10. Quality Management
In the Quality Management world it is used a terminologythat seems similar to the one we use in our daily
language.
However, there are several concepts that have nuances in
2
its meaning, those nuances make them different to whatwe intuitively understand.
It is important to review them first.
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
3/43
10. Quality Management
Object: something perceivable or conceivable.
Process: set of activities interrelated that uses resourcesin order to change one objet into another.
3
roce ure: spec c way o per orm ng act v t es. t can ewritten or not.
Register: document that brings objective evidence aboutthe performed activities and the obtained results.
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
4/43
10. Quality Management
Product: Process result. Services are considered as nontouchable products.
Client: the one who receives a product
4
Supplier: the one who provides a product
Client and supplier can be external or internal
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
5/43
10. Quality Management
Human Resources
Procedures
PROCESS
SUPPLIER CLIENT
Product Product
5
Material Resources
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
6/43
10. Quality Management
ContractBasic
engineering
Detailed
EngineeringPurchasing
Shipping PackingFactory
Manufacturing
6
Site
assembly Commissioning Tests Acceptance
Project lifecycle as an interrelated structured process
WTG supply contract (t-k)
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
7/43
10. Quality Management
Quality definitions:
Philip Crosby: Quality is the fulfilling of requirements
7
.
ISO 9000: The ability of a set of intrinsic characteristics tosatisfy requirements
Requirements: Needs or expectations. They can be explicit or implicit and
must be identified during the project requirement development process
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
8/43
10. Quality Management
Quality problem: It is produced when the full requirementsatisfaction is not achieved
Non conformity: Non compliance with a requirement
8
e ect: on comp ance w t a requ rement assoc atewith a planned use
Defects and non conformities are not the same. There isa very important difference because of legal implications:responsibility of products
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
9/43
10. Quality Management
Corrective action: Action taken in order to eliminate anexisting non conformity origin
Preventive action: Action taken in order to eliminate apotential non conformity origin
9
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
10/43
10. Quality Management
Efficacy: Extension in what the planned activities areperformed or planned targets are achieved (effectiveness)
Efficiency: Ratio between the achieved results and theused resources
10
Improvement action: Action taken in order to improvethe efficacy and efficiency
Corrective actions and preventive actions
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
11/43
10. Quality Management
The Quality Management System is the set of: Organizational structure
Processes
Resources
Procedures
needed to set and fulfill quality policy and quality targets
11
The Project Quality Management processes include all theactivities that establish Quality policies
Quality Targets Quality Responsibilities
in order that the project satisfies the needs that originated it
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
12/43
10. Quality Management
The Quality Plan is a document where
Standards
Processes Resources
Practices
12
are described for a specific project
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
13/43
10. Quality Management
CONTRACTORS
QUALITY
MANAGEMENTSYSTEM
CLIENTS
REQUIREMENTSPROJECT
13
QUALITY
MANUALCONTRACT
PROJECT
QUALITY
PLAN
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
14/43
10. Quality Management
Project Quality Management process include:
QUALITY PLANNING
14
QUALITY ASSURANCE (QA)
QUALITY CONTROL (QC)
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
15/43
10. Quality Management
Project Quality Management process include:
QUALITY PLANNING
15
QUALITY ASSURANCE
QUALITY CONTROL
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
16/43
10.1 Quality Planning
Identify quality rules relevant for the project, and how toachieve them
Must be done during the project planning phase, and caninfluence the rest of the planning activities
16
For Quality Planning it must be taken into account:
External factors
Internal factors Project scope statement
Project management plan
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
17/43
10.1 Quality Planning
Tools and techniques used for Quality Planning:
Cost/benefit analysis
17
Benchmark with other projects
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
18/43
10.1 Quality Planning
Tools and techniques used for Quality Planning:
Cost/benefit analysisCost: Quality Management costs
Benefit: less reprocess less cost
18
Benchmark with other projects
more stakeholders satisfactionCost of Quality: total quality cost, management plus reprocess costs
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
19/43
10.1 Quality Planning
Tools and techniques used for Quality Planning:
Cost/benefit analysis
19
Benchmark with other projects
Improvement ideas
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
20/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
20
Quality baseline Updated Project Management Plan
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
21/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
Describes the practical implementation of the Quality Management System
Part of the Project Management Plan
Includes the a roach to:
21
