54
CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science Directorate NASA Langley Research Center Hampton, VA 23681-2199 Science Systems and Applications, Inc (SSAI) One Enterprise Parkway Hampton, Virginia 23666

CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

  • Upload
    vudan

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES DMT to DAAC Production Requests YEAR 2008

by

CERES Data Management Team

Climate Sciences Branch Science Directorate

NASA Langley Research Center Hampton, VA 23681-2199

Science Systems and Applications, Inc (SSAI) One Enterprise Parkway

Hampton, Virginia 23666

Page 2: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 2

posted at: http://asd-www.larc.nasa.gov/ceres/dmt2daac/

Document Revision Record

IssueDate Release Number

DCCRa

Number Preparedb

by Description of Revision

Section Affected

1/23/08 R11V1 tbd ebg • Closed Aqua Edition2A SRBAVG requests (PRs 124-07, 125-07) • Added Terra Editon2F and Aqua Edition2C CRS and FSW requests (PRs 1-08 to 8-08) • Added Terra and Aqua Beta4W and Beta4C TSI requests (PRs 7-08 to 10-08) • Added Terra and Aqua Beta4W and Beta4C synoptic SARB requests (PRs 7B-08 to

10B-08)

Table 1:

2/25/08 R11V2 tbd ebg • Corrected ending date for Terra Edition2F FSW request (PR 1-08) • Comment related to Inst SARB processing applies to Aqua and not Terra. Removed

comment from request (PR 1-08 to 3-08) • Closed Aqua Edition2B CRS post processing for 2006 (PR 77-07) • Closed Aqua Edition2B SSF processing (PR 10-07 to 12-07) • Closed Aqua Edition2B SFC processing (PR 7-07 to 9-07) • Closed Aqua Edition2B CRS processing (PRs 84A-07 to 84D-07)

Table 1:

3/12/08 R11V3 tbd lhc • Added Aqua and Terra Beta1-Ed3 SSFI processing for seasonal months beg. 10/03 and January and July 06 (PRs 11-08 and 12-08, respectively)

• Changed cc5 value from “020029” to “020030” for PRs 01-08 through 06-08 • Closed PRs 1-06 and 2-06

Table 1: Table 2:

4/07/08 R11V4 tbd lhc • Added PRs 13-08 and 14-08 for Terra and Aqua Inversion Beta1-Ed3 • Closed PRs 3-08, 6-08, 90-0, 91-07, 92-07, 80-07, 90A-07, and 91A-07, and 130-07

through 135-07 • Corrected processing dates for 7-07 and 10-07 and added explanatory note in red in

comment section above those PRs • PR 133-07 Output PS was modified according to 3/26/08 note in comment section above

block of PRs • Added note to comments to turn on CloudVis file for PRs 11-08, 12-08, 132-07 • Added corrective note to PRs 92-07, 96-07, 132-07, 135-07, and 138-07 regarding

CloudVis flag • Added PRs 15-08 and 16-08 to reprocess selected days through Clouds for the evaluation

of the sample GMAO G5 data • Ending dates added for PRs 1-02 and 2-06

Table 1:

Table 2:

Page 3: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 3

Document Revision Record

IssueDate Release Number

DCCRa

Number Preparedb

by Description of Revision

Section Affected

6/09/08 R11V5 tbd lhc • Closed PRs 73-07, 91-08, 15-08, 16-08, 12-08, 11-08, 10-08, 10B-08, 9-08, 9B-08, 8-08, 8B-08, 7-08, 7B-08, 5-08, 4-08, 129-07, 136-07, 137-07, 138-07

• Closed PRs 108-07 through 113-07 for Subsystem 10 to be reopened at a later date • Added PRs 17-08, 18-08, 19-08, 20-08 to process ISCCP-D2like (PGE 9.0P1) for FM1,

FM2, FM3, and FM4 • Added PRs 21-08 through 35-08 for Instrument Subsystem validation (ValR10-Ed2)

processing through Instrument and ERBE-like • Added PRs 36-08 through 44-08 for ValR11 runs for gains and SRF through August

2007

Table 1:

6/18/08 R11V6 tbd lhc • Corrected date for PR 40-08 from 09/07 to 08/07 • Added date to Revision history table for 6/09/08 • Corrected Instrument column value for PR 23-08 “FM1, FM2, FM3” to “FM4” • Corrected Output PS for PRs 21-08 thru 24-08 from “ValR10” to “ValR10-Ed2” • Corrected Input PS for PRs 21-08 and 22-08 from “ValR10” to “ValR10-Ed2”

Table 1:

6/23/08 R11V7 tbd lhc • Added PR 45-08 to process 1 day of latest G5 sample data through Clouds • Closed PRs 36-08 through 44-08, 4-08, 129-07 • Changed PRs 11-08 and 12-08 to indicate still open instead of closed

Table 1:

6/27/08 R11V8 tbd lhc • Added PRs 46-08 through 52-08 Table 1:

7/16/08 R11V9 tbd lhc • Added PRs 53-08 through 64-08 • Closed PRs 128-07 and 45-08 • Reinstated “on hold” comment for PRs 21-08 through 35-08 • 7/9/08 – changed PS4_1 for PRs 63-08 and 64-08 from Edition2B to Edition1B-MIGBP• 7/16/08 – Changed output PS for PRs 61-08 and 60-08 from “Ed2-NoSW” to Ed2C-

NoSW”

Table 1:

Page 4: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 4

Document Revision Record

IssueDate Release Number

DCCRa

Number Preparedb

by Description of Revision

Section Affected

7/21/08 R11V10 tbd lhc • Closed PRs 46-08 through 52-08, 127-07, 19-08, 1-08 • Added PRs 65-08 through 72-08 to process Beta4 and Beta5 SYN/AVG/ZAVG • Added PR 73-08 to process the Beta1 GGEO ISCCP-D2like • Added PRs 74-08 through 79-08 to process Beta10 and Edition2A GGEO from 11/05

through 08/07 • Changed PS2 and PS3 for PR 31-08 from “ValR10-Ed2” to “ValR10” • Added PRs 31-08B through 31-08D for ERBE-like ValR10 • Divided PRs 29-08 and 30-08 so that PGE CER1.2P1 has separate PRs for ValR10 • Removed “ON HOLD” note from PRs21-08 through 35-08 • 8/1/08 – Added “HOLD NOTICE” to comments for PRs 74-08 through 79-08 • 8/1/08 – Filled in CC numbers for cc4_0, cc9_3, and cc12 for PRs 74-08 through 79-08

Table 1:

9/26/08 R11V11 tbd lhc • Canceled further processing of PRs 11-08 and 12-08 • Canceled all processing for PRs 13-08, 14-08, 67-08, 68-08, 69-08, 71-08 • Corrected underscore typo in PS for PRs 60-08 and 61-08 from “_NoSW” to “-NoSW” • Closed PRs 126-07, 17-08, 18-08, 20-08 through 34-08, 60-08 through 62-08, 65-08, 66-

08 • Changed SCCR number affiliated with PRs 74-08 through 79-08 from 675 to 653 • Correct PR 57-08 to replace input “PS4_1” with “PS1” • Correct PRs 31-08D and 31-08E to change Cmdline arg from “M” to “N” • Added PRs 80-08 through 81-08, then canceled PR 81-08 • Modified PRs 70-08 and 72-08 to eliminate the April months already processed in SIT

and to add the remainder of the 2001 months

Table 1:

11/3/08 R11V12 tbd lhc • Closed PRs 58-08, 59-08, 72-08, 73-08, 81-08 • Put HOLD status on PRs 57-08, 56-08, and 55-08 • Added PRs 82-08, 83-08, and 84-08 to produce the Beta1 ISCCP-D2like-Day/Nit/GEO

products • Note added to DAAC verification column heading to use most recent CC# when one is

not provided

Page 5: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 5

Document Revision Record

IssueDate Release Number

DCCRa

Number Preparedb

by Description of Revision

Section Affected

12/08/08 R11V13 tbd lhc • Added PRs 89-08 through 92-08 for Ed2 G5-CERES MOA and PMOA (89-08 canceled)

• Added PRs 85-08 through 88-08 for Beta6 SYN/AVG/ZAVG • Placed 53-08 and 54-08 on hold for July 2007 forward • Canceled 74-08 to 79-08, to be requested at a more realistic time

12/31/08 R11V14 tbd lhc • Closed 90-07, 83-08, 85-08, 86-08, 87-08, 88-08, 90-08, 92-08

a. Document Configuration Change Request Number b. Prepared by: ebg - Erika Geier, NASA lhc – Lisa Coleman, SSAI

Page 6: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 6

CERES DMT to DAAC Production Requests, YEAR 2008

This set of tables serves as a format for requesting production activities from the CERES Data Management Team (DMT) to the Langley TRMM/Terra Information System (LaTIS). The organization of the requests is as follows: • CERES Data Processing Policy • Table 1:: Production Request for CERES Processing (PR) • Table 2:: Standing Production Request for CERES Misc. Processing (M-PR) • Table 3:: Standing Production Request for CERES Terra Processing (AM-PR) • Table 4:: Standing Production Request for CERES Aqua Processing (PM-PR) A Change bar (|) is used, on left side of document, to indicate changes since the last request. Note: Shaded boxes are completed Production Requests. All CERES Processing Requests should be referenced as: CERES PR’Item#’. Examples: CERES PR3-99 is Production Request 3 made in year 1999 and CERES PM-PR 4-01 is the 4th standing Aqua production request made in 2001.

