CALCULATION SHEET PEMBANGUNAN CONVEYOR SYSTEM TERMINAL CURAH KERINGNo.I

UraianPEKERJAAN PEMBANGUNAN RAK KONVEYOR (STRUKTUR BARU) J. Colom Tinggi

VolumeJ. Galang Panjang Lebar Tebal Jumlah BERAT / mtr

JUMLAH TOTAL

A. Konveyor Gudang Baru I Struktur 1 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Plate 10 mm 2 Besi IWF 250x125x6x9 II Konveyor 1 UNP 150x75x6 III Hoper 1 UNP 150x75x6 UNP 150x75x6 2 Besi Siku L 100x100x10 Besi Siku L 100x100x10 3 Plate 8 mm Plate 8 mm Plate 8 mm Plate 8 mm Plate 8 mm IV Kepala Plate 8 mm Besi Siku L 100x100x10 V 1 2 3 4 5 6 VI 1 2 3 4 5 6 Pengecatan Besi HWF 300x300x10x15 Besi IWF 250x125x6x9 UNP 150x75x6 - 6 M Besi Siku L 100x100x10 Plate 10 mm Plate 8 mm Lain-Lain Baut Beugel M20 x 10" Poer Beton Galian Tanah Lantai Kerja Pasir Urug Tiang Pancang

16.00 10.00 10.00 2.00 2.00 20.00

1.2 3 5 2 3.6 4 0.4 104.5 0.4 0.01

19.2 30 50 4 7.2 2 418

94 94 94 94 94 29.60

1,804.80 2,820.00 4,700.00 376.00 676.80 499.20 12,372.8

Kg Kg Kg Kg Kg Kg Kg

120

1.55

186

18.67

3,472.0

Kg

5 5 5 5 5 5 5 5 5

11 12.5 15.8 3.95 2.90 0.90 2.38 2.38 2.95

1.65 2.00 1.40 1.40 2.95

0.008 0.008 0.008 0.008 0.008

55 62.5 79 19.75 1492.92 561.60 1037.40 1037.40 2715.18

18.67 18.67 6.83 6.83 1492.92 561.60 1037.40 1037.40 2715.18

1,026.7 1,166.7 539.8 135.0 1,492.9 561.6 1,037.4 1,037.4 2,715.2

Kg Kg Kg Kg Kg Kg Kg Kg Kg

12.58 20.90

12.58 6.83

785.2 142.7

Kg Kg

1.8 1 0.6 0.4 0.160 21.938

110.4418 303.5 119.65 40.00 5.00

198.7 418.0 182.1 47.9 6.4 122.3

M2 M2 M2 M2 M2 M2

20 40

0.6

0.6

0.6

4 8.64

40

6

80.0 8.6 8.6 0.7 0.7 240.0

Bh m3 m3 m3 m3 M

VII Kesimpulan A 1 Besi HWF 300x300x10x15 2 Besi IWF 250x125x6x9 3 UNP 150x75x6 4 Besi Siku L 100x100x10 5 Plate 10 mm 6 Plate 8 mm 7 Pengecatan B. Konveyor Gudang 009 I Struktur 1 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Besi HWF 300x300x10x15 Plate 10 mm 2 Besi IWF 250x125x6x9 II Konveyor 1 UNP 150x75x6

10,377.60 Kg 12,372.80 Kg 5,665.33 Kg 817.5 Kg 499.2 Kg 7629.7 Kg 975.4 M2

20.00 12.00 12.00 2.00 2.00 2.00 25.00

1.2 3 5 1.7 3 4 4 0.4 126 0.4 0.01

24 36 60 3.4 6 8 2 504

94 94 94 94 94 94 29.6

2,256.00 3,384.00 5,640.00 319.60 564.00 752.00 624.00 14,918.4

Kg Kg Kg Kg Kg Kg Kg Kg

144

1.55

223.2

18.67

4,166.4

Kg

No.I

UraianIII Hoper PEKERJAAN PEMBANGUNAN RAK KONVEYOR 1 UNP 150x75x6 (STRUKTUR BARU) UNP 150x75x6 2 Besi Siku L 100x100x10 Besi Siku L 100x100x10 3 Plate 8 mm Plate 8 mm Plate 8 mm Plate 8 mm Plate 8 mm IV Kepala Plate 8 mm Besi Siku L 100x100x10 V. 1 2 3 4 5 6 VI 1 2 3 4 5 6 Pengecatan Besi HWF 300x300x10x15 Besi IWF 250x125x6x9 UNP 150x75x6 Besi Siku L 100x100x10 Plate 10 mm Plate 8 mm Lain-Lain Baut Beugel M20 x 10" Poer Beton Galian Tanah Lantai Kerja Pasir Urug Tiang Pancang J. Colom Tinggi

