Case Histories Russ Snyders, PE Associate Vice President May 31, 2013 Imagine the result

Case Histories

  • Upload
    lakia

  • View
    71

  • Download
    0

Embed Size (px)

DESCRIPTION

Case Histories. Russ Snyders, PE Associate Vice President May 31, 2013. Imagine the result. Labor and Industries Requirements. WAC 296-800-17007 Include multiemployer workplaces in your program if necessary . - PowerPoint PPT Presentation

Citation preview

Page 1: Case Histories

Case Histories

Russ Snyders, PEAssociate Vice President

May 31, 2013

Imagine the result

Page 2: Case Histories

Labor and Industries Requirements

• WAC 296-800-17007• Include multiemployer workplaces in your program if necessary.

• Applies when:

Your employees may be exposed to hazardous chemicals used by another employer;�

OR

Another employer's employees may be exposed to hazardous chemicals you or your �employees use.

Examples include employees of construction companies, cleaning services, or maintenance contractors visiting or working on-site.

Page 3: Case Histories

Global Harmonization

• WAC 296-901-14010 Written hazard communication program.

• The methods the employer will use to provide the other employer(s) on-site access to safety data sheets for each hazardous chemical the other employer(s)' employees may be exposed to while working;

Page 4: Case Histories

Labor and Industries Requirements

• The methods the employer will use to inform the other employer(s) of any precautionary measures that need to be taken to protect employees during the workplace's normal operating conditions and in foreseeable emergencies;

Page 5: Case Histories

Sources

• Purchase Order Requirements

• Capital Projects– Submittals– Who is reviewing?

Page 6: Case Histories

Adjacent Property Impacts

• Clinic in a neighborhood retail area

• Staff report headaches, light-headed, nausea and respiratory symptoms

• Varying degree of symptoms

• Odor in the building is getting stronger

Page 7: Case Histories

Adjacent Property Impacts

• Adjacent Building renovating for a new tenant

• Application of an epoxy floor finish

• Fans blowing out of the work area towards fresh air intake of clinic

• Applicators are not wearing PPE

Page 8: Case Histories

Adjacent Property Impacts

• Decided to close the office

• Contacted Patients

• Contacted Property Managers

• Sent most of the staff home

Page 9: Case Histories

Adjacent Property Impacts

• Implement Emergency Management

• L&I brought in by the Property Managers

• Negotiated to reschedule work on a weekend when clinic closed

• Worked to re-open the clinic for evening appointments

Page 10: Case Histories

Lessons LearnedGeneral Cases

• Review products at design stage

• Have trained professionals review product submittals

• Use ducted ventilation and off-hour scheduling

• Provide oversight at Project Coordination level

Page 11: Case Histories

Contractor Coordination

• Demo/Abate Mechanical Project

• Asbestos Pipe Insulation

• Multi-contractor site

• General Contractor in control of site

Page 12: Case Histories

Discovery

• Happen to walk on site

• Stop Work

• Clean up an asbestos spill

• Still had to complete the abatement

Page 13: Case Histories

Lessons Learned

• Owner’s Representative not familiar with the regulations

• Impacts the asbestos pipe fitting insulation

• Asbestos debris spread through out the mechanical room

• Mechanical contractor works the next day

Page 14: Case Histories

Lessons Learned

• Insure that hazard is communicated by General Contractor

• Confirm that Personnel are have asbestos awareness training

• Review the sequencing of the work at preconstruction conference

• Keep specialty vendors in the communication loop

Page 15: Case Histories

Questions?