Upload
haliem
View
215
Download
0
Embed Size (px)
Citation preview
CASE STUDY
CESAR-CHAVEZ SCHOOLIn February of 2005, the Cesar Chavez School saw an opportunity. They were paying high rent for space in a poorly retrofitted warehouse. They wanted an alternative that would provide a prime educational setting within the span of a few short months. Initially, they doubted that modular construction could provide the modern aesthetic that their urban surroundings. Our distributor (Innovative Modular Solutions), told the Chavez board, to their surprise, that a new building could be ready in time for the fall semester. A new school would save a year’s rent and could be custom designed to facilitate their unique educational goals. In a few short years, the building would have paid for itself in rent savings alone. The presentation drawings prepared by Whitley and Lee Stevens Architects allowed the board to “see” their new building and modify it to best suit their needs. The building now evokes pride in the neighborhood and in children who attend the gleaming facility.
Cesar-Chavez is a new charter school formed in Detroit. The charter serves a predominantly Latino population base and was formed to instill a sense of community, as well as encouraging academic and social pride amongst an at-risk youth population
KEY ACHIEVEMENTS
8 month construction time
Two story
Ceramic lavatories
Recessed lockers
Energy efficient heating system
Spacious classrooms
Serving you nationwide from South Whitley, IN (260) 723-5131 • Rochester, IN (574) 223-4934 • Marysville, WA (360) 653-5790& Leola, PA (717) 656-2081 • Visit us online at www.whitleyman.com
Cesar-Chavez School
PROJECT NAMECESAR-CHAVEZ SCHOOL LOCATIONDETROIT, MI
DEVELOPERINNOVATIVE MODULAR SOLUTIONSOF NAPERVILLE, IL
ARCHITECTLEE STEVENS (AIA) OF PORT HERON, MI
PROJECT TYPEPERMANENT-TWO-STORIESNON-COMBUSTIBLE MATERIALS
BUILDING SIZE:35,000 SQ.. FT.
K E Y FA C T S