VolumeJ. Galang Panjang Lebar 6 11 6 12.5 6 15.8 6 3.95 6 2.90 1.65 6 0.90 2.00 6 2.38 1.40 6 2.38 1.40 6 2.95 2.95 Tebal Jumlah 66 75 94.8 23.7 1791.50 673.92 1244.88 1244.88 3258.22 BERAT 18.67 JUMLAH TOTAL 1,232.0 Kg / mtr 18.67 1,400.0 Kg 6.83 647.8 Kg 6.83 162.0 Kg 1791.50 1,791.5 Kg 673.92 673.9 Kg 1244.88 1,244.9 Kg 1244.88 1,244.9 Kg 3258.22 3,258.2 Kg

0.008 0.008 0.008 0.008 0.008

12.58 20.90

12.58 6.83

785.2 142.7

Kg Kg

1.8 1 0.6 0.4 0.160 21.938

129.4504 364.2 139.40 50.00 1.00

232.9 504.0 218.5 55.8 8.0 34.5

M2 M2 M2 M2 M2 M2

50 50

0.6

0.6

0.6

4 10.8

50

6

200.0 10.8 10.8 0.9 0.9 300.0

Bh m3 m3 m3 m3 M

VII Kesimpulan B 1 Besi HWF 300x300x10x15 2 Besi IWF 250x125x6x9 3 UNP 150x75x6 4 Besi Siku L 100x100x10 5 Plate 10 mm 6 Plate 8 mm 7 Pengecatan C. Konveyor Samping Gudang I Struktur 1 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 Besi HB 300x300x10x15 2 Plate 10 mm 3 Besi IWF 250x125x6x9 Besi IWF 250x125x6x9 Besi IWF 300x150x6.5x9 4 UNP 150x75x6 UNP 150x75x6 UNP 150x75x6 UNP 150x75x6 5 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 II Konveyor 1 UNP 150x75x6 III Kepala Plate 8 mm Plate 8 mm Besi Siku L 100x100x10 Besi Siku L 100x100x10

12,915.60 14,918.40 6,798.40 952.50 624.00 8,998.64 1,053.72

Kg Kg Kg Kg Kg Kg M2

2.00 4.00 2.00 2.00 6.00 18.00 2.00 2.00 8.00 23.00

2.8 4.45 4.15 6.58 8.8 2.55 2.96 5.4 8.8 4 2 43 2 4 20 8 4 8 16 8 4 16 16 0.4 121 35 1.4 5.7 2.7 0.45 1.7 7 3.5 2.1 3.5 7.5 2.7 1.9 0.4 0.01

5.6 17.8 8.3 13.16 52.8 45.9 5.92 10.8 70.4 2 484 70 60.2 11.4 10.8 9 13.6 28 28 33.6 28 30 43.2 30.4

94 94 94 94 94 94 94 94 94 29.60 29.60 36.7 18.67 18.67 18.67 18.67 12.67 12.67 12.67 12.67 12.67 12.67 12.67

526.40 1,673.20 780.20 1,237.04 4,963.20 4,314.60 556.48 1,015.20 6,617.60 574.08 14,326.4 2,072.0 2,209.3 212.8 201.6 168.0 253.9 354.7 354.7 425.6 354.7 380.0 547.2 385.1

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

132

1.55

204.6

18.67

3,819.2

Kg

12.58 30.23 20.90 37.00

12.58 30.23 12.67 12.67

785.2 1,886.0 264.7 790.4

Kg Kg Kg Kg

No.I

UraianPEKERJAAN PEMBANGUNAN RAK KONVEYOR IV Ekor (STRUKTUR BARU) Plate 8 mm Besi Siku L 100x100x10 V 1 2 3 4 5 6 7 VI 1 2 3 4 5 6 Pengecatan Besi HWF 300x300x10x15 Besi IWF 250x125x6x9 Besi IWF 300x150x6.5x9 UNP 150x75x6 - 6 M Besi Siku L 100x100x10 Plate 10 mm Plate 8 mm Lain-Lain Baut Beugel M20 x 10" Poer Beton Galian Tanah Lantai Kerja Pasir Urug Tiang Pancang J. Colom Tinggi

VolumeJ. Galang Panjang Lebar Tebal Jumlah BERAT JUMLAH TOTAL / mtr 10.24 10.24 638.9 Kg 18.65 12.67 236.2 Kg

