradecuts.However,insomeinstancessuchgradecutswillbegradedouttomatchthesurroundingcontours,ifwildlifeimpactscanbeavoided.Newgradingoverexistingfoundations,equipmentpads,orfingerroadsmaybenecessaryfortheinstallationofnewaccessroadsandfoundationpadsforrepoweredturbines.

Removalofexistingwindturbinesistypicallyundertakenconcurrentlywithotherrepoweringactivitiestominimizeprojectduration.Forexample,ifarepoweringprojectinvolvestheremovalof100turbinesinseveraldistinctlocations,theprojectcouldbephasedsuchthatonceturbineremovaliscompleteinonearea,roadinfrastructureupgradescanbeinitiatedinthatareawhilewindturbinesareremovedinanother.Windturbineremovalmaybelimitedtothedrymonthsbecauseoftheweightofturbinecomponentsandtheheavyequipmentusedforturbineremoval.Allturbineremovalactivitieswillconfinedtosmall,site‐specificstagingareas.Thesestagingareaswillbereclaimedoncompletionoftherepoweringproject.

Meteorological Tower Removal 

Temporarymeteorologicaltowerssetupinadvanceofindividualrepoweringprojectsaswellasexistingmeteorologicaltowersattherepoweringprojectsitewouldberemovedpriorto

Page 18: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐18 

October 2014ICF 00323.08

 

constructingthepermanentmeteorologicaltowers.Becausemeteorologicaltowerstypicallyapproximatethehubheightoftheturbinesforwhichmeteorologicaldataarecollected,theexistingmeteorologicaltowerswouldnotsufficefortheproposedrepoweredturbines.

Removalofmeteorologicaltowerstypicallyincludesseveralsteps.Theabovegroundcomponentsofthetowerareremovedbycuttingonelegandpushingthetoweroverinapredetermineddirection.Thefoundationisexcavatedbydiggingatrencharoundthefoundation(anapproximately4‐footradius).Thetop2feetofthefoundationisbrokenupandburiedinthetrench.Thefoundationmustbeburiedwithtopsoilataminimumdepthof2feet.Ifallthefoundationmaterialcannotbeburied,itisremovedfromthesite.Uponcompletionoftowerandfoundationremoval,theexcavatedareaisbackfilled.Itisanticipatedthatalltemporaryandexistingmeteorologicaltowerswillberemoved.Onceameteorologicaltowerisremoved,thesitewillbereclaimedasdescribedbelow.

Road Infrastructure Upgrades 

Fourth‐generationturbinetowersandbladesaresignificantlylongerthanolderturbinecomponentsandrequirelargerandlongertrucksandcranesfortransportandinstallation.Thesevehiclesrequirewiderroadswithshallowerturnsandgradientsthancurrentlyexist.Consequently,theexistingroadinfrastructuremustbeupgradedtoaccommodateconstructionoftherepoweredturbines.Roadinfrastructureupgradeswouldincludegrading,widening,andre‐gravelingoftheexistingroads,aswellasconstructionofnewroads.Existingculvertsmayneedtobeupgradedforexistingroadsandnewculvertsmaybeneededfornewroads.

Existing Roads 

Mostroadsinternaltotheportionoftheprogramareacurrentlysupportingwindenergydevelopmentwouldbewidenedtoaccommodatelargertowersaswellaslargerequipmentnecessarytoinstallrepoweredturbines.Itislikelythatthelocationsrequiringthemostroadworkarethosewhereroadscurveastheyclimbhillstotheridgetops.Inaddition,eachoftheaccessroadentranceswouldneedtobewidenedtoprovidesufficientspacefortheminimumturningradiusofconstructioncranesandotherflatbeddeliverytrucks.

Publicroadsusedtoaccesstheprogramareamayalsorequireupgradesand/orwideningtosupporttheweightoftrucksandturbinecomponents,aswellastoallowpassageofturbinecomponents.

Culvertsaregenerallyinstalledaspartoftheroaddrainagesystemonslopes,althoughsomeareinstalledatsmallstreamcrossings.Existingculvertsmayneedtobereplacedwithlargerculvertsorreinforcedtoprovideadequatesizeandstrengthforconstructionvehicles.

New Roads 

Newserviceroadswouldneedtobedevelopedfromexistingmainroadstoaccessrepoweredturbinesites—especiallythoseintheareabetweenthegeneralplan–definedAPWRAandtherevisedprogramareaboundary.Newserviceroadswouldtypicallyconsistofagravelroadbedandshoulders(includingcut‐and‐fillslopes).Exactlocationsoftheroadsarenotknownatthistime.Inaddition,newstormwaterculvertsmayneedtobeinstalledaspartofthenewroadinfrastructure.

Page 19: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐19 

October 2014ICF 00323.08

 

Wind Turbine Installation  

Installationofrepoweredturbineswouldoccurthroughouttheprogramarea.Arangeofturbinetypesmaybeusedduringthecourseofrepowering,althoughonlyoneortwotypesofturbinesarelikelytobeinstalledinanysinglerepoweringproject.AllareanticipatedtofallwithintheparametersdescribedinFourth‐GenerationTurbinesabove.

Installationofwindturbinesistypicallylimitedtothedrymonthsbecauseoftheweightofboththeturbinecomponentsandtheheavyequipmentnecessarytoperformthework;however,someworknotrequiringheavyequipmentcouldbeperformedatothertimes.

Foundation 

Thetypeofturbinefoundationuseddependsonterrain,windspeeds,andwindturbinetype.Figure2‐4depictstwofoundationtypesthatmaybeusedintheprogramarea:aninverted“T”slabfoundationandaconcretecylinderfoundation.

AninvertedTslabfoundationisatypeofspreadfootingfoundation.Asingleconcretepadisplacedatgroundlevel.Partofthepadmaybeplacedbelowgroundleveldependingontheslope.Atthecenterofthepadisacylindricalconcreteblocktowhichthewindturbinetowerisbolted;hencethename,invertedT.Thediameterofthecylindricalconcreteblockisequivalenttothetowerbasediameter.Thesizeoftheconcretepadisdeterminedbywindturbinesizeandsite‐specificconditions(e.g.,expectedmaximumwindspeeds,soilcharacteristics).Itsweightmustbesufficienttoholdthewindturbineinplace.

Aconcretecylinderfoundationisatypeofpierfoundation.Asinglehollow,concretecylinderisplacedunderground.Anchorboltsrunthelengthofthecylindertoanembeddedringatthecylinder’sbase.Earthfillisplacedinsideandoutsidethecylinder.Thefrictionoftheearthfillagainstthehollowpierholdsthefoundationandattachedwindturbineinplace.Thediameterofthecylinderisslightlylargerthanthatofthewindturbinetowerbase.Thelengthofthecylinderisdeterminedbywindturbinesizeandsitespecificconditions.

Construction  

Repoweredturbineconstructionentailsplacementofanewtower,rotor,nacelle,transformer,andfoundation.ConstructionandinstallationofrepoweredturbinesisregulatedbyexistingCountyconditionsofapproval,buildingpermitrequirements,andgradingpermitrequirements.

Acranepadareawouldbeleveledandgradedateachturbineaddress.Thecranepad—aflat,level,andcompactedarea—wouldprovidethebasefromwhichthecranewillworktoplacetheturbine.Thissitewouldalsobeusedasalaydownareaforoffloadingturbinecomponents.Thetowerfoundationwouldbeconstructedwithinthecranepadarea.Allwindturbineconstructionactivitieswouldoccurwithinthecranepadarea.AportionofthecranepadareamaybeleftinplacefollowingconstructionforfutureO&Mactivities;theremainingareawouldbereclaimed.

Dependingonthesizeandlocationoftherepoweringproject,aconcretebatchplantmaybenecessary.Aconcretebatchplantisafacilitywhereconcreteismixedforturbinefoundations.Afterconstruction,thesiteofthebatchplantwouldbereclaimed.Smallerprojectsmaynotrequirebatchplants;instead,theconcretewouldbemixedindividuallyforeachturbinewithinthecranepadareaormixedoffsiteatanexistingplant.Itisestimatedthatthreetoeightbatchplantswouldberequiredfortheoverallprogram.

Page 20: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐20 

October 2014ICF 00323.08

 

Thefoundationwouldbeinstalledimmediatelyadjacenttothecranepad,withinthecranepadarea.Whilethefoundationtypeisdeterminebyterrain,windspeeds,andturbinetype,ingeneral,thefoundationisformedbyplacingconcreteinanexcavatedfootingwithreinforcedsteel.

Theturbinetowers,nacelles,andbladesaredeliveredtoeachturbinelocationintheorderofassembly,oncetheconcreteofthefoundationhasset.Onsitetowerassemblyreducestheneedtoclearadditionalstagingareas.Largecranesarebroughttoeachsitetoliftandassembletheturbinecomponents.First,thebasesectionofthetowerissecuredtothefoundation.Theremainingtowersectionsarethenconnectedtothebasesection.Thenacelleandrotoraredeliveredtotheturbinesite.Bladesareboltedtotherotorhub,liftedbyaconstructioncrane,andconnectedtothemainshaft.

Duringconstructionofoldfirst‐generationturbinesinthe1980s,whenrockwasexcavatedforthefoundationortogradeapad,itwasplacedinnearbypiles.Dependingonsitingrequirementsofrepoweredturbines,relocationofsomeoftheserockpilesmaybenecessarytofacilitateturbineplacementandconstruction.Movingrockpileswouldrequireuseofanexcavator.

Lighting 

TheFederalAviationAdministration(FAA)determinesproject‐specificlightingrequirements,butingeneral,FAArequiresthatasinglewarninglightcanbeusedforgroupsofturbineslessthan200feettall.Typically,turbinestallerthan200feetmustbeindividuallylit.Consequently,becausefourth‐generationturbinesaregenerallywellover200feetinheight,allrepoweredwindturbineswouldrequireFAAlighting.LightingofthewindfarmwouldbeincompliancewiththeFAAObstructionMarkingandLightingAdvisoryCircular(AC70/7460‐1K).Intensityofthelightswouldbebasedonalevelofambientlight,withilluminationlessthan2foot‐candlesbeingnormalfornighttimeandilluminationgreaterthan5foot‐candlesbeingthestandardfordaytime.Becausesomeevidencesuggeststhatlightsmaybeanattractantforbirdsduringnighttimemigration(Kerlingeretal.2010),theminimumnumberofrequiredlightswouldbeusedtominimizeattractantsforbirdsduringnighttimemigration.Throughitsreviewprocess,theFAAcouldrecommendthattowermarkingsoraviationsafetylightingbeinstalledonalloronlyaportionoftheturbinetowers.TheFAAcouldalsodeterminethattheabsenceofmarkingand/orlightingwouldnotthreatenaviation.

Collection System Upgrades and Installation 

Eachnewrepoweredwindturbinemustbeconnectedtotheelectricalcollectionsystem.Thecollectionsystemmoveselectricitygeneratedbyeachturbinethroughalow‐voltagelinetoatransformer,whichbooststhevoltageandconveystheelectricitytoamedium‐voltagelinethatcarriestheelectricitytoasubstation.Thesubstationiswherethevoltagelevelofthecollectionsystemissteppeduptothatofthepowergrid.Fromthesubstation,electricityiscarriedthroughautilityinterconnectionpointontolargerutilitytransmissionlinesthatdistributeelectricitytothepowergrid.TransmissionlinesintheprogramareaaremaintainedbyPG&E.Removalofoldcollectionlinesandconstructionofnewlines(turbinetosubstation)arepartoftheprogram,butconstructionofnewtransmissionlines(substationtopowergrid)isnot.

Asrepoweringprojectsareimplemented,theabovegroundcomponentsofoldcollectionsystemswouldberemovedandnewcollectionsystemswouldbeinstalled.Eachwindprojectwouldhaveitsownelectricalcollectionsystem.Theprogram‐levelanalysisassumesthateachprojectwouldconstructitsownsubstationorupgradeanexistingone.Asdescribedbelow,someequipmentwill

Page 21: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐21 

October 2014ICF 00323.08

 

bereplacedwhilesomewillberemovedandnotreplaced.Stagingareasrequiredforcollectionsysteminstallationandareaswherecollectionsystemcomponentshavebeenremovedandnotreplacedwillbereclaimed.Eachofthecollectionsystemcomponentsisdiscussedbelow.