CERES Data Processing Policy

Under normal circumstances, a Data Month must be processed with a unique Software Code. If an emergency Software Code Fix must be made in the middle of a processing month, all days previously processed must be reprocessed to maintain consistency of the data.

Page 7: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 7

CERES Production Requests, YEAR 2008 RP = Runtime Parameter.

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

12/3/08 – Process overlap data for G5-CERES (SCCRs 686 for MOA and 684 for PMOA) NOTE: The available data months to run at this time are not those that correspond to currently planned Edition2 2008 processing. They are of the same format, however, and are suitable for the first production runs of the newly delivered Regrid MOA and PMOA PGEs. Computing Platform – Magneto P4 ENVIRONMENT VARIABLES For 12.1P1 For PR 90-08 Set G5Stream = 1 For PR 92-08 Set G5Stream = 2

cc12= assigned with latest promotion cc9_1= assigned with latest promotion

92-08 12.1P1 CERES PS12in=DAO-G5-CERES PS12out= DAO-G5-CERES

9/30/2007 12/31/2007 Done 12/31/08

91-08 9.1P1 CERES PS12= DAO-G5-CERES

PS9_1= DAO-G5-CERES

10/2007 11/2007

90-08 12.1P1 CERES PS12in=DAO-G5-CERES PS12out= DAO-G5re-CERES

10/01/2007 10/31/2007 Done 12/31/08

Page 8: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 8

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

89-08 9.1P1 CERES PS12= DAO-G5re-CERES

PS9_1= DAO-G5re-CERES

10/07 10/07 Cancel. 12/8/08

11/19/08 – Process SYN/AVG/ZAVG Beta6 SCCR 689 NOTE: April 2001 was originally processed thru TSI and SYNI at the SCF, so it must be processed in the Op environment before that month can run thru SS8 Computing Platform – Magneto P4 For 86-08 , use PS7_1 and PS7_2 =Beta5 except for months 1/01, 7/01, 10/01 when Beta4 is used For PR 86-08: Month -Instrument 01-FM1, 02-FM2, 03-FM2, 04-FM2, 05-FM1, 06-FM1, 07-FM1, 08-FM2, 09-FM2, 10-FM2, 11-FM1, 12-FM1

cc4_0= cc4_2= cc5= cc12= cc6= cc10= cc11= cc11_6= cc7_1= cc7_2=

cc8=assigned with latest promotion

88-08 7.1.1P1 FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A

PS7_1=Beta5 04/01 04/01 Done 12/14/08

87-08 7.2.1P1 FM2

PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5

PS7_2=Beta5 04/01 04/01 Done 12/16/08

86-08 8.1P1 FM1 or FM2

PS7_1=Beta5/Beta4 (see note) PS7_2=Beta5/Beta4(see note)

PS8=Beta6 01/01 12/01 Done. 12/22/08

Page 9: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 9

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

85-08 8.1P1 FM3 or FM4

PS7_1=Beta4/Beta5(Apr) PS7_2=Beta4/Beta5(Apr)

PS8=Beta6 07/02 (FM4) 10/02 (FM4) 1/03 (FM3) 4/03 (FM4)

07/02 10/02 1/03 4/03

Done. 12/23/08

11/03/08 – Process PGE CER9.0P1 (SCCR 672) to correspond with full Terra and Aqua Data record processed to date, and CER11.7P1 (SCCR 675) to correspond with GEO data record to date No need to reprocess Beta1 months already processed – see PRs 17-08 through 20-08 for months already processed through 9.0P Cross-track data only FM1: 5/2000 thru 7/2000,11/2000 thru 1/2001, 5/2001 thru 7/2001, 11/2001 thru 12/2005, 3/2006 thru 8/2007 FM2: 3/2000 thru 4/2000, 8/2000 thru 10/2000, 2/2001 thru 4/2001, 8/2001 thru 10/2001, 1/2006 thru 2/2006 FM3 = 7/02; 11/02 thru 1/03; 5/03 thru 7/03; 4/05 thru 12/07 FM4 = 7/02 thru 10/02; 2/03 thru 4/03; 8/03 thru 3/05 Computing Platform: Run on Magneto – ASDC P4

cc4_5= TerraEd2B: 026030, 027031 (7/04, 7/05) AquaEd2B: 034039 TerraEd2F: 027033

AquaEd2C: 034040 cc9=02303

cc11= cc11_7=

84-08 9.0P1 FM1, FM2 PS4_5=Edition2B/ Edition2F

PS9_0=Beta1 03/2000 ( see PRs 17-08 and 18-08 for months already processed)

08/2007

83-08 9.0P1 FM3, FM4 PS4_5=Edition2B/ Edition2C

PS9_0=Beta1 07/2002 ( see PRs 19-08 and 20-08 for months already processed)

08/2007 Done. 12/22/08

Page 10: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 10

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

83-08 9.0P1 FM3, FM4 PS4_5=Edition2B/ Edition2C

PS9_0=Beta1 07/2002 ( see PRs 19-08 and 20-08 for months already processed)

08/2007

82-08 11.7P1 Composite PS11=Edition2A PS11_7=Beta1 03/2000 (process months with corresponding GGEO data - except 07/02, 10/02, 01/03, &

04/03)

10/2005 (except 07/02, 10/02, 01/03, & 04/03)

Process ERBE-like Edition2 Combined Satelllite Process with instruments in crosstrack only These PRs should have been included with the suite of PRs 46-08 through 52-08

cc3=024031 cc3_2=024031

81-08 3.2P1 FM1+FM3 PS3=Edition2 (Terra) PS3=Edition2 (Aqua)

PS3_2=Edition2 1/07 8/07 Done. 10/17/08

80-08 3.2P1 FM2+FM3 PS3=Edition2 (Terra) PS3=Edition2 (Aqua)

PS3_2=Edition2 1/07 8/07 Cancel. 9/30/08

Page 11: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 11

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

07/21/08 – Process GGEO (SCCR 653) All input to PGE 11.1P10 must be in MCIDAS format Note: SFC input to GGEO must always be from the crosstrack instrument. FM1 is in crosstrack 11-12/05, 3/06 through 6/08 Use FM2 for 01-02/06 http://asd-www.larc.nasa.gov/dsnyder/Terra/ceres_info.html Note: These PRs correct usage of cc9 to now be cc9_3, consistent with the latest version of the Operator’s Manual 8/1/08 HOLD NOTICE: PRs 74-08, 75-08, and 76-08 are on hold until the Beta10 runs are approved PR 77-08 is on hold pending the availability of input products. As inputs become available, PR 77-08 may be processed

cc4_0=021022, 021023 cc9_3=023031 cc11= cc11_4= cc11_6= cc12=017027, 017028, 018029

79-08 11.1P10 11.1P10 11.1P10 11.1P10 11.1P10

11.1P10 11.1P10 11.1P10

11.1P10

METEO-5 METEO-7 METEO-8 METEO-9 MTSAT-1 GOES-09 GOES-10 GOES-11 GOES-12

PS4_0= NSIDC_NESDIS SS9_1=PS12= DAO-GEOS4

PS11_M=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time

78-08 11.2P2 Composite PS11_M=Beta10 PS11=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time

77-08 11.4P1 Composite PS11_M=Beta10 PS11_4=Beta10 11/05 8/07 12/8/08 - Cancel until more realistic time

Page 12: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 12

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

76-08 11.1P10 11.1P10 11.1P10 11.1P10 11.1P10

11.1P10 11.1P10 11.1P10 11.1P10

METEO-5 METEO-7 METEO-8 METEO-9 MTSAT-1 GOES-09 GOES-10 GOES-11 GOES-12

PS4_0= NSIDC_NESDIS SS9_1=PS12= DAO-GEOS4

PS11_M=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time

75-08 11.2P2 Composite PS11_M=Edition2A PS11=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time

74-08 11.6P1 Composite PS11=Edition2A PS11_6=Edition2A 11/05 8/07 12/8/08 - Cancel until more realistic time

07/21/08 – Process new PGE CER11.7P1 (SCCR 675)

cc11= cc11_7=

73-08 11.7P1 Composite PS11=Edition2A PS11_7=Beta1 07/02 10/02 01/03 04/03

07/02 10/02 01/03 04/03

Done. 10/7/08

Page 13: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 13

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

07/16/08 – Process Beta5 TISA TSI (SCCR 671) Process Synoptic SARB SYNI (SCCR 663, 662) Process SYN/AVG/ZAVG (SCCR 667) Rerunning Beta4 Aprils as Beta5, along with additional months, to test logic associated with the number of days of the month Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05.