1.8 1 1.2 0.6 0.4 0.160

230.68554 60.2 93.33 267.35 40.00

415.2 554.0 72.2 56.0 106.9 6.4 53.0

M2 M2 M2 M2 M2 M2 M2

46 46

0.6

0.6

0.6

4 9.936

46

6

184.0 9.9 9.9 0.8 0.8 276.0

Bh m3 m3 m3 m3 M

VII Kesimpulan C 1 Besi HB 300x300x10x15 2 Besi IWF 250x125x6x9 3 Besi IWF 300x150x6.5x9 4 UNP 150x75x6 5 Besi Siku L 100x100x10 6 Plate 10 mm 7 Plate 8 mm 8 Pengecatan D. Konveyor Depan Gudang 007 I Struktur 1 Besi HB 300x300x10x15 2 Plate 10 mm 3 Besi IWF 250x125x6x9 Besi IWF 250x125x6x9 Besi IWF 300x150x6.5x9 4 UNP 150x75x6 UNP 150x75x6 UNP 150x75x6 5 Besi Siku L 100x100x10 Besi Siku L 100x100x10 II Konveyor 1 UNP 150x75x6 III Kepala Plate 8 mm Besi Siku L 100x100x10 IV Ekor Plate 8 mm Besi Siku L 100x100x10 V 1 2 3 4 5 6 7 VI 1 2 3 4 5 6 Pengecatan Besi HWF 300x300x10x15 Besi IWF 250x125x6x9 Besi IWF 300x150x6.5x9 UNP 150x75x6 - 6 M Besi Siku L 100x100x10 Plate 10 mm Plate 8 mm Lain-Lain Baut Beugel M20 x 10" Poer Beton Galian Tanah Lantai Kerja Pasir Urug Tiang Pancang

21,683.92 16,398.40 2,209.34 4,655.47 4,093.23 574.08 3,310.13 1,263.85

Kg Kg Kg Kg Kg Kg Kg M2

10.00 10.00

8.5 4 2 15 8 2 10 16 16 0.4 28.7 15 1.4 1.7 5.7 0.45 2.7 1.8 0.4 0.01

85 2 114.8 30 21 13.6 11.4 4.5 43.2 28.8

94 29.60 29.60 36.7 18.67 18.67 18.67 12.67 12.67

7,990.00 249.60 3,398.1 888.0 770.7 253.9 212.8 84.0 547.2 364.8

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

37

1.55

57.35

18.67

1,070.5

Kg

12.58 20.90

12.58 12.67

785.2 264.7

Kg Kg

10.24 18.65

10.24 12.67

638.9 236.2

Kg Kg

1.8 1 1.2 0.6 0.4 0.160

85144.8 21 74.67 111.55 10.00

153.0 144.8 25.2 44.8 44.6 1.6 22.8

M2 M2 M2 M2 M2 M2 M2

10 10

0.6

0.6

0.6

4 2.16

10

6

40.0 2.2 2.2 0.2 0.2 60.0

Bh m3 m3 m3 m3 M

No.I

UraianPEKERJAAN PEMBANGUNAN RAK KONVEYOR VII Kesimpulan D (STRUKTUR BARU) 1 Besi HB 300x300x10x15 2 Besi IWF 250x125x6x9 3 Besi IWF 300x150x6.5x9 4 UNP 150x75x6 5 Besi Siku L 100x100x10 6 Plate 10 mm 7 Plate 8 mm 8 Pengecatan J. Colom Tinggi

VolumeJ. Galang Panjang Lebar Tebal Jumlah BERAT / mtr

JUMLAH TOTAL 7,990.00 4,286.08 770.70 1,621.20 1,412.97 249.60 1,424.09 436.84 Kg Kg Kg Kg Kg Kg Kg M2

E. Gantry Loader I Struktur 1 Besi IWF 300x150x6.5x9 Besi IWF 300x150x6.5x9 Besi IWF 300x150x6.5x9 2 Besi IWF 250x125x6x9 3 UNP 250x90x9 II Konveyor 1 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 2 Ban Komplit 3 Sistem Hidrolik III Tripper Car 1 Besi IWF 250x125x6x9 UNP 150x75x6 UNP 150x75x6 UNP 150x75x6 UNP 150x75x6 2 Besi Rel Uk. S12 3 Roda Rel Komplit IV Kepala Plate 8 mm Besi Siku L 100x100x10 V Ekor Plate 8 mm Besi Siku L 100x100x10 VI 1 2 3 4 5 6 Pengecatan Besi IWF 300x150x6.5x9 Besi IWF 250x125x6x8 UNP 250x90x9 UNP 150x75x6 Besi Siku L 100x100x10 Plat 8 mm

