29
Light Rail Transit Improving mobility Easing congestion Strengthening our communities Central Corridor CEAM Jan. 28, 2010

Central Corridor Light Rail Transit - City Engineers Association

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Light Rail Transit

Improving

mobilityEasing

congestion

Strengthening

our communities

Central Corridor

CEAMJan. 28, 2010

2

Today’s Topics

• Welcome

• Project overview

• Questions and

comments

Light Rail TransitCentral Corridor

3

Light Rail TransitCentral Corridor

Important

link in the

regional

transit

network

Regional Transit System

(Adopted 2008)

4

Building on Hiawatha

LRT Success

• Exceeding expectations

– 30,500 ave. weekday riders

– Half of riders new transit users

• 34 local bus route connections

south of downtown

• Supporting development

– 7,700 new housing units

constructed since 2000

– 7,150 forecasted new housing

units by 2020

Light Rail TransitCentral Corridor

5

Light Rail TransitCentral Corridor Route and Stations

6

• 35 minutes from downtown to

downtown

• 7 ½ minutes between trains

during peak periods

• 31 vehicles

• 135 people per vehicle

• 41,690 projected riders per

weekday by 2030

Light Rail TransitCentral Corridor

Operations

7

Prepare DEIS; select alignment & mode

Conduct Preliminary Engineering (PE)

Enter Final Design

Begin heavy construction

Execute Full Funding Grant Agmt

Start operation

Light Rail TransitCentral Corridor

2010

2014

Timeline

2007

Complete

8

Project Partners

• Met Council/Metro Transit

• Mn/DOT

• Ramsey County

• Hennepin County

• County Transit Improvement Board

• City of St. Paul

• City of Minneapolis

• University of Minnesota

Light Rail TransitCentral Corridor

9

Light Rail TransitCentral Corridor

Ramsey

Co.

7%

Federal

50%

State

10%

Hennepin

Co.

3%

Sources of Funds

Project Cost:

$941 Million

Plus $15 million for

up to 3 infill stations

County

Transit

Imp.

Board

30%

St. Paul

<1%

10

Light Rail TransitCentral Corridor

University Avenue Cross Section Showing Changes

at a Typical Station

11

Alignment on

Washington AvenueLight Rail TransitCentral Corridor

Oak

Ch

urc

h

Un

ion

Harv

ard

Waln

ut

On

tari

o

Hu

ron

Ple

asan

t

12

Conducted Four Traffic

Analyses

• Study 1: Operation of Wash Ave

with LRT and traffic, 2014

• Study 2: Impacts due to

shortened tunnel, 2014

• Study 3: Small area study,

function of 48 intersections, 2030

– LRT at grade, transit/pedestrian

mall, closed to auto traffic

• Study 4: Intra-campus Roadway

Network

Light Rail TransitCentral Corridor

13

Washington Avenue

Transit/Ped MallLight Rail TransitCentral Corridor

14

Washington Ave. Transit/Ped Mall

15

Washington Avenue

Transit/Ped MallLight Rail TransitCentral Corridor

Light Rail TransitCentral Corridor

Construction Contracts

17

Contract Packages

Civil East

Civil West

• Advanced Traffic Improvements

• Civil East Construction

• Civil West Construction, including

Washington Avenue Bridge (WAB)

• Operations and Maintenance Facility (OMF)

