16
1 Guzoo inspection may 2011 a f or f Khll al crl d Rhbl cr Ld, l kw Gz, ld wh h pr f albr. prrd fr th Dr f agrlr, Fd d Rrl Dl d h Dr f sbl Rr D l f h pr f albr b h cd a f z d aqr. caza Rr

CAZA Full Report of GuZoo Inspection, May2011

  • Upload
    caawps

  • View
    219

  • Download
    0

Embed Size (px)

Citation preview

Page 1: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 1/16

Guzoo inspection may 2011

a f or f Khll al

crl d Rhbl cr Ld, l

kw Gz, ld wh h pr

f albr.

prrd fr th Dr f agrlr, Fd dRrl Dl d h Dr f sbl

Rr Dl f h pr f albr b h

cd a f z d aqr.

caza Rr

Page 2: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 2/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

e sr ..........................................................3

ird ........................................................................4

al cll & Rrd mg .......................5

Wldlf d crlld al trr sdrd ..6

Wldlf d crlld al c sdrd ....7

off-s Dl sdrd ................................................7

s cr d ed sdrd ..............7

pbl d sff sf sdrd .....................................8

sff er d trg sdrd ..........................8Grl ehb sdrd ................................................9

al Hlh cr sdrd ........................................10

al Bhr Hbdr sdrd ......................... 11

Grl al cr sdrd ......................................11

cldg c d obr .......................12

s phgrh .............................................................13

taBLe oF contents

Page 3: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 3/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

executive summaRy

i arl 2011 th cd a f z d aqr (caza) w rd b h Gr f alb

d rw f h r f fl ld r thr Hll albr kw Gz. th r

rdd fr dd, bj, rfl f ll f h fl’ r bd

h rqr f h albr z sdrd. sbql caza w rd wr rr r

h f h wll h grl hlh f h l h fl.

caza dld l lkd drl h albr z sdrd lg h caza

ing approach and philosophy. CAZA then assembled an inspection team consisting of a highly qualied, experience

ld vrr d rfl wh l hbdr d g r.

o m 4 & 5 h caza d Gz. Drg h h wr rd b rr f albr sbl Rr Dl (sRD) d h albr s fr pr f al (a

pca).

Drg h 108 l f h albr z sdrd wr d d rd g h caza

fr d rg r. Bd h G rd r f:

Rg f 3- d drd: 0

Rg f 2- drd: 31

Rg f 1- d drd b wh ffr ld d : 45

Rg f 0 – d drd d lkl d : 32

i g Gz’ rfr, h r h rd w rd h l r h ld h

rd bd h br f l d. Gz hd rg f 49%.

The inspection indicates that there are two signicant underlying issues affecting the operations of GuZoo. The r

rr; h d h f h wr rl f h rqr f h albr z s

drd.

Lack of nancial resources is at the base of many of the inadequate structures and facilities at GuZoo. Without t

r bld, d grd dd h r frrr h hr h b,

wll b, lk f bl hg, hb d r fl. i dd h lk f rr

leads to an inadequate number of trained, qualied staff which leads directly to unacceptable standards of clean

hb d r frrr h wrr d fd rr r. th lk f rr lld dd ll hrfl fd r h rd kll r hr dd l h r

rrl rd rr bg g h ll. Fll h lk f rr rb l h

f rr ll hlh d g .

th f h wr wh r rl k rqr f h albr sdrd . al d

tication is a critical step in managing an animal collection, and as has been identied in numerous comments, th

is not provided for at GuZoo. The owner has not put in place an identication program and has clearly indicated

d l d . i dd h h l rl rh rgr h ld

rr ff rg, d g h dd f dg h fr. Fll h rr rgr

Page 4: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 4/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

Gz wh h rl f h rr drbd h drd, ldg h rl d

wh rr d b ld h g f h ll. th rbl rbd b

b f dr l fl dg d r. th wr h lf f r wh fr

b d h lr r d kwldg f dr wldlf d l dg hq.

intRoDuction

The Canadian Association of Zoos and Aquariums (CAZA) was formed in 1975 as a national, not-for-prot organ

. i h l f h d qr cd. Rrg h ldg lg

rk d qr, r r h wlfr f l d rg h d f

, d, d .

thr r w albr Gr dr wh dr lgl jrd r . th Dr agrlr, Fd d Rrl Dl (aaFRD) dr h al pr a d rgl. th

Dr f sbl Rr Dl (sRD) dr h Wldlf a d rgl. ag

wh hr dr h al pr a r rbl fr fr f al cr sdrd.

i arl 2011 caza w rd b h Gr f albr d rw f h r f fl

ld r thr Hll albr kw Gz. th f h r w fllw:

caza wll d dd, bj, rfl f ll f h fl’ r

bd h rqr f h albr z sdrd. sbql caza wll rd wr rr h

r h f h wll h grl hlh f h l h fl.

caza wll:

Dl l d r bd h albr z drd. th l d r b•

rwd d rd b h Dr rr h hdld .