2.00 2.00 4.00 10.00 8.00

5.2 6 4.62 5.7 4

10.4 12 18.48 57 32

36.7 36.7 36.7 29.6 34.7

381.68 440.40 678.22 1,687.20 1,109.33

Kg Kg Kg Kg Kg

48 48 48 48 48

0.6 0.8 0.6 0.8 1.7

28.80 38.40 28.80 38.40 81.60

12.67 12.67 12.67 12.67 12.67

364.8 Kg 486.4 Kg 364.8 Kg 486.4 Kg 1,033.6 Kg 8.0 Buah 2.0 Set

2 4 2 2 5 2

6.3 1.25 1.21 11 1.7 317

12.60 5.00 2.42 22.00 8.50 634.00

29.60 18.67 18.67 18.67 18.67 12.00

373.0 93.3 45.2 410.7 158.7 7,608.0 4.0

Kg Kg Kg Kg Kg Kg Bh

12.58 20.90

12.58 12.67

1,570.5 529.5

Kg Kg

10.24 18.65

10.24 6.83

1,277.7 254.8

Kg Kg

1.2 1 0.86 0.6 0.4

40.88 69.60 32.00 37.92 255.55 22.82

49.1 69.6 27.5 22.8 102.2 22.8

M2 M3 M2 M3 M2 M3

VII Kesimpulan F 1 Besi IWF 300x150x6.5x9 2 Besi IWF 250x125x6x9 3 UNP 250x90x9 4 UNP 150x75x6 5 Besi Siku L 100x100x10 6 Plate 8 mm 7 Pengecatan 8 Ban Komplit 9 Sistem Hidrolik 10 Besi Rel Uk. S12 11 Roda Rel Komplit F. Gantry Hoper I Struktur 1 Besi IWF 300x150x6.5x9 Besi IWF 300x150x6.5x9 Besi IWF 300x150x6.5x9 2 Besi IWF 250x125x6x9 3 UNP 250x90x9

1,500.30 2,060.16 1,109.33 707.84 3,520.23 2,848.19 294.0 8.0 2.0 7608.0 4.0

Kg Kg Kg Kg Kg Kg M2 Buah Set Kg Buah

4.00 2.00 4.00 10.00 8.00

7 10 4 5.7 4

28 20 16 57 94

36.7 36.7 36.7 29.6 34.7

1,027.60 734.00 587.20 1,687.20 3,258.67

Kg Kg Kg Kg Kg

No.I

UraianII Konveyor PEKERJAAN PEMBANGUNAN RAK KONVEYOR 1 Besi Siku L 100x100x10 (STRUKTUR BARU) Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 Besi Siku L 100x100x10 2 Ban Komplit 3 Sistem Hidrolik III Kepala Plate 8 mm Besi Siku L 100x100x10 IV Ekor Plate 8 mm Besi Siku L 100x100x10 V Hoper 1 Plate 8 mm 2 Besi Siku L100x100x10 VI 1 2 3 4 5 Pengecatan Besi IWF 300x150x6.5x8 Besi IWF 250x125x6x8 UNP 250x90x9 Besi Siku L 100x100x10 Plat 8 mm J. Colom Tinggi

VolumeJ. Galang Panjang Lebar 48 0.6 48 0.8 48 0.6 48 0.8 48 1.7 Tebal Jumlah 28.80 38.40 28.80 38.40 81.60 BERAT 12.67 JUMLAH TOTAL 364.8 Kg / mtr 12.67 486.4 Kg 12.67 364.8 Kg 12.67 486.4 Kg 12.67 1,033.6 Kg 8.0 Buah 2.0 Set

12.58 20.90

12.58 12.67

1,570.5 529.5

Kg Kg

10.24 18.65

10.24 12.67

1,277.7 472.5

Kg Kg

50.8 74.8

12.67

3,169.9 947.5

Kg Kg

1.2 0.8 0.86 0.4

64 57 94.00 330.35 73.62

76.8 45.6 80.8 132.1 147.2

M2 M2 M2 M2 M3

VII Kesimpulan E 1 Besi IWF 300x150x6.5x9 2 Besi IWF 250x125x6x9 3 UNP 250x90x9 4 Besi Siku L 100x100x10 5 Plate 8 mm 6 Pengecatan 7 Ban Komplit 8 Sistem Hidrolik G. PlatForm dan Penutup I Struktur Platform 1 UNP 150x75x6 2 Besi Siku L 100x100x10 Besi Siku L 100x100x10 3 Plate Bordes 4.5 mm 4 Pipa Galvanis 1.5" II Struktur Penutup 1 Besi Siku L70x70x7 Besi Siku L70x70x7 Besi Siku L70x70x7 Besi Siku L70x70x7 Besi Siku L70x70x7 Besi Siku L70x70x7 2 Pipa Galvanis 1" (lengkung) Pipa Galvanis 1" (lengkung) 3 Plate Penutup 1.2 mm Plate Penutup 1.2 mm Plate Penutup 1.2 mm Plate Penutup 1.2 mm III 1 2 3 4 IV 1 2 3 4 5 6 Pengecatan UNP 150x75x6 Besi Siku L70x70x7 Pipa Galvanis 1.5" Plat Penutup 1.2 Kesimpulan UNP 150x75x6 Besi Siku L70x70x7 Plate Penutup 1.2 mm Plate Bordes 4.5 mm Pipa Galvanis 1.5" Pengecatan

2,348.80 Kg 1,687.20 Kg 3,258.67 Kg 4,685.40 Kg 6,018.11 Kg 482.6 M2 8.0 Buah 2.0 Set

1.2

132.83 797

0.8 797 797 797

0.8

2

106.27 956.40 797.00 637.60 #######

18.67 12.67 12.67 38.19 3.62

1,983.64 12,114.40 10,095.33 24,349.94 5,770.28

Kg Kg Kg Kg Kg

484

1

313

3.1

2 2 81 2 2 53

484 2 313 2 2 2 404 404 313 313 2 2

484 313 3 5.1 2 2

968.00 968.00 162.00 ####### 626.00 106.00 968.00 626.00 ####### 808.00 ####### 626.00