Crosstrack Only

FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07

FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/0 ENVIRONMENT VARIABLES: Environment variable for synoptic SARB must be set as follows: SS7_2_MATCH = C4

cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1= cc7_2=004008 cc8=

Page 14: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 14

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

72-08 7.1.1P1 FM1, FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A

PS7_1=Beta5 04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04

04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04

Done. 10/9/08

71-08 7.1.1P1 FM3, FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A

PS7_1=Beta5 04/03 04/04 04/05

04/03 04/04 04/05

Canceled. 9/26/08. Processed at SCF

Page 15: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 15

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

70-08 7.2.1P1 FM1, FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5

PS7_2=Beta5 04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04

04/00 04/01 04/02 04/03 04/04 04/05 01/01 02/01 03/01 05/01 06/01 08/01 09/01 11/01 12/01 02/04

Done. 10/28/08

69-08 7.2.1P1 FM3, FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta5

PS7_2=Beta5 04/03 04/04 04/05

04/03 04/04 04/05

Canceled. 9/26/08. Processed at SCF

68-08 8.0P1 FM1, FM2 PS7_1=Beta5 PS7_2=Beta5

PS8=Beta5 04/00 04/01 04/02 04/03 04/04 04/05

04/00 04/01 04/02 04/03 04/04 04/05

Canceled. 9/25/08 To be processed at SCF

Page 16: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 16

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

67-08 8.0P1 FM3, FM4 PS7_1=Beta5 PS7_2=Beta5

PS8=Beta5 04/03 04/04 04/05

04/03 04/04 04/05

Canceled. 9/25/08 To be processed at SCF

07/16/08 – Process Beta4 SYN/AVG/ZAVG (SCCR 667) Crosstrack Only

FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01

FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07

FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/0

cc7_1= cc7_2=004007 cc8=

66-08 8.0P1 FM1, FM2 PS7_1=Beta4 PS7_2=Beta4

PS8=Beta4 7/00 Seasonal months EXCEPT April only

10/05 Done. 9/7/08

65-08 8.0P1 FM3, FM4 PS7_1=Beta4 PS7_2=Beta4

PS8=Beta4 7/02 Seasonal months EXCEPT April only

10/05 Done. 9/7/08

Page 17: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 17

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

06/24/08 Process Clouds and Inversion Edition2 for 2 years of Aqua (01/01/2004 through 12/31/2005) with special IGBP map (SCCR 673) PRIORITY NOTE: Special processing with “run-in-the-background” priority Process cross-track only for January 04 through February 05, FM3 for March through December 2005 Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure to use CERES_ECS–OA0063m_Aqua-MODIS_Edition1A and CER_ECS-OA0213m_Aqua-MODIS_Edition1A as clear sky maps as starting point Rename 01/01/2004 and 01/02/2004 CER_ECS-OA0063m_Aqua-MODIS_Edition1A and CER_ECS-OA0213m_Aqua-MODIS_Edition1A and start with the renamed ones. ENVIRONMENT VARIABLES

Note: Need to turn OFF CloudVis files: $ENV{‘CV’} = ‘n’; NEW! Need to set $ENV{‘MODIS_IGBP’}=’y’

cc12=most recent cc1=most recent cc4_0=most recent cc4_1=

cc4_2= cc4_3=

64-08 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM3, FM4 MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1=Edition1B PS4_1=Edition1B-MIGBP

01/01/2004 12/31/2005

63-08 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1

FM3, FM4 PS4_1=Edition1B PS4_1=Edition1B-MIGBP PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= Ed2C-MOD-C4-Land-IGBP

01/01/2004 12/31/2005

Page 18: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 18

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

06/24/08 Process Clouds, Inversion, SARB, and TISA-Gridding (SFC and FSW), Edition2 through September 2007 PRIORITY NOTE: Aqua processing through May 07 is the highest priority PR 55-08, 5-08, and 57-08 7/27/07 forward on hold pending resolution of mismatched MODIS input file Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps for 7/06 ValR13 run. Rename the 7/1/05 Edition1A CERES_ECS files and start with those. Do NOT use CERES_ECS start-up maps when running Edition1B, instead rename Edition1B maps and use those as starting point. Wrong CC number used for 4.5-6.2P2 and 4.5-6.4P1. Will rerun when remainder of 2007 is processed.

Note: Use Edition2A-QC clear-sky maps for Terra ENVIRONMENT VARIABLES

Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’; NEW! Need to set $ENV{‘MODIS_IGBP’}=’n’

cc12=most recent cc1=most recent cc4_0=most recent cc4_1=

cc4_2= cc4_3= cc2_4= cc4_8= cc4_9= cc4_10= cc9_1= cc9= cc9_3= cc9_4=

cc5= cc5_4= cc6= cc6_3=

cc9_1=

62-08 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM3, FM4 MODIS V005

PS1=Edition2/Ed2-NoSW PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1=Edition1B 1/1/07 9/01/07 Done. 9/3/08

Page 19: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 19

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

61-08 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1

FM3, FM4 PS1=Edition1B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5=Edition2C/Ed2C-NoSW

1/1/07

9/01/07 Done. 9/3/08

60-08 9.2P1 9.3P1 9.4P1

FM3, FM4 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2C/Ed2C-NoSW

PS9=Edition2C/Ed2C-NoSW

12/31/06 hour 12

9/1/07 hour 11 Done. 9/3/08

59-08 5.0P1 5.1P2 5.4P2

FM3 V005 MOD08

PS4_5=Edition2C PS5 = Edition2C PS12=DAO-GEOS4

PS5=Edition2C 1/01/07 8/31/07 Done. 10/1/08

58-08 6.1P1 6.2P1 6.3P1

FM3 PS4_5=Edition2C PS5=Edition2C PS9_1=PS12= DAO-GEOS4

PS6=Edition2C 1/01/07 8/31/07 Done. 10/2/08

57-08 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM1, FM2, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1= Edition2A-QC 1/1/07

9/01/07 11/3/08 – ON HOLD 7/27/07 forward

56-08 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM1, FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= Edition2F

1/1/07

9/01/07

11/3/08 – ON HOLD 7/27/07 forward

55-08 9.2P1 9.3P1 9.4P1

FM1, FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F

PS9= Edition2F 12/31/06 hour 12

9/1/07 hour 11 11/3/08 – ON HOLD 7/27/07 forward

54-08 5.0P1 5.1P1 5.4P1

FM1 V005 MOD08

PS4_5=Edition2F PS5 = Edition2F PS12=DAO-GEOS4

PS5=Edition2F 1/01/07 8/31/07 12/4/08 – ON HOLD 7/01/07 forward

Page 20: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 20

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

53-08 6.1P1 6.2P1 6.3P1

FM1 PS4_5=Edition2F PS5=Edition2F PS9_1=PS12= DAO-GEOS4

PS6=Edition2F 1/01/07 8/31/07 12/4/08 – ON HOLD 7/01/07 forward

06/24/08 Process Instrument and ERBE-like Edition2 through September 2007 with gains and SRF delivered 5/30/08 PRIORITY NOTE: Aqua processing through May 07 is the highest priority

cc1=most recent cc1_2= cc1_3= cc2= cc2_1=

cc3= 52-08 2.4P1 FM1, FM2

FM3 FM4*

cmdline arg = 12 PS2=Edition2 *PS2=Ed2-NoSW (FM4)

01/07 08/07 done. 6/27/08

51-08 1.3P3 FM1, FM2 FM3, *FM4

PS1=Edition1-CV *PS1=Ed1-CV-NoSW (FM4)

PS1_1=Edition2 *PS1_1=Ed2-NoSW (FM4)

1/1/07

9/01/07 Done. 7/4/08

50-08 1.2P1 FM1, FM2 FM3 *FM4

PS1=Edition2 *PS1=Ed2-NoSW (FM4)

PS1_1=Edition2 *PS1_1=Ed2-NoSW (FM4)

1/1/07

9/01/07 Done. 7/4/08

Page 21: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 21

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

49-08 2.2P1 FM1, FM2 FM3, *FM4

PS1=Edition2 PS2_1=NSIDC PS2_4=Edititon2 Cmdline arg = AFMT *PS1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)

PS2=Edition2 *PS2=Ed2-NoSW (FM4)

1/01/07

8/31/07

Done. 7/4/08

48-08 2.3P1 FM1, FM2 FM3, *FM4

PS1=Edition2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg = AFMT *PS1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)

PS2=Edition2 *PS2=Ed2-NoSW (FM4)

2/01/07 3/01/07 4/01/07 5/01/07 6/01/07 7/01/07 8/01/07 9/01/07

2/01/07 3/01/07 4/01/07 5/01/07 6/01/07 7/01/07 8/01/07 9/01/07

Done. 7/4/08

47-08 2.3P2 FM1, FM2 FM3, *FM4

PS1= Edition2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg = AFMT *PS2_1=Ed2-NoSW (FM4) *PS2_4=Ed2-NoSW (FM4)

PS2=Edition2 *PS2=Ed2-NoSW (FM4)

1/31/07 2/28/07 3/31/07 4/30/07 5/31/07 6/30/07 7/31/07 8/31/07

1/31/07 2/28/07 3/31/07 4/30/07 5/31/07 6/30/07 7/31/07 8/31/07

Done. 7/4/08

Page 22: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 22

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

46-08 3.1P1 FM1, FM2 FM3, *FM4

PS2=Edition2 *PS2=Ed2-NoSW (FM4)

PS3=Edition2 *PS3=Ed2-NoSW (FM4)

01/07 08/07 Done. 7/4/08

06/19/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, GEOS-4 MOA data Use DAO-TestSCF2-G5-CERES MOA created at SCF. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use Edition2A-QC clear-sky maps

Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;

cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036

cc4_2=028036

45-08 4.1-4.1P4 4.1-4.2P3

FM2 MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF2- G5-CERES

PS4_1= TestSCF2-G5-CERES

1/06/06 1/06/06

Done. 6/26/08

06/02/08 Validate Instrument and ERBE-like gains and SRF through September 2007 delivered 5/30/08

cc1=most recent cc1_2= cc1_3= cc2= cc2_1= cc3=

Page 23: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 23

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

44-08 2.4P1 FM1, FM2 FM3, FM4

PS1=ValR11 PS2_1=NSIDC cmdline arg = 12

PS2=ValR11 01/07 08/07

01/07 08/07

Done. 6/19/08

43-08 2.2P1 FM1, FM2 FM3, FM4

PS1=ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT

PS2=ValR11 1/01/07 4/30/07 8/01/07

1/31/07 6/01/07 8/31/07

Done. 6/16/08

42-08 2.3P1 FM1, FM2 FM3, FM4

PS1=ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT

PS2=ValR11 2/01/07 6/01/07 9/01/07

2/01/07 6/01/07 9/01/07

Done. 6/16/08

41-08 2.3P2 FM1, FM2 FM3, FM4

PS1= ValR11 PS2_1=NSIDC PS2_4=ValR11 Cmdline arg = AFMT

PS2=ValR11 7/31/07 8/31/07

7/31/07 8/31/07

Done. 6/16/08

40-08 3.1P1 FM1, FM2 FM3, FM4

PS2= ValR11 PS3= ValR11 9/07 08/07

09/07 08/07

Done. 6/16/08

39-08 1.2P1 FM4 PS1=ValR11 PS1_1=ValR11 1/1/07 4/30/07 7/31/07

2/01/07 6/01/07 9/01/07

Done. 6/16/08

38-08 1.2P1 FM1, FM2 FM3

PS1=ValR11 PS1_1=ValR11 1/1/07 4/30/07 7/31/07

2/01/07 6/01/07 9/01/07

Done. 6/16/08

37-08 1.3P3 FM4 PS1=Ed1-CV-NoSW

PS1_1=ValR11 1/1/07 4/30/07 7/31/07

2/01/07 6/01/07 9/01/07

Done. 6/16/08

Page 24: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 24

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

36-08 1.3P3 FM1, FM2 FM3

PS1=Edition1-CV

PS1_1=ValR11 1/1/07 4/30/07 7/31/07

2/01/07 6/01/07 9/01/07

Done. 6/16/08

05/20/08 Process validation of Instrument Subsystem delivery (SCCR 610) through ERBE-like ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs. CORRECTION 9/8/08 – PRs 31-08C and 31-08D Cmdline arg “M” changed to “N”

cc1= cc1_2= cc1_3= cc1_4= cc1_5= cc2= cc2_1= cc3=

35-08 2.4P1 FM1, FM2 FM3, FM4

PS1=ValR10-Ed2 PS2_1=NSIDC cmdline arg = A F M T

PS2=ValR10-Ed2 1/07

8/07 cancel

34-08 2.2P1 FM1, FM2 FM3, FM4

PS1=ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T

PS2=ValR10-Ed2 09/01/07 3/5/05 3/15/05 3/25/05

09/30/07 3/5/05 3/15/05 3/25/05

Done. 9/9/08

33-08 2.3P1 FM1, FM2 FM3, FM4

PS1=ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T

PS2=ValR10-Ed2 10/01/07 10/01/07 Done. 9/9/08

32-08 2.3P2 FM1, FM2 FM3, FM4

PS1= ValR10-Ed2 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T

PS2=ValR10-Ed2 8/31/07 8/31/07 Done. 9/9/08

Page 25: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 25

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

31-08D 2.2P1 FM1, FM2 FM3, FM4

PS1=ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T

PS2=ValR10 09/01/07 3/5/05 3/15/05 3/25/05

09/30/07 3/5/05 3/15/05 3/25/05

Done. 8/21/08

31-08C 2.3P1 FM1, FM2 FM3, FM4

PS1=ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T Cmdline arg=A F N T

PS2=ValR10 10/01/07 10/01/07 Done. 8/21/08

31-08B 2.3P2 FM1, FM2 FM3, FM4

PS1= ValR10 PS2_1=NSIDC PS2_4=Edition2 Cmdline arg=A F M T Cmdline arg=A F N T

PS2=ValR10 8/31/07 8/31/07 Done. 8/21/08

31-08 3.1P1 FM1, FM2 FM3, FM4

PS2= ValR10-Ed2 PS2=ValR10

PS3= ValR10-Ed2 PS3=ValR10

09/07 09/07 Done. 8/21/08

30-08 1.1P3 1.1P5 1.2P1

FM1, FM2 FM3

(PS1=>)

PS1=ValR10 8/31/07 3/5/05 3/15/05 3/25/05

10/1/07 3/5/05 3/15/05/ 3/25/05

Done. 8/21/08

30-08B 1.2P1 FM1, FM2 FM3

(PS1=>)

PS1=ValR10 8/31/07 3/5/05 3/15/05 3/25/05

10/1/07 3/5/05 3/15/05/ 3/25/05

Done. 8/21/08

Page 26: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 26

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

29-08 1.1P5 1.2P1

FM4 (PS1=>) PS1=ValR10 3/5/05 3/15/05 3/25/05

3/5/05 3/15/05 3/25/05

Done. 8/21/08

29-08B 1.1P5 1.2P1

FM4 (PS1=>) sat=SW_OFF, ic=OFF

PS1=ValR10 8/31/07

10/1/07

Done. 8/21/08

29-08C 1.2P1 FM4 (PS1=>) PS1=ValR10 3/5/05 3/15/05 3/25/05

3/5/05 3/15/05 3/25/05

Done. 8/21/08

29-08D 1.2P1 FM4 (PS1=>) sat=SW_OFF, ic=OFF

PS1=ValR10 8/31/07

10/1/07

Done. 8/21/08

28-08 1.3P2 FM1, FM2 FM3

PS1=ValR10

PS1_3=ValR10 09/07 09/07 Done. 8/21/08

27-08 1.3P2 FM4 PS1=ValR10

PS1_3=ValR10 09/07 09/07 Done. 8/21/08

26-08 1.3P1

FM1, FM2 FM3

PS1=ValR10

PS1_3=ValR10 09/01/07 09/30/07 Done. 8/21/08

25-08 1.3P1

FM4 PS1=ValR10 PS1_1=ValR10 09/01/07 09/30/07 Done. 8/21/08

24-08 1.3P3 FM1, FM2 FM3

PS1=ValR10

PS1_1=ValR10 PS1=ValR10-Ed2

3/5/05 3/15/05 3/25/05

03/05/05 03/15/05 03/25/05

Done. 9/9/08

23-08 1.3P3 FM1, FM2 FM3 FM4

PS1=ValR10

PS1_1=ValR10 PS1=ValR10-Ed2

3/5/05 3/15/05 3/25/05

03/05/05 03/15/05 03/25/05

Done. 9/9/08

22-08 1.2P1

FM4 PS1=ValR10 PS1=ValR10-Ed2

PS1=ValR10 PS1=ValR10-Ed2

3/5/05 3/15/05 3/25/05

03/05/05 03/15/05 03/25/05

Done. 9/9/08

Page 27: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 27

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

21-08 1.2P1

FM1, FM2 FM3

PS1=ValR10 PS1=ValR10-Ed2

PS1=ValR10 PS1=ValR10-Ed2

3/5/05 3/15/05 3/25/05

03/05/05 03/15/05 03/25/05

Done. 9/9/08

05/20/08 Process new TISA PGE 9.0P1 (SCCR 672) for Beta1 results This PGE was delivered to both warlock and magneto Cross-track data only Data Months with “*” have priority over data months without “*”. If the TISA Working Group decides the results from the “*” months are not of the quality hoped for, the remaining monhs will not need to be processed. Data Months with “**” are based on Edition2C (Aqua) or Edition2F (Terra) input data

cc9=023030 cc4_5= TerraEd2B: 026030, 027031 (7/04, 7/05) AquaEd2B: 034039 TerraEd2F: 027033 AquaEd2C: 034040

20-08 9.0P1 FM4 PS4_5=Edition2B (except for months with “**”) PS4_5=Edition2C (for months with “**”)

PS9_0=Beta1 *10/02 *04/03 01/04 01/05 **01/06 **07/06

10/02 04/03 01/04 01/05 01/06 07/06

Done. 7/20/08

19-08 9.0P1 FM3 PS4_5=Edition2B PS9_0=Beta1 *07/02 *01/03

07/02 01/03

Done. 7/18/08

18-08 9.0P1 FM2 PS4_5=Edition2B PS9_0=Beta1 04/00 04/00 Done. 7/19/08

Page 28: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 28

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

17-08 9.0P1 FM1 PS4_5=Edition2B (except for months with “**”) PS4_5=Edition2F (for months with “**”)

PS9_0=Beta1 *07/02 *10/02 *01/03 *04/03 **01/06 **07/06

07/02 10/02 01/03 04/03 01/06 07/06

Done. 7/18/08

04/07/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, GEOS-4 MOA data Use DAO-GEOS4 MOA created at ASDC. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use Edition2A-QC clear-sky maps

Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;

cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036

cc4_2=028036

16-08 4.1-4.1P4 4.1-4.2P3

FM2 MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1= Test-C5G4-CERES2

1/06/06 1/29/06

1/06/06 1/29/06

done. 4/08

Page 29: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 29

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

04/07/08 Process Cloud (SCCR 654 CERESlib SCCR 655) Evaluating GMAO G5 data – MODIS Collection5, G-5 MOA data MOA data were created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward Note: Use G5 MOA Clear-sky maps already generated for earlier G5 test runs (reference PR 135-07).

