2
CASE STUDY CESAR-CHAVEZ SCHOOL In February of 2005, the Cesar Chavez School saw an opportunity. They were paying high rent for space in a poorly retrofitted warehouse. They wanted an alternative that would provide a prime educational setting within the span of a few short months. Initially, they doubted that modular construction could provide the modern aesthetic that their urban surroundings. Our distributor (Innovative Modular Solutions), told the Chavez board, to their surprise, that a new building could be ready in time for the fall semester. A new school would save a year’s rent and could be custom designed to facilitate their unique educational goals. In a few short years, the building would have paid for itself in rent savings alone. The presentation drawings prepared by Whitley and Lee Stevens Architects allowed the board to “see” their new building and modify it to best suit their needs. The building now evokes pride in the neighborhood and in children who attend the gleaming facility. Cesar-Chavez is a new charter school formed in Detroit. The charter serves a predominantly Lano populaon base and was formed to insll a sense of community, as well as encouraging academic and social pride amongst an at- risk youth populaon KEY ACHIEVEMENTS 8 month construction time Two story Ceramic lavatories Recessed lockers Energy efficient heating system Spacious classrooms

Cesar-Chavez is a new charter school formed in Detroit ... · CESAR-CHAVEZ SCHOOL In February of 2005, the Cesar Chavez School saw an opportunity. They were ... The presentation drawings

  • Upload
    haliem

  • View
    215

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Cesar-Chavez is a new charter school formed in Detroit ... · CESAR-CHAVEZ SCHOOL In February of 2005, the Cesar Chavez School saw an opportunity. They were ... The presentation drawings

CASE STUDY

CESAR-CHAVEZ SCHOOLIn February of 2005, the Cesar Chavez School saw an opportunity. They were paying high rent for space in a poorly retrofitted warehouse. They wanted an alternative that would provide a prime educational setting within the span of a few short months. Initially, they doubted that modular construction could provide the modern aesthetic that their urban surroundings. Our distributor (Innovative Modular Solutions), told the Chavez board, to their surprise, that a new building could be ready in time for the fall semester. A new school would save a year’s rent and could be custom designed to facilitate their unique educational goals. In a few short years, the building would have paid for itself in rent savings alone. The presentation drawings prepared by Whitley and Lee Stevens Architects allowed the board to “see” their new building and modify it to best suit their needs. The building now evokes pride in the neighborhood and in children who attend the gleaming facility.

Cesar-Chavez is a new charter school formed in Detroit. The charter serves a predominantly Latino population base and was formed to instill a sense of community, as well as encouraging academic and social pride amongst an at-risk youth population

KEY ACHIEVEMENTS

8 month construction time

Two story

Ceramic lavatories

Recessed lockers

Energy efficient heating system

Spacious classrooms

Page 2: Cesar-Chavez is a new charter school formed in Detroit ... · CESAR-CHAVEZ SCHOOL In February of 2005, the Cesar Chavez School saw an opportunity. They were ... The presentation drawings

Serving you nationwide from South Whitley, IN (260) 723-5131 • Rochester, IN (574) 223-4934 • Marysville, WA (360) 653-5790& Leola, PA (717) 656-2081 • Visit us online at www.whitleyman.com

Cesar-Chavez School

PROJECT NAMECESAR-CHAVEZ SCHOOL LOCATIONDETROIT, MI

DEVELOPERINNOVATIVE MODULAR SOLUTIONSOF NAPERVILLE, IL

ARCHITECTLEE STEVENS (AIA) OF PORT HERON, MI

PROJECT TYPEPERMANENT-TWO-STORIESNON-COMBUSTIBLE MATERIALS

BUILDING SIZE:35,000 SQ.. FT.

K E Y FA C T S