8
Case Study Procedure for Site Release e.g. PWR NPP

Case Study Procedure for Site Release

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Case Study Procedure for Site Release

Case StudyProcedure for Site Release

e.g. PWR NPP

Page 2: Case Study Procedure for Site Release

Case StudyDismantling of a PWR NPP

• The dismantling of a PWR NPP is shown here in 4 phases

• In these phases the most activated and contaminated materials were dismantled and discharged

• The rest of the buildings and the site is left for the free release and demolition

Page 3: Case Study Procedure for Site Release

I II

III IV

Page 4: Case Study Procedure for Site Release

Case Study Release Procedure for a PWR NPP

This is the start point for the release procedure:Materials left are• concrete• some drains• air condition• build-in metals• metal stairways

Page 5: Case Study Procedure for Site Release

Case Study: Interior of the reactor building, some levels and a vertical plane

Page 6: Case Study Procedure for Site Release

Case Study: site layoutControlled Area

Page 7: Case Study Procedure for Site Release

Case Study Release Procedure of a PWR NPP

• This is the goal:

heFrom operation times morgen ?To Green Field!

Page 8: Case Study Procedure for Site Release

Case Study: Release Procedure of a PWR NPPTask:

Generate the documents for the application for the releaseprocedure and the license for free release of the reactor building.

To follow this strategy it is necessary to clear these questions:

• Which chronicle order leads to the best results in aspect to a short duration of the whole process?

• Could some areas released during the process?• Which measures to proof the level of contamination gives where

the best results?• How is the ALARA Principle obtained?• How is the process documented?