Note: Need to turn on CloudVis files: $ENV{‘CV’} = ‘y’;

cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036

15-08 4.1-4.1P4 4.1-4.2P3

FM2 MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES

PS4_1= Test-G5-CERES2

1/06/06 1/29/06

1/06/06 1/29/06

done. 4/18/08

Page 30: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 30

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

4/01/08 Process Inversion SSF (SCCR 666) Processing same months as Clouds to validate Beta1-Ed3 Run all of Inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed.

cc12=most recent (016023, 016025,

018029) cc2_4=most recent cc4_1 = Terra: 029037 Aqua: 031040 cc4_5 =

Terra: 029035 Aqua: 035040

cc4_8= Terra: 027033 Aqua: 034040

cc4_9= Terra: 026032 Aqua: 026035

cc4_10=023032 14-08 4.5-6.1P4

4.5-6.2P3 4.5-6.4P2

FM1, FM2 MODIS V005

PS4_1=Beta1-Ed3 PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 =NULL

PS4_5=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006

10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006

Canceled. 8/18/08

13-08 4.5-6.1P5 4.5-6.2P3 4.5-6.4P2

FM3, FM4 MODIS V005

PS4_1=Beta1-Ed3 PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 =NULL

PS4_5=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006

10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006

Canceled. 8/18/08

Page 31: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 31

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

2/29/08 Process Clouds SSFI (SCCR 658) Validating Beta1-Ed3 Four seasonal months beginning with October 2003 and also July 2006 to coincide with Calipso, and using MODIS Collection 5. January 2006 is processed with both Collection 4 and 5 at the request of the Inversion Team.

Use start-up maps supplied with delivery - For Terra: CER_ECS-SOA0160m_Terra-MODIS_StartUp_016000.XXXXMM For Aqua: CER_ECS-SOA0160m_Aqua-MODIS_StartUp_016000.XXXXMM where MM means month (01 --> Jan, 02--> Feb, so on) 4/2/08 correction - Turn on ClouVis files: $ENV{‘CV’} = ‘y’:

cc12=most recent (016023, 016025,

018029) cc1=most recent

(Terra: 028029, 030032, 031036 Aqua: 028029,

029030, 030032, 031036)

cc4_0P1=most recent (021021, 021022)

cc4_1P6, cc4_2, & cc4_3=

Terra: 029037 Aqua: 031040

12-08 4.1-4.1P6 4.1-4.2P4 4.1-4.2P5 4.1-4.3P3

FM1, FM2 MODIS V005

PS1=Edition2/Ed2-NoSW PS4_0=NSIDC-NESDIS PS12=DAO-GEOS4

PS4_1=Beta1-Ed3 10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006

10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006

Cancel further processing. 8/18/08

11-08 4.1-4.1P6 4.1-4.2P4 4.1-4.2P5 4.1-4.3P3

FM3, FM4 MODIS V005

PS1=Edition2/Ed2-NoSW PS4_0=NSIDC-NESDIS PS12=DAO-GEOS4

PS4_1=Beta1-Ed3

10/01/2003 1/01/2004 4/01/2004 7/01/2004 1/01/2006 7/01/2006

10/31/2003 1/31/2004 4/30/2004 7/31/2004 1/31/2006 7/31/2006

Cancel further processing 8/18/08

Page 32: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 32

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

1/22/08 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument TSI for the seasonal months (Jan, Apr, Jul, and Oct) for one year on the magneto cluster. Process Terra and Aqua crosstrack instrument synoptic SARB for one month on the cluster. Remember to set envrionment variable as follows: SS7_2_MATCH = C4 Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05

cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006

10-08 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A

PS7_1=Beta4c 1/01 seasonal months only

10/01 seasonal months only

Done. 5/9/08

10B-08 7.2.1P1 FM1 or FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4c

PS7_2=Beta4c 1/01

1/01

Done. 5/20/08

9-08 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A

PS7_1=Beta4c 1/03 seasonal months only

10/03 seasonal months only

Done. 5/9/08

Page 33: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 33

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

9B-08 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4c

PS7_2=Beta4c 1/03 1/03 Done. 5/21/08

1/22/08 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument for the seasonal months (Jan, Apr, Jul, and Oct) for one year on warlock Process Terra and Aqua crosstrack instrument synoptic SARB for one month on warlock. Remember to set envrionment variable as follows: SS7_2_MATCH = C4 Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05

cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006

8-08 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A

PS7_1=Beta4w 1/01 seasonal months only

10/01 seasonal months only

Done. 5/5/08

8B-08 7.2.1P1 FM1 or FM2 PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4w

PS7_2=Beta4w 1/01

1/01

Done. 5/27/08

Page 34: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 34

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

7-08 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A

PS7_1=Beta4w 1/03 seasonal months only

10/03 seasonal months only

Done. 5/5/08

7B-08 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4w

PS7_2=Beta4w

1/03 1/03 Done. 5/27/08

1/8/08 Promote SARB (SCCR 664) Process TISAgridding (SCCR 619). Do not proceed Edition2C until ValR11 files have been verified. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. MATCH data for this round of processing is MODIS collection 5 based, environment variable must be set, for all 3 SARB PGEs, as follows:SS5_MATCH = C5 Process CRS for crosstrack instrument ONLY FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05

cc12= most recent cc4_5= most recent cc5=020030 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent

6-08 5.0P1 5.1P2 5.4P2

FM3 V005 MOD08

PS4_5=Edition2C PS5 = ValR11 PS12=DAO-GEOS4

PS5=ValR11 5/06 5/06 done. 3/17/08

5-08 5.0P1 5.1P2 5.4P2

FM3 V005 MOD08

PS4_5=Edition2C PS5 = Edition2C PS12=DAO-GEOS4

PS5=Edition2C 5/1/06 12/31/06 Done. 4/28/08

4-08 6.1P1 6.2P1 6.3P1

FM3 PS4_5=Edition2C PS5=Edition2C PS9_1=PS12= DAO-GEOS4

PS6=Edition2C 5/1/06 12/31/06 Done. 4/28/08

Page 35: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 35

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

1/8/08 Process SARB (SCCR 664) Process TISAgridding (SCCR 619). Do not process Edition2F until ValR11files have been approved MATCH files for these runs are collection 5 based, environment variable must be set, for all 3 SARB PGEs, as follows: SS5_MATCH = C5 PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. Process Terra CRS and FSW for crosstrack instrument ONLY FM1 is crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05, 3/06 - 2/07 FM2 is crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01, 1/06 - 2/06

cc12= most recent cc4_5= most recent cc5=020030 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent

3-08 5.0P1 5.1P1 5.4P1

FM1 V005 MOD08

PS4_5=Edition2F PS5 = ValR11 PS12=DAO-GEOS4

PS5=ValR11 5/06 5/06 done. 3/17/08

2-08 5.0P1 5.1P1 5.4P1

FM1 V005 MOD08

PS4_5=Edition2F PS5 = Edition2F PS12=DAO-GEOS4

PS5=Edition2F 5/06 12/06 done

1-08 6.1P1 6.2P1 6.3P1

FM1 PS4_5=Edition2F PS5=Edition2F PS9_1=PS12= DAO-GEOS4

PS6=Edition2F 5/1/06 12/31/06 Done. 7/10/08

Page 36: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 36

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

12/17/07 Process Cloud (SCCR 654 CERESlib SCCR 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition1A CERES_ECS files and start with those. These runs are being requested in order to evaluate the Jan’06 G5-CERES. No need to do any testing in SI&T. These are not official CERES runs, but rather test runs.

4/2/08 Note: For PR 138-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;

cc12=999999 cc1=most recent cc4_0=most recent cc4_1=030039 cc4_2=030039 cc4_3 = 030039 cc2_4=most recent cc4_5=cc4_8= 034040 cc4_9=025034 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031

138-07 4.1-4.1P5 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM3 MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES

PS4_1= Test-G5-CERES1

1/06 1/06 Done. 3/23/08

137-07 4.5-6.1P3 4.5-6.2P2 4.5-6.4P1

FM3 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL

PS4_5= Test-G5-CERES1

1/06 1/06 Done. 3/23/08

Page 37: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 37

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

136-07 9.2P1 9.3P1 9.4P1

FM3 PS9_1=PS12=DAO- TestSCF-G5-CERES PS4_5= Test-G5-CERES1

PS9= Test-G5-CERES1

1/06 1/06 Done. 3/23/08

12/17/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition2-QC CERES_ECS files and start with those. These runs are being requested in order to evaluate the Jan’06 G5-CERES data. No need to do any testing in SI&T. These are not official CERES runs, but rather test runs. 3/26/08 - Note for Terra SFC G5 - the output production strategy for CER9.2P1 data are TestSCF-G5-CERES due to an operator error. The output PS was incorrectly changed from Test-G5-CERES1 to TestSCF-G5-CERES. The final outputs from the monthlies are Test-G5-CERES1.

