BLOCKS 3 & 4 HISTORY• EPSA FOR BLOCKS 3 & 4 SIGNED ON
FEBRUARY 9, 2003 BY ENCANA.
• CCED TOOK OVER 50% OF THE ASSET FROM ENCANA IN NOVEMBER 2007.
• EXPLORATION COMMENCED IN 2009.
3
BLOCK 3
BLOCK 4
0 50 Km
BLOCK 51
BLOCK 42
BLOCK 6
BLOCK 64
1972-1984
1983-1986
1985-1990
1991
1992-1994
1999
2001
2005-2007
2009-2012
CCED ACHIEVEMENTS
1. BUILT EARLY PRODUCTION FACILITIES TO PRODUCE OIL WITHIN 5 MONTHS AFTER THE GREEN LIGHT FROM MOG.
2. PREPARED AND SUBMITTED THE FIELD DEVELOPMENT PLAN TO MOG.
3. IDENTIFIED FURTHER EXPLORATION OPPORTUNITIES AND INITIATED A PLAN TO EXPLORE
5
EARLY/ PERMANENT
PRODUCTION FACILITIES
2
Abandoned Alam Station
ALAM METERING
STATION
FARHA
OIL PROCESSING & MOVEMENT
SAIWAN PF
QA PDO Station
SAIWAN WIFEXISTING
Early Production
Facility
FUTUREQARN ALAM METERING
STATION
8” P
DO
16”(16 Km)
FUTURENEW
8”
6
7
DRILLING PROGRAM
NOTE: 24 WELLS WERE SUCCESSFUL OUT OF 30 DRILLED EXPLORATION/APPRAISAL/DEVELOPMENT PRODUCERS WELLS - 80% SUCCESS
WELLS DRILL AS OF FEBRUARY 2012 FURTHER WELLS TO BE DRILLED
PRODUCER INJECTOR WATER SOURCE DRYHOLE PRODUCER INJECTOR WATER
SOURCE
BLOCK 3 24 5 1 3 31 20 10
BLOCK 4 6 0 0 3 2 0 0
TOTAL 30 5 1 6 33 20 10
PRODUCTION FIGURES
8
0.00
20,000.00
40,000.00
60,000.00
80,000.00
100,000.00
120,000.00
140,000.00
160,000.00
180,000.00
200,000.00
220,000.00
240,000.00
260,000.00
280,000.00
300,000.00
320,000.00
340,000.00
360,000.00
380,000.00
400,000.00
Jul-10 Aug-10 Sep-10 Oct-10 Nov-10 Dec-10 Jan-11 Feb-11 Mar-11 Apr-11 May-11 Jun-11 Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12
Farha Saiwan
20112010 2012
15,865. 13,741.36
44,784.62
28,283.13
36,693.74
22,588.0513,949.93
21,006.01
32,943.75
80,500.63
104,396.39
131,692.23
151,966.82
191,862.11
215,924.17
195681.17
254,972.96
327,323.01
315,004.66
377,946.85
MMBO
CCED OMANMONTHLY OIL PRODUCTION
9
OVER 7,000,000 KM DRIVEN (CRUDE HAULAGE) WITH ONLY ONE RTA.
OPERATION STARTED WITH FOUR (4) TANKERS AND INCREASED TO THIRTY ONE (31).
HIGHEST DAILY VOLUME TRANSPORTED; 14,498 BARRELS.HIGHEST DAILY NUMBER OF TANKERS OFFLOADED IN ALAM IS
63.HIGHEST MONTHLY VOLUME TRANSPORTED; MARCH 2012
MTD 377,947 BARRELS. HIGHEST MONTHLY KM DRIVEN FEBRUARY 2012 MTD 542,174
KM.
CRUDE OIL TRUCKING OPERATION
9 9
WHY CCED IS A SUCCESS
1. TEAM WORK
2. TEAM EMPOWERMENT
3. LEADERSHIP
4. SKILLED PEOPLE
5. PLANNING, PLANNING, PLANNING
6. COMMUNICATION
7. RELATIONSHIP
8. SIMULTANEOUS APPRAISAL AND DEVELOPMENT
12
OMANIZATION PLAN 2008 - 2015
2008 2009 2010 2011 2012 2013 2014 20150
10
20
30
40
50
60
70
80
90
Local %Expat %
YEAR
PERC
ENT
(%)
14
EMPLOYEE TOTALSDescription Number of Employees
as of 21st April 2012
OMANI NATIONALS CURRENTLY WORKING IN CCED 141 (52 Muscat + 89 Field)
EXPATS CURRENTLY WORKING IN CCED 67
OMANIZATION % 68%
OMANI NATIONALS TO BE RECRUITED 2012
46Operators & Technicians
EXPATS TO BE RECRUITED IN 2012
19Managers/Technical
15
16
BLOCKS 3 & 4 INVESTMENT
INVESTMENT 2010 – 2012:
OVER $ 300 MILLION USD
PLANNED INVESTMENT 2013 – 2017:
OVER $ 500 MILLION USD
ENHANCED OIL RECOVERY
1. PRIMARY
2. WATER INJECTION AS SECONDARY RECOVERY – PILOT STARTED.
3. CHEMICAL, SURFACTANT OR MICROBIAL AS TERTIARY RECOVERY
17
ENHANCED OIL RECOVERY4. VAST EXTRA HEAVY OIL
RESERVES WHICH REQUIRES THE UTILIZATION OF THERMAL RECOVERY METHODS.
18
TOTAL NEW FIELD EXPLORATION IN THE WORLD
$120
$100
$80
$60
$40
$20
$0
$/BA
RREL
IN 2
007
USD
70,000
60,000
50,000
40,000
30,000
0
NU
MBE
R O
F N
EW F
IELD
WIL
DCA
TS D
RILL
ED IN
TH
E W
ORL
D
$140
20,000
10,000
Data Source – IHSData Source – IHS
MAJOR
INDEPENDENT
NOCs
OIL PRICE
1992-1996
75%75%
8%8%24,62324,623
17%17%
1987-1991
75%75%
8%8%36,06236,062
17%17%
1982-1986
84%84%
6%6%63,93563,935
10%10%
1977-1981
84%84%
6%6%61,94361,943
10%10%
2002-2006
87%87%
6%6%35,95435,954
7%7%
1997-2001
76%76%
10%10%22,29922,299
14%14%
19