5/13/2019 Page 1MTR Corporation

Challenges and lessons learnt from Typhoon

Mangkhut

Allan Fung, Infrastructure Maintenance Manger – East Rail Line and Ma On Shan Line

Page 2: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Agenda

5/13/2019 Page 2MTR Corporation

Preparation

Challenges

Lessons learnt

Staff appreciation

Page 3: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Preparation – Staff standby

5/13/2019 Page 3MTR Corporation

Rolling stock depot Infrastructure rapid response unit

Station back of house Control centre war room

Page 4: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Preparation – Gear up

5/13/2019 Page 4MTR Corporation

Screen mesh for road vehicle Tree team and contractor staff

Road – Rail Vehicle for light rail Recovery train for heavy rail

Page 5: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Preparation – while trains were still running

• Inspection from driving cab

• Sand bags at critical locations

• Elevated PPE for staff

• Enhanced customer care

5/13/2019 Page 5MTR Corporation

Page 6: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges – Tree falling on tracks

5/13/2019 Page 6MTR Corporation

Tree branches entangling the overhead lines Fallen trees blocking the tracks

Page 7: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges – Roads blocked

5/13/2019 Page 7MTR Corporation

• We were

basically

trapped en

route to the

incident

sites.

Page 8: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges – Extensive damage, long recovery

5/13/2019 Page 8MTR Corporation

• Recovery could only start at

around 19:40 of 17 Sep.

• The damage to the whole

network was very extensive.

Recovery extended to the

daytime of 18 Sep especially

on East Rail Line and Light

Rail.

• Tree trimming by arborists

during traffic hours.

• It took almost 2 days to

finish.

Page 9: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges – Upsurge of service demand

5/13/2019 Page 9MTR Corporation

• Crowd management

➢ KOT, TAW, SHT, TAP &

SHS

➢ Shuttle bus operation

➢ Police assistance

➢ Crossline manpower

support

➢ Over 4,000 station staff

have been mobilized

throughout Mangkhut’s

battering

Sheung Shui

Shatin

Tai Wai

Page 10: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges at East Rail Line

5/13/2019 Page 10MTR Corporation

EAL resumed train

service at 18:56

Page 11: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Challenges at Light Rail

5/13/2019 Page 11MTR Corporation

40 Fallen tree reports• Tin Shui Wai District : 15 locations • Tuen Mun District: 21 locations• Yuen Long District: 1 location• Corridor: 3 locations

8 Locations where OHL equipment was

damaged• Stop Siu Hei• Yau Oi Loop• Stop Ming Kum• Stop Lam Tei• Stop between Hung Shui Kiu and Tong Fong

Tsuen• Stop Wetland park• Stop Hang Mei Tsuen• Stop Shui Pin Wai

3 Flooding Area

Page 12: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Lessons Learnt

• More efficient tools, faster tree

cutting.

• Unmanned track vehicles,

strategic CCTV coverage etc,

avoid being kept in the dark

during typhoon no.9 and 10.

• Better coordination on partial

resumption of train service.

• Even better customer

communication, Traffic News.

• Feasibility study for “no tree

zone”.

5/13/2019 Page 12MTR Corporation

Page 13: Challenges and lessons learnt from Typhoon Mangkhut · 5/13/2019  · Agenda MTR Corporation 5/13/2019 Page 2 Preparation Challenges Lessons learnt ... KOT, TAW, SHT, TAP & SHS Shuttle

Staff Appreciation

5/13/2019 Page 13MTR Corporation

Typhoon staff deployment

Dept Engineering Station and

others

Total

No. of Staff 1,300 4,800 6,100

• Over 6,000 staff

deployed.

• Various appreciation

functions conducted.

• A video clip on MTR’s

Facebook to recognized

their effort.