4/2/08 Note: For PR 135-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;

cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036 cc4_3 = 028036 cc2_4=most recent cc4_5=cc4_8= 027033 cc4_9=025031 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031

Page 38: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 38

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

135-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM2, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES

PS4_1= Test-G5-CERES1

1/06 1/06 done. 3/18/08

134-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM2 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL

PS4_5= Test-G5-CERES1

1/06 1/06 done. 3/18/08

133-07 9.2P1 9.3P1 9.4P1

FM2 PS9_1=PS12=DAO- TeestSCF-G5-CERES PS4_5= Test-G5-CERES1

PS9= Test-G5-CERES1 (see 3/26/08 note in comments above for PGE 9.2P1)

1/06 1/06 done. 3/19/08

Page 39: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 39

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

12/17/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) MOA and PMOA data will be created on the SCF and delivered to the ASDC. There are no code deliveries to the ASDC capable of producing G5-CERES based MOA at this time. Purpose of this request is to evaluate the G5-CERES data provided by GMAO prior to GMOA beginning production for 12/97 forward. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps. Rename the Edition2-QC CERES_ECS files and start with those. These runs are being requested in order to evaluate the G5-CERES data. No need to do intense testing in SI&T. These are not official CERES runs, but rather test runs.

4/2/08 Note: For PR 132-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;

cc12=999999 cc1=most recent cc4_0=most recent cc4_1=028036 cc4_2=028036 cc4_3 = 028036 cc2_4=most recent cc4_8=027033 cc4_9=025031 cc4_10=022031 cc9_1=999999 cc9=022029 cc9_3=023031 cc9_4=022031

132-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM1, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-TestSCF- G5-CERES

PS4_1= Test-G5-CERES1

7/04 7/04 done. 3/23/08

131-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM1 PS4_1= Test-G5-CERES1 PS12=DAO-TestSCF- G5-CERES PS2_4=Edition2 PS4_7=NULL

PS4_5= Test-G5-CERES1

7/04 7/04 done. 3/23/08

Page 40: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 40

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

130-07 9.2P1 9.3P1 9.4P1

FM1 PS9_1=PS12=DAO- TestSCF-G5-CERES PS4_5= Test-G5-CERES1

PS9= Test-G5-CERES1

7/04 7/04 done. 3/23/08

12/17/07 Process TISA TSIB (SCCR 660) Process Synoptic SARB (SCCR 663, 662) Process Terra and Aqua crosstrack instrument for the seasonal months (Jan, Apr, Jul, and Oct) between covers-open and 10/05. Remember to stage GGEOW files for seasonal months 1/01, 10/01, 1/02, 4/02, 7/02, 10/02, 1/03, 4/03, 10/03, 7/04, 10/04, 1/05, 7/05, and 10/05. Environment variable for synoptic SARB must be set as follows: SS7_2_MATCH = C4 Only crosstrack instrument data will be processed. FM1 is in crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05 FM2 is in crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01 FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05

cc4_0=most recent cc4_2=most recent cc5=most recent cc12=most recent cc6=most recent cc10=most recent cc11=most recent cc11_6=most recent cc7_1=012017 cc7_2=004006

129-07 7.1.1P1 FM1 or FM2 PS6=Edition2C PS12=DAO-GEOS4 PS10=Edition2D PS11=Edition2A

PS7_1=Beta4

4/00 seasonal months only

10/05 seasonal months only

Done 6/3/08

128-07 7.2.1P1 FM1 or FM2

PS4=NSIDC-NESDIS PS4_2=Edition2-QC PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4

PS7_2=Beta4 4/00 seasonal months only

10/05 seasonal months only

Done. 6/24/08

127-07 7.1.1P1 FM3 or FM4 PS6=Edition2B PS12=DAO-GEOS4 PS10=Edition2A PS11=Edition2A

PS7_1=Beta4

10/05 seasonal months only

Done. 7/11/08

Page 41: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 41

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

126-07 7.2.1P1 FM3 or FM4 PS4=NSIDC-NESDIS PS4_2=Edition1A PS5=Edition2B PS12=DAO-GEOS4 PS7_1=Beta4

PS7_2=Beta4 7/02 seasonal months only

10/05 seasonal months only

Done. 8/18/08

11/27/07 Process TISA averaging (sccr 637) GGEOW files must be staged for 7/02, 9/02, 10/02, 11/02, 1/03, 3/03, 4/03, 5/03, 8/03, 9/03, 10/03, 12/03, 2/04, 3/04, 6/04, 7/04, 10/04, 12/04, 1/05, 5/05, 7/05, 9/05, and 10/05. Note: There is no reason to ever produce a -NoSW SRBAVG output. 12/11/07 FM4 for Oct 2004 has saturated radiances from Oct 1 - 12, 2004. Current processing left these FOVs off all data sets from BDS/IES onward. This causes problems for TISA. All FM4 data from Instrument through TISA must be reprocessed for Oct’04 in a manner that estimates the saturated radiances and fluxes rather than eliminating them .

cc4_0=use latest cc9_3 =use latest cc9_1=use latest cc10_5=016030 cc10_4=016030 cc11=use latest cc11_6=use latest

125-07 10.1P5 10.1P4

FM3, FM4 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=Edition2A 7/02 11/04

9/04 3/05

Done 12/25/07

124-07 10.1P5 10.1P4

FM3 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=Edition2A 10/04 4/05

10/04 10/05

Done 12/26/07

6/8/07 Promote TISA averaging (sccr 650) GGEOW files must be staged for 1/01, 2/01, 5/01, 8/01, 10/01, 12/01, 1/02, 4/02, 5/02, 7/02, 9/02, 10/02, 11/02, 1/03, 3/03, 4/03, 5/03, 8/03, 9/03, 10/03, 12/03, 2/04, 3/04, 6/04, 7/04, 10/04, 12/04, 1/05, 5/05, 7/05, 9/05, and 10/05. SRBAVG processing is not setup for -NoSW input, and it doesn’t make sense to even produce such a data set.

cc4_0=use latest cc9_3 =use latest cc9_1=use latest cc10_?=017031 cc10_?=017031 cc11=use latest cc11_6=use latest

Page 42: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 42

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

113-07 10.0P1 10.0P2 10.0P3

FM3, FM4 PS9=PS9_3=Edition2A PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=ValR9 7/02 1/03 10/04

7/02 1/03 10/04

Closed 5/29/08. To be reopened at a later date.

112-07 10.0P1 10.0P2 10.0P3

FM3, FM4 PS9=PS9_3=Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=ValR10 7/02 1/03

7/02 1/03

Closed 5/29/08. To be reopened at a later date.

111-07 10.0P1 10.0P2 10.0P3

FM1, FM2 PS9=PS9_3=Edition2C PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=ValR9 7/02 1/03

7/02 1/03

Closed 5/29/08. To be reopened at a later date.

110-07 10.0P1 10.0P2 10.0P3

FM3 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=Edition2B 7/02 10/05 Closed 5/29/08. To be reopened at a later date.

109-07 10.0P1 10.0P2 10.0P3

FM4 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=Edition2B 7/02 3/05 Closed 5/29/08. To be reopened at a later date.

Page 43: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 43

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

108-07 10.0P1 10.0P2 10.0P3

FM1, FM2 PS9=PS9_3= Edition2B PS11=PS11_6= Edition2A PS9_1=PS12= DAO-GEOS4

PS10=Edition2E 3/00 10/05 Closed 5/29/08. To be reopened at a later date.

6/8/07 Process Cloud (last promoted SCCRs 654 & 655) Process Inversion (SCCR 659) Process TISA gridding (SCCR 594) 7/20/07 added Jan’06 to Edition requests as per e-mail with science. Remember to rename Edition2-QC clear sky maps. 7/25/07 Rerun Clouds ValR13 with incremented cc#. First time around there was a problem with the recently staged MODIS files. 7/27/07 ASDC has requested that instead of rerunning with a new cc#, reuse the cc# but alter the processing strategy to ValR13B. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed. Note: Please make sure NOT to use CERES_ECS start-up maps for 7/06 ValR13 run. Rename the 7/1/05 Edition2-QC CERES_ECS files and start with those. The CERES_ECS startup maps CAN be used to process 9/22/06 ValR13, which is getting run to verify that an eclipse is handled correctly. Do NOT use CERES_ECS start-up maps when running Edition2F, instead rename Edition2-QC maps and use those as starting point. FM1 was in stow Jan and Feb 2006. 4/2/08 Note: For PRs 92-07 and 96-07, the following instruction was omitted: Need to turn on CloudVis files: $ENV[‘CV’} = ‘y’;

cc12=most recent cc1=most recent cc4_0=most recent cc4_1=028036 028037 cc4_2=028036 028037 cc4_3 = 028036 028037 cc2_4=most recent cc4_8=027033 cc4_9=025031 cc4_10=022031 cc9_1=most recent cc9=022029 cc9_3=023031 cc9_4=022031

96-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM1, FM2, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1= ValR13B 7/06 7/06 done 8/6/07