Collection Lines 

Typicalconstructionofnewcollectionsystemsrequiresinstallationofundergroundlow‐andmedium‐voltagelines,transformers,andatleastoneoverheadpowerpole.Thereareseveraltypesofpowerpoles.Linepolesareusedtostringabovegroundcollectionlinesandonlyhaveinsulatingdevices.Cornerpoleshavejumperwires,arelocatedatturnsorbendsinthecollectionsystemalignment,andmayrequireguywires.Poleswithpole‐toptransformers,capacitorbanks,andmeteringsetsmayalsobeused.Riserpolesareusedwherecollectionlinestransitionfromundergroundtoanelevated,abovegroundconfigurationwherethelinesenterasubstation.Disconnectors,cut‐outs,switches,lightningarresters,andotherelectricaldevicesmaybemountedonriserpoles.

Low‐voltagelinesconnectanindividualturbineorgroupofturbinestothetransformerthatsupportsthem.Low‐voltagelinesrangefrom1to600volts,andalinemayrangefrom10to200feetlong.Alllow‐voltagelinesarecurrentlyunderground.Allnewlineswouldalsobeconstructedunderground.Becauseoftheirage,itisunlikelythatanyoftheexistinglow‐voltagecollectionlineswouldbeusedfortherepoweredturbines.

Medium‐voltagelinesconnecttransformerstoasubstationorutilityinterconnectionpoint.Themedium‐voltagelinesarenormallybetween601voltsand35kV.Typically,constructionandinstallationofallnewmedium‐voltagelineswouldbeundergroundwhereverpossible,exceptfortheirpointofconnectionwiththesubstationandfromthesubstationtotheinterconnectionpoint.Existingabovegroundlinesmayalsobeused;however,mostoftheexistingabovegroundmedium‐voltagelineswouldberemovedandnotreplaced.Ifinstallationofnewabovegroundcollectionlinefacilitiesisrequired,thenitwouldbecompletedincompliancewiththelatestrecommendationsoftheAvianPowerLineInteractionCommittee(APLIC).

Installationofundergroundlow‐andmedium‐voltagelinesisaccomplishedusingacut‐and‐coverconstructionmethod.Typically,aminimumaccesswidthof20feetisrequiredtoallowforthetrenchexcavation,butthiswidthmayvary.Thelengthoflinevarieswiththedistancetothesubstation.Thetopsoilisseparatedfromthesubsurfacesoilforlaterreplacement.Thetrenchisthenplowedusingaspecialbulldozerattachmentthatburiesthelineswhiledisturbinglessthanameter‐widestripofsoil.Oncethecollectionlinesarelaidintheditch,thetrenchispartiallybackfilledwithsubsurfacesoil.Communicationlines(discussedbelow)arethenplacedinthetrenchaswell.Thetrenchisthenbackfilledwiththeremainingsubsurfacesoil,compacted,andthencoveredwithreservedtopsoil.

Transformers and Power Poles 

Transformersboostthevoltageoftheelectricityproducedbytheturbinestothevoltageofthecollectionsystem.Eachrepoweredturbinewouldhaveitsowntransformeradjacenttoorwithintheturbine.

Currently,mostmedium‐voltagelinesareabovegroundandsupportedbypowerpoles.Eachlinerequiresaright‐of‐way(typically50feetwide)and26or27woodordirect‐embeddedsteelorself‐supportingsteelpolesperlinearmile.Allexistingpoleswouldberemovedaspartofrepowering.No

Page 22: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐22 

October 2014ICF 00323.08

 

newpoleswouldbeinstalledwhereundergroundingofelectricalequipmentisfeasible.Theinstallationofoverheadpowerlinesandpoleswouldbelimitedtolocationswhereundergroundlinesareinfeasibleandimmediatelyoutsidethesubstationswhereundergroundmedium‐voltagelinestypicallycomeabovegroundtoconnecttothesubstation.

Toinstallpowerpoles,alaydownareaisrequired.Tomountthemedium‐voltagelinesonapowerpole,apullsiteandatensionsitearerequired.Polesites,pullsites,tensionsites,accessroads,andlaydownareasarecleared(i.e.,mowed)ifnecessary.Poleholesandanynecessaryanchorholesareexcavated.Wherepossible,amachineaugerisusedtoinstallpoles.Thewidthanddepthofthesettingholedependsonthesizeofthepole,soiltype,span,andwindloading.

Powerpolesareframed,devicesinstalled,andanyanchorsandguywiresareinstalledbeforethepoleisset.Anchorsandguywiresinstalledduringconstructionareleftinplace.Aftersettingthepole,conductorsarestrung.

Theremovalofexistingpowerpoles,powerlines,andcommunicationlinesentailsremovingthepolesdirectlywithanexcavatorandimmediatelyloadingthemontoatruckforremovalfromthesite.Wireiscut,coiled,andremovedfromthesiteforrecycling/scrapvalue.

Substations 

Substationsuselargetransformerstoboostthevoltageleveloftheelectricalcollectionsystemtothatofthelocalpowergrid(operatedbyPG&E).Transformersaretheprincipalcomponentofasubstation,butsubstationsalsorequireswitches,meteringdevices,lightningprotection,andotherappurtenantfacilities.Alargerepoweringprojectmayrequiremultiplesubstations,ormultipleprojectsmayconnecttoasinglesubstationwhereprojectscanbeseparatelymetered.Thelocationofasubstationisdeterminedbythelocationofthepowergridinterconnectionpoint.BothPG&Eandwindcompany–operatedsubstationsarepresentintheprogramarea;however,repoweringactivitiesevaluatedinthisPEIRarelimitedtothoseactivitiesassociatedwithsubstationsownedandoperatedbytheprojectapplicants.ActivitiesassociatedwithPG&EsubstationsarenotpartoftheprogramevaluatedinthisPEIR.

Tosupporttheprogram,existingsubstationswouldbereplaced,upgraded,orexpanded.Thetypicalsubstationwouldencompassapproximately3acres,withanadditional3acrestemporarilyusedduringconstruction.Substationsitesaregraded,paved,orsurfaced(e.g.,compactedandgraveled),andtheareaisfencedandlightedforsafetyandsecurityreasons.Offroadtravelisnotnecessarybecausesubstationswouldbeaccessedbyneworexistingroads.

Communication System Installation 

Eachrepoweredwindturbinemustbeconnectedtothedatacommunicationsystem.Thecommunicationsystemisusedtomonitor,andinsomecasescontrol,theoperationofwindturbines(e.g.,whetheraturbineisonorofforhowmuchpoweritisproducing)andtransmitsthesedatathroughcommunicationlinesorwirelesstechnology.Communicationsystemsmaybesettotriggeranalarmifcertainoperationalconditionsarise.Thecommunicationsystemisinstalledinthesamealignmentandatthesametimeastheelectricitycollectionsystem.Consequently,theinstallationprocessisthesameasthatdescribedforthecollectionsystem.

Page 23: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐23 

October 2014ICF 00323.08

 

Permanent Meteorological Tower Installation 

Asystemofupto16meteorologicaltowerswouldbeinstalledinstrategiclocationsaspartofindividualrepoweringprojectstomeasurewindspeedanddirection.Allpermanentmeteorologicaltowerswouldbefreestandingtowerswithoutguywires,approximately80meterstall.

Equipment Maintenance during Construction 

Duringconstruction,refuelingandmaintenanceofequipmentandvehiclesthatareauthorizedforhighwaytravelwouldbeperformedoffsiteatanappropriatefacility.Equipmentandvehiclesthatarenothighwayauthorizedwouldbeservicedontheprojectsitebyamaintenancecrewusingaspeciallydesignedvehiclemaintenancetruck.

Reclamation Activities 

Postconstruction Reclamation 

AsdescribedinSection2.4.5,the2005CUPsrequirethatwindcompaniesremoveallfacilitiesandrestorepropertiestopreinstallationconditionsoncethewindfarmisdecommissioned.Forrepoweringprojects,thisrequiremententailsremovingallfirst‐andsecond‐generationwindturbinefacilityinfrastructurethatisnolongerneededfortherepoweredproject.Sitereclamationistypicallyimplementedaftertherepoweredturbinesareinstalledandalltemporaryequipmentandinfrastructureisremovedfromthatarea.

Reclamationactivitiesinvolvereturninglandsdisturbedbyinfrastructureinstallationorremovaltopreprojectconditions.Somefacilities(e.g.,roadways,turbinefootings,undergroundcollectorlines)maybeleftinplaceifdoingsoisdeemedtobemoreprotectiveofnaturalresourcesthanremoval.Ateachreclamationsite,theentiresiteiscontourgraded(ifnecessaryandenvironmentallybeneficial),stabilized,andreseededwithanappropriateseedmixturetomaintainslopestability.Nosoilisremovedfromthesite.Figure2‐9showsreclamationofaturbinepadsite.Exceptionstoreturningasitetopreinstallationconditionsmaybemade,withapprovaloftheCountyPlanningDepartment,ifsuchreclamationactivitieswouldorcouldcreatewaterqualityissues(e.g.,erosion)oriftheactivitiesmayadverselyaffectspecial‐statusspecies(e.g.,burrowingowlburrowcomplexes,uplandhabitatforCaliforniared‐leggedfrogorCaliforniatigersalamander).

Roadsthatarenotnecessaryafterturbineremovalandthatarenotwantedbylandownerswouldalsobereclaimedunlessaresourceagency(CDFWorUSFWS)determinesthatreclamationwouldbedetrimentaltospecial‐statusspecies.Inaddition,someroadswidenedforconstructionmaybereturnedtopreprojectwidthsandwidenedareasreclaimed.Roadreclamationmayincludecontourgradingtoconformtonaturalsurroundinggroundlevelsandbackfillingroadcutsonslopes.

Postproject Reclamation 

Attheendofthe30‐yearCUPterm,itisanticipatedthattheCounty’sconditionsofapprovalwillrequirethatwindcompaniesremoveallturbine‐relatedinfrastructureandreturnthesitetopreturbineconditionsunlessanexceptionismadebythePlanningDirector.Becauseitisverydifficulttoanticipateprojectsiteconditions30yearsinadvance,projectapplicantsarerequiredtodevelopareclamationplanincoordinationwiththeCounty,USFWS,andCDFW.ThereclamationplanmustbecompletedandapprovedbytheCounty6monthsinadvanceofproject

Page 24: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐24 

October 2014ICF 00323.08

 

decommissioningorat29.5yearsintothepermit,whichevercomesfirst,sothattheplanmaybeimplementedimmediatelyuponcessationofturbineoperation.

2.5.4 Operations  

TurbineswouldbeoperatedinaccordancewithmanufacturerrecommendationsandavoidanceandminimizationmeasuresdescribedinSection3.4,BiologicalResources.Manufacturerrecommendationsforcut‐inspeedforrepoweredturbinesareexpectedbe3.5–4meterspersecond.Thetypicalcut‐outspeedis20–25meterspersecond.

Seasonalshutdownofindividualturbinesmayberequiredasanadaptivemanagementaction,butonlyifimpactsonavianspeciesarehigherthananticipatedintheestimatespresentedinSection3.4ofthisPEIR.Repoweredturbines,onceinstalled,wouldnotbepermanentlyshutdownordecommissionedpriortotheendofthepermittermunlesstheyfailorsustainirreversibledamageduringoperationsthatnecessitatetheirremovalforsafetyconcerns.

2.5.5 Maintenance 

Facility Maintenance 

Windcompaniesconductregularmaintenanceonturbinestoensureproperoperation.Theseactivitiesareconsistentwiththemaintenanceactivitiesforfirst‐andsecond‐generationturbinesasdescribedinSection2.4.3withonemajorexception;repoweredwindturbinesarenotremovedorrelocatedaspartofongoingmaintenance.Current‐generationturbinesaremuchlargerandrequirelargerequipment(e.g.,cranesandflatbedtrucks)toinstallorremove.Furthermore,becausethefoundationsofcurrent‐generationturbinesaremuchlargerthanthoseoffirst‐andsecond‐generationturbines,theconstructionofnewfoundationsrequiressignificantgrounddisturbance.Thesefactorsrendermovingcurrent‐generationturbinestonewlocationsafterinitialinstallationtechnicallydifficultandfinanciallyinfeasible.

Oneotherdifferenceinmaintenancerequirementsisthatthelevelofefforttomaintainundergroundcollectionlinesislessthanthatrequiredforabovegroundlinesbecauseundergroundlinesareprotectedfromweatherandinteractionswithbirds.

