    BpNetwork Luanda

    Ethernet connectivity

    provided by ITA

    Monthly ReportAugust 2013

    By Eng. Saher Ghayyad Page 1

  • 7/27/2019 Ceragon Monthly Report August 2013

    2/22

    Table of Contents

    Table of Contents.................................................................................................................................2

    1.Network layout..................................................................................................................................32.Network performance.......................................................................................................................4

    2.1 Heliport to Sonils Warehouse........................................................................5

    2.1.1 Heliport To Mundo Startel / Mundo Startel To Heliport Link...............................................5

    2.1.2 Sonils Base To Mundo Startel / Mundo Startel To Sonils Base Link.....................................7

    2.3 Torres Atlantico To Sonils Warehouse / Sonils WareHouse To Torres

    Atlantico Link......................................................................................................8

    2.4Torres Atlantico To DeBeers (XPIC) / DeBeers To Torres Atlantico (XPIC) Link

    ......................................................................................................................... 10

    2.5DeBeers To Chicala / Chicala To DeBeers Link............................................13

    2.6 Chicala To Torres Atlantico / Torres Atlantico To Chicala Link....................14

    2.7 HUC&SURF To WareHouse / Warehouse To HUC&SURF Link......................16

    By Eng. Saher Ghayyad Page 2

  • 7/27/2019 Ceragon Monthly Report August 2013

    3/22

    1. Network layout

    ITA is providing BP Angola with a dedicated wireless network connecting 7 BP sites.

    One additional site is required as a repeater.The following links are in use:

    1. Heliport to Sonils Warehouse via Mundo Startel repeater (45Mbit Full Duplex,FD)

    2. Sonils Warehouse to Sonils Huc & Surf (45Mbit FD)

    3. Sonils Warehouse to Torres Atlantico (45Mbit FD)

    4. DeBeers to Torres Atlantico (Dual carrier800Mbit FD)

    5. De Beers to Chicala (45Mbit FD)

    6. Chicala to Torres Atlantico (45Mbit FD)

    7. Sonils Yard B to Yard D (45Mbit FD)

    8. Torres Atlantico to Torres Elise (45 Mbit FD)

    By Eng. Saher Ghayyad Page 3

  • 7/27/2019 Ceragon Monthly Report August 2013

    4/22

    2. Network performance

    The following performance reports are based on monthly accumulated link error and signal

    performance. The reporting period for all links is from 1 st of August 2013 till 31st of August

    2013.

    The used abreviations indicate the following per month:

    UAS : Unavailable seconds (critical)

    ES : Error seconds

    SES : Sever Error Seconds (critical)

    Min RSL :Minimum Receive Signal Level

    Max RSL :Maximum Receive Signal Level

    Min TSL :Minimum Transmit Signal Level

    Max TSL :Maximum Transmit Signal Level

    Integrity :Link is up and running (critical)

    Responsibility for power supply is with the client.

    By Eng. Saher Ghayyad Page 4

  • 7/27/2019 Ceragon Monthly Report August 2013

    5/22

    2.1 Heliport to Sonils Warehouse

    2.1.1 Heliport To Mundo Startel / Mundo Startel To Heliport Link

    Table 1: Heliport To Mundo Startel Link

    Figure 1: Uptime / Alarms Heliport To Mundo Startel Link

    Table 2: Mundo Startel To Heliport Link

    By Eng. Saher Ghayyad Page 5

  • 7/27/2019 Ceragon Monthly Report August 2013

    6/22

    Figure 2: Uptime Mundo Startel To Heliport Link

    As per above tables and figures, Heliport to Mundo Startel link as well as Mundo Startel to

    Heliport link was up and running for the whole month without any issues.

    By Eng. Saher Ghayyad Page 6

  • 7/27/2019 Ceragon Monthly Report August 2013

    7/22

    2.1.2 Sonils Base To Mundo Startel / Mundo Startel To Sonils Base Link

    Table 3: SonilsWareHouse To Mundo Startel Link

    Figure 3: Uptime Sonils WareHouse to Mundo Startel Link

    Table 4: Muindo Startel To Sonils WareHouse Link

    By Eng. Saher Ghayyad Page 7

  • 7/27/2019 Ceragon Monthly Report August 2013

    8/22

    Figure 4: Uptime Mundo Startel To WareHouse

    As per above tables and figures, Sonils WareHouse to Mundo Startel link as well as Mundo

    Startel to Sonils WareHouse link was up and running for the whole month without any issues

    except on the 23rd of August 2013 when it recorded -99 from 3:15 p.m. till 4:00 p.m. Our

    analysis leads to a power issue causing the link to be down.

    2.3 Torres Atlantico To Sonils Warehouse / Sonils WareHouse To Torres Atlantico Link

    Table 5: Torres Atlantico To WareHouse Link

    By Eng. Saher Ghayyad Page 8

  • 7/27/2019 Ceragon Monthly Report August 2013

    9/22

    Figure 5: Uptime Torres Atlantico To WareHouse

    Table 6: WareHouse To Torres Atlantico Link

    By Eng. Saher Ghayyad Page 9

  • 7/27/2019 Ceragon Monthly Report August 2013

    10/22

    Figure 6: Uptime Warehouse To Torres Atlantico

    As per above tables and figures, WareHouse to Torres Atlantico link as well as Torres

    Atlantico to Warehouse link was up and running for the whole month without any issues

    except on the 23rd of the month when it recorded -99 at Sonils Base from 3:15 p.m. till 4:00

    p.m. Our analysis leads to a power issue causing the link to be down.