Page 44: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 44

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

95-07 4.1-4.1P4 FM1, FM2, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1= ValR13B 9/22/06 9/22/06 done 8/6/07

94-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM1, FM2 PS4_1=ValR13B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= ValR13B 7/06 7/06 done 8/6/07

93-07 4.5-6.1P2 FM1, FM2 PS4_1=ValR13B PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= ValR13B 9/22/06 9/22/06 done 8/6/07

92-07 4.1-4.1P4 4.1-4.2P3 4.1-4.2P2 4.1-4.3P2

FM1, FM2, MODIS V005

PS1=Edition2 PS4_0=NSIDC- NESDIS PS12=DAO-GEOS4

PS4_1= Edition2A-QC 1/06 4/30/06

1/06 1/1/07

done. 3/12/08

91A-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= Edition2F 1/06

1/06

done. 10/02/07

91-07 4.5-6.1P2 4.5-6.2P2 4.5-6.4P1

FM1, FM2 PS4_1=Edition2A-QC PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7=NULL

PS4_5= Edition2F 4/30/06 1/1/07 Done. 3/12/08

90A -07 9.2P1 9.3P1 9.4P1

FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F

PS9= Edition2F 1/06 1/06 done. 10/2/07

Page 45: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 45

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

90-07 9.2P1 9.3P1 9.4P1

FM1, FM2 PS9_1=PS12=DAO-GEOS4 PS4_5=Edition2F

PS9= Edition2F 4/30/06 hour 12 1/1/07 hour 11 Done. 3/12/08

3/15/07 Promote SARB (SCCR 648, 647, 651, 664) Process TISAgridding (sccr 619). Do not proceed until ValR10 files have been verified. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. 3/23/07 There is a hold on these PRs. SARB may make a delta delivery to support Aqua processing. 3/30/07 All MATCH data received to date is MODIS collection 4 based. Added ValR10 requests for FM4 and filled in dates for FM3 ValR10 requests. 5/3/07 Added PRs for Aqua Version2B CRS processing of 7/02 - 12/05 data. Modified PRs for the Aqua Version2B CRS 1/06 - 4/06 data extension. Process CRS for crosstrack instrument ONLY FM3 is in crosstrack: 7/02, 11/02 - 1/03, 5/03 - 7/03, 4/05 - 12/07 FM4 is in crosstrack: 7/02 - 10/02, 2/03 - 4/03, 8/03 - 3/05

cc12= most recent cc4_5= most recent cc5=020029 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent

89-07 5.0P1 FM4 V004 MOD08

PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4

PS5=ValR10 7/02 7/02 done 6/14/07

88-07 5.1P2 FM4 V004 MOD08

PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4

PS5=ValR10 7/02 7/02 done 6/15/07

87-07 5.4P2 FM4 V004 MOD08

PS5=ValR10 PS12=DAO-GEOS4

PS5_4=ValR10 7/02 7/02 done 6/18/07

86-07 5.0P1 FM3 V004 MOD08

PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4

PS5=ValR10 12/05 4/06

12/05 4/06

done 7/3/07

Page 46: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 46

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

85-07 5.1P2 FM3 V004 MOD08

PS4_5=Edition2B PS5 = ValR10 PS12=DAO-GEOS4

PS5=ValR10 12/05 4/06

12/05 4/06

done 7/3/07

84-07 5.4P2 FM3 V004 MOD08

PS5=ValR10 PS12=DAO-GEOS4

PS5_4=ValR10 12/05 4/06

12/05 4/06

done 7/3/07

84A-07 5.0P1 FM3 or FM4 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 7/02 1/06 Done 2/12/08

84B-07 5.1P2 FM3 or FM4 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 7/02 1/1/06 hour 11 Done 2/12/08

84C-07 5.4P2 FM3 or FM4 V004 MOD08

PS5=Edition2B PS12=DAO-GEOS4

PS5_4=Edition2B 7/02 12/05 Done 2/12/08

84D-07 6.1P1 6.2P1 6.3P1

FM3 or FM4 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4

PS6=Edition2B 7/02 1/1/06 hour 11 Done 2/15/08

83-07 5.0P1 FM3 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 12/05 2/06

5/06 done 10/31/07

82-07 5.1P2 FM3 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 12/31/05 hour 12 1/1/06 hour 12

5/1/06 hour 11 done 10/31/07

81-07 5.4P2 FM3 V004 MOD08

PS5=Edition2B PS12=DAO-GEOS4

PS5_4=Edition2B 1/06 4/06 done 11/5/07

80-07 6.1P1 6.2P1 6.3P1

FM3 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4

PS6=Edition2B 12/31/05 hour 12

5/1/06 hour 11 done 11/25/07

Page 47: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 47

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

3/15/07 Process SARB (SCCR 648, 647, 651) Process TISAgridding (sccr 619). Do not process until Terra Edition2B cc5= 333333 files have been verified. (These are the ValR files for Terra.) 4/17/07 Terra collection 4 MODIS inputs available through 7/06 and MATCH files available through 6/06. PGEs 5.1P2 MUST be processed on the IBM Cluster. PGE 5.4P2 MUST be processed on warlock. PGE 5.0P1 can process on either machine. FM1 is in stow during 1/06 and 2/06. Therefore no 2/28/06 overlap data will be available to gridding. Process Terra CRS and FSW for crosstrack instrument ONLY FM1 is crosstrack: 5/00 - 7/00; 11/00 - 1/01; 5/01 - 7/01; 11/01 - 12/05, 3/06 - 2/07 FM2 is crosstrack: 2/00 - 4/00; 8/00 - 10/00; 2/01 - 4/01; 8/01 - 10/01, 1/06 - 2/06

cc12= most recent cc4_5= most recent cc5=020029 cc5_4=021030 cc6=019024 cc6_3=020026 cc9_1=most recent

79-07 5.0P1 FM1 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 3/06 5/06 6/06

done 12/3/07

78-07 5.1P1 FM1 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 3/1/06 5/1/06 hour 11 6/30/06

done 12/3/07

77-07 5.4P1 FM1 V004 MOD08

PS5=Edition2B PS12=DAO-GEOS4

PS5_4=Edition2B 3/06 4/06 6/06

Done 1/31/08

76-07 5.0P1 FM2 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 12/05 3/06 done 11/30/07

75-07 5.1P1 FM2 V004 MOD08

PS4_5=Edition2B PS5 = Edition2B PS12=DAO-GEOS4

PS5=Edition2B 12/31/05 hour 12

3/1/06 hour 11 done 11/30/07

74-07 5.4P1 FM2 V004 MOD08

PS5=Edition2B PS12=DAO-GEOS4

PS5_4=Edition2B 1/06 2/06 done 11/30/07

73-07

6.1P1 6.2P1 6.3P1

FM1

PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4

PS6=Edition2C 3/1/06 5/1/06 hour 11 6/06

Done. 12/14/07

Page 48: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 48

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

72-07 6.1P1 6.2P1 6.3P1

FM2 PS4_5=Edition2B PS5=Edition2B PS9_1=PS12= DAO-GEOS4

PS6=Edition2C 12/31/05 hour 12

3/1/06 hour 11 done 11/30/07

2/1/07 Process Inversion (sccr 638) Process TISA Gridding (sccr 594) ValRs must be approved before Edition2B processing can begin. Using Aqua Edition2A/Ed2A-NoSW SSF as input, reprocess SSF and SFC as Edition2B/Ed2B-NoSW to correct SOFA SW Model B surface fluxes. Run all of inversion using dynamic Spectral Correction Coefficients. (Always use PS4_7 = NULL. NEVER use default/static coefficients from CERESlib.) Always use Spectral Correction Coefficients that correspond to instrument getting processed.

3/25/08 note: There should be no data processing for Production Strategy “Ed2B-NoSW” (PRs 10-07 and 7-07) for data dates, 07/19/2005 – 08/30/2005. This processing is covered under PRs 222-05 through 227-05 using Production Strategy “AnomOps-Ed1-CV”. (note added and PRs corrected 3/25/08)

cc12=017027 cc2_4=most recent cc4_6=most recent cc4_5=034039 cc4_9=024033 cc4_10=022030 cc9_1= 016021 cc9 = cc9_2= 022029 cc9_3=023031 cc9_4=022031

12-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1

FM3 PS4_6=Edition2A PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL

PS4_5=Edition2B 7/2/02 hour 15 1/1/06 12/31/05 hour 11

Done 2/7/08

11-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1

FM4 PS4_6=Edition2A PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL

PS4_5=Edition2B 7/2/02 hour 15 3/30/05 hr 17 Done 1/15/08

Page 49: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 49

Table 1: Production Request for CERES Processing (PR)

PR Year

& Item_# PGEs

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification (If no CC #

provided, use most recent)