Ingeneral,maintenanceactivitieswouldconsistofequipmentreplacement,collectionsystemrepair,androadmaintenanceasnecessary.Maintenance‐relatedgrounddisturbancewouldtakeplacewithinthefootprintoftheinitialconstruction‐relateddisturbanceareas.Repairandmaintenanceofaccessroadswouldtakeplacewithinthefootprintsofexistingaccessroads.Turbinesmayneedtoberepairedorreplaced(usingtheexistingtowerandfoundation)atarateofapproximatelyoneturbineevery5years.Nonewpermanenteffectsareanticipatedduringmaintenanceactivities,andtemporarilyaffectedareas,ifany,wouldberestoredfollowingdisturbance.

Fire Prevention 

Windfarmswithenclosedtubulartowersandnooverheadlinesorpowerpolesposereducedfirerisk;accordingly,itisanticipatedthattheCountycouldreducefirebreakrequirementsinassociationwithrepoweringefforts.Areductioninthenumberandextentoffirebreakswouldreduceground‐disturbingactivitiesaroundrepoweredturbines.TheCaliforniaDepartmentofForestryandFireProtection(CALFIRE)wouldbeconsultedinthedevelopmentofanyamendments

Page 25: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐25 

October 2014ICF 00323.08

 

proposedbytheCounty.Specificchangesarenotproposedaspartoftheprogram,butwouldbedevelopedduringimplementationandinconsultationwithCALFIREandtheCountyFireDepartmentasconditionsofapprovaloftheCUPs.

2.6 Specific Projects PermitapplicationsfortwospecificrepoweringprojectsintheprogramareahavebeensubmittedtotheCountybyGoldenHillsWind,LLC(GoldenHills)(asubsidiaryofNextEra),whichisproposingtheGoldenHillsProject,andEDFRE(formerlyknownasenXco),whichisproposingthePattersonPassProject.TheseareindependentwindenergyrepoweringprojectsthattheCountyhaschosentoanalyzeinasingledraftPEIR.However,likethenearbySandHillrepoweringproject(whichisbeinganalyzedinaseparateCEQAprocess),theymaybeapprovedseparatelyfromeachotherandfromtheprogram.Theirapprovalisnotdependentontheapprovalofanyotherrepoweringproject,andtheapprovalofeitherwillnotcausetherepoweringofanyotherproject.TheenvironmentalimpactsoftheseprojectsareevaluatedinthisPEIRattheprojectlevel.Itisanticipatedthattheproject‐specificmitigationmeasurescontainedinthisPEIRwillbeincludedasenforceableconditionsofapprovalofanyCUPsapprovedfortheseprojects.

Eachoftheproposedprojectsisdescribedbelow.Ingeneral,proposeddevelopmentactivitieswouldbethesameasthosedescribedaboveunderProposedRepowering;theseactivitiesarenotrepeatedhere.However,additionaldiscussionisprovidedwherenecessarytoaddressspecificdesign,siting,orpotentialimpactmechanismsthatarenotdescribedabove.Whereproject‐leveldesignhasnotbeencompleted,project‐relatedmetrics(e.g.,areasofdisturbanceassociatedwithspecifictypesofactivities)arebasedontherecentlycompletedVascoWindsprojectinthenorthern(ContraCostaCounty)portionoftheAPWRA.

2.6.1 Golden Hills Wind Energy Facility Repowering Project 

GoldenHillsproposestorepoweranexistingwindenergyfacilityintheprogramareatoreplaceoutdatedandinefficientwindturbineswithfewerandmoreefficientturbines.TheproposedGoldenHillsProjectwoulddecommissionandremoveexistingwindturbinesontheexistingwindenergyfacilitysite,installnewandfewerturbines,andmakeimprovementstorelatedinfrastructure.Theproposedprojectwouldcompriseupto52new1.7MWGEturbines.Theproposedprojectarea,existingandproposedturbinelayoutareshowninFigure2‐10.

Project Location and Land Ownership 

TheGoldenHillsprojectareaencompassesapproximately4,528acreson38parcels.Siteaccessisfromlocalroadsthroughexistinggates.Theproposedprojectwouldimproveaccessatgatesinsideandaroundthesite.TheparcelsmakinguptheprojectareaarelistedinTable2‐3.

Table 2‐3. Golden Hills Project Parcels 

Assessor’sParcelNumber Acreage

99A‐1760‐1‐3 112.9

99A‐1770‐2‐1 119.7

99A‐1770‐2‐2 38.8

Page 26: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐26 

October 2014ICF 00323.08

 

Assessor’sParcelNumber Acreage

99A‐1770‐2‐3 47.6

99A‐1770‐3 157.4

99A‐1770‐4 159.1

99A‐1770‐999‐99 3.8

99A‐1780‐1‐4 549.8

99A‐1785‐1‐14 199.4

99A‐1790‐1 156.8

99A‐1790‐2 153.1

99A‐1790‐3 319.9

99A‐1795‐1 634.7

99A‐1810‐1 252.0

99B‐5650‐1‐4a 64.7

99B‐5650‐2‐1 70.5

99B‐5650‐2‐3a 0.1

99B‐5650‐2‐4a 70.0

99B‐6400‐1‐10 51.0

99B‐6400‐1‐8 0.4

99B‐6400‐1‐9 0.7

99B‐6400‐2‐2 3.4

99B‐6400‐2‐3 0.2

99B‐6400‐2‐6 296.0

99B‐6400‐4a 33.0

99B‐6425‐2‐3 252.3

99B‐7800‐2 10.7

99B‐7800‐9 38.1

99B‐7890‐1‐3a 133.8

99B‐7890‐2‐4a 107.5

99B‐7890‐5a 8.9

99B‐7900‐1‐3 15.8

99B‐7900‐1‐4 0.1

99B‐7900‐1‐5a 253.8

99B‐7900‐1‐6 6.1

99B‐7900‐1‐7a 148.0

99B‐7900‐2a 9.9a Acreageshownisportionofparcelwithinprojectarea;remainderofparcelisoutsideprojectareaboundary

Existingoperationsaresubjecttothetermsandconditionsoftheexistingleaseagreementswiththeunderlyinglandowners.IftheCountyapprovestheproposedproject(byapprovingtheCUP),theexistingeasementsbetweenGoldenHillsandeachlandownerwouldberevisedandformalizedtoidentifythefinallocationofproposedprojectcomponents.ThecreationandmodificationoftheselandowneragreementstoaccommodatetheproposedprojectarenotsubjecttoCEQArequirements.

Page 27: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐27 

October 2014ICF 00323.08

 

Project Need, Goals, and Objectives 

AsrecognizedbytheCounty,theproposedprojectwouldservethepublicandmarketneedforelectricalenergy,thedocumentedandpublicpolicyneedtoproducerenewableenergy,andthewidelyheldpublicandregulatoryagencyneedtosubstantiallyreduceavianmortalityrelatedtowindturbineoperations.Thegoalsoftheapplicantreflectthoseoftheprogram:torepoweritswindfarmassetsincompliancewiththeexistingCUPsandapplicablelaws,reduceavianmortality,andmeetCountygeneralplanandstategoalsforproductionofrenewableenergy.

Theapplicant’sobjectivesfortheproposedprojectincludeimplementationofprovisionsofthe2010AgreementtoRepowerTurbinesattheAltamontPassWindResourceArea.Consistentwiththatagreement,GoldenHillsintendstoreplaceapproximately2,400turbinesbetween2010and2014,andwillshutdownallitsexistingturbinesbyNovember2015.GoldenHills’objectiveover4yearsistoreplaceitsestimated160MWofgeneratingcapacityintwophases,beginningwiththe88.4MWGoldenHillsPhase1Project,whichistheprojectaddressedinthisPEIR.GoldenHillsPhase2willbeevaluatedinaseparateCEQAdocument.The2010AgreementwasinpartintendedtosatisfyNextEra’sobligationsunderthe2007SettlementAgreement.

The2010Agreement,amongotheritems,specifiedamitigationfeeforongoingharmtofocalraptorspecies.Underthisclause,NextEraagreedtopayamitigationfeeof$10,500perMWofinstalledcapacityforeachrepoweringphase.ThesefundswouldgotosupportCEC’sPublicIntegratedEnergyResearchProgramforscientificresearchontheeffectsofwindturbinesonbirdsandbatsintheAPWRA,aswellastosupportotherentities(e.g.,theEastBayRegionalParkDistrict,theLivermoreAreaRegionalParkDistrict)engagedinconservationeffortsforbirdandbatspeciesintheAPWRAandvicinity.Becausethisagreementisinplace,thatcontributionisconsideredpartoftheproject,andisaccountedforinthediscussionofimpactsonbiologicalresourcesinSection3.4.

Existing Facilities  

GoldenHillswouldremoveupto775windturbinesontheexistingwindfarmsite,includingtheassociatedtransformers,electricalequipment,andmeteorologicaltowers.Decommissioningandremovaloftheexistingturbinesandancillaryfacilitieswouldallowtheexistingwindenergyfacilitytoberepowered.

Theexistingwindturbines,ofvariousmodels,arecharacterizedbyhubheightsof18–43meters(60–140)feetandrotordiametersof18–33meters(59–108feet).Theexistingturbinefoundationsareconcretepiersorpadswithapproximately10feetofdrainrockplacedaroundeachfoundation.Theexistingundergroundcollectionsystemwouldremaininplaceandwouldnotbeexcavated.

Existingroadsandotherdisturbedareasnotneededfortheproposedproject’snewturbineswouldbedecommissioned,contourgraded(ifnecessaryandifenvironmentallybeneficial),stabilized,andreseededwithanappropriateseedmixturetomaintainslopestability.Temporaryerosioncontrolmeasureswouldbeimplementedtomaintaintopsoilandrevegetation.

Proposed Project  

GoldenHillswouldinstallupto52new1.7MWturbinesandrelatedinfrastructurewithanaggregatenominalnameplatecapacityof88.4MW.Thespecificequipmentchosenfortheproposedprojectwoulddependonfinalmicrositing.

Page 28: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐28 

October 2014ICF 00323.08

 

Sitingwouldbedeterminedpriortoconstructionandonthebasisofvarioussitingcriteria,suchasterrain,geotechnicalconsiderations,andtheopportunitytoavoidorminimizepotentialimpacts,includingimpactsonavianspecies.GoldenHillswoulddevelopasitingstrategytoavoidandminimizebirdandbatmortality,usingpredictivemodelstositeturbinesinareaswiththeleastpotentialforavianimpactstooccur.Thesemodels,developedbySmallwoodandNeher(2010),incorporateutilizationdata;digitalelevationmodeling;slopeattributes;techniquestoidentifysaddles,notches,andbenches;andassociationsbetweenbirdutilizationandslopeattributes.Themodelsessentiallyresultintheidentificationofareaswithpredictedhighactivitywherewindturbinesshouldnotbeplaced.

Constructionofthewindturbineswouldincorporatebestmanagementpractices(BMPs)thatarestandardpracticeandnormallyrequiredbybuildingpermitsforlargeprojects(e.g.,dustsuppression,erosioncontrolmeasures,trafficmanagement,noisecontrols,coveringorenclosureofdrymaterials,controlledhandlingofhazardousmaterials).ManyofthesepracticeswouldbemandatedasmitigationmeasuresidentifiedinthisPEIR;moreover,becauseprojectproponentsfullyanticipateimplementationofsuchpractices,manymaybeincorporateddirectlyintotheindividualprojectproposals.

Wind Turbines 

GoldenHillswouldlikelyselectaturbinewithcharacteristicssimilartothoseoftheGE1.7XLemodel:a1.7MWturbinewithahubheightof80–96meters(262–315feet),arotordiameterof100–115meters(328–377feet),atotalheightupto153meters(502feet),andaminimumdistancefromgroundtorotortipat6:00positionof30meters(98feet).

Foundations 

Oncetheroadshavebeenconstructedorupgraded,turbinefoundationswouldbeconstructed.Ageotechnicalreportwouldbepreparedtoidentifytheappropriateturbinefoundationdesign.Pendingcompletionofthegeotechnicalanalysis,eachfoundationisexpectedtorequireanexcavationofupto18meters(60feet)indiameter,withfoundationsconstructedofsteel‐reinforcedconcrete.Concreteforthefoundationswouldbeprovidedfromthetemporarybatchplantandtransportedusingconcretetrucks.Arectangulargravelcranepadareaapproximately20by40meters(65by130feet)wouldbedevelopedatthebaseofeachtower.

Roadway Improvements 

Turbinetransportinvolvesequipmentandcranespecificationsthatdictateroadwidthandturningradii.Toallowsafepassageofthelargetransportequipmentusedinconstruction,all‐weathergravelroadswouldbebuiltwithadequatedrainageandcompactiontoaccommodatesuchvehicles.Theproposedroadconstructiondescribedbelowisdesignedtominimizedisturbance,avoidsensitiveresources,andmaximizetransportationefficiency.