Provide two qualied inspectors (one an experienced zoo veterinarian) to visit the site and utilize the preapprov•

caza l h r f h fl. caza wll rd d rdl f

r h Dr rr . u l f h fl , caza dg

wll rd rbl rgr rr h Dr’ dg().

prd rr dg whhr h fl l wh h albr z sdrd d h fl•

rd z Dl pl; wh drd, f , h fl flg l wh; d gg

hw r whhr l b lhd. Rr b bd h Dr dg

lr h m 16, 2011.

Maintain condentiality of any and all correspondence and other documentation related to this contract.•

a r h gr caza dld l lkd drl h albr z sdrd d l

h caza rg rh d hlh. th caza rg fllw:

caza rd rg bd fr ll .•

a h drd l f h rd wll b wrdd r f 2•

if d ll wll l f h h g ddl rg d•

r f 3.

If an institution does not achieve standard they will be given a score of 1 if it appears that the deciency can b•

Page 5: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 5/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

rectied in a reasonable period of time.

if r h h wll b bl drd rbl rd f h wll b rd 0•

th fr d r wr rwd wh albr Gr rr b lfr drd fr g. caza bld g f ld vrr d rf

wh l hbdr d g r. th br h h

years of experience in the zoo eld.

o m 4 & 5 h caza d Gz. Drg h h wr rd b rr

f albr sbl Rr Dl (sRD) d h albr s fr pr f al (aspca)

dd h r h r wr bl rfr Gz’ rd dl l d whr r

ate the American Zoo Association (AZA) Minimum Standards for Mammals as dened within the current Alberta

sdrd. D wr hld wh h wr f h fl d h r rr. th

rd hr d frhg r d ll qr.

a l fdbk lfr w hld m 9 wh rr fr albr d l rl f h

wr dd d rrg d l wr rwd d grd .

th rr r h ’ br d rg f h Gz fl. th fll f

ld “Fl G i Fr” ldd wh h rr d hld b ld b h dld

d r f h r. th rr rrd rlll h l f h i Fr d

albr sdrd. th grh h h llr h rg fd h fr.

animaL coLLection & RecoRDs manaGement

th b fr l g rgr l

ff d r rrd . th d

clearly dened in the Alberta Standards. Individual ani-

mal identication is the key to a meaningful record sys-

. th wr h dd h h d w, r 

d h d h fr, ddll df ll f 

h l h ll.

The lack of individual animal identication precludes the

l f ff ll g

d l hlh rrd f lgl ll- g lrg br f l d .

th rlg lk f bl k rll -

possible for regulatory agencies to have any condence

l rkg wh h ll h brh,

rg, dh, q d d f -

l fr/ hr r ddl.

th lk f ff r f l d gr wh h ll bd wh h lk f l

identication places the entire animal inventory of domestic and controlled animals ‘at risk’ in the event of an infec

 

0

1

2

3

4

5

6

7

8

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 6: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 6/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

d brk h r.

th rlld f d l d fr h Gz rr bd wh h lk f lr

ff r f rlld d rlld l h rr, h b f r rrg rgr fr fdrll rgld d h tB d Brll d h lk f hrd hlh r

hrgh r r , hdld rr rg d ff r hlh rgr

r drbl d rk h l f h rg l fr Gz d rl r

d r-bk ffr h f h dg f f d lg Gz.

WiLDLiFe anD contRoLLeD animaL tRanspoRtation

stanDaRDs

Once again the lack of individual identication and an ac -

ceptable record keeping system makes it very difcult to

dr f l wh rg rgl -

rrg.

