5
Central Arkansas Transit Authority Enhancing the Downtown Economy

Central Arkansas Transit Authority

Embed Size (px)

DESCRIPTION

Central Arkansas Transit Authority. Enhancing the Downtown Economy. Streetcar Cost Comparison. Comparison of Initial Start Up Costs . Comparison of Streetcar Operations. Construction of the River Rail was relatively low . The River Rail is operated very efficiently, - PowerPoint PPT Presentation

Citation preview

Page 1: Central Arkansas Transit Authority

Central Arkansas Transit Authority

Enhancing the Downtown Economy

Page 2: Central Arkansas Transit Authority

Historic Streetcar Systems In the United States Initial Investment

City In Operation Construction Cost Track Miles Cost/MileKenosha 2000 $6,200,000 1.9 $3,263,158

Little Rock 2004 $30,000,000 3.4 $8,823,529Memphis 1993 $103,000,000 10.02 $10,279,441Tampa 2002 $48,300,000 2.7 $17,888,889

Comparison of Initial Start Up Costs

Comparison of Streetcar Operations

The River Rail is operated very efficiently, costing $35 less per hour than the next most efficient historic streetcar system.

Streetcar Cost Comparison

Construction of the River Rail was relatively low.

Page 3: Central Arkansas Transit Authority

Study area based on a ¼ mile buffer area(a 5 minute walk) AND the built environment

Study area = less than 1 square mile

Inventory of Businesses &Capital Improvements

------------------------------------• Walking tour of area• Forming key partnerships• Contacting each location• Verifying data & info

Economic Enhancement Study

Page 4: Central Arkansas Transit Authority

Have the downtowns experienced an economic revitalization?

Page 5: Central Arkansas Transit Authority

River Rail Expansion Studies

• Extension north along Main St in NLR – 2.5 miles

• Extension south along Main St in LR – 1.5 miles