Aftersensitiveareashavebeenidentifiedandmarked,initialgradingofaccessroadsandinteriorprojectroadswouldcommence.TheproposedpermanentgravelroadswouldbeconstructedtoCountystandards.Cutmaterialswillbeusedasfillonsite;nomaterialwouldbedisposedofoffsite.Generalcut‐and‐fillslopeswouldbeestablishedata2:1ratio.Thefinallocationoftheroadandthecut‐and‐fillvolumeswouldbebasedongrading,construction,andenvironmentalpermittingrequirements;topography;andsoundengineeringprinciples.Theconstruction‐relatedassumptionsforroadsaredescribedbelow.

Page 29: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐29 

October 2014ICF 00323.08

 

Interior Project Roads 

Theprojectwouldinvolveconstructionofabout104,000linearfeetofroadways.Interiorprojectroadswouldhavetemporaryconstructionwidthsupto52feet:amaximum40‐footwidthplustwo6‐footshoulders.Followingprojectconstruction,thepermanentaccessroadswouldbefinalized(seebelow);temporarilydisturbedshouldersandpassingareaswouldbereclaimed.Tothegreatestextentpossible,thenewroadwaysystemwouldbedesignedtolimitdisturbanceandavoidsensitiveresources.Theproposedproject’sinteriorroadsystemwouldfollowexistingroadwayalignmentswherepossible,butgradeadjustmentsasrequiredbytheturbinemanufacturerswouldbemadeinmanylocationstoaccommodatemaximumgrades.Themaximumroadgradeonaccessroadsusedduringconstructionwouldbeapproximately10%.

Temporarypassingareaswouldbeprovidedalongone‐wayroadwaysapproximatelyevery2,500feettofacilitatesafepassingoftrafficthroughthesiteinterior.Upto50%oftheturnoutareasdevelopedduringconstructionwouldbemaintainedtosupportsafepassingforsubsequentO&Mtrafficontheinteriorroadsystem.Theremainingturnoutsandturnaroundareaswouldbereclaimedandtemporaryshoulderareascouldberestored.Temporarilydisturbedareaswouldberestoredinaccordancewiththeproposedproject’sreclamationplanandwithallrelevantpermitconditions.

Drainageculverts(neworupgradeofexisting)wouldbeinstalled(orremoved)inaccordancewithCountystandards.Primarily,theseculvertswouldbeinstalledtodivertwaterawayfromareaswheredrainageswalesintersectwithroadways,thuspreventinghighstormwaterflowsfromcrossingroadsurfaces.

Postconstruction Project Road Conditions 

Followingroadconstruction,allroadswillbeinspectedtodetermineifandwhereanyadditionalgradingoradditionalgravelwillbenecessarytomeetCountystandards.Additionally,finalroadshapingwillbecompletedtoensureproperwaterflowawayfromcut‐and‐fillslopesandintoditchesandculverts.Erosioncontroldevicesalsowillbeinstalledorcompleted,disturbedareasadjoiningtheroadswillberestored,andtheappropriateerosioncontroldeviceswillbeinstalled.

Followingconstruction,dependingonwhethertheywillbeneededtoprovideaccessforO&M,roadswillbeleftinplaceorrestoredinconformancewithCountystandards.Roadsleftinplacewillbeinspectedandgradedwherelowspotsandrutshaveformed.Culvertswillbeleftinplaceandroadedgeswillberestored.

Improvements at Local Access Roads 

Proposedprojectingress/egresstothesitewouldbeviaNorthFlynnRoad,PattersonPassRoad,andMidwayRoad.

Totheextentpossible,existingroadswouldbeusedforproposedprojectconstructionandoperations.Theexistingroadwaysystemprimarilyconsistsofgravelaccessroadsupto16feetwide.All‐weathergravelroadswouldbebuiltwithadequatedrainageandcompactiontoaccommodateequipmenttransportvehicles.Improvementscouldrequirethewideningofroadwaysoutlinedabovetoprovideadditionalshoulderandlanewidths.Minordrainageimprovementscouldberequiredtoadjustexistingdrainageinletstogradeandprovideroadsideditches.

Page 30: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐30 

October 2014ICF 00323.08

 

AllroadimprovementswouldbedesignedaccordingtoAlamedaCountydesignstandards.PreliminarydesignfortheprojectingressandegresspointswouldbeprovidedtotheAlamedaCountyPublicWorksDepartment.Encroachmentpermits,forminorroadwayimprovementsifneeded,wouldbeneededfromtheAlamedaCountyPublicWorksDepartmentandwouldbedesignedtomeetAlamedaCountyDesignStandards(andCaltransHighwayDesignManualStandards,asapplicable).Anencroachmentpermitforimprovementswithinthepublicright‐of‐wayfallingwithinAlamedaCountywouldbeneeded,andtheAlamedaCountyPublicWorksDepartmentwouldconductdesignreviewoftheproposedimprovements.

Afterconstruction,thepermanentaccessroadswouldbereducedinwidthto25feetandtheremainingdisturbedareawouldbereclaimed.TemporarilydisturbedareaswouldbereclaimedasdeterminedthroughconsultationswithUSFW,CDFW,andtheCounty.Erosioncontroldeviceswouldbeinstalledorcompleted.DrainageculvertswouldbeinstalledorremovedasappropriateinaccordancewithAlamedaCountystandardstopreventhighstormwaterflowsfromcrossingroadsurfaces.

GoldenHillswouldrepair,repave,orreconstructthoseportionsofexistingCountyroadsdamagedduringconstructioninaccordancewithapplicabledesignstandardsagreeduponpriortobeginningconstruction.

Power Collection System 

Collection Lines 

Thepowercollectionsystemwouldconsistofmedium‐voltage,high‐density,insulatedundergroundcablesthatwouldconnecttheturbinestotheonsitesubstation.Theundergroundcollectioncablesaregenerallyburiedintrenchesadjacenttotheroadbedoftheinterioraccessroads.Communicationlineswouldbeinstalledinthesametrenches.Noexistingcollectionlineswouldbeused.

Trenchingequipmentwouldbeusedtoexcavatetrenchesinorneartheaccessroadbedtoallowinstallationoftheinsulatedundergroundcablesthatwouldconnecteachturbinetothesubstation.Thetrenchestypicallywouldbe12–24incheswideand48inchesdeep,buttheirdepthandnumberwouldbedeterminedultimatelybythesizeofthecablerequiredandthethermalconductivityofthesoilorrocksurroundingthetrench.Thelargeconductorcableswouldbeplacedwithinthetrenches,packedinsandornativematerialsdependingonthesoilproperties,andcoveredtoprotectthecablesfromdamageorpossiblecontact.Opticalfibercommunicationlinksandcommunicationlinesforturbineperformanceremote‐sensingequipmentwouldbeplacedinthesametrenchesastheconductorcables.Inlocationswheretwoormoresetsofundergroundlinesconverged,pad‐mountedswitchpanelswouldbeusedtotiethelinestogetherintooneormoresetsoflargerfeederconductors.Theaccumulatedcablesfromtheindividualarrayswouldbespaced10feetapartoneithersideoftheroadsystemin“homeruns”totheonsitesubstation.Thelocationsoftheburiedinfrastructurewouldberecordedinas‐builtprojectdiagramsthatwouldbedevelopedattheendoftheconstructionperiod.Becauseasignificantportionoftheundergroundcollectioncableswouldbeinstalledparalleltoandwithinthefootprintofareastemporarilydisturbedbyroadconstruction,installationofthecollectionsystemisonlyexpectedtoresultinminimaladditionalpermanentsurfacedisturbance.

Becauseundergroundcollectioncableswouldbeinstalledparalleltoandwithinthefootprintofareastemporarilydisturbedbyroadconstruction,installationofthecollectionsystemisnot

Page 31: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐31 

October 2014ICF 00323.08

 

expectedtoresultinpermanentsurfacedisturbance.Installationwouldresultinanestimated14.3acresoftemporarydisturbance.

Collector Substation 

Themainfunctionsofacollectorsubstationaretostepupthevoltagefromthecollectionlines(34.5kV)tothetransmissionlevel(115kV)andtoprovidefaultprotection.Thebasicelementsofthesubstationfacilitiesareacontrolhouse,abankofoneortwomaintransformers,outdoorbreakers,capacitorbanks,relayingequipment,high‐voltagebuswork,steelsupportstructures,anundergroundgroundinggrid,andoverheadlightning‐suppressionconductors.Themainoutdoorelectricalequipmentandcontrolhouseareinstalledonaconcretefoundation.

Theexistingonsitesubstation(Midway)servesasthecollectorsubstationfortheexistingwindfarm.Thissubstationwouldbereplacedbyanotherinthesamegenerallocation.Thesubstationwouldconsistofagraveledfootprintareaofapproximately2acres,a12‐footchain‐linkperimeterfence,andanoutdoorlightingsystem.Thenewlightswouldbeshieldedordirecteddownwardtoreduceglare.Forthepurposesofthisanalysisitisassumedthattheselightswouldremainonfromdusktodawn.Constructionofthesubstationwouldentailatotaldisturbanceareaofupto6acres.Ofthese6acres,3acreswouldbedisturbedtemporarilyduringconstructionandwouldberestoredafterconstructioniscomplete.Theremaining3acreswouldbepermanentlydisturbed.

Anenergystorageunitencompassingapproximately1acrewouldbeconstructedwithinthe3‐acrepermanentdisturbancefootprintofthecollectorsubstationfacility.Themodulardesignwouldaccommodatelithium‐ionbatteries,eitherinabuildingorinapproximatelythirty40‐footInternationalStandardOrganization(ISO)containers.Thefacilitywouldcontainallnecessaryenergymanagementhardwareandsoftwaretomanageenergysupplyfromtheturbinestothepowergrid,aswellasafiredetectionandsuppressionsystemandairconditioning.Constructionisanticipatedtorequireapproximately4months.Batteryreplacementwouldberequiredoverthelifeoftheproject,andwastebatterieswouldberemovedfromthesiteandtransportedeithertothemanufacturerortoanapprovedbatteryreprocessorforrecyclingordisposal.

Meteorological Towers 

Theproposedprojectwouldentailconstructionoffourpermanentmeteorologicaltowersdistributedthroughtheprojectareatomonitorweatherconditionsandwindspeed.Eachfreestandingtowerwouldbemountedonacircularpierorslabfoundationsurroundedbyacircularareaofgraveltoaradiusofabout15feet.

Operations and Maintenance Facilities and Other Project Elements 

Operationsandmaintenancefacilitieswouldinvolveapermanentdisturbanceof2acres.Thepreciselocationofthesefacilitieshasnotyetbeenidentified.

Uptofourportabletoiletswouldbemaintainedyear‐roundonsiteandservicedbyacontractor.Nootherwater,wastewater,orsewer/septicsystemsarepresentattheexistingwindfarm,andnochangestothewater,wastewater,orsewer/septicsystemareproposedtosupporttheproposedproject.

Page 32: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐32 

October 2014ICF 00323.08

 

Project Construction 

TurbineswouldlikelybedeliveredtothesitefromthePortofStocktonorothernearbyportorrailtransferlocation.Towerassemblyrequirestheuseofonelargetrack‐mountedcraneandtwosmallcranes.Theturbinetowers,nacelles,androtorbladeswouldbedeliveredtoeachfoundationsiteandunloadedbycrane.Alargetrack‐mountedcranewouldbeusedtohoistthebasetowersectionverticallythenloweritoverthethreadedfoundationbolts.Thelargecranewouldthenraiseeachadditionaltowersectiontobeboltedthroughtheattachedflangestothetowersectionbelow.Thecranethenwouldraisethenacelle,rotorhub,andbladestobeinstalledatopthetower.Twosmallerwheeledcraneswouldbeusedtooffloadturbinecomponentsfromtrucksandtoassistintheprecisealignmentofthetowersections.

Schedule 

Proposedprojectconstructionwouldproceedafterallconstruction‐relatedpermitsareissued.TheseactivitiesareanticipatedtoproceedaccordingtothephasesoutlinedinSection2.5.3,RepoweringActivities.Construction‐relatedbestmanagementpractices(BMPs)wouldbeimplementedduringtheNovember–Aprilwetseason.Thefinalapprovedworkhourswouldbespecifiedintheproposedproject’sCUP.Ifextendedhoursarenecessaryordesired,theappropriateapprovalswouldbesought.