Quality baseline Updated Project Management Plan
Quality AssuranceQuality Control
Continuous Improvement
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
22/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
Used in Quality Assurance and Quality Control processes
22
Quality baseline Updated Project Management Plan
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
23/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
23
Quality baseline Updated Project Management Plan
Verify all the needed stepsUsed in QC process
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
24/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
24
Quality baseline Updated Project Management PlanQuality targets are registered
Quality performance measured against it
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
25/43
10.1 Quality Planning
As the result of the Quality Planning we get:
Quality Management Plan Quality Metrics
Quality Checklists
25
Quality baseline
Updated Project Management Plan
Including Quality Management Plan
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
26/43
10. Quality Management
Project Quality Management process include:
QUALITY PLANNING
26
QUALITY ASSURANCE
QUALITY CONTROL
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
27/43
10.2 Quality Assurance
Application of all the planned and systematic quality activitiesin order to ensure that the project uses all the neededprocesses to meet requirements
Usually supervised by specific teams
27
Quality Management Plan Quality Metrics Work Performance Information Change Requests Quality Control measurements (feedback for QA) Corrective and preventive actions Defect reparation
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
28/43
10.2 Quality Assurance
Tools and techniques used for Quality Assurance:
Quality AuditsStructured and independent review to check if the project activities
comply with the organizations politics, processes and procedures
28
o programmed or random
o internally or externally made
Process AnalysisIn order to identify improvements both technical and organizational
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
29/43
10.2 Quality Assurance
As the result of the Quality Assurance we get:
Requested changes Updates:
Organizations process actives
29
ro ect anagement an
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
30/43
10. Quality Management
Project Quality Management process include:
QUALITY PLANNING
30
QUALITY ASSURANCE
QUALITY CONTROL
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
31/43
10.3 Quality Control
Supervise the final specific project results (deliverables,cost performance, schedule), to check if the relevant
quality rules are met
Identify the way to eliminate unsatisfactory results
31
It must be continuous during all the project
Performed by an specific department or unit
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
32/43
10.3 Quality Control
For Quality Control it must be taken into account:
Project Management Plan Quality Metrics
Quality Checklists
32
Work performance report Approved change requests
Deliverables
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
33/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Root cause analysis (Ishikawa diagram) Control diagrams
Flux diagrams
33
Histograms Pareto diagrams
Dispersion diagram
Statistic sampling
Inspection
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
34/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Root cause analysis (Ishikawa diagram): it shows howdifferent factors/causes can be linked to problems/effects
34
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
35/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Control diagrams: they show the steadiness of the process.Normally used for repetitive activities (e.g. production lots)
35
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
36/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Flux diagrams: graphical representation of a process. Theyhelp to analyze how problems can be created.
36
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
37/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Histograms: they show variables distribution. It helps toidentify the problem causes by the shape and width of thedistribution
37
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
38/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Pareto diagrams: Specific histogram ordered by frequency, toguide the corrective actions. Also called 80/20 (80% ofproblems coming from 20% of causes Paretos law
38
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
39/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Dispersion diagram: they show the relation pattern betweenvariables
39
l l
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
40/43
10.3 Quality Control
Tools and techniques used for Quality Control:
Statistic sampling: Choose a part of the population forinspection.
40
Inspection: Product or work exam, to check its compliancewith the rules. They can be made at all levels:
Activities
Final project result
10 3 Q li C l
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
41/43
10.3 Quality Control
As the result of the Quality Control we get:
Quality Control Measurements (QC that feedback QA) Recommended corrective actions
Recommended preventive actions
41
Requested changes
Defect fixing (defects identified and fixing recommended)
Validated deliverables
Updates:
Quality baseline
Organizations process actives (fulfilled checklists, learned lessons)
Project Management Plan
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
42/43
Questions & Answers
42
7/29/2019 CEESP Electrical Energy Project Management 10 Quality Management
43/43
43