Capital Plan
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 2/27
Overview
$3,129,102 Loan Order (Reduced from
$3,256,978)
Majority is to replace vehicles in DPW and its
divisions. Much of the equipment is over twentyyears old and in advanced stages of disrepair.
$900,000 is for building and infrastructure
improvement projects.
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 3/27
Cost SavingsCost savings totaling almost $450,000
•Reuse of equipment and parts when appropriate(i.e. – using existing sander bodies on newchassis) = $160,000
•Moving newer loader from Cemetery division toParks division = $150,000
•Strategic use of three vans donated from TrinityAmbulance = $127,000 this year
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 4/27
Infrastructure Improvements$175,000 for City Infrastructure• $150,000 for Street and Sidewalk
improvements• $25,000 for a backup power generator at
DPW facility$757,000 for School Infrastructure
• $300,000 for two chillers at the Butler andBailey Schools
• $120,000 for windows at the Leblanc School• $250,000 for doors and weatherization
upgrades at Lowell High School
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 5/27
Streets – Current Sanders•Four (4) MackR685T SanderTrucks
•Average age =25 years
•Odometers notworking
•Parts are notavailable
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 6/27
Streets – Sander Replacements•Four (4)
InternationalWorkstar7400
•Sanderbodies to bereused,saving a totalof $160,000
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 7/27
Streets – Current Sander/Dumps
•Four (4) Mack
DM685Sander/DumpTrucks
•Average Age= 28 Years
•Parts are not
available
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 8/27
Streets – Replacement Sander/Dumps
•Four (4)International
Workstar7400 withsander/dumpequipment
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 9/27
StreetsCurrent CaterpillarBackhoe with 3,938
hours
Replacement 2011Deere 310SJ
Backhoe
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 10/27
StreetsCurrent 1993 Ford F-350 Pickup that was
recently burned
Replaced with 2011
Ford F-350 Pickup
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 11/27
StreetsCurrent 1993 VolvoL90C Loader
Replaced with 2011
Volvo L90C Loader
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 12/27
Streets – Tree RemovalCurrent 1989International
Skyworker
Replaced with 2011International 4300
with Forestry Package
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 13/27
Streets
Snogo WK-800 forsnow removal
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 14/27
Lands & BuildingsCurrent 1995 FordBronco with 124,000miles
Replaced with 2011Ford F150 6800GVW
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 15/27
Lands & Buildings
•Three (3) Vans
•Average age =16 years
•Two have failedinspections
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 16/27
Lands & Buildings
Replaced with one2011 Utility Trucks
and two UtilityVans.
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 17/27
Electrical
•Current 1996Ford Bucket
Truck
•Replaced withFord F-450
Aerial Lift
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 18/27
Parks – Original Request
•7 vehicles and 1piece ofequipment in totalto be replaced
•Average Age of16 years
•Average Mileage
is over 100,000miles
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 19/27
Parks – Original Request
ID# Type Vehicle Year Life Condition 2011 2012
6 Van Plymouth 1995 10 Poor - 30,900
8 Van Chevy 1996 10 Poor 45,000 -
9 Van Ford 1996 10 Poor - 30,900
10 Van Chevy 1992 10 Poor - 30,900
11 Pickup Ford 1997 10 Poor 30,000 -
12 Pickup GMC 1989 10 Poor 45,000 -
14 Pickup Chevy 1992 10 Poor 30,000 -
16 Utility Chevy 1988 10 Poor 55,000 -
19 Utility Ford 1987 10 Poor 45,000 -
30 Chipper unknown 1994 15 Poor 48,935
31 Dump Ford 1972 15 Poor 48,935 -
347,870 92,700
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 20/27
Parks – With Trinity Donations
ID# Type Vehicle Year Life Condition 2011 2012
6 Van Plymouth 1995 10 Poor 30,000 - 8 Van Chevy 1996 10 Poor 45,000 -
9 Van Ford 1996 10 Poor 30,000 -
10 Van Chevy 1992 10 Poor 30,000 -
11 Pickup Ford 1997 10 Poor - 30,900
12 Pickup GMC 1989 10 Poor 45,000 - 14 Pickup Chevy 1992 10 Poor 30,000 -
16 Utility Chevy 1988 10 Poor 55,000 -
19 Utility Ford 1987 10 Poor 45,000 -
30 Chipper unknown 1994 15 Poor - 41,200
31 Dump Ford 1972 15 Poor - 50,403 220,000 122,503
Moved three vans scheduled tobe replaced 2012 to 2011 inorder to take advantage of vandonations
To offset move, moved pickup,chipper, and dump to 2012.Also recently found cheaper
chipper.
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 21/27
Parks – Purchases
Parks 8 – Van will be replaced with a Utility Truckoutfitted for the Parks maintenance staff.
Parks 12 – Pickup will be replaced with a utility truckoutfitted for mechanics/garage.
Parks 14 – Pickup will be replaced with a pickup.
Parks 16 – Utility truck will be replaced with a Ford F350utility truck outfitted for fuel/maintenance.
Parks 19 – Utility truck will be replaced with a utility truckoutfitted as a welder utility truck.
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 22/27
Fire
•Currently using
two CrownVictorias, oneChevy Impala, anda van
•Will be replacingwith three cars and
one van
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 23/27
General Fund Net Debt Service 2011-2015
$0$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
2011 2012 2013 2014 2015
School Equipment Library Landfill Land Acquisition E911 Other No Capital plan
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 24/27
General Fund Net Debt Service 2011-2015 With Year 1
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000$7,000,000
$8,000,000
$9,000,000
$10,000,000
2011 2012 2013 2014 2015
School Equipment Library Landfill Land Acquisition E911 Other Year 1 Only
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 25/27
General Fund Net Debt Service 2011-2015 With Years 1-2
$0$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
2011 2012 2013 2014 2015
School Equipment Library Landfill Land Acquisition E911 Other Years 1-2
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 26/27
General Fund Net Debt Service 2011-2015 With Years 1-3
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
2011 2012 2013 2014 2015
School Equipment Library Landfill Land Acquisition E911 Other Years 1-3
8/7/2019 Capital Plan Presentation 3_22_2011 Final
http://slidepdf.com/reader/full/capital-plan-presentation-3222011-final 27/27
General Fund Net Debt Service 2011-2015 With Years 1-4
$0
$1,000,000
$2,000,000
$3,000,000
$4,000,000
$5,000,000
$6,000,000
$7,000,000
$8,000,000
$9,000,000
$10,000,000
2011 2012 2013 2014 2015
School Equipment Library Landfill Land Acquisition E911 Other Years 1-4