Upload
sema
View
27
Download
0
Embed Size (px)
DESCRIPTION
CE Results Framework for PRSCs in Lao PDR. The World Bank Institute. September 2, 2004 Moira Hart-Poliquin Chirine Alameddine. DESIGNING CE STRATEGIES IN SUPPORT OF PRSCs. Lessons Learned from Past PRSCs Why a consistent CE framework makes sense for PRSCs - PowerPoint PPT Presentation
Citation preview
1
CE Results Framework for PRSCs in Lao PDR
September 2, 2004Moira Hart-Poliquin
Chirine Alameddine
The World Bank Institute
2
1. Lessons Learned from Past PRSCs
2. Why a consistent CE framework makes sense for PRSCs
3. How CE could support PRSC reforms in Lao PDR
DESIGNING CE STRATEGIES IN SUPPORT OF PRSCs
3
PRSC
• Investment in CE (FW) tackles both:• Ownership Institutional incentives and policies• Implementation Organizational systems and processes• Selectivity of results is key; results should be realistic, relevant, and
feasible• Need convincing approach to capacity problem in order to sell tough
targets• Strengthening systems and processes builds confidence and ability to
achieve results
• Challenges to policy reform are two-fold • PRSC tackles policy reform for PRSP Ownership
Implementation
4
• Supports shift towards results-oriented indicators and progress benchmarks
• Helps to align donor support• Has the explicit goal of aligning Bank support• Requires ongoing monitoring and feedback into program
implementation for long term institutional capacity building
Main Message:• A strategic and structured approach to CE makes sense for improving:
• M&E• donor alignment• design and targeting of CE interventions• institutional constraints as well as organizational and individual capacity
issues
LESSONS LEARNED FROM PAST PRSCs
5
WHY A CONSISTENT AND SYSTEMATIC CE FW MAKES SENSE FOR PRSC
PRSCs important entry point because government-owned and supported indirectly by donors financially and technically
Use PRSC results matrix to prioritize and develop shared view (with government and donors) on capacity constraints and effective interventions that go beyond training and focus on capacity issues at the organizational and individual levels.
Donor Coordination: E.g., Japan & EU have CD programs in LaosOpportunity to coordinate and target these investments to have a greater impact Promote with partners moving beyond traditional training to measure and monitor organizational and individual capacities.
Use supervision process to monitor progress on capacities related to the results matrix
6
Objective
Institutional
Organizational
Individual
Baseline Capacity
Inputs/Interventions
Outcome/Indicator
Results C
hain
Current level of capacity
Interventions to address constraints
Simple, customized and measurable indicators
BENEFITS OF A CONSISTENT AND SYSTEMATIC CE FW
More effective design of capacity interventionsBetter Monitoring Improved donor coordination
7
• Building Constituencies for Change - Exposing Lao leaders to lessons learned from leaders in China and Vietnam on facilitating reform. Examples:
• Service Delivery: Improved tracking, better PEM, policies for improved transparency
• PSD: Market-oriented reform, transition of economic institutions, SMEs, and attracting investment
• Leadership Skills- Strengthening leadership skills and confidence to make change, achieve PRSC triggers and implement new policies through innovative approaches (e.g. Rapid Results to help jump start and enhance implementation)
• Assessing Capacity Needs- For each set of triggers, identify organizational and individual constraints where knowledge sharing, training, study tours, or twinning could contribute to removing bottlenecks
SUPPORTING PRSC REFORMS THROUGH…
8
HOW CAN CT MEMBERS SUPPORT THIS PROCESS
Applying a consistent CE framework to support the PRSC outcomes
Advocating for improved coordination
Strengthening analytical capacity by involving local experts/partners in analytical work from the initial design stage
9
THANK YOU
10
Objective: Developing a public expenditure tracking system that will lead to a situation where the GOL/MOE can determine what fund are going where and for what
result
Institutional Organizational Individual
Baseline Capacity
No tradition of expenditure tracking for purpose of accountability for equity and efficiency
MOE does not have education policy division to analyze results of PETS activities and present them in ways that are useful to decision-makers
Limited knowledge of public expenditure tracking systems
Inputs/Interventions
Participation of MOE in first PETS activity, as part of multi-agency team, with Bank support
Creation of education policy division in MOE, under EDP II, with training and specific policy exercises
Participation in Bank-funded multi-country PETS training course (2004)
Participation in Bank-funded multi-agency PETS exercise (2004/05)
Outcome/Indicator
MOE decision-makers appreciate benefits of first PETS exercise and plan to adapt, expand and repeat exercise
First PETS successfully undertaken in 2005 in social sectors
Expanded PETS undertaken in later years
Example: CE issues in Education
Results C
hain
• Education Division policy created and staffed with appropriately trained personnel•PETS-related policy produced to acceptable standard
11
Objective: Effective Decentralization
Institutional Organizational Individual
Baseline Capacity
Clarity of roles and responsibilities
Donor coordination
Existence and quality of business processes
Effectiveness of organizational structure
Adequacy of skills
Inputs/Interventions
TA for policy options Promote dialogue on
strengthening the road transport industry (private sector)
Processes for key support functions: fin. mgmt., procurement, M&E
TA for manuals, guidelines, procedure
Training in key support functions: fin. mgmt., procurement, M&E
Outcome/Indicator
Accountability structure
Shift in key roles across public-private sector boundary
Performance-related skills improvement
Example: CE issues in RMP2
Results C
hain
12
Objective: Functional budget classification
Institutional Organizational Individual
Baseline Capacity
Centralized control approach in MoF and at policy level
Agencies preference for budget consolidation to allow flexibility
Lack of technical skills to prepare classification structure
Inputs/Interventions
Knowledge sharing/dialogue/study tours to neighbors for decision makers make the case for move from expenditure system to functional
Long term coaching for training in designing and implementation of a “functional” classification system
TOTs for extensive training at agency, with local institutional base and provincial level in application of system
Outcome/Indicator
Timeliness, transparency, and coherence of budget envelopes
FY2004 budget presented following administrative, functional and simplified line-item structure
Same system applied for execution and accounting
Results C
hain
Example: CE issues in PEM