Upload
vomien
View
224
Download
3
Embed Size (px)
Citation preview
About the Institute
Central Training Institute for
Instructors, Chennai was established
in November, 1962 under the aegis of
NCVT, DGE&T, Min. of Labour and
Employment, Govt. of India, New
Delhi with ILO assistance, to train
Vocational Instructors for Industrial
Training Institutes/ Centers
About the Institute
Subsequently Model Training
Institute was also created in
February 1965 to enable instructor
trainees to have practice teaching.
Presently the institute has been
identified to train the craft
instructors required for Center Of
Excellence (COE) under the World
Bank assisted “Vocational Training
improvement Project”
Our Mission
To Produce Competent,
Disciplined and Quality Craft
Instructors and Craftsmen in
certain designated trades
ObjectivesOnly Institute in India to Train exclusively Craft
Instructors
• Training provided to the faculty of state
government craft instructors as and when
deputed by them
• Training provided to the faculty of central
government, public sector, private sector,
establishments and faculty of private ITCs
• Training provided to individuals who are
desirous to become craft instructors
Our Activities
• Craft Instructor Training
• Modular pattern
• Trades
– Machinist,
– Turner, Fitter,
– Draughtsman (civil),
– Mechanic (Motor Vehicle),
– Mechanic (Diesel),
– Electrician,
– Welder,
– Foundryman
Craftsmen Training
One Year Trades
COPA, Cutting & Sewing, Mechanic (Diesel), Welder, Foundryman
Two Year Trades
Machinist, Turner, Fitter, Draughtsman (civil), Mechanic (Motor Vehicle), Electrician, Welder, Mechanic (R&TV), Electronic Mechanic
Three Year Trades
Tool & Die Maker
Our Activities
• Short term courses for Craft Instructors
– Development and use of Audio Visual Aids
– Computer Literacy
• Short term courses to unorganised sector
– Repair & Maintenance of Two Wheelers for
Bike Technicians and Members of
Tamilnadu Two wheeler Owners Association
• NCC activities
• Blood Donation Camp
• Celebration of National Functions
8
Mr. D. Vijaya KumarPrincipal
Mr. M. S. BalakrishnanVice Principal
Mrs. Prema PaulrajChief Medical Officer
Mr. Authi NarayananAsst Director of Training
Mr. R. MurugarajanAsst Director of Training
Mr. S.C. DeogamAsst Director of Training
Central Training Institute for Instructors
9
Each Section is managed by
Training OfficerSection in-charge for
Craft Instructor Training
Vocational InstructorsSection in-charge forCraftsmen Training
Assisted by
Assisted by
Workshop Attendant
10
Office Management is offered by
Registrar &
Drawing & Disbursing Officer
Office Superintendent
Assisted by
Assisted by
Accountant &Internal Auditor
11
Office Management is supported by
Upper Division ClerksSection in-charge
Lower Division Clerks
Assisted by
Assisted by
Office Attendants, Security Personnel,
Cleaning & sanitation staff
Performance of 2009-10Financial – Plan – VTIP
(World bank Assisted Scheme)
TE OE M&S MW M&E OAE Others
0
200
400
600
800
1000
1200
1400
1600
1800
530
100 100
1600
500
50 70
530
100 100
1600
500
50 69
Sanctioned
Expd Incurred
In thousands
13
Financial OutlayScheme - Non-Plan
Salary` 4.02 Crore
Office Expenditure` 55 lakhs
Raw Materials` 7 lakhs
Minor Works` 20 lakhs
Professional & Spl Services` 9 lakhs
Scholarship & Stipend` 2 lakhs
Travel Expenditure` 2.5 lakhs
14
Financial OutlayScheme - Plan
Salary` 9.75 lakhs
Office Expenditure` 1 lakhs
Raw Materials` 1 lakhs
Minor Works` 5 lakhs
Machinery & Equipments` 28 lakhs
Travel Expenditure` 4 lakhs
15
Financial OutlayScheme - VTIP
Office Expenditure` 1 lakhs
Raw Materials` 1 lakhs
Minor Works` 10 lakhs
Machinery & Equipments` 10 lakhs
Travel Expenditure` 7 lakhs
Targets Achieved – Minor WorksPlan – Upgradation
Renovation of Principal Room (Rs.1,24,656)
Renovation of EM Section (Rs.1,08,400)
Ramp for Differently Abled Persons at main building (Rs.34,600)
Toilet for students at Foundryman section (Rs.6,68,700)
Ramp at Hostel for Differently Abled Persons (Rs.34,600)
Construction of toilet for differently abled persons at main building (Rs. 2,37,700)
Targets Achieved – Minor WorksPlan – VTIP
New workshop – Annexe Building for Tool & Die Maker Section (Rs.7,56,600 + 8,29,500)
Targets Achieved – Minor WorksNon - Plan
Renovation of Principal Room (Rs.8,22,500)
Lubricating & Cutting Oil
Renovation of staff toilet at new workshop and office (Rs.1,74,400)
Repair and maintenance of Sub-Station (Rs.4,74,000)
Renovation of EM Electrical works (Rs.2,97,728)
Targets Achieved – Machinery & Equipments
Plan – Upgradation Interactive Board, Interactive Pad, Visual
Presenter
Magnetic board, White board
LCD TV, PA System with Speakers, Home theater System
Air Conditioners
Machinery for carpentry section
Submerged Arc Welding Machine
Radial Drilling Machine
Gas Manifold System for Welding Section
Targets Achieved – Machinery & EquipmentsPlan – VTIP
Computers, and UPS
Server and UPS
Cutting tools
Car washer & Hoist
Physical Targets AchievedTraining – CITS & CTS
Conventional Trade Instructors - 776
MRC course - 71
Computer Literacy Course (Microsoft) - 361
Craftsmen - 270
Other - 42
Physical Targets AchievedTrade Testing Cell
Final Trade Test for Craftsmen
July 2009 - 271
Jan 2010 - 30
Final Trade Test for Craft Instructor
Apr 2009 - 138
July 2009 - 237
Oct 2009 - 321
Jan 2010 - 266
Final Trade Test for Craft Instructor (Non-
modular)
Physical Targets AchievedTrade Testing Cell
All India Trade Test for Apprentices
April 2009 - 232
Oct 2009 - 142
Skill Competition for Apprentices
April 2009 - 120
Sep 2009 - 95
May 2009 - 12
Nov 2009 - 07
All India Skill Competition for Craftsmen
Jan 2010 - 27
Quality Improvement ProgramAction Plan
In House Training Program at ATI,
Hyderabad, Organised in collaboration with
Quality Council of India, - Attended by 3
Staff
Organised an Awareness program on Quality
control – Documentation in collaboration with
STQC, Chennai, Attended by 30 staff