Gz rl h fr whh l q

rg r h h l bg rrd r

hlh d fr f f d d Gz d

rl qr wl rrd l. al

r, hwr, frql qrd fr g wh r-

h d rdrb l d r hd b l

rrr h r f rrg rl l ,rg d kg- r lg-ff l rl

r. th l fr f d

r drg rr bd wh h r f -

l rr r h l fr f.

all l rg hld b ld fr rd drg whh d rd r wld h

h r r lf. m qr rd fr wl rrd l wdl d

30 d. th rl h Gz. i dd f wl rrd l b h fl

rr rqr wh h drd h bg dhrd Gz.

 

0

1

2

3

4

5

6

7

8

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 7: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 7/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

WiLDLiFe anD contRoLLeD animaL containment

stanDaRDs

th rr f ff brrr

d wldlf h d ll dr.

i bl brrr h l wh Gz b

ff hl brrr f h hld

h ll. Whl h f wl, lrg ,

br d r bd h rr f rr-

hl rk l h , h

g f d br f wld lkl h lrgr 

gl. th r f h rr wldlf -r h rk f h rfr f f, rlld

d bw d fr-rgg wldlf l.

th lk f r f lkd l hldg r

ld ld l , hf r b r bl

jr.

oFF-site DispLay stanDaRDs

off- wr drbd h Dl pl h h r rwd b rdg Gzrr h rgr h b rl dd.

species conseRvation anD eDucation stanDaRDs

th albr z sdrd rqr h hr b “-

d rgr” l ll ld r-

tions. CAZA considers ‘active education programming’

b d rgr h l h drbf fr d b r r rfr-

h ll ld bl r h

fr f q d wr r d. thr

h rgr l. Whl hr r lbl

hb rqrd b h albr sdrd, rl f 

h wr fd b r.

 

0

0.5

1

1.52

2.5

3

3.5

4

4.5

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

 

0

0.5

1

1.5

2

2.5

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 8: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 8/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

puBLic anD staFF saFety stanDaRDs

th lk f dq hf fl fr dgr l

r f wrkg r fr rg

r dgr l hb. thr r fw, f 

, dgr l hb h d dq,

f, r hf r. i w d h l wr

hfd r b fr hb lg d

. thr wr gll dr d-

gr rr/r hf r hb r

b hr wr lkg h h dr

d wr f qbl rgh drg h

animals they were conning. There was also no way tofl h hf r fr lg f -

closures resulting in a signicant accumulation of fecal

rl d w fd h r.

th ff l dq r d

l lr dl rqrd b albr drd. th l f f, w fd d

bddg lrl d h lr r rrl rd bl

r fr h l h ll. thr l dq ff fl r hb f l h

gh b hfd fr hb rg b ll rr hrd l kr ..: b, k, k

hr, lk, .

n-dgr l r r lr h r lf lkd d rd r -rk

b b h bl. th l bg bl dr, rd wh h bl bl f

r. Wh r lbl f h r.

th caza r hd r fr h lgh, rr rl d l h ld rr

ldg h sl cr Br, h ld r bldg, d h ld dr br. th h h dr d l

f l h r d bh h d l hlh rk.

staFF expeRience anD

tRaininG stanDaRDs

Appropriate numbers of trained, qualied staff are key to

h fl r f lgl fl. a d

rl h ll f ff lbl r fr ll-

h d h f h Gz r

dq d rl lr r ld

0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

 0

0.5

1

1.5

2

2.5

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 9: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 9/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

d d rqrd h albr sdrd. i d wh h wr w kwldgd h

br f ff wr dq hwr h d h h dd h h rr hr r ff. th

of volunteers was discussed and the idea largely discarded by the owner due to the difculties involved in providir . a lgl fl h dq l f kwldgbl ff dr r

rd fr h b d f h ll. vlr rd ff wh l hbdr b

r ll ld wh rj d rgr bd h b rl d f h

a ff rg rgr l rqr f h albr sdrd b d Gz.

GeneRaL exHiBit stanDaRDs

ehb d l hldg fl r

dq w fr h l bg hld

h. s f h hb grll bl b

there is a lack of xed and variable cage furniture in

hb rg l b d -

press a full range of physical activity. Much of the xed

g fr h d b d lfr r

r rr d f, fr : hhd h k lr wh h l hg

dhd, dhd l d brk rrr h l-

r q lr, lfr fr h l r

l.