Workforce 

Basedondataprovidedfortypicalwindenergyprojectsofsimilarsize,approximately50workerswouldbeemployedtodecommissiontheexistingwindfarm.Onaverage,approximately200workerswouldbeemployedduringconstruction,withapeakworkforceof300.Craftworkerswouldincludemillwrights,ironworkers,electricians,equipmentoperators,carpenters,laborers,andtruckdrivers.Localconstructioncontractorsandsupplierswouldbeusedtotheextentpossible.

Construction Equipment and Ancillary Construction Facilities 

ThetypesofequipmentlistedinSection2.5.3,RepoweringActivities,wouldbeusedduringthevariousstagesofdecommissioningandconstruction.Onaverage,allequipmentisassumedtooperateforapproximately10hoursperday.Theprobablefueltypeisdiesel.

Temporary Concrete Batch Plant 

Dependingonweatherconditions,concretetypicallyneedstobepouredwithin90minutesofmixingwithwater.Deliverytimetoonsitepourlocationswouldlikelyexceed90minutesfromexistingconcretesuppliersintheproposedprojectvicinity.Accordingly,GoldenHillsproposestoconstructanonsitetemporaryconcretebatchplanttofacilitateconcretedeliveryfortheturbinefoundations.

Thetemporarybatchplantwouldoperateonlyduringconstruction.Thebatchplantwouldrequireastand‐alonegeneratorofapproximately250kW.Fuelforthegeneratorwouldbeobtainedfromanabovegroundstoragetank(AST)withsecondarycontainmentforspillprevention.Itisestimatedthatthebatchplantwouldconsumeupto5,400gallonsofwaterperday.Atemporary5,000‐gallonwatertankwouldbeplacedonsitetoreplenishthebatchplantwater,asneeded.

Page 33: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐33 

October 2014ICF 00323.08

 

Stockpilesofsandandaggregatewouldbesituatednearthebatchplantinamannerthatwouldminimizeexposuretowind.Concretewouldbedischargedusingascrewconveyordirectlyintoanelevatedstoragesilo.TheconstructionmanagersandcrewwoulduseBMPsandstandardoperatingprocedurestokeeptheplant,storage,andstockpileareascleanandtominimizethebuildupoffinematerials.

Portable Rock Crusher 

Toconstructandimproveproposedprojectroads,arockcrusherwouldberequiredtoprovideappropriatelysizedaggregateforfillandroadbase.Theportablerockcrusherwouldbeco‐locatedwiththebatchplant.InaccordancewithBMPs,therock‐crushingareawouldbesprayedbyawatertrucktosuppressdust.Thecrusherproposedforthisprojectincorporatesseveraldust‐suppressionfeatures,includingscreensandwaterspray.Dust‐controlmeasureswouldbeusedatallemissionpointsduringoperation,includingstartupandshutdownperiods,asrequired.

Equipment Maintenance 

Duringconstruction,refuelingandmaintenanceofequipmentandvehiclesthatareauthorizedforhighwaytravelwouldbeperformedoffsiteatanappropriatefacility.Equipmentandvehiclesthatarenothighwayauthorizedwouldbeservicedonsitebyamaintenancecrewusingaspeciallydesignedvehiclemaintenancetruck.

Staging and Laydown Areas 

Theproposedprojectincludesconstructionstagingareas(forstorageofprojectcomponentsandequipment)andadditionallaydownareasateachturbinelocation(foroffloadingandstorageofthetowercomponents).

Construction Staging Areas 

Temporarystagingareaswouldbeusedduringconstruction.Itisanticipatedthatuptosixstagingareas,rangingfrom1.7to7.0acres(average3.4acres),wouldbeusedforthestorageofturbinecomponents,constructionequipment,officetrailers,andothersuppliesincludinghazardousmaterials.Thebatchplant,rockcrusher,andassociatedfuelandwatertankswouldbeco‐locatedwithinthedisturbedareafootprintofoneofthestagingareas.Trailerswouldbeplacedatthestagingareastosupportworkforceneedsandsitesecurity.Thetrailerswouldalsohouseafirstaidstation,emergencyshelter,andhandtoolstorageareafortheconstructionworkforce.Vegetationwouldbeclearedandeachconstructionstagingareawouldbegradedtobelevel.Itthenwouldbecoveredwitha4‐inchgravelsurfaceandappropriateerosioncontroldevice(e.g.,earthberm,siltfences,strawbales)wouldbeinstalledtomanagewaterrunoff.Diversionditcheswouldbeinstalled,asnecessary,topreventstormwaterfromrunningontothesitefromsurroundingareas.Followingcompletionofconstructionactivities,thecontractorwouldrestorethetemporaryconstructionstagingareas.Thegravelsurfacewouldberemovedandtheareaswouldbecontourgraded(ifnecessaryandifenvironmentallybeneficial)toconformwiththenaturaltopography,stockpiledtopsoilwouldbereplaced,andtheareawouldbestabilizedandreseededwithanappropriateseedmixture.

Page 34: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐34 

October 2014ICF 00323.08

 

Laydown Areas 

Alaydownareawouldbeconstructedateachnewturbinepadtoaccommodateoffloadingandstorageofthetowersections,nacelle,rotorhub,andblades,aswellassomeconstructionequipment.Eachlaydownareawouldoccupyapproximately0.5acre.Thelaydownareaswouldincludeacompacted,gravel‐surfacedcranepadwithinthe0.5‐acrearea.Thecranepadwouldbeapproximately65feetwide(adjacenttotheturbineaccessroad)toallowalargetrack‐mountedcranetoaccesstheturbinefoundations.Thelaydownareasmustbelevelornearlyleveltoallowthecranetoliftthelargeandextremelyheavyturbinecomponentssafely,andvegetationclearingand/orgradingwouldbenecessary.Thecranepadwouldbeconstructedusingstandardcut‐and‐fillroadconstructionprocedures.Thelaydownareaswouldgenerallybecircular.Theactualdimensionsoftheindividuallaydownareaswouldbebasedonsitetopographyandtheneedtominimizecutandfill.

Hazardous Materials Storage 

Hazardousmaterialswouldbestoredatoneofthestagingareas(useofextremelyhazardousmaterialsisnotanticipated).Tominimizethepotentialforharmfulreleasesofhazardousmaterialsthroughspillsorcontaminatedrunoff,thesesubstanceswouldbestoredwithinsecondarycontainmentareasinaccordancewithfederal,state,andlocalrequirementsandpermitconditions.Storagefacilitiesforpetroleumproductswouldbeconstructed,operated,andmaintainedinaccordancewiththeSpillPreventionControlandCountermeasures(SPCC)Planthatwouldbepreparedandimplementedfortheproposedproject(CodeofFederalRegulations[CFR],Title40,Part112).TheSPCCPlanwouldspecifyengineeringstandards(forexample,secondarycontainment);administrativestandards(forexample,trainingwithspecialemphasisonspillprevention,standardoperatingprocedures,inspections);andBMPs.

AHazardousMaterialsBusinessPlan(HMBP)wouldbedevelopedfortheproposedproject.TheHMBPwouldcontainspecificinformationregardingthetypesandquantitiesofhazardousmaterials,aswellastheirproduction,use,storage,spillresponse,transport,anddisposal.

Traffic and Parking 

GoldenHillswouldprepareaTrafficManagementPlanfortheproposedprojecttoreducehazardsthatwouldresultfromtheincreasedtrucktraffic,andtoensurethattrafficflowonlocalpublicroadsandhighwayswouldnotbeadverselyaffected.Thisplanwouldincorporatemeasuressuchasinformationalsigns,trafficcones,andflashinglightstoidentifyanynecessarychangesintemporarylandconfiguration.Flaggerswithtwo‐wayradioswouldbeusedtocontrolconstructiontrafficandreducethepotentialforaccidentsalongroads.Speedlimitswouldbesetcommensuratewithroadtype,trafficvolume,vehicletype,andsite‐specificconditionsasnecessarytoensuresafeandefficienttrafficflow.Onsiteconstructiontrafficwouldberestrictedtotheroadsdevelopedfortheproposedproject.Useofexistingunimprovedroadswouldberestrictedtoemergencysituations.

Preconstructiondecommissioningactivitiesanddeliveryofconstructionmaterialsandequipmentwouldrequireapproximately16,513fullyloadedinboundtripsoflargetruckstothesitefromoffsitesources,foratotalofupto33,026inboundand(empty)outboundtrucktripsassociatedwiththeproposedproject.Itisestimatedthatupto900ofthesetripswouldincludeoversizedvehiclesdeliveringwindturbinegeneratorandsubstationmaterials,heavyequipment,andotherconstruction‐relatedmaterials.Constructionoftheproposedprojectcomponents(roads,turbines,substation,andelectrical/communicationlines)wouldoccurataboutthesametime,using

Page 35: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐35 

October 2014ICF 00323.08

 

individualvehiclesformultipletasks.Basedondataprovidedfortypicalsimilarlysizedwindenergyprojects,itisanticipatedthatduringtheconstructionperiod,therewouldbeapproximately60dailyroundtripsbyvehiclestransportingconstructionpersonneltothesite.Assumingthatconstructionmaterialdeliveriesfromexternalsourceswouldoccuroverthe8‐monthconstructionperiodat20workdayspermonth,anaverageofabout81one‐waytrucktripsperday(thatis,40.5trucksgeneratingonetriptotheproposedprojectsiteandonetripfromthesite)wouldbeaddedtobackgroundtrafficvolumesonarearoadways.Inadditiontotheselargetruckloads,dumptrucks,concretetrucks,watertrucks,cranes,andotherconstructionandtradevehiclesoperatingwithintheprojectareawouldentailmorethan12,000trucktrips.

Construction‐relatedparkingwouldbelocatedinconstructionstagingareas.Carpoolingfromalocationwithin10milesofthesite,otherthantheO&Mfacility,wouldalsobeused.

Afterconstruction,O&Moftheproposedprojectwouldrequireapproximatelyeightroundtripsperdayusingpickupsorotherlight‐dutytrucks.

Water and Wastewater Needs 

Waterforprojectconstructionactivitieswouldbeprovidedthroughanagreementwithmunicipalorprivatesuppliers.Temporaryonsitewatertanksandwatertruckswouldbemadeavailableforfirewatersupport,dustsuppression,andconstructionneeds.Oneormore3,500‐gallontanksorothermeansoffirewatersupportwouldbesubjecttoapprovalbyAlamedaCounty.

Duringconstruction,upto50milliongallonsofwaterwouldbeusedfordustcontrolonroadsandduringgradingandsitework,aswellasformixingwithcementandaggregatetoformconcrete.Dailywaterusewouldvary,dependingontheweatherconditionsandtimeofyear,whichaffecttheneedfordustcontrol.Hot,dry,windyconditionswouldnecessitategreateramountsofwater.Tankertruckswouldapplywatertoconstructionareaswhereneededtoaidinroadcompactionandreduceconstruction‐generateddust.

Forconstructionoffoundations,waterwouldbetransportedtothebatchplantsitewhereitwouldbeusedtomixconcrete.Aminimalamountofwaterwouldberequiredforconstructionworkerneeds(drinkingwater,sanitationfacilities).Thiswaterwouldbetruckedinordeliveredasbottleddrinkingwater.Alocalsanitationcompanywouldprovideandmaintainappropriateconstructionsanitationfacilities.Portabletoiletswouldbeplacedateachofthecraneassemblyareas,theconcretebatchplant,thesubstation,andthetrailerpadarea.Whennecessary,additionalfacilitieswouldbeplacedatspecificconstructionlocations.

AppropriateBMPtrainingwouldbeprovidedtotruckoperatorstopreventrunofffromdustsuppressionandcontrolactivities.Waterusedforcementmixingandtruckwashingwouldbemanagedinaccordancewithapplicablepermitconditions(andBMPs)andwouldnotbedischargedoffsite.

Demarcation of Sensitive Resources 

Sensitiveresourcesadjacenttoandwithinconstructionareaswouldbemarkedtoensureadequateavoidance.Sensitiveareasidentifiedthroughtheenvironmentalapprovalandpermittingprocesseswouldbestakedandflagged.Priortoconstruction,anenvironmentalinspector(ifrequired),theconstructioncontractor,andanysubcontractorswouldconductawalk‐throughofareastobeaffected,orpotentiallyaffected,byconstructionactivities.Thepreconstructionwalk‐throughs

Page 36: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐36 

October 2014ICF 00323.08

 

wouldbeconductedregularlytoidentifysensitiveresourcestobeavoided,limitsofclearing,locationofdrainagefeatures,andthelayoutforsedimentationanderosioncontrolmeasures.Followingidentificationofthesefeatures,specificconstructionmeasureswouldbereviewed,andanymodificationstoconstructionmethodsorlocationswouldbeagreeduponbeforeconstructioncouldbegin.Resourceagencyrepresentativeswouldbeconsultedorincludedonthesewalk‐throughsasneeded.

