CBC 7 Report to June C4. Discussions in Meeting. Next CBC Meeting Coordination with Committees GCI Work Plan Progress Development of 2009 – 2011 Work Plan CB in the Regions. CBC 8 Opportunity for inter-committee coordination. 22-24, Boulder. Coordination with Committees - ADC. - PowerPoint PPT Presentation

Citation preview

Page 1: CBC 7 Report to June C4

CBC 7 Report to June C4

Page 2: CBC 7 Report to June C4

Discussions in Meeting

• Next CBC Meeting• Coordination with Committees• GCI • Work Plan Progress• Development of 2009 – 2011 Work Plan• CB in the Regions

Page 3: CBC 7 Report to June C4

CBC 8 Opportunity for inter-committee coordination

2008

May Jun Jul Aug Sep Oct Nov Dec

ADC19-22,

Geneva21-24,

Boulder

CBC3-5,

Tashkent15-17,Athens

STC22-23,

Geneva8-9,

Paris

UIC6-8,

Toronto22-24,

Boulder

C417-18,

Geneva25-26,

Boulder

ExCom15-16,

Geneva18,

Beijing

Plenary19-20,Beijing

22-24,Boulder

Page 4: CBC 7 Report to June C4

Coordination with Committees - ADC

– CB and the GEO Portal: Accepted ADC proposal to establish a joint task team (Alan Edwards, Gordon Bridge, Hilcea Ferreira, Imraan Saloojee)

• First OB – review existing requirements drafted by CBC

• Second OB – assess impact– Prioritization of requirements– Feasibility of the current architecture– phasing of requirements– evaluate impact on existing Tasks (and update the GEO wp

if necessary)

• Third OB – start implementation (through existing or new task)

– Best Practices Wiki for capturing “Good CB practice”• Hilcea Santos Ferreira • Chris Mannaerts

– Possible Joint Session in Boulder

Page 5: CBC 7 Report to June C4

Coordination with Committees - UIC• US 06 01

– Linkage with determining CB needs (CB0701b)– UNECA contribute to user requirements in Africa

• Potential UIC “call for participation”– Identification of projects provides a linkage with

donor engagement task• Develop CB requirements from IGOS Theme Reports• COP’s as a vehicle to determine CB needs• Joint Session in Boulder – would require planning

between co chairs

Page 6: CBC 7 Report to June C4

GCI and CB

• IOC Task Force and CBC: Hilcea Santos Ferreira,Gordon Bridge, Alan Edwards

• CBC members identifying test cases in each GEO region to provide specific user feedback on portal “usability” e.g. Kenyan Wildlife Services

Page 7: CBC 7 Report to June C4

Work Plan Progress

• Task progressing well– Most will continue into next work plan– Excellent Progress made with Chlorogin (POGO, EC0607) ,

Building National Capacity (UNEP, CB0701d), Open Source (CB0701e)

– Recurring theme: resources for task implementation• Resource Mobilisation

– Identification of showcase projects from current tasks– Possible Meetings with Resource Providers

• Task Sheets– Addition of “capacity building” info Box

Page 8: CBC 7 Report to June C4

2009 – 2011 Workplan:CB Overarching themes/Tasks (OAT)

• Resource mobilization

• Promoting education, training and certification (Build Individual Capacity to use EO)

• Strengthening and building networks (Build Institutional Capacity to use EO)

• Advancing Earth Observation through infrastructure development (Build Earth Observation capacity through technology transfer)

• Outreach and institutional reinforcement (Continuous Needs/Gap Assessment)

Page 9: CBC 7 Report to June C4

OAT and the CB Strategy

• The objectives outlined in the Capacity Building strategy, therefore, need to be the driver of the 2009-2011 Work Plan Capacity Building activities

• The 2009-2011 Work Plan should include, realign and possibly redefine priority actions identified in the strategy

• The 2009-2011 Work Plan should address the I3 of Capacity Building namely Infrastructure, Institutional and Individual

• The current Work Plan largely focuses on developing the cross-cutting dimension of capacity building; a bigger focus is required in the 2009-2011 Work Plan, through sub-tasks, on developing societal-benefit-area specific capacity building activities

Page 10: CBC 7 Report to June C4

OAT and current tasks

• Resource mobilization

CB0701a

• Promoting education, training and certification

CB0801; AG0607; WE0605

• Strengthening and building networks

EC0607; CB0701d; CB0702(will this end in 08 ?)

• Advancing Earth observation through infrastructure development

CB0701e; WA0607; CB0604

• Outreach and institutional reinforcement

CB0701b; CB0701c;

Page 11: CBC 7 Report to June C4

OAT and suggestions from CBC6 + GEOSec Call• Resource mobilization

FP7 - establishing a Capacity Building advisory capability in support of Earth Observation (EO) activities

• Promoting education, training and certificationBuild Individual Capacity to use EO

GMOSS summer schools;GEONETCast training channelGEOBON;ForrestMonitorIRI /Gmoss Summer School

• Strengthening and building networksBuild Institutional Capacity to use EO

Implementing CBERS GEO CB Network;

• Advancing Earth observation through infrastructure development Build Earth Observation capacity through infrastructure development & technology transfer CBERS,SERVIR Africa,

• Outreach and institutional reinforcementCB Portal;Games ContestUser Oriented workshops for GEOSS outreach and feedback

Page 12: CBC 7 Report to June C4

Recommendations to C4 and Excom

• Promote the identification of CB contact points in GEO Caucuses