Wr d fr l h h

gr d l d rd dq r fr

ld d wd. ohr wr rd lr r

dq , l d l. th ld r bldg d h sl cr bldg r dq

fr r wrg h ll. vl r h hldg r d hr r rr hf g

h hldg r h l d b d d f h hldg r b ld. th J

q hld h whr rd, ld wr hlr. aza m Hbdr Gdl fr ml gg dr hldg fl wh rr bw 18-29c (65-85F) drg rd f

rr.

th G hlld hr r ff rl drg r f h . o d wllw

posefully created for the Tule elk contained a signicant volume of grossly contaminated water. Another depressio

h wlf hb lkl rd b dggg f h wl, h lr l f grl d wr.

thr r hd wr drkr fr dr lr hrfr frh wr wld d b d

bl l dl hrgh h wr b dlr h lr h rqr f h albr

 

0

2

4

6

8

10

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 10: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 10/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

dards. At the time of the inspection many of the water containers were contaminated with dirt and some had sign

lg grwh. a wrr h r f h gl lr wr bg d f

the season during the inspection. The provision of clear, fresh water to such a large collection as specied by t

albr sdrd wld b r hllgg wh h g l f ff.

animaL HeaLtH caRe stanDaRDs

Dlg d g ff l

hlh rgr d rrd dd -

mal identication, effective surveillance (necropsy and

r ), ll h hbdr fr-

(d, br), r r

d fdbk.

There is no individual animal identication which makes

ff, r, l hlh g

rgr bl. nr r rfrd fr-

ql d r rfrd rl

h g ll r wl rrd l. thr

r dl hbdr d l br rrd

and the veterinarian does not have a xed schedule of 

r Gz.

thr wr rl fr rr rw f dfr w r g l h ll rqrd h drd hwr d rw r f h l

h ll rbl brgh h f h rr. th wr r d g fr

rdd b h r f w l .

n dl rrd r d b h rr hr r l. th l dl rrd r h

g rrg l whh r k h rrd bk d bl h ldr rrd h z

th gh avma drd b wld caza rd drd h rqr dl f b

l r d dl rrd.

thr r ff rr fl fr f h h b hll rrd b hd,

h-l. th rr d h hl rr g d q.

th drd rqr h ll dh b rrd h rr. th G rr ggd h w

done however, the veterinarian did not think that was necessarily the case. Without individual animal identicatio

h d l r rrd, hr w rl h dffr f .

B f h lk f ff r f rlld wldlf d rlld l h r, h

r bl h h albr drd lrl d h ll l h Gz r hld b

ered ‘controlled’ animals and should therefore not be allowed to leave the premises. Without this restriction of anim

, hr rd rk f d rd fr h fl whh l r rl

fr rlld d d f h rlld b d fr h d. thr hw

0

1

2

3

4

5

6

7

8

9

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 11: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 11/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

confusion on this subject that needs to be claried.

thr r b gd rr/l rlh b hr h b h l h

hlh f h ll hld b gd b h rr.

animaL BeHaviouR HusBanDRy stanDaRDs

Bhrl rh r ld b

rdd d ld hb b.

thr h b ff rg bhrl rh-

d l d . thr ll d f 

rg h wld fl hbdr r l hlh

r rdr.

 

th ll d gg dg lr h h b

l f rr rdg r d r 

wh h lr. B f h ll r-

r hb h wg fr r h d,

r r h wlfr f h l

h ff r d rl rr. th l,

gr d hb r l ll dd

f rrl fr.

th fdg f dd k d wh brbr rld h dh f gr. all dd k d rd kllrr hlh rk b h r h l w lld r wh wdrd h rd kw.

pl bg d bg wr frql hb d h hbdr rl wll f-

fr l d rd fr r (fr-) d l h l wrk hr w h r

This might be considered ‘food enrichment’ but the containers represent a risk if eaten.