    2.4 Torres Atlantico To DeBeers (XPIC) / DeBeers To Torres Atlantico (XPIC) Link

    Table 7: Torres Atlantico To DeBeers(XPIC) Link

    By Eng. Saher Ghayyad Page 10

  • 7/27/2019 Ceragon Monthly Report August 2013

    11/22

    Figure 7: Torres Atlantico To DeBeers Uptime

    Table 8: DeBeers to Torres Atlantico (XPIC) Link

    By Eng. Saher Ghayyad Page 11

  • 7/27/2019 Ceragon Monthly Report August 2013

    12/22

    Figure 8: DeBeers to Torres Atlantico Uptime

    As per above tables and figures, DeBeers to Torres Atlantico link as well as Torres Atlantico

    to DeBeers link was up and running for the whole month without any issues.

    By Eng. Saher Ghayyad Page 12

  • 7/27/2019 Ceragon Monthly Report August 2013

    13/22

    2.5 DeBeers To Chicala / Chicala To DeBeers Link

    Table 9: DeBeers To Chicala Link

    Figure 9: Uptime Debeers To Chicala

    Table 10: Chicala To DeBeers Link

    By Eng. Saher Ghayyad Page 13

  • 7/27/2019 Ceragon Monthly Report August 2013

    14/22

    Figure 10: Uptime Chicala To Debeers

    As per above tables and figures, DeBeers to Chicala link as well as Chicala to DeBeers link

    was up and running for the entire month without any issues.

    2.6 Chicala To Torres Atlantico / Torres Atlantico To Chicala Link

    Table 11: Chicala To Torres Atlantico Link

    By Eng. Saher Ghayyad Page 14

  • 7/27/2019 Ceragon Monthly Report August 2013

    15/22

    Figure 11: Chicala To Torres Atlantico Uptime

    Table 12: Torres Atlantico To Chicala Link

    By Eng. Saher Ghayyad Page 15

  • 7/27/2019 Ceragon Monthly Report August 2013

    16/22

    Figure 12: Torres Atlantico To Chicala Uptime

    As per above tables and figures, Chicala to Torres Atlantico link as well as Torres Atlantico

    to Chicala link was up and running for the whole month without any issues.

    2.7 HUC&SURF To WareHouse / Warehouse To HUC&SURF Link

    By Eng. Saher Ghayyad Page 16

  • 7/27/2019 Ceragon Monthly Report August 2013

    17/22

    Figure 13: Frame Error rate HUC&SURF (Yard A) to Sonils Warehouse (YardB)

    Figure 13: HUC&SURF (Yard A) Uptime

    By Eng. Saher Ghayyad Page 17

  • 7/27/2019 Ceragon Monthly Report August 2013

    18/22

    Table 14: Frame Error rate Sonils Warehouse (YardB) to HUC&SURF (Yard A)

    Figure 14: Uptime Yard B

    As per above tables and figures, HUC&SURF to Warehouse link as well as Warehouse to

    HUC&SURF link was up and running for the whole month without any issues except on the

    23rd of August when it recorded -99 from 3:15 p.m. till 4:00 p.m. Our analysis leads to a

    power issue causing the link to be down.

    By Eng. Saher Ghayyad Page 18

  • 7/27/2019 Ceragon Monthly Report August 2013

    19/22

    2.8 Sonils Warehouse (Yard B) to Sonils Yard D

    Table 15: Frame Error rate Sonils Warehouse (Yard B) to Sonils Yard D

    Figure 15: Sonils Warehouse Yard B Uptime

    By Eng. Saher Ghayyad Page 19

  • 7/27/2019 Ceragon Monthly Report August 2013

    20/22

    Table 16: Frame Error rate Sonils Warehouse (Yard D) to Sonils Yard B

    Figure 16: Sonils Warehouse Yard D Uptime

    By Eng. Saher Ghayyad Page 20

  • 7/27/2019 Ceragon Monthly Report August 2013

    21/22

    As per above tables and figures, Sonils Warehouse (Yard B) to Yard D link as well as Yard D

    link was up and running for the whole month without any issues except on the 23 rd of August

    when it recorded -99 from 3:15 p.m. till 4:00 p.m. Our analysis leads to a power issue causing

    the link to be down.

    2.9 Torres Elise to DeBeers link (internet in use)

    Table 17: Torres Elise to DeBeers link

    Table 18: DeBeers To Torres Elise link

    As per above tables and figures, ITA BPC to DeBeers and DeBeers to ITA BPC link was up

    and running for the whole month without any major issues.

    By Eng. Saher Ghayyad Page 21

  • 7/27/2019 Ceragon Monthly Report August 2013

    22/22

    3.0 Torres Atlantico to Torres Elise / Torres Elise to Torres Atlantico (internet in use)

    Table 19: Frame Error Rate Torres Atlantico to Torres Elize

    Table 20: Frame Error Rate Torres Elise to Torres Atlantico

    As per above tables and figures, Torres Atlantico to Torres Elise link as well as Torres Elise

    to Torres Atlantico link was up and running for the whole month without any issues.

    3.1 Summary

    All ITA links were up and running during the month of August 2013. There were no major

    issues recorded except for some power and interference issues that have been mentioned.

    By Eng Saher Ghayyad Page 22