7.38 7.38 7.38 7.38 7.38 7.38 2.46 2.46 9.72 9.72 9.72 9.72

7,147.07 7,147.07 1,196.10 14,328.10 4,621.97 782.63 2,381.28 1,539.96 23,561.28 7,853.76 31,032.07 6,084.72

Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg Kg

0.86 0.4 0.11963

106.27 6524.00 1594.00 #######

91.4 2609.6 190.7 14,101.2

M2 M2 M2 M2

1,983.64 57,432.66 68,531.83 24,349.94 9,691.52 16,992.89

Kg Kg Kg Kg Kg M2

No.

UraianJ. Colom Tinggi

VolumeURAIAN PERHITUNGAN J. Galang Panjang Lebar Tebal Jumlah BERAT / mtr = = = = = = = = = = = = = = JUMLAH TOTAL JUMLAH TOTAL 216.0 119.0 37.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 70.0 1.0 M Set Set Set Set Set Set Set Set Set Set Unit Set ls

INSTALASI MEKANIKAL SISTEM KONVEYOR II PEKERJAAN PEMBANGUNAN RAK KONVEYOR I LOADING (STRUKTUR BARU) A. Mekanikal Konveyor A11 (Gudang Baru (010)) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley/snup pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) 8 9 10 11 12 13 14

Plummer Block SNV 250 Sprocket dan chain Cleaning Belt Brake System conveyor Geared Motor 3P, 75 kW/1500 rpm, ratio output 49 rpm Proteksi belt system (belt alignment) Splicing belt conveyor

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

B. Mekanikal Konveyor A10 (Gudang 009) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 75 kW/1500 rpm, ratio output 49 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor C. Mekanikal Konveyor A9 (Samping Gudang 009) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

259.0 143.0 45.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 86.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley 12 Geraed Motor 3P, 30 kW/ 1500 rpm, ratio output 49 rpm- Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor

= = = = = = = = = = = = = =

75.0 39.0 14.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 24.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

D. Mekanikal Konveyor A8 (Samping Gudang 008) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 37 kW/1500 rpm, ratio output 49 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor E. Mekanikal Konveyor A7 (Joint Jalan & Trestle) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

173.0 88.0 30.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 56.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley

= = = = = = = =

47.0 24.0 9.0 3.0 1.0 1.0 1.0 12.0

M Set Set Set Set Set Set Set

No.I

Uraian

VolumeJumlah = 1.0 Set BERAT JUMLAH TOTAL 1.0 Set / mtr = = 1.0 Set = 1.0 Unit = 14.0 Set = 1.0 ls

- Jumlah pasangan sprocket dan chain pada drive pulley 9 Sprocket PEMBANGUNAN RAK KONVEYOR PEKERJAANdan chain Tinggi J. Galang dan tail Lebar Tebal - J. Colomcleaning belt untuk drive Panjang pulley 10 Cleaning BARU) Jumlah (STRUKTURBelt - Jumlah pemasangan Brake system pada drive pulley 11 Brake System conveyor 12 Geared Motor 3P, 20 kW/1500 rpm, ratio output 53 rpm - Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor

F. Mekanikal Konveyor A6 (Trestle) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 75 kW/1500 rpm, ratio output 53 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor G. Mekanikal Konveyor A5 (Joint Trestle & Dermaga) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 20 kW/1500 rpm, ratio output 53 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor H. Mekanikal Konveyor A4 (Dermaga) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 75 kW/ 1500 rpm, ratio output 53 rpm13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor I. Mekanikal Konveyor A3 (Tripper Car) 1 Through Roller,dia. 4" (Panjang 3 x 48 cm) 2 Bend pulley, dia 12" (Panjang 1 x 145 cm) 3 Plummer Block SNV 250 4 Brake System conveyor 5 Geared Motor 3P, 20 kW/ 1500 rpm, ratio output 53 rpm6 Proteksi belt system (belt alignment) J. Mekanikal Konveyor Gantry Loader A. Mekanikal Konveyor A2 (Gantry Loader 1) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

401.0 201.0 68.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 132.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

47.0 24.0 9.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 14.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

629.0 316.0 106.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 208.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor / 1 meter jarak antar through roller + spare Penyangga tarikan penegang belting dari 2 sisi Penyangga masing-masing pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set

