    Process selection Deciding on the way production of goods or

    services will be organized

    Major implications Capacity planning

    Layout of facilities

    Equipment Design of work systems

    Introduction

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    3/25

    6-3 Process Selection and Facility Layout

    Forecasting

    Product and

    Service Design

    Technological

    Change

    Capacity

    Planning

    ProcessSelection

    Facilities and

    Equipment

    Layout

    Work

    Design

    Figure 6.1

    Process Selection and System Design

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    4/25

    6-4 Process Selection and Facility Layout

    Key aspects of process strategy Capital intensive equipment/labor

    Process flexibility

    Adjust to changes

    Design

    Volume

    technology

    Process Strategy

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    5/25

    6-5 Process Selection and Facility Layout

    Job shop Small scale

    Batch

    Moderate volume

    Repetitive/assembly line

    High volumes of standardized goods or services

    Continuous

    Very high volumes of non-discrete goods

    Process Types

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    6/25

    6-6 Process Selection and Facility Layout

    Process Type

    Job Shop Appliance repairEmergency

    room

    Not

    feasible

    Batch Commercial

    bakeryClassroom

    Lecture

    Repetitive Automotiveassembly

    Automatic

    carwash

    Continuous

    (flow)

    Not

    feasible

    Oil refinery

    Water purification

    Figure 6.2

    ProductProcess Matrix

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    7/25

    6-7 Process Selection and Facility Layout

    Dimension

    Job variety Very High Moderate Low Very low

    Process

    flexibility

    Very High Moderate Low Very low

    Unit cost Very High Moderate Low Very low

    Volume of

    output

    Very High Low High Very low

    Figure 6.2 (contd)

    ProductProcess Matrix

    6 8 P S l ti d F ilit L t

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    8/25

    6-8 Process Selection and Facility Layout

    Automation: Machinery that has sensing andcontrol devices that enables it to operate

    Fixed automation

    Programmable automation

    Automation

    6 9 P S l ti d F ilit L t

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    9/25

    6-9 Process Selection and Facility Layout

    Computer-aided design andmanufacturing systems (CAD/CAM)

    Numerically controlled (NC) machines

    Robot Manufacturing cell

    Flexible manufacturing systems(FMS)

    Computer-integrated manufacturing (CIM)

    Automation

    6 10 P S l ti d F ilit L t

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    10/25

    6-10 Process Selection and Facility Layout

    Layout: the configuration of departments,work centers, and equipment, with particular

    emphasis on movement of work (customers

    or materials) through the system

    Facilities Layout

    6 11 P S l ti d F ilit L t

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    11/25

    6-11 Process Selection and Facility Layout

    Requires substantial investments of moneyand effort

    Involves long-term commitments

    Has significant impact on cost and efficiencyof short-term operations

    Importance of Layout Decisions

    6 12 P S l ti d F ilit L t

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    12/25

    6-12 Process Selection and Facility Layout

    Inefficient operations

    For Example:

    High Cost

    Bottlenecks

    Changes in the design

    of products or services

    The introduction of new

    products or services

    Accidents

    Safety hazards

    The Need for Layout Decisions

    6 13 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    13/25

    6-13 Process Selection and Facility Layout

    Changes inenvironmental

    or other legal

    requirements

    Changes in volume of

    output or mix of

    products

    Changes in methodsand equipment

    Morale problems

    The Need for Layout Design (Contd)

    6 14 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    14/25

    6-14 Process Selection and Facility Layout

    Product layouts

    Process layouts

    Fixed-Position layout

    Combination layouts

    Basic Layout Types

    6 15 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    15/25

    6-15 Process Selection and Facility Layout

    Product layout Layout that uses standardized processing

    operations to achieve smooth, rapid, high-volume flow

    Process layout Layout that can handle varied processing

    requirements

    Fixed Position layout Layout in which the product or project remains

    stationary, and workers, materials, andequipment are moved as needed

    Basic Layout Types

    6 16 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    16/25

    6-16 Process Selection and Facility Layout

    Raw

    materials

    or customer

    Finished

    item

    Station

    2

    Station

    3

    Station

    4

    Material

    and/or

    labor

    Station

    1

    Material

    and/or

    labor

    Material

    and/or

    labor

    Material

    and/or

    labor

    Used for Repetitive or Continuous Processing

    Figure 6.4

    Product Layout

    6 17 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    17/25

    6-17 Process Selection and Facility Layout

    High rate of output Low unit cost

    Labor specialization

    Low material handling cost

    High utilization of labor and equipment

    Established routing and scheduling

    Routing accounting and purchasing

    Advantages of Product Layout

    6-18 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    18/25

    6-18 Process Selection and Facility Layout

    Creates dull, repetitive jobs Poorly skilled workers may not maintain

    equipment or quality of output

    Fairly inflexible to changes in volume Highly susceptible to shutdowns

    Needs preventive maintenance

    Individual incentive plans are impractical

    Disadvantages of Product Layout

    6-19 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    19/25

    6-19 Process Selection and Facility Layout

    Can handle a variety of processingrequirements

    Not particularly vulnerable to equipment

    failures Equipment used is less costly

    Possible to use individual incentive plans

    Advantages of Process Layouts

    6-20 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    20/25

    6 20 Process Selection and Facility Layout

    In-process inventory costs can be high Challenging routing and scheduling

    Equipment utilization rates are low

    Material handling slow and inefficient

    Complexities often reduce span of supervision

    Special attention for each product or customer

    Accounting and purchasing are more involved

    Disadvantages of Process Layouts

    6-21 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    21/25

    6 21 Process Selection and Facility Layout

    Line Balancing is the process of assigning

    tasks to workstations in such a way that

    the workstations have approximately

    equal time requirements.

    Design Product Layouts: Line Balancing

    6-22 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    22/25

    6 22 Process Selection and Facility Layout

    Cycle time is the maximum time

    allowed at each workstation tocomplete its set of tasks on a unit.

    Cycle Time

    6-23 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    23/25

    6 23 Process Selection and Facility Layout

    Percent idle time =Idle time per cycle

    (N)(CT)

    Efficiency = 1 Percent idle time

    Calculate Percent Idle Time

    6-24 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    24/25

    6 24 Process Selection and Facility Layout

    Assign tasks in order of most following

    tasks.

    Count the number of tasks that follow

    Assign tasks in order of greatest positional

    weight.

    Positional weight is the sum of each tasks

    time and the times of all following tasks.

    Some Heuristic (intuitive) Rules:

    Line Balancing Rules

    6-25 Process Selection and Facility Layout

  • 7/28/2019 Chap006_Process Selection & Facility Layout

    25/25

    6 25 Process Selection and Facility Layout

    Information Requirements:1. List of departments

    2. Projection of work flows

    3. Distance between locations

    4. Amount of money to be invested

    5. List of special considerations

    6. Location of key utilities

    Designing Process Layouts