• Systems

• Fare Collection System

Light Rail TransitCentral Corridor

18

35W

UNIVERSITY AVE SE

5TH ST SE

WEST RIVER PKWY S

2ND ST SE

8TH ST SE

OA

K S

T S

E

19T

H A

VE

S

ELM ST SE

6TH ST S

15TH

AV

E S

E10TH

AV

E S

E

4TH ST S

6TH ST SE

11TH

AV

E S

E

7TH ST SE

6TH

AV

E S

E

3RD ST S

MAIN ST SE

8TH

AV

E S

E

RIVER RD E

12TH

AV

E S

E

4TH ST SE

7TH

AV

E S

E

1ST ST S

14TH

AV

E S

E

5TH

AV

E S

E

ON

TA

RIO

ST

SE

ER

IE S

T S

EESSEX ST SE

EA

ST

RIV

ER

RD

WASHINGTON AVE SE

CE

DA

R A

VE

S

FAIRMONT ST

CH

UR

CH

ST

SE

RIVERSIDE AVE

11TH

AV

E S

3R

D A

VE

SE

FULTON ST SE

HU

RO

N B

LV

D S

E

COLE A

VE SE

24T

H A

VE

SE

DELAWARE ST SE

19T

H A

VE

N

HA

RV

AR

D S

T S

E

PL

EA

SA

NT

ST

SE

12TH

AV

E S

2ND ST S

19T

H A

VE

SE

WASHINGTON AVE S

22N

D A

VE

SE

13TH

AV

E S

E

25TH

AV

E S

E

13TH

AV

E S

DIAGO

NAL ROADW

AY

15TH

AV

E S

4TH

AV

E S

E

2N

D A

VE

SE

23R

D A

VE

S

INTERCAMPUS TRANSITW

23R

D A

VE

SE

22N

D A

VE

S

18TH

AV

E S

E

SA

INT

MA

RY

S A

VE

7TH

ST

S

WA

LN

UT

ST

SE

27T

H A

VE

SE

5TH

ST S

ROLLINS AVE SE

21S

T A

VE

S

PILLSBURY DR SE

9TH

AVE S

E

BEACON ST

17T

H A

VE

SE

16TH

AV

E S

E

LOCUST ST

16TH

AV

E S

DARTMOUTH PL

17TH

AV

E S

E

16TH

AV

E S

13TH

AV

E S

E

27TH

AV

E S

E

5TH ST SE

ELM ST SE

3RD ST S

18T

H A

VE

SE

2ND ST S

3RD ST S

RIVER RD E

6TH ST SE

7TH ST SE

9TH

AV

E S

E

4TH ST SE

4TH ST SDELAWARE ST SE

2ND ST S

5TH ST S

9TH A

VE SE

U of M Route Network ScenariosScenario 2B - Pleasant St

T

March 28, 2008

Advanced Traffic

ImprovementsLight Rail TransitCentral Corridor

Proposed new roadway

connections

Converted to 2-way

streets

Intersection traffic

control and/or capacity

improvements

•Stripe NB left turn lane

•Modify signal phasing

•Install traffic signal

•Construct turn lanes

•Install traffic signals

•Construct turn lanes

•Install traffic signal

•Construct turn lanes

•Install all way stop

•Construct turn lanes

•Mill and overlay E. River Rd

Construct new segment

and overlay existing

Phase I

Phase II

19

Bidding Schedule*One-Step Procurement PackagesLight Rail Transit

Central Corridor

IFB

Advertisement

Bid Opening Council Award Construction

Starts

4th Street

Advanced Utility

Relocations

May 22, 2009

(Complete)

Aug 13, 2009

(Complete)

Aug 26, 2009

(Complete)

Sept 2009

(Complete)

Advanced Traffic

Improvements

Dec 17, 2009

(Complete)

Jan 27, 2010

(Complete)

March 10,2010 March 2010

Operations and

Maintenance

Facility

June 3, 2010 Aug 2, 2010 Sept 22, 2010 Oct 2010

* Assumes FTA awards Full Funding Grant Agreement in Q3 - 2010

Invitation for Bid (IFB)

Last updated: 1/13/10 4:00PM

20

Bidding Schedule*Two-Step Procurement Packages

Light Rail TransitCentral Corridor

*Assumes FTA awards Full Funding Grant Agreement in Q3 – 2010

**Anticipated Limited NTP and early move-in

Invitation for Prequalification (IFP) &

Invitation for Bid (IFB)

IFP

Advertisement

Pre-Qual

Submittal

Docs due from

Contractors

Bid Docs

Released/

IFB

IFB Bid

Opening

Council

Award

Construction

Starts**

Civil East

Construction

Dec 1, 2009

(Complete)

Jan 13, 2010

(Complete)

Feb 22, 2010 April 22, 2010 June 23, 2010 July 2010

Civil West

Construction &

Washington

Ave Bridge

Feb 5, 2010 March 11, 2010 April 21, 2010 June 21, 2010 July 14, 2010 Aug 2010

Systems Feb 25, 2010 March 31, 2010 May 13, 2010 July 12, 2010 Aug 11, 2010 Sept 2010

Last updated: 1/13/10 4:00PM

Light Rail TransitCentral Corridor

4th Street Advanced

Utility Relocation

22

Current Activities

Xcel relocating duct &

constructing new vault

Xcel rebuilding

existing duct

Xcel building

new duct

Xcel building

manholes

Xcel building

manholes

CCPO chilled

water lines

23

CCPO Work on Chilled Water Lines4th and Wall

Jan. 14, 2010

24

CCPO Work on Chilled Water Lines4th and Sibley

Jan. 13, 2010

25

Xcel Building Manholes 4th and Wacouta

Jan. 13, 2010

26

Xcel Building New Duct 4th and Jackson

Jan. 13, 2010

27

Xcel Rebuilding Existing Duct 5th and Robert

Jan. 13, 2010

28

Xcel Relocating Duct & Building New Vault 4th and Minnesota

Jan. 13, 2010

29

Light Rail TransitCentral Corridor More Information

Check out our website:

• www.centralcorridor.org

Contact the Central Corridor Project Office:

• 540 Fairview Avenue North

St. Paul, MN 55104

• Construction Hotline: 651-602-1404

• Comment Line: 651-602-1645

• Email: [email protected]