  • 1 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Process Selection and Facility Layout

    CHAPTER

    6

  • 2 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Questions for Process Analysis

    and Design

    Is the process designed to achieve competitive advantage in terms of differentiation, response, or low cost?

    Does the process eliminate steps that do not add value?

    Does the process maximize customer value as perceived by the customer?

    Will the process win/keep orders?

  • 3 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Process Selection and System Design

    Forecasting

    Product and service design

    Capacity planning

    Facilities and Equipment

    Layout

    Work design

    Process selection

  • 4 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Types of Processes

    Job Shops - Small runs/variety Batch Processing - Similar groups Repetitive/Assembly - Discrete goods Continuous Processing - Bulk/no variety Projects - Nonroutine jobs

  • 5 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Repetitive Production

  • 6 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Continuous Production

  • 7 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Product-Process Lifecycle Matrix

    Flexibility-Quality Dependability-Cost

    Continuous Flow

    Assembly Line

    Batch

    Job Shop

    Low Volume One of a

    Kind

    Multiple Products,

    Low Volume

    Few Major

    Products, Higher Volume

    High Volume,

    High Standard-

    ization

    Commercial Printer

    Heavy Equipment

    Automobile Assembly

    Sugar Refinery

    Flexibility- Quality

    Dependability Cost

  • 8 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Automation/Technology Decisions Automation -- The substitution of technology for

    human activity Key Question -- How does technology fit

    strategically (appropriateness)? Four other questions managers must ask--

    What will new technology do and not do? What will new technology require? What will new technology cost (total/life cycle)? How certain are we of the answers above?

  • 9 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Automation Numerically controlled machines

    (NC) Robotics, Vision, Automatic ID Computer-aided design and

    manufacturing systems (CAD/CAM) Flexible manufacturing systems Computer-integrated

    manufacturing (CIM)

  • 10 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    The Need for Layout Decisions Inefficient operations For Example:

    High Cost Bottlenecks

    Changes in the design of products or services

    The introduction of new products or services

    Accidents

    Safety hazards

  • 11 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    The Need for Layout Designs (Contd) Changes in environmental or other legal requirements

    Changes in volume of output or mix of

    products

    Changes in methods and equipment

    Morale problems

  • 12 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Basic Layout Types

    Product Layouts Process Layouts Fixed-Position Combination Layouts Cellular Layouts

  • 13 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Basic Layout Types Product Layout

    Uses standardized processing operations to achieve smooth, sequential, rapid, high-volume flow (production/assembly lines)

    Process Layout By Department or Function. Flexibly handles

    varied processing requirements Fixed Position Layout

    Product or project stationary, and workers, materials, and equipment are moved to site as needed

  • 14 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Cellular Layouts

    Cellular Manufacturing

    Group Technology

    Flexible Manufacturing Systems

  • 15 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Cellular Layouts

    Cellular Manufacturing Machines grouped into cells to make

    families of items with similar processing requirements

    Group Technology Grouping items into part families based

    on design or manufacturing similarities

  • 16 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996 Ch 6 - 33 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e

    Flexible Manufacturing System

    Parts Finished goods

    Load Unload

    Computer control room

    Terminal

    Machine Machine

    Tools

    Conveyor

    Pallet

  • 17 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996 Ch 6 - 37 1998 by Prentice-Hall Inc Russell/Taylor Oper Mgt 2/e

    Components Of CIM

    CIM

    Product design

    Manufacture

    Process planning

    Systems management

    Robotics FMS NC/CNC/ DNC Cells

    and centers Automated inspection

    AGV, ASRS

    JIT/ kanban

    DSS/ES/ AI

    LAN, TOP, satellites

    TQM

    Bar codes, EDI

    MRP

    GT CAE CAD IGES, PDES, DMIS

    DFM

    Cellular manufacturing

    MAP, STEP

    CAD/CAM

    CAPP

  • 18 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Other Service Layouts

    Warehouse and Storage Frequency of use, item correlation

    Retail Customer needs, traffic pattern/flow

    Office Less flow dependent

  • 19 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Tools for Process Design

    Flow Diagrams Process Charts Time-Function/Process Mapping Service Blueprints

  • 20 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Production Process Flow Diagram

    Shipping

    Customer

    Customer sales representative

    take order

    Prepress Department (Prepare printing

    plates and negatives)

    Printing Department

    Collating Department

    Gluing, binding, stapling, labeling

    Polywrap Department

    Purchasing (order inks, paper, other

    supplies) Vendors

    Receiving

    Warehousing (ink, paper, etc.)

    Accounting

    Information flow Material flow

  • 21 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Time Function Map

    Customer

    Sales

    Production control

    Plant A

    Warehouse

    Plant B

    Transport

    Order Product

    Process Order

    Print

    Extrude

    Receive product

    Wait

    Move

    Wait Wait Wait

    Move

    Ord

    er

    Ord

    er

    WIP

    WIP

    WIP

    WIP

    Pro

    duct

    Prod

    uct

    Prod

    uct

    12 days 1 day 1 day 1 day 1 day 13 days 4 days 10 days 9 days

  • 22 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    SUBJECT: Request tool purchase

    Dist (ft) Time (min) Symbol Description

    lo D Write order

    o On desk 75 o D To buyer

    n D Examine = Operation; = Transport; o = Inspect; D = Delay; = Storage

    Process Chart Example

  • 23 IRWIN

    a Times Mirror Higher Education Group, Inc. company, 1996

    Service Blueprinting