Materials and Services 

Approximately200,000cubicyardsofaggregatewouldbebroughtontotheproposedprojectsiteforroadwayconstruction,turbinefoundations,andtheonsitesubstations.

Inspection and Startup Testing 

Priortooperation,eachcompletedturbinewouldbeinspectedandcheckedformechanical,electrical,andcontrolfunctionsinaccordancewiththemanufacturer’sspecificationsbeforebeingreleasedforstartuptesting.Aseriesofstartupprocedureswouldthenbeperformedbythemanufacturer’stechnicians.Electricaltestsonthetransformers,undergroundpowerlines,andcollectorsubstationwouldbeperformedbyqualifiedengineers,electricians,andtestpersonneltoensurethatelectricalequipmentisoperatingwithintolerancesandthattheequipmenthadbeeninstalledinaccordancewithdesignspecifications.TheabovegroundpowerlinesinterconnectingtothePG&Esystemwouldbetestedandinspectedasrequired.

Cleanup and Restoration 

Clearinganddisposingoftrash,debris,andscrubonthoseportionsofthesitewhereconstructionwouldoccurwouldbeperformedattheendofeachworkdaythroughallstagesofconstruction.Existingvegetationwouldbeclearedonlywherenecessary.Allexcavationsmadebyclearingwouldbebackfilledwithcompactedearthandaggregateassoonascableinfrastructureistested.Disposalofcuttingsanddebriswouldbeinanapprovedfacilitydesignedtohandlethewaste.

Beforeconstructioniscomplete,allremainingtrashanddebriswouldberemovedfromthesite.AlltemporarilydisturbedareaswouldbereturnedtotheirpreviouscontoursandanydebriswouldberemovedandproperlydisposedofoffsiteconsistentwithAlamedaCountyrestorationrequirementsanddescribedinaReclamationPlan,whichwouldbedevelopedpriortoconstructionaspartoftheconstructionplanningandpermittingprocess.Anymaterialplacedintheareasofthefoundationsorroadswouldbecompactedasrequiredforsoilstability.

Operation and Maintenance 

O&MactivitiesfortheproposedprojectwouldbesimilartotheO&Mactivitiespresentlyconductedfortheexistingwindfacility.

Safety and Environmental Compliance Programs 

Quality Assurance and Quality Control 

Aqualityassurance/qualitycontrol(QA/QC)programwouldbeimplementedtoensurethatconstructionandstartupofthefacilityarecompletedasspecified.GoldenHillswouldberesponsibleforensuringimplementationoftheQA/QCprogrampriortoconstruction.TheprogramwouldspecifyimplementingandmaintainingQA/QCprocedures,environmentalcomplianceprogramsand

Page 37: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐37 

October 2014ICF 00323.08

 

procedures,andhealthandsafetycomplianceprogramsandprocedures,andwouldintegrateGoldenHill’sactivitieswiththecontractorsduringprojectconstruction.Theengineeringprocurementandconstruction(EPC)contractorandturbinesupplierwouldberesponsibleforenforcingcompliancewiththeconstructionproceduresprogramofallofitssubcontractors.

Environmental Compliance 

Orientationofconstructionstaffwouldincludeeducationonthepotentialenvironmentalimpactsofprojectconstruction.Theconstructionmanagerwouldestablishproceduresforstafftoformallyreportanyissuesassociatedwiththeenvironmentalimpacts,tokeepmanagementinformed,andtofacilitaterapidresponse.

Stormwater Control 

Becausetheproposedprojectwoulddisturbmorethan1acre,itwouldrequirecoverageunderthestate’sGeneralPermitforStormWaterDischargesAssociatedwithConstructionandLandDisturbanceActivities(Order2010‐0014‐DWQ)(ConstructionGeneralPermit).Permitcoveragewouldbeobtainedbysubmittingpermitregistrationdocuments(PRDs)totheStateWaterResourcesControlBoardthroughitsStormwaterMultipleApplicationandReportTrackingSystem(SMARTS)website.ThePRDsincludeanoticeofintent,sitemaps,astormwaterpollutionpreventionplan(SWPPP),arisklevelassessment,andothermaterials.TheSWPPPwouldincludetheelementsdescribedinSectionAoftheConstructionGeneralPermitandmapsthatshowthelocationandtypeoferosioncontrol,sedimentcontrol,andnon‐stormwaterBMPs,whichareintendedtopreventsignificantwaterqualityimpactsonreceivingwaters.Dependingontherisklevel,theSWPPPmayalsospecifythatsamplingofpHandturbidityintherunoffleavingthesitebeconductedduringconstruction.TheSWPPPwouldalsodescribesiteinspection,monitoring,andBMPmaintenanceproceduresandschedules.

Safety Compliance 

GoldenHillsanditsconstructioncontractorsandsubcontractorswouldberesponsibleforconstructionhealthandsafetyissues.Eachcontractorandsubcontractorwouldprovideahealthandsafety(H&S)coordinator,whowouldensurethatapplicablelaws,regulations,ordinances,andstandardsconcerninghealthandsafetyarefollowedandthatanyidentifieddeficienciesarecorrectedasquicklyaspossible.TheH&Scoordinatorwouldconductonsiteorientationandsafetytrainingforcontractandsubcontractemployeesandwouldreportbacktotheonsiteconstructionmanager.Uponidentificationofahealthandsafetyissue,theH&Scoordinatorwouldworkwiththeconstructionmanagerandresponsiblesubcontractorordirecthireworkerstocorrecttheviolation.

Emergency Situations 

Ifseverestormsresultinadownedinterconnectionpowerline,standardO&Mprocedureswouldbeapplied.Theturbineswouldbeequippedwithinternalprotectivecontrolmechanismstosafelyshutthemdownintheeventofahigh‐voltagegridoutageoraturbinefailurerelatedtofireormechanicalproblems.Aseparatelow‐voltagedistributionservicefeedmightbeconnectedtothelow‐voltagesideofthecollectorsubstationasabackupsystemtoprovideauxiliarypowertoprojectfacilitiesincaseofoutages.Forsafety,thecollectorsubstationwouldbefenced,locked,andproperlysignedtopreventaccesstohigh‐voltageequipment.Safetysignagewouldbepostedaroundturbines,transformers,otherhigh‐voltagefacilities,andalongroads,asrequired.

Page 38: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐38 

October 2014ICF 00323.08

 

Public Access and Security 

Theproposedprojectwouldbelocatedentirelyonprivatepropertyandpublicpropertywithrestrictedpublicaccess.Onlyauthorizedaccesstotheprojectsitewouldbeallowed.Thesiteisfencedandthecollectorsubstationswouldbefencedwithanadditional12‐foot‐high,chain‐linkfencetopreventpublicandwildlifeaccesstohigh‐voltageequipment.Safetysignswouldbepostedinconformancewithapplicablestateandfederalregulationsaroundallturbines,transformers,andotherhigh‐voltagefacilitiesandalongaccessroads.Vegetationclearancewouldbemaintainedadjacenttoprojectingressandegresspointsandaroundthecollectorsubstations,transformers,andinterconnectionriserpoles.

Hazardous Materials Storage and Handling 

TheCounty’sHazardousMaterialsProgramDivisionistheCertifiedUnifiedProgramAgency(CUPA)forallareasofAlamedaCounty.ManagementofhazardousmaterialswouldbeconductedinaccordancewithaCounty‐approvedHMBPdevelopedfortheproposedprojectpursuanttotherequirementsoftheCUPA.HazardousmaterialsusedduringO&MactivitieswouldbestoredwithintheexistingO&MbuildinginabovegroundcontainerswithappropriatespillcontainmentfeaturesasprescribedbythelocalfirecodeortheSPCCPlanfortheO&Mbuildingasstipulatedbytheappropriateregulatoryauthority.SuchmaterialswouldbesimilarintypeandamounttothosecurrentlystoredandusedforO&Mfortheexistingfacility.

Lubricantsusedintheturbinegearboxarepotentiallyhazardous.Thegearboxwouldbesealedtopreventlubricantleakage.Thegearboxlubricantwouldbesampledperiodicallyandtestedtoconfirmthatitretainsadequatelubricatingproperties.Whenthelubricantshavedegradedtothepointwheretheyarenolongeradequate,thegearboxwouldbedrained,newlubricantwouldbeadded,andtheusedlubricantswouldbedisposedofatanappropriatefacilityinaccordancewithallapplicablelawsandregulations.

Transformerscontainoilforheatdissipation.Thetransformersaresealedandcontainnopolychlorinatedbiphenyls(PCBs)ormovingparts.Thetransformeroilwouldnotbesubjecttoperiodicinspectionanddoesnotneedreplacement.

O&Mvehicleswouldbeproperlymaintainedtominimizeleaksofmotoroil,hydraulicfluid,andfuel.Duringoperation,O&MvehicleswouldbeservicedandfueledattheexistingO&Mbuilding(usingmobilefueltanks)oratanoffsitelocation.Nostoragetanksarelocatedattheexistingwindfarm,andnoneareproposed.

Operation and Maintenance Activities 

Maintenanceofturbinesandassociatedinfrastructureincludesawidevarietyofactivities.Routinemaintenanceinvolvesactivitiessuchascheckingtorqueontowerboltsandanchors;checkingforcracksandothersignsofstressontheturbinemainframeitselfandotherturbinecomponents;inspectingforleakageoflubricants,hydraulicfluids,andotherhazardousmaterialsandreplacingthemasnecessary;inspectingthegroundingcables,wireropesandclips,andsurgearrestors;cleaning;andrepainting.Mostroutinemaintenanceactivitiesoccurwithinandaroundthetowerandthenacelle.CleanupfromroutinemaintenanceactivitieswouldbeperformedatthetimemaintenanceisperformedbytheO&Mpersonnel.Whileperformingmostroutinemaintenanceactivities,O&Mstaffwouldtravelbypickuporotherlight‐dutytrucks.Inaddition,onroutinemaintenancesuchasrepairorreplacementofrotorsorothermajorcomponentscouldbenecessary.

Page 39: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐39 

October 2014ICF 00323.08

 

Suchmaintenancewouldinvolveuseofoneormorecranesandequipmenttransportvehicles,thoughthecraneswouldnotbeaslargeasthetrack‐mountedcranesusedtoerecttheturbinetowers.

Monitoringoftheproposedproject’soperationswouldbecomputer‐based;computersinthebaseofeachturbinetowerwouldbeconnectedtotheexistingO&Mfacilitythroughfiber‐optictelecommunicationlinks.

TheO&Mworkforceisnotanticipatedtochangefromtheexistingturbinetechnicians,operationspersonnel,administrativepersonnel,andmanagementstaff.O&Mstaffwouldcontinuetomonitorturbineandsystemoperation,performroutinemaintenance,shutdownandrestartturbineswhennecessary,andprovidesecurity.AllO&MstaffwouldbetrainedregularlytoobserveBMPs.

Ultimate Decommissioning and Reclamation  

Theanticipatedlifeofthewindfarmismorethan30years,asupgradingandreplacingequipmentcouldextendtheoperatinglifeindefinitelywithappropriatepermitapprovals.However,thelifeoftheproposedprojectforCEQApurposeswouldbecoterminouswiththetermoftheCUPrequiredforitsoperation

Theultimatedecommissioningandremovaloftheproposedprojectwouldbesimilartothedecommissioningandremovalofexistingwindfarmcomponentsthatwouldbeundertakenpriortoconstructionofrepoweredfacilities,exceptthatconsiderablyfewerturbineswouldberemoved.Inaddition,existingserviceroadswouldbeused.Nonewaccessroadswouldberequired,andnoroadsextantatthattimeareexpectedtorequirewidening.