GeneRaL animaL caRe stanDaRDs

Fr rll r h ll rd

b gd hl d, hwr, h ll f 

r d hbdr rd b lk f ql-

ed animal care personnel and a lack of knowledge of 

bl l r drd. th rlg g-

eral animal care is decient in many ways from basic

hg d r d rk g d

l rh d rg.

thr ll -gg rr d. Wr 

0

1

2

3

4

5

6

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

 

0

1

2

3

4

5

6

7

Rating 3 Rating 2 Rating 1 Rating 0

Frequency

Frequency

Page 12: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 12/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

lbl d ql bld r drbl hrgh h r. m l r lkl dd

now for uid intake in the winter supplemented by fresh water when made available. Animals without access to a

wrr r dd wr drb r f l d l wr r h h

of inspection were mostly dirty and many water containers had signicant algae growth even though the temperaturd rll l.

concLuDinG comments anD oBseRvations

Drg h 108 l f h albr z sdrd wr d d rd g h caza i

fr d rg r. Bd h G rd r f:

Rg f 3- d drd: 0

Rg f 2- drd: 31Rg f 1- d drd b wh ffr ld d : 45

Rg f 0 – d drd d lkl d : 32

g Gz’ rfr, h r h h rd w rd h l r h h

h rd bd h br f l d. Gz hd rg f 49%.

The inspection indicates that there are two signicant underlying issues affecting the operations of GuZoo. The rst

r; h d h f h wr rl f h rqr f h albr z sdrd

A lack of nancial resources is at the base of many of the inadequate structures and facilities at GuZoo. Without t

r bld, d grd dd h r frrr h hr h b, wll b, lk f bl hg, hb d r fl. i dd h lk f rr l

o an inadequate number of trained, qualied staff which leads directly to unacceptable standards of cleanliness

hb d r frrr h wrr d fd rr r. th lk f rr l ld

dd ll hrfl fd r h rd kll r hr dd l h r rr

rd rr bg g h ll. Fll h lk f rr rb l h

f rr ll hlh d g .

The position of the owner with respect to several key requirements of the Alberta Standards is an issue. Animal ident

cation is a critical step in managing an animal collection, and as has been identied in numerous comments, this is n

provided for at GuZoo. The owner has not put in place an identication program and has clearly indicated he does n

l d . i dd h h l rl rh rgr h ld rr

rg, d g h dd f dg h fr. Fll h rl f h rr, drb h drd, wh h rr rgr Gz, ldg h rl d wh

rr d b ld h g f h ll. th rbl rbd b h b

dr l fl dg d r. th wr h lf f r wh fr l b d

h lr r d kwldg f dr wldlf d l dg hq.

o rqr f h r w ffr rgrdg hw lg wld k, r f, h fl

be brought into compliance with the Alberta Standards. Given the underlying issues of insufcient resources and t

owners position on the Standards it seems unlikely without a signicant change in one or both of these that complian

hbl.

Page 13: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 13/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

a r f caza drd h albr sdrd w l rqd. i h l h bh d

k , h caza drd r r dld d f h r lr r dl h

d h albr sdrd. th dd r f f d r, ff rg, rr r, hfl, l r, rrd , rl d l lg d dl, r

d. thr r br f r h r ddrd h caza drd h r h albr s

dards. These include governance, nancial management, support organization and research. Due to the differen

h rrg f h w f drd, dld r ld b lhd hwr wld

signicant effort to accomplish accurately.

site pHotoGRapHs

th fllwg hgrh r rr l f h k b h drg hr th r dd frhr llr d d h d br d h i

Fr d h rr.

a l f h rl d wr dh

fd h rk. albr sdrd rqr dl l-

g d r f bl wr.

arb l lr hwg dgd hl

l rl d blr w. thr r “

b “ g d h bll rh hrgh h

f h bl.

Page 14: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 14/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 association Des zoos et aQuaRiums Du canaDacanaDian association oF zoos anD aQuaRiums

ol wr r cbr / cd G l-

r

cbr hlr hwg bld f fl rl.

L lr- pr d f rr g h-

rd l.

L lr- hwg bld f w fd d f

l rl.

Page 15: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 15/16

association Des zoos et aQuaRiums Du canaDaGuzoo inspection may 2011 canaDian association oF zoos anD aQuaRiums association Des zoos et aQuaRiums Du canaDa

sk Dr wr k hwg lg bld . tgr elr - hf dr l b gr l d

b rl rd.

Wr hldg - fd rr r- grll -

k d rl d.

Wlf lr- ll hlr lbl d

dg wr l.

Page 16: CAZA Full Report of GuZoo Inspection, May2011

8/6/2019 CAZA Full Report of GuZoo Inspection, May2011

http://slidepdf.com/reader/full/caza-full-report-of-guzoo-inspection-may2011 16/16

613-567-0099 613-233-543800-280, rue Metcalfe St. O ttawa, Ontario, Canada, K2P 1R7 www.. f@