= = = = = =

10.0 2.0 4.0 1.0 1.0 4.0

Set Set Set Set Unit set

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley

= = = = = = = = = =

45.0 23.0 9.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0

M Set Set Set Set Set Set Set Set Set

No.I

Uraian

VolumeJumlah = 1.0 Set BERAT JUMLAH TOTAL 1.0 Unit / mtr = = 14.0 Set = 1.0 ls

- Jumlah pemasangan Brake system pada drive pulley 11 Brake System conveyor PEKERJAAN PEMBANGUNAN RAK KONVEYOR Tebal J. Colom Tinggi J. Galang Panjang Lebar 12 Geared Motor 3P, (STRUKTUR BARU) 22 kW/ 1500 rpm, ratio output 53 rpm- Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Mekanikal Konveyor A1 (Gantry Loader 2) Belt conveyor, BW = 1,20 M Through Roller, dia. 4" (Panjang 3 x 48 cm) Return Roller, dia. 4" (Panjang 1 x 145 cm) Bend pulley, dia. 12" (Panjang 1 x 145 cm) Take Up Pulley tension, dia 20" (Panjang 1 x 145 cm) Tail Pulley, dia. 24" (Panjang 1 x 145 cm) Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining Plummer Block SNV 250 Sprocket dan chain Cleaning Belt Brake System conveyor

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare

Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Geared Motor 3P, 22 kW/ 1500 rpm, ratio output 53 rpm- Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set Proteksi belt system (belt alignment) - Penyambungan belt konveyor Splicing belt conveyor URAIAN PERHITUNGAN

= = = = = = = = = = = = = =

44.0 23.0 9.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 14.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

III

INSTALASI MEKANIKAL SISTEM KONVEYOR UNLOADING

JUMLAH TOTAL

A. Mekanikal Konveyor B8 (Depan Gudang 007) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 22 kW/1500 rpm, ratio output 49 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor B. Mekanikal Konveyor B7 (Depan Gudang 008) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

65.0 33.0 12.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 20.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare

Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley 12 Geared Motor 3P, 55 kW/1500 rpm, ratio output 53 rpm- Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor

= = = = = = = = = = = = = =

265.0 133.0 46.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 88.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

C. Mekanikal Konveyor B6 (Joint Jalan & Trestle) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 22 kW/1500 rpm, ratio output 53 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

47.0 24.0 9.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 14.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

No.

Uraian

VolumeBERAT JUMLAH TOTAL 401.0 M / mtr = = 201.0 Set = 69.0 Set = 3.0 Set = 1.0 Set = 1.0 Set = 1.0 Set = 12.0 Set = 1.0 Set = 1.0 Set = 1.0 Set = 1.0 Unit = 132.0 Set = 1.0 ls

D. Mekanikal Konveyor B5 (Trestle) RAK KONVEYOR PEKERJAAN PEMBANGUNAN I 1 Belt conveyor, BW = 1,20 M Tebal Jumlah - J. Colom konveyor x 2J. Galang Panjang Lebar Panjang Tinggi + spare (STRUKTUR BARU) - Panjang konveyor / 1 meter jarak antar through roller + spare 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) - Panjang konveyor / 3 meter jarak antar return roller + spare 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) - Penyangga tarikan penegang belting dari 2 sisi 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) - Jumlah take up pulley tension system - Jumlah pulley akhir 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining- Jumlah pulley awal - Penyangga masing-masing pulley 8 Plummer Block SNV 250 - Jumlah pasangan sprocket dan chain pada drive pulley 9 Sprocket dan chain - Jumlah cleaning belt untuk drive dan tail pulley 10 Cleaning Belt - Jumlah pemasangan Brake system pada drive pulley 11 Brake System conveyor 12 Geared Motor 3P, 75 kW/1500 rpm, ratio output 53 rpm - Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor E. Mekanikal Konveyor B4 (Joint Trestle & Dermaga) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 22 kW/1500 rpm, ratio output 53 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor F. Mekanikal Konveyor B3 (Dermaga) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 75 kW/1500 rpm, ratio output 53 rpm 13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor MESIN BAGGING G.

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

47.0 25.0 10.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 14.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = = =

630.0 316.0 107.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 208.0 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

- Jumlah Mesin Bagging

7.0 Unit

H. Mekanikal Konveyor Gantry Hoper A. Mekanikal Konveyor B2 (Gantry Hoper 1) 1 Belt conveyor, BW = 1,20 M 2 Through Roller, dia. 4" (Panjang 3 x 48 cm) 3 Return Roller, dia. 4" (Panjang 1 x 145 cm) 4 Bend pulley, dia. 12" (Panjang 1 x 145 cm) 5 Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) 6 Tail Pulley, dia. 24" (Panjang 1 x 145 cm) 7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining 8 Plummer Block SNV 250 9 Sprocket dan chain 10 Cleaning Belt 11 Brake System conveyor 12 Geared Motor 3P, 22 kW/ 1500 rpm, ratio output 53 rpm13 Proteksi belt system (belt alignment) 14 Splicing belt conveyor B. 1 2 3 4 5 6 Mekanikal Konveyor B1 (Gantry Hoper 2) Belt conveyor, BW = 1,20 M Through Roller, dia. 4" (Panjang 3 x 48 cm) Return Roller, dia. 4" (Panjang 1 x 145 cm) Bend pulley, dia. 12" (Panjang 1 x 145 cm) Take Up Pulley tension, dia. 20" (Panjang 1 x 145 cm) Tail Pulley, dia. 24" (Panjang 1 x 145 cm)

