Upload
daniel-carter
View
220
Download
0
Embed Size (px)
DESCRIPTION
How is EPBD Achieved? Software used to produce EPC Use SAP programs for domestic dwellings and student flats – (each self contained flat needs it’s own certificate based on SAP, and the whole building and common areas need a certificate based on SBEM.) Use SBEM for all other University buildings above 1000m2 or rented, or when they are sold. For either program, need full details of building envelope (room size, wall type and size, window type and size, lighting, plus full HVAC details). Data collection is the most difficult part. Data entry into program may take up to 5 man days per building.
Citation preview
CaSPr Energy TSNCaSPr Energy TSN33rdrd Sept, Glasgow Sept, Glasgow
Energy Performance of Buildings Energy Performance of Buildings Directive Directive
David Stutchfield David Stutchfield Energy OfficerEnergy OfficerUniversity of St AndrewsUniversity of St Andrews
EPBD Scope EPBD Scope
Included in SBSA Section 6 Energy 2007 Requires an Energy Performance Certificate to be displayed (in a prominent place) in University buildings. Applies to new buildings from May 2007, any buildings sold after summer 2008, rented and all University buildings over 1000m2 by January 2009. Section 6 also requires a building log book and building metering
How is EPBD Achieved?How is EPBD Achieved?
Software used to produce EPC Use SAP programs for domestic dwellings and student flats – (each self contained flat
needs it’s own certificate based on SAP, and the whole building and common areas need a certificate based on SBEM.)
Use SBEM for all other University buildings above 1000m2 or rented, or when they are sold.
For either program, need full details of building envelope (room size, wall type and size, window type and size, lighting, plus full HVAC details). Data collection is the most difficult part. Data entry into program may take up to 5 man days per building.
SBEM OutputSBEM Output