10-07 4.5-6.6P3 4.5-6.2P2 4.5-6.4P1

FM4 PS4_6=Ed2A-NoSW PS12=DAO-GEOS4 PS2_4=Edition2 PS4_7 = NULL

PS4_5=Ed2B-NoSW 3/30/05 hr 18 3/30/05 hr 18 8/31/05

1/1/06 12/31/05 hour 11 7/18/05 12/31/05 hr 11

Done 2/7/08

9-07 9.2P1 9.3P1 9.4P1

FM3 PS9_1=PS12= DAO-GEOS4 PS4_5=Edition2B

PS9=Edition2B 7/2/02 1/1/06 hr 11 Done 2/12/08

8-07 9.2P1 9.3P1 9.4P1

FM4 PS9_1=PS12= DAO-GEOS4 PS4_5=Edition2B

PS9=Edition2B 7/2/02 3/30/05 hour 17 Done 1/8/08

7-07 9.2P1 9.3P1 9.4P1

FM4 PS9_1=PS12= DAO-GEOS4 PS4_5=Ed2B-NoSW

PS9=Ed2B-NoSW 3/31/05 hr 12 3/31/05 hr 12 8/31/05 hr 12

1/1/06 hr 11 7/01/05 hr 11 1/01/06 hr 11

Done 2/12/08

Page 50: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 50

CERES Miscellaneous Standing Production Requests

Table 2: Standing Production Request for CERES Misc. Processing (M-PR)

M-PR Date

& Item_# PGE

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification

3/22/06 Process MOA and PMOA (starting when SCCR 615 promotes and is checked out) PMOA overlap is critical. Please wait unil next month of MOA is available prior to processing PMOA. Overlap from previous and next months is critical. If MOA cc# changes for current month, either rename or rerun last day of previous month. If MOA cc# changes for next month, temporarily rename first day of next month before processing PMOA.

cc12=018029 cc9_1=016022

2-06 12.1P1 CERES PS12=DAO-GEOS4 1/31/06 12/31/07 Done 3/12/08 1-06 9.1P1 CERES PS12=DAO-GEOS4 PS9_1=PS12=

DAO-GEOS4 1/06 12/07 Done 3/12/08

10/18/02 Process Snow map for Clouds use latest ccode for cc4_0

3-02 4.1-4.0P1 CERES PS4_0=NSIDC- NESDIS

8/01

8/12/02: Process ERBElike Snow map required for Terra and Aqua. This request is typically run 5 days after the end of the data month, after inputs are available.

use latest ccode for cc2_1 (See Table 1:)

1-02 2.1P1 CERES PS2_1=NSIDC 6/18/02

Page 51: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 51

CERES Terra Standing Production Requests

Table 3: Standing Production Request for CERES Terra Processing (AM-PR)

AM-PR Date

& Item_# PGE

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to process

DAAC Verification

11/9/05: Use PS1 = ‘Edition1-CV’ Standing Request: Terra Instrument SS1 {FM1, FM2} Processing Request. Reprocessing requests provided for 2/25/00 - 11/1/05 (PR 154-05, 158-05). This standing request only takes data forward from where the reprocessing request left off.

use latest ccode {cc1} (See Table 1:)

7-05 6-05

1.1P3 1.2P1 1.3P1

FM1,FM2 (PS1=>) PS1=Edition1-CV 11/2/05

11/9/05: Standing Request: Terra ERBElike SS2, SS3 {FM1, FM2} Processing Request Reprocessing requests provided for 2/25/00 - 11/1/05 (PR 153-05, 155-05 to 157-05). This standing request only takes data forward from where the reprocessing request left off.

ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.

use latest ccodes {cc2, cc2_1, cc3} (See Table 1:)

5-05 4-05 3-05

2.2P1 2.3P2 2.3P1

FM1,FM2 PS1=Edition1-CV PS2_1=NSIDC cmdline arg = A F N T

PS2=Edition1-CV 11/2/05 10/31/05 12/1/05

2-05 3.1P1 FM1,FM2 PS2=Edition1-CV PS3=Edition1-CV 11/05 1-05 1.3P2 FM1,FM2 PS1=Edition1-CV PS1=Edition1-CV 11/05

8/2/02 Processing Scenario updated/corrected; Added PR 1A-02. 2/8/02: New processing scenario for Baseline1-QC BDS and ERBElike processing. Anticipate this will go into affect starting with Feb 2002 data. For earlier data, continue using PR 1-00 through PR 8-00. PRs 1-02 and 2-02 are to run 48 hours after data date; PR 1A-02 is run at the end of the month. Standing Request: Terra Instrument SS1 {FM1, FM2} Processing Request Note: Delete these data sets after data reprocessed as Baseline1 or Edition1. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.

use latest ccode {cc1, cc2} (See Table 1:)

Page 52: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 52

Table 3: Standing Production Request for CERES Terra Processing (AM-PR)

AM-PR Date

& Item_# PGE

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to process

DAAC Verification

2-02 1.1P3 1.2P1 1.3P1

FM1,FM2 (PS1=>) PS1=Baseline1-QC ??

1-02

2.2P1 FM1,FM2 PS1=Baseline1-QC

PS2_1=NotAvailable cmdline arg = C F N T

PS2=Baseline1-QC ??

1A-02 1.3P2 FM1,FM2 PS1=Baseline1-QC PS1=Baseline1-QC ??

Page 53: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 53

CERES Aqua Standing Production Requests

Table 4: Standing Production Request for CERES Aqua Processing (PM-PR)

PM-PR Date

& Item_# PGE

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification

11/9/05 Edition1-CV processing limited to FM3 while FM4 experiencing SW problems. This request is run 5-25 days after the end of the data month, when ASDC has received as much data as they expect to receive. Edition1-CV processing requests for 6/18/02 - 11/1/05 are listed as regular PRs (PRs 171 to 182-05 Standing Request: Aqua Instrument SS1 and ERBElike SS2 {FM3} Processing Request. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.

use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc1_5, cc2, cc2_1, cc2_4, cc3, cc3_2} (See Table 1:)

18-05 1.1P5 1.2P1 1.3P1

FM3 (PS1=>) PS1=Edition1-CV

PS1=Edition1-CV PS1_3=Edition1-CV

11/2/05

17-05 2.2P1 2.3P2 2.3P1

FM3 PS1=Edition1-CV PS2_1=NSIDC cmdline arg = A F N T

PS2=Edition1-CV 11/2/05 10/31/05 12/1/05

16-05 1.3P2 FM3 PS1=Edition1-CV PS1=Edition1-CV 11/05 15-05 3.1P1 FM3 PS2=Edition1-CV PS3=Edition1-CV 11/05

11/9/05 Ed1-CV-NoSW processing replaces Ed1-NoSW and should be run until SW problems on FM4 can be corrected or further problems occur. Ed1-CV-NoSW processing requests for 3/31/05 - 11/1/05 are listed as regular PRs (PR 159-05 to 164-05). This request is run 5-25 days after the end of the data month, when ASDC has received as much data as they expect to receive. Standing Request: Aqua Instrument SS1 and ERBElike SS2 {FM4} Processing Request. Instrument cmdline arg:-ic OFF -sat SW_OFF (these args. are for Ed1 NoSW processing) ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.

use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc1_5, cc2, cc2_1, cc2_4, cc3, cc3_2} (See Table 1:)

14-05 1.1P5 1.2P1 1.3P1

FM4 (PS1=>) PS1=Ed1-CV-NoSW

PS1=Ed1-CV-NoSW PS1_3=Ed1-CV-NoSW

11/2/05

Page 54: CERES DMT to DAAC Production Requests · CER-DM-PR-2008 Date: 1/5/2009 CERES DMT to DAAC Production Requests YEAR 2008 by CERES Data Management Team Climate Sciences Branch Science

CER-DM-PR-2008 Date: 1/5/2009

CERES Data Management Team Page 54

Table 4: Standing Production Request for CERES Aqua Processing (PM-PR)

PM-PR Date

& Item_# PGE

Instrument (INST)

Input Production Strategy

Output Production Strategy

Begin Datadate to

process

End Datadate to

process

DAAC Verification

13-05 2.2P1 2.3P2 2.3P1

FM4 PS1=Ed1-CV-NoSW PS2_1=NSIDC cmdline arg = A F N T

PS2=Ed1-CV-NoSW 11/2/05 10/31/05 12/1/05

12-05 1.3P2 FM4 PS1=Ed1-CV-NoSW PS1=Ed1-CV-NoSW 11/05 11-05 3.1P1 FM4 PS2=Ed1-CV-NoSW PS3=Ed1-CV-NoSW 11/05

12/20/03: Use PS1 = ‘Baseline1-QC’ until further notice PRs 12-03 and 13-03 are to run 48 hours after data date; PR 11-03 is run at the end of the month. Standing Request: Aqua Instrument SS1 {FM3, FM4} Processing Request. Note: All Baseline1-QC files may be deleted when data has been reprocessed as Baseline1. Baseline1-QC files do not need to be archived. If they are archived, they should be deleted when Baseline1 is processed. ERBElike cmdline arg notes: M = monthly Spectral Correction Coefficients (SCC); N = not monthy, use static SCC. A = actual Snow map; C = composite Snow map. F has to do with ADMs.

use latest ccode {cc1, cc1_2, cc1_3, cc1_4, cc2, cc2_1, cc3} (See Table 1:)

30-02 1.1P5 1.2P1 1.3P1

FM3,FM4 (PS1=>) PS1=Baseline1-QC 12/02

29-02 2.2P1 FM3,FM4 PS1=Baseline1-QC PS2_1=NotAvailable cmdline arg = C F N T

PS2=Baseline1-QC 12/02

28-02 1.3P2 FM3,FM4 PS1=Baseline1-QC PS1=Baseline1-QC 12/02