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir Jumlah pulley awal Penyangga masing-masing pulley Jumlah pasangan sprocket dan chain pada drive pulley Jumlah cleaning belt untuk drive dan tail pulley Jumlah pemasangan Brake system pada drive pulley Jumlah pemasangan elektro motor pada drive pulley Panjang belt konveyor / 3 meter @ 2 Set Penyambungan belt konveyor

= = = = = = = = = = = = = =

46.0 24.0 10.0 3.0 1.0 1.0 1.0 12.0 1.0 1.0 1.0 1.0 13.3 1.0

M Set Set Set Set Set Set Set Set Set Set Unit Set ls

-

Panjang konveyor x 2 + spare Panjang konveyor / 1 meter jarak antar through roller + spare Panjang konveyor / 3 meter jarak antar return roller + spare Penyangga tarikan penegang belting dari 2 sisi Jumlah take up pulley tension system Jumlah pulley akhir

= = = = = =

46.0 24.0 9.7 3.0 1.0 1.0

M Set Set Set Set Set

No.I

Uraian

VolumeJumlah = 1.0 Set BERAT JUMLAH TOTAL 12.0 Set / mtr = = 1.0 Set = 1.0 Set = 1.0 Set = 1.0 Unit = 13.3 Set = 1.0 ls JUMLAH TOTAL

7 Drive Pulley, dia. 24" (Panjang 1 x 145 cm) rubber lining Jumlah pulley awal PEKERJAAN PEMBANGUNAN RAK KONVEYOR Tebal - J. Colom masing-masing pulleyPanjang Lebar 8 Plummer BARU) Penyangga Tinggi J. Galang (STRUKTURBlock SNV 250 - Jumlah pasangan sprocket dan chain pada drive pulley 9 Sprocket dan chain - Jumlah cleaning belt untuk drive dan tail pulley 10 Cleaning Belt - Jumlah pemasangan Brake system pada drive pulley 11 Brake System conveyor 12 Geared Motor 3P, 22 kW/ 1500 rpm, ratio output 53 rpm- Jumlah pemasangan elektro motor pada drive pulley - Panjang belt konveyor / 3 meter @ 2 Set 13 Proteksi belt system (belt alignment) - Penyambungan belt konveyor 14 Splicing belt conveyor INSTALASI ELKTRIKAL SISTEM KONVEYOR LOADING URAIAN PERHITUNGAN

IV

A. Panel Induk Gudang 009 1 Panel komplit (lengkap beserta aksessoris) - Cubicle panel, Uk. 200 x 80 x 60 cm (Indoor) - MCCB 1000 A, 3 Phase - MCCB 150 A, 3 Phasa - MCCB 75 A, 3 Phasa - MCCB 50 A, 3 Phasa - Aksessoris 2 Kabel supply power NYFGBY 2 (4x 185 mm) 3 Ducting kabel (kabel tray besi + cover + support) B. Panel Distribusi 1 Panel komplit (lengkap beserta aksessoris) - Cubicle panel, Uk. 200 x 280 x 60 cm (Indoor) - MCCB 150 A, 3 Phasa - MCCB 75 A, 3 Phasa - MCCB 50 A, 3 Phasa - Magnetik Contactor 150 A, 3 Phasa - Magnetik Contactor 75 A, 3 Phasa - Magnetik Contactor 50 A, 3 Phasa - Thermal overload relay (TOR) - Timer C. Panel Gudang 010 - Cubicle panel, Uk. 80 x 60 x 30 cm (Indoor) - MCCB 150 A, 3 Phasa - Magnetik Contactor 150 A, 3 Phasa - Thermal overload relay (TOR) - Timer D. Panel Lokal - Panel , Uk. 40 x 30 x 20 cm (Outdoor) - MCCB 25 A E. Kabel - Kabel NYY 4x16 mm2 - Kabel NYY 4x16 mm2 - Kabel NYY 4x16 mm2 - Kabel NYY 4x50 mm2 - Kabel NYY 4x16 mm2 - Kabel NYY 4x50 mm2 - Kabel NYY 4x16 mm2 - Kabel NYY 4x35 mm2 - Kabel NYY 4x25 mm2 - Kabel NYY 4x50 mm2 - Kabel NYY 4x50 mm2 - Kabel NYF 4x2.5 mm2 Kesimpulan Kabel - Kabel 4x16 mm2 - Kabel 4x25 mm2 - Kabel 4x35 mm2 - Kabel 4x50 mm5 - Kabel NYF 4x2.5 mm2 INSTALASI ELKTRIKAL SISTEM KONVEYOR UNLOADING PUPUK

- Panjang jalur kabel dari Ruang Genset ke Gudang 009 - Panjang instalasi kabel power