Decommissioningwouldinvolveremovingtheturbines,transformers,substations,foundationsandrelatedinfrastructuretoadepthof3feetbelowgrade.Asinglelargecranewouldbeusedtodisassembletheturbines,andsmallercraneswouldliftthepartsontotruckstobehauledaway.Generally,turbines,electricalcomponents,andtowerswouldeitherberefurbishedandresoldorrecycledforscrap.Allunsalvageablematerialswouldbedisposedofatauthorizedsitesinaccordancewithfederal,state,andlocallaws,regulations,ordinances,andadoptedCountypoliciesineffectatthetimeoffinaldecommissioning.Followingremovaloftheequipmentandstructures,adozerwouldbeusedtospreaddirtoverthefoundations.Roadreclamationwouldbeaccomplishedusingscrapersandgraveltrucks.SitereclamationafterdecommissioningwouldbesubjecttoaCounty‐approvedreclamationplan(CountyCodeArticle88‐3.8).Basedonsite‐specificrequirements,thereclamationplanwouldincluderegrading,spotreplacementoftopsoil,andrevegetationofdisturbedareaswithanapprovedseedmix.

2.6.2 Patterson Pass Project 

Project Location and Land Ownership 

ThePattersonPassWindFarmRepoweringProject(PattersonPassProject)wouldentailrepoweringoftheexisting21.8MWwindfarm,permittedunderCUPC‐8263,ENXCO,Inc./PattersonPassFarms,ownedbyPattersonPassWindFarm,LLC(PattersonPass).Theexistingwindfarmoriginallycomprised336NordankandBonus65kWturbines,ofwhich317turbinesremainoperational.ThePattersonPassProjectisdepictedinFigure2‐11.

Page 40: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐40 

October 2014ICF 00323.08

 

AccesstothePattersonPassProjectwouldbethroughexistingprivategates,likelyfromPattersonPassRoad,JessRanchRoad,orboth.

Project Need, Goals, and Objectives 

TheprojectobjectiveistorepowertheexistingPattersonPassWindFarmonprivatelandownedbyEDFREanddevelopa19.8MWcommerciallyviablewindenergyfacilitythatwoulddeliverrenewableenergytothePG&E/CAISOpowergridtomeetthestate’sRPSgoals.PattersonPassWind,LLCanditsparentcompanyEDFREwerepartytothe2007SettlementAgreementdescribedabove;theproposedrepoweringwouldfulfillEDFRE’sobligationsunderthatagreement.

Theproposedprojectelementsarelistedbelow.

Atotalnameplategenerationcapacityofupto19.8MW.

Removalofexistingwindturbinesandinstallationof8–12newwindturbinegenerators,towers,foundations,andpad‐mountedtransformerstomeetmilestonessetforthintheproject’spowerpurchaseagreement.

Developmentofprojectroadsandinstallationofapowercollectionsystemasnecessary.

Useofexistingelectricalpowertransmissionlinestoconveythewindenergyproducedbytheprojecttolocalandregionalenergymarkets.

Useofexistingroadsthatprovideaccessthroughoutmuchoftheprogramarea.

Useofexistingsubstationandswitchyard(withpotentialupgradesoftheexistingequipmentwithinthefootprintoftheexistingfacility).

UseoftheexistingO&Mfacilityandothersupportfacilitiesadjacenttotheprojectareathatareavailableforprojectutilizationandthatwillcontinuetoreceivepowerfromthesubstationduringtherepoweringprocess.

Existing Facilities 

ThePattersonPassWindFarm,commissionedin1984,hasbeenoperationalfor27years.Itcomprisesthreeparcels,totalingapproximately952acres,whollyownedbyPattersonPass,asubsidiaryofEDFRE(Table2‐4).Thelocationoftheprojectandthedistributionoftheexistingfirst‐generationturbinesareshowninFigure2‐11.

Table 2‐4. Patterson Pass Project Parcels 

Assessor’sParcelNumber ApproximateAcres

099A‐1800‐001‐00 617.8

099A‐1800‐002‐01 148.7

099B‐7985‐001‐02 185.4

Operation and Maintenance 

TheexistingPattersonPassO&Mbuilding,encompassingapproximately4,600squarefeet,housesmaintenanceequipment,sparepartsinventories,collection/communicationsystemsequipment,andthewindfarmcontrolcenter.

Page 41: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐41 

October 2014ICF 00323.08

 

Thewindfarmisstaffed5daysaweek,8hoursaday,withweekendmonitoring.Mostexistingwindturbinesarefittedwithcontrolsystemsattheturbinetowers;thesesystemsareincommunicationwitharemote,centralizedcontrolcenter,connectedtotheOpto‐22SCADAsystemtocollectdata.Additionally,eachturbinefunctionsasastandaloneunit.

ThewindturbinecontrolandmonitoringsystemsutilizecommunicationlinesthatgenerallyrunparallelwiththecollectionsystemlinesandconnectbacktothePattersonPassO&MbuildingthroughtheOpto‐22SCADAsystem.

Turbine Foundations 

Theexistingturbinefoundationsareconcrete,singlespreadorpierfoundationssupportingtubulartowers.Eachfoundationhasafootprintofapproximately20by20feet.

Access Roads 

AccesstotheprojectareaisthroughlockedgatesfromCountyandprivateroads(PattersonPassRoadandJessRanchRoad,respectively).Intheprojectarea,mainaccessroadsconnectturbinestrings,andspurroadsbranchfromthemainaccessroadstoindividualturbinesandotherfacilities.

Collection System 

ElectricityiscollectedfromeachwindturbineandtransmittedtotheADCCsubstation,whereitsvoltageisincreasedforinterconnectionwithPG&E’stransmissionlines,whichtraversetheprojectarea.Thecollectionsystemincludespad‐mountedtransformers,undergroundcables,overheadcablesonapproximately100woodenpoles,assortedcircuitbreakersandswitches,electricalmetering/protectiondevices,andtheADCCsubstationitself.ExistingcollectionlinesintheprojectareaareownedbyPattersonPass.ThePattersonPassProjectconnectsdirectlywithPG&EthroughtheADCCsubstationtothe330kVAtransmissionlines.

Meteorological Towers 

Approximately13meteorologicaltowers,18–80meters(60–263feet)tallarepresentonsite.Thesetowersmonitorandrecordmeteorologicaldatasuchaswindspeed,winddirection,andatmosphericpressure.Uptotwoexistingtowerswillbeutilizedasthetwopermanentmeteorologicaltowersfortheproposedproject.Allotherexistingmeteorologicaltowerswillberemovedduringdecommissioningorconstruction.

Proposed Project 

Theproposedprojectcomponentsaredescribedbelow.Theproposedprojectwouldentailthreephases:decommissioningandremovaloftheexistingwindfarmfacilities,constructionoftheproposedPattersonPassProject,andoperationoftheproposedproject.AconceptuallayoutoftheproposedprojectisshowninFigure2‐11.

Decommissioning the Existing Facilities 

Decommissioningtheexistingprojectwouldrequireremovalofthewindturbinenacelles,blades,towers,andotherfacilities.Somefacilities—suchastheO&Mbuilding,substation,andone80‐metermeteorologicaltowers—wouldberetainedandmaybeupgradedasnecessary.TheO&Mfacilitywouldcontinuetooperateinsupportoftherepoweringproject.Ingeneral,otherfacilitiesfromthe

Page 42: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐42 

October 2014ICF 00323.08

 

existingprojectthatcouldnotbereused—suchascollectionlines,someaccessroads,andturbinefoundations—wouldberemovedwherefeasibleandinalignmentwithresourceagency(USFWSandCDFW)recommendations.Allremovalactivitieswouldbecarriedouttominimizedisturbance.Itisanticipatedthatexistingroadsmaybeleftinplacetominimizedisturbance(withupgradesasnotedbelow).Equipmentthatcannotbesalvagedwouldbedisposedofataproperlylicensedlandfill.AlistofexistingstructuresandturbinesthatmayberemovedisshowninTable2‐5.

Table 2‐5. Structures to be Decommissioned 

Component Quantity Size

Windturbines

Turbinerotorstoberemoved 324 7.5‐meterblades

Turbines/towerstobedisassembled 128 60ft

Turbines/towerstobedisassembled 196 80ft

Nordtank65 118 80ft

Bonus65 206 80ft

Turbines/towerstoberemoved 128 60ft

Turbines/towerstoberemoved 196 80ft

Turbinefoundationstobeburied 336 20by20ft

Downtowerboxremoved n/a

Downtowerboxfoundationburied n/a

ElectricalEquipment

Transformersremoved 46 500kVA

Transformerfoundationsburied 46 13.5by10ft

Electricalpoleswithequip(firesafetyclearingrequirement) 48

Riserpoles 67

ElectricalOHlinesremoved(includespoles)(miles) 3.1 21kVA

Undergroundpowerandcommunicationlines 21kVA(miles) 3.59 21kVA

Undergroundpowerandcommunicationlines480V(miles) 9.02 480Volt

MetTowers

Latticemettowers 5 60ft

Latticemettowers 1 80ft

Polemettowers 4 80ft

Polemettowers 2 120ft

Wind Turbines 

Theproposedturbineswouldbethree‐blade,upwindturbinesontubulartowers(Figure2‐2).Arangeofturbinesarebeingconsideredfortheproposedproject;eachwouldhaveanameplatecapacityof2.4–3.3MW,arotordiameterof90–125meters(295–410feet),towersupto84meters(276feet),andamaximumturbineheightof146meters(480feet).Forexample,theVestasV1123.3MWturbine,witha112‐meter(367–foot)rotordiameterand84‐meter(276‐foot)hubheight,turnsat16.1rpm.Thetubularsteeltowerswouldhaveinternalladderstothenacelle,thecolorof

Page 43: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐43 

October 2014ICF 00323.08

 

towersandrotorswouldbeneutralandnonreflective(e.g.,dullwhiteorlightgray),andnacelleswouldbecompletelyenclosedtominimizeperchingopportunities.

Eachturbinewouldinvolvea0.5‐acretemporarylaydownareatoaccommodateturbinecomponentsandtheequipmentnecessaryforturbineinstallation.Followinginstallation,thelaydownareaswouldberestoredtopreprojectconditions.

TurbineplacementwouldconformtothesetbackconditionsshowninTable2‐2.Allturbineswouldbesitednolessthanthreetimesthetotalturbineheight(i.e.,fromthegroundsurfacetothetipofthebladeinthe12o’clockposition)fromanydwellingunitand2.5timesthetotalturbineheightfromanypublicroad,trail,recreationarea,commercialorresidentialzoning,unlessinformationinareportpreparedbyaqualifiedprofessionalandverifiedbytheCountydemonstratesthatalessersetbackisadequate.Innocasewouldasetbacklessthan50%oftheestablishedsetbackbeallowed.

Temporary Staging Areas 

Theproposedprojectwouldlikelyrequireuptothreetemporarystagingareasencompassingatotalofupto10acres.Totheextentpossible,thelaydownareaswouldbelocatedinareaswithexistingturbinesandaccessroadstominimizedisturbanceofnaturalhabitats.PattersonPasswouldusethestagingareasforstorageofturbinecomponents,constructionequipment,jobtrailers,andthematerialsneededforprojectconstruction.AccesstothetemporarystagingareaswouldbefromeitherPattersonPassRoadorJessRanchRoad.Uponcompletionofconstruction,thetemporarystagingareaswouldberemoved.

Foundations 

Thefreestandingtubulartowerswouldbemountedonsteelandconcretefoundations.Twotypesarebeingconsidered:theinvertedTspreadfootingandthetensionlesspierfooting(Figure2‐4).Foundationswouldbedesignedinconsiderationofsite‐specificconditionsandthedesignengineer’srequirements.Oncethefoundationisconstructed,theturbinetowerswouldbeanchoredtothebasewithlongsteelbolts.Theareasurroundingeachfoundationwouldberestoredbybackfilling,compacting,andburyingthefoundation.Followingbackfilling,thefoundationpedestalwouldstandapproximately1footabovethesurroundinggrade.

Roadway Improvements 

Theproposedprojectwouldrequireupto7milesofprivateonsiteaccessroads(Figure2‐11).Duringconstruction,accessroadswouldbegradedandtemporarilygraveleduptoawidthof35feettoallowsufficientspacefortwolanesoftravelandtofacilitatemovementoflargeequipment(e.g.,cranes,turbinecomponents).Cutandfillnecessaryforroadconstructionwouldbebalancedonsite.Nosoilwouldbeimportedorexportedforroadconstruction.Gravelforconstructionofnewroadswouldbetruckedinfromanexistingsourceandwouldbecompactedtoformastableroadsurface.Totheextentpossible,existingaccessroadswouldbereused;howevertheexistingroadswereconstructedtoaccommodatemuchsmallerfirst‐generationturbines,andinmanycasesarenotadequatetosupportconstructionoroperationofthenewproject.

Afterconstruction,theroadedgeswouldberestoredandreseeded,whereappropriate,andthewidthoftheroadswouldbereducedto16feetforcontinueduseduringO&Mactivities.

Page 44: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐44 

October 2014ICF 00323.08

 

AccesstotheprojectareawillbefromPattersonPassRoadatthesouthernportionoftheprojectareaandfromJessRanchRoadatthenortheastcorneroftheprojectarea.ImprovementstoPattersonPassRoad(straightening,widening,orimprovingtheturnintotheprojectarea)maybenecessarytofacilitatethedeliveryofturbinesandassociatedparts.TheseimprovementswouldbeundertakenwithintheexistingCountyrightofwayand/orwithintheprojectarea,whichabutsPattersonPassRoad.ImprovementstoJessRanchRoad(wideningtheexistingturn)mayalsoberequiredtofacilitatetheturnintotheprojectarea.

AnewaccessroadwouldbeconstructedfromJessRanchRoad(showningreeninFigure2‐11).Thismodifiedalignmentwouldavoidbothwetlandsandoccupiedburrowingowlhabitatandwouldbebuiltregardlessofwhichoftheadditionalthreeroadoptions(discussedbelow)isselected.

Threeroadwayoptionsarebeingconsideredtoreduceonsitegrading,ofwhichonlyonewouldbeselected.Option1(showninpurpleinFigure2‐11)wouldbeapproximately4,562feetlongandwasconsideredasthelikelyoptionintheDraftPEIR.Option1wouldresultinthemostdisturbance.Option2(showninblueinFigure2‐11)wouldbeapproximately2,719feetlongandwouldentailimprovinganexistingroadfromthenorththroughtheGoldenHillsprojectarea.(TheproponentoftheGoldenHillsProjectproposesimprovementofthisexistingaccessroadaspartoftheGoldenHillsProject,asshowninFigure2‐10oftheDraftPEIR.)ForOption2,approximately350feetofnewroadwaywouldbeconstructedtoconnecttheGoldenHillsprojectareatothePattersonPassprojectarea.Option3,approximately2,312feetlong,wouldbypassburrowingowlhabitatandwouldconsequentlyresultinfewerimpactsthanOption1.Option3wouldlikelybeselectedifaccessrightsforOption2cannotbeobtained.BothOptions2and3wouldcreatefewertemporaryandpermanentimpactsthanOption1,whichwasanalyzedanddisclosedintheDraftPEIR;accordingly,selectionofeitheroptionwouldnotresultinanynewsignificantimpacts.

Power Collection System 

Electricalcollectionlinesfortheproposedprojectwouldbeundergroundfromeachturbinesitetotheexistingsubstation.Theburiedcablesystemmayincludejunctionboxesthatwouldhousecablesplicesandallowaccesstothecableforanyneededmaintenanceorrepairs.Thecablesbeburiesusinganopentrenchingmethodorwouldbeinstalledusinghorizontaldirectionaldrilling(HDD)technology.Thecableswouldbeburiedapproximately36–48inchesdeep.TheconceptuallayoutofthepowercollectionsystemisshowninFigure2‐11.Thetemporarydisturbanceareaforcableinstallationwouldbeminimizedtotheextentfeasible;itwouldtypicallybeapproximately20feetwideinmostlocations.

ThepowercollectionsystemwouldconnecttotheexistingADCCsubstation,andthenthroughtheshortexistinggen‐tieoverheadlineintotheexistingPG&Etransmissionlinesthattraversetheprojectarea.Becausetheproposedprojectwouldhaveelectricalgenerationcapacitysimilartothatoftheexistingproject,nosubstantialmodificationstothesubstation(outsidetheexistingfenceline)orPG&Etransmissionlineareanticipated.Someminorequipmentimprovementswithintheexistingsubstationfootprintmaybecompletedtoreplaceoldequipmentortobringtheequipmentuptocurrentsafetyandoperationalstandards.Allworkwouldbeconductedwithinthegraveledfootprintoftheexistingsubstation.

Operations and Maintenance Facility and Other Project Elements  

Theproposedprojectwouldusetheexisting4,600‐square‐footO&Mbuilding.Operations,storage,andrepairswouldtakeplaceattheexistingfacility,whichwouldreceivepowerfromatemporary

Page 45: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐45 

October 2014ICF 00323.08

 

generatorduringthedecommissioningandconstructionphases.Uponcompletionofconstruction,theO&MfacilitywouldreceivepowerfromtheexistingpowerlinesonPattersonPassRoad.SomeexpansionoftheO&Mfacilitymaybenecessarytoaccommodateconstructionandnewsecurityrequirements.Portablerestroomswouldbeusedduringtheconstructionphase,andtheexistingO&MbuildingrestroomfacilitieswouldbeusedduringO&Mactivities.

Project Construction 

PattersonPasswouldbeginconstructionoftheproposedprojectaftercertificationofaFinalEIRandreceiptofallrequiredpermits.Construction,includingdecommissioningoftheexistingfacilities,wouldlikelyoccurearlyin2015andwouldconclude6–9monthslater.Typicalconstructionstepsarelistedbelow.

Demarcationofconstructionareasandanysensitivebiological,cultural,orotherresourcesneedingprotection.

Decommissioningoftheexistingwindfarm.

Disassemblyofexistingturbines.

Removaloffoundationsasrequiredfornewroadandturbineconstruction.

Restoration.

Constructionoftemporarystagingareas.

Gradingandroadconstruction.

Turbinefoundationconstruction.

Powercollectionsystemandcommunicationlineinstallation.

Turbineinstallation.

Upgradestothesubstation(asrequired).

Erosionandsedimentcontrol.

Finalroadconstruction.

Finalcleanupandrestoration.

TheconstructionofanyexpansionnecessaryattheexistingO&Mbuildingwouldnotdependonthesequenceofconstructionfortherestoftheproject.

Theconstructioncontractorswouldpreparetheprojectarea,deliverandinstalltheprojectfacilities,overseeconstruction,andcompletefinalcleanupandrestorationoftheconstructionsites.PattersonPasswouldimplementBMPsconsistentwithstandardpracticeandwiththerequirementsofthisEIRandanystateorfederalpermitstominimizesoilerosion,sedimentationofdrainagesdownslopeoftheprojectarea,andanyotherenvironmentalimpacts.Examplesoflikelyerosioncontrolmeasuresarelistedbelow.

Useofstrawwattles,siltfences/strawbaledikes,andstrawbalestominimizeerosionandcollectsediment(toprotectwildlife,nomonofilament‐coveredsedimentcontrolmeasureswouldbeused).

Re‐seedingandrestorationofthesite.

Page 46: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐46 

October 2014ICF 00323.08

 

Maintenanceoferosioncontrolmeasures.

Regularinspectionandmaintenanceoferosioncontrolmeasures.

ConstructiontrafficroutingwouldbeestablishedinaConstructionTrafficPlan,whichwouldincludeatrafficsafetyandsigningplanpreparedbyEDFREincoordinationwiththeCountyandotherrelevantagencies.Theplanwoulddefinehours,routes,andsafetyandmanagementrequirements.

Theconstructionactivitiesandtheapproximatedurationofeacharelistedbelow.

Phase1—Decommissioningofexistingplant:4weeks.

Phase2—Laydownarea:2weeks.

Phase3—Roadconstruction:16weeks.

Phase4—Foundations/electrical:12weeks.

Phase5—Turbinedeliveryandinstallation:12weeks.

Phase6—Electricaltrenching:14weeks.

Phase7—Cleanup:12weeks.

Project Decommissioning 

Theproposedprojectisassumedtohaveausefullifeofapproximately25–30years,basedoncurrentturbinedesignsandexpectedservicelife.Newtechnologymaybecomeavailableforanotherrepoweringoftheproposedprojectinthefuture.Decommissioningtheproposedprojectwouldrequireremovalofthewindturbinenacelles,blades,towers,andotherfacilities.Ingeneral,otherprojectfacilitiesthatcouldnotbereused—suchascollectionlines,someaccessroads,andturbinefoundations—wouldberemoved,exceptincaseswhereremovalwouldresultinsubstantialimpactsonterrestrialspeciesorhabitats(e.g.,someturbinefoundations,roads).Anyremovaloffacilitieswouldbeundertakentominimizedisturbance.

2.7 Other Future Projects and Applications SeveralpotentialrepoweringprojectswouldbeundertakenintheAPWRA.Atthistime,thereisnotenoughspecificdetailontheseprojectstoevaluatethemataprojectlevel.Table2‐6showsthenamesofeachoftheseprojects,andthenameplatecapacityofeachproject.

Page 47: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐47 

October 2014ICF 00323.08

 

Table 2‐6. Other Future Projects 

ProjectName NameplateCapacity(MW)

GoldenHillsPhase2(GoldenHills)a 41

SummitWind(AWI) 95

MulqueeneyRanch(Brookfield) 80

SandHillsWind(Ogin)a 34a GoldenHillsPhase2isaproposedprojectthatwouldbeevaluatedunderasubsequentCEQAdocument.Theprojectconsistsofapproximately24GeneralElectric1.7MWturbineson80‐metertowers.TheGoldenHillsPhase2CEQAdocumentisanticipatedforreleaseshortlyafterthecompletionoftheFinalPEIR.

b SandHillsWindisa34MWprojectcurrentlybeingevaluatedunderaseparateCEQAdocument.Althougha4MWpilotprojectusinganexperimentalturbinedesigniscurrentlyindevelopment,forthepurposesoftheprogram‐levelanalysisinthisPEIR,ithasbeenassumedthattheSandHillsprojectinitsentiretywouldbeconstructedusingconventionalfourth‐generationturbines.

2.8 References Cited AlamedaCounty.1998.DraftEnvironmentalImpactReport—RepoweringaPortionoftheAltamont

PassWindResourceArea.August.StateClearinghouse#98022024.Hayward,CA:AlamedaCountyCommunityDevelopmentAgency.

AlamedaCountyScientificReviewCommittee.2007.SRCSelectionofDangerousWindTurbines.P67.

———.2008a.SRCHazardousTurbineRatingList.P68.UpdatedMarch16,2008.

———.2008b.HazardousRatingScaleoftheSRC.P69.February1.Final.

———.2008c.GuidelinesforSitingWindTurbinesRecommendedforRelocationtoMinimizePotentialCollision‐RelatedMortalityofFourFocalRaptorSpeciesintheAltamontPassWindResourceArea.P70.February7.

Barclay,R.M.R.,E.F.Baerwald,andJ.C.Gruver.2007.VariationinBatandBirdFatalitiesatWindEnergyFacilities:AssessingtheEffectsofRotorSizeandTowerHeight.CanadianJournalofZoology85:381–387.

Brown,K.,K.S.Smallwood,andB.Karas.2013.VascoAvianandBatMonitoringProject2012–2013AnnualReport.Final.September.PreparedbyVentusEnvironmentalSolutions,Portland,OR.PreparedforNextEraEnergyResources,Livermore,CA.

ICFJones&Stokes.2009.AltamontPassWindResourcesArea48‐HourSearchIntervalBirdFatalityStudy.Draft.June.(ICF00904.08.)Sacramento,CA.PreparedforAltamontCountyCommunityDevelopmentAgency,Hayward,CA.

InsigniaEnvironmental.2009.2008/2009AnnualReportfortheBuenaVistaAvianandBatMonitoringProject.September4.Martinez,CA.PreparedforContraCostaCounty.

Kerlinger,P.,J.L.Gehring,W.P.Erickson,R.Curry,A.Jain,andJ.Guarnaccia.2010.NightMigrantFatalitiesandObstructionLightingatWindTurbinesinNorthAmerica.TheWilsonJournalofOrnithology122(4):744–754.

Page 48: Chapter 2 Program Description Program Location and Program ...€¦ · Program Description 2.1 Program Location and Program Area The program area is located in the Altamont Hills

Alameda County Community Development Agency  Program Description 

 

APWRA Repowering Final PEIR 2‐48 

October 2014ICF 00323.08

 

Smallwood,K.S.2008.AssessmentofRelocation/RemovalofAltamontPassWindTurbinesRatedasHazardousbytheAlamedaCountySRC.P103.

Smallwood,K.S.,andB.Karas.2009.AvianandBatFatalityRatesatOld‐GenerationandRepoweredWindTurbinesinCalifornia.JournalofWildlifeManagement73(7):1062–1071.

Smallwood,K.S.,andL.Neher.2010.SitingRepoweredWindTurbinestoMinimizeRaptorCollisionsattheTresVaquerosWindProject,ContraCostaCounty,California.April.Draft.PreparedfortheEastBayRegionalParkDistrict.