= = = = = = = =

1.0 1.0 4.0 1.0 7.0 1.0 180.0 716.0

Unit Bh Bh Bh Bh Ls M M

= = = = = = = = =

1.0 4.0 1.0 7.0 8.0 2.0 14.0 24.0 24.0

Unit Bh Bh Bh Bh Bh Bh Bh Bh

= = = = =

1.0 1.0 2.0 4.0 4.0

Unit Bh Bh Bh Bh

= =

11.0 Unit 11.0 Bh

15 15

20 313 313

31320 20 15

20 198 198 198 198

198 20 20 20 20 15

20

90 90 90 90 90 9040

175 85 85 85 85 85 85 4545 157 260

= = = = = = = = = = = = = = = = =

761.0 741.0 726.0 408.0 393.0 190.0 175.0 85.0 45.0 157.0 260.0 3941.0 2796.0 45.0 85.0 1015.0 3941.0

M M M M M M M M M M M M M M M M M

V

URAIAN PERHITUNGAN

JUMLAH TOTAL

A. Panel Induk Gudang 007 1 Panel komplit (lengkap beserta aksessoris) - Cubicle panel, Uk. 100 x 200 x 60 cm (Indoor) - MCCB 1000 A, 3 Phase - MCCB 150 A, 3 Phasa - MCCB 75 A, 3 Phasa - MCCB 50 A, 3 Phasa

= = = = =

1.0 1.0 3.0 2.0 5.0

Unit Bh Bh Bh Bh

No.I

Uraian- Aksessoris PEKERJAAN PEMBANGUNAN RAK KONVEYOR 2 Kabel supply power (STRUKTUR BARU) NYFGBY 2 (4x 185 mm) 3 Ducting kabel (kabel tray besi + cover + support)

VolumeTebal - J. Colom jalur kabel dariGalang Genset ke Panel Gudang Panjang Tinggi J. Ruang Panjang Lebar - Panjang instalasi kabel power Jumlah = 1.0 Ls BERAT JUMLAH TOTAL 175.0 M / mtr = = 756.0 M

B. Panel Distribusi 1 Panel komplit (lengkap beserta aksessoris) - Cubicle panel, Uk. 200 x 80 x 60 cm (Indoor) - MCCB 150 A, 3 Phasa - MCCB 75 A, 3 Phasa - MCCB 50 A, 3 Phasa - Magnetik Contactor 150 A, 3 Phasa - Magnetik Contactor 75 A, 3 Phasa - Magnetik Contactor 50 A, 3 Phasa - Thermal overload relay (TOR) - Timer C. Panel Mesin Bagging - Cubicle panel, Uk. 100 x 80 x 30 cm (Indoor) - MCCB 75 A, 3 Phasa - MCCB 25 A, 1 Phasa D. Panel Lokal - Panel , Uk. 40 x 30 x 20 cm (Outdoor) - MCCB 25 A 2 Kabel Kabel NYY 4x16 mm2 Kabel NYY 4x16 mm2 Kabel NYY 4x50 mm2 Kabel NYY 4x16 mm2 Kabel NYY 4x50 mm2 Kabel NYY 4x16 mm2 Kabel NYY 4x35 mm2 Kabel NYY 4x25 mm2 Kabel NYY 4x16 mm2 Kabel NYY 3x4 mm2 Mesing Bagging 1 Mesing Bagging 2 Mesing Bagging 3 Mesing Bagging 4 Mesing Bagging 5 Mesing Bagging 6 Mesing Bagging 7 Kesimpulan Kabel Kabel NYY 3x4 mm2 Kabel NYY 4x16 mm2 Kabel NYY 4x25 mm2 Kabel NYY 4x35 mm2 Kabel NYY 4x50 mm5 Kabel NYF 4x2.5 mm2

= = = = = = = = =

1.0 3.0 2.0 5.0 6.0 4.0 10.0 20.0 20.0

Unit Bh Bh Bh Bh Bh Bh Bh Bh

= = =

1.0 Unit 1.0 Bh 8.0 Bh

= =

9.0 Unit 9.0 Bh

15 15

20 313 313

31320 20 15

20 198 198 198 198

198 20 20 20 20 15

20

150 150 150 150 150 150

220 75 75 75 75 75 75 75

= = = = = = = = = = = = = = = = = = = = = = =

806.0 791.0 776.0 458.0 443.0 240.0 225.0 75.0 45.0 525.0 45.0 55.0 65.0 75.0 85.0 95.0 105.0 525.0 2340.0 75.0 225.0 1219.0 3859.0

M M M M M M M M M M M M M M M M M M M M M M M

-

VI

INSTALASI ELKTRIKAL SISTEM KONVEYOR UNLOADING PUPUK Pembuatan Bangunan Genset dan Gardu PLN

URAIAN PERHITUNGAN

JUMLAH TOTAL

A

=

174.0 M2

DUMAI, 2010 ASMEN PERALATAN & INSTALASI

JALALUDDIN, ST