17
CAL DQM Report June 2 nd – June 9 th

CAL DQM Report

  • Upload
    jolie

  • View
    43

  • Download
    0

Embed Size (px)

DESCRIPTION

CAL DQM Report. June 2 nd – June 9 th. June 2 nd Upadate B.C’s. Checkout Runs: QINJ 17966 0(0) 12(1) 1(0) UNO 17967 0(0) 1(0) 0(0) PED 17968 0(0) 0(0) 0(0) Version 3587 311 b.c.’s 2 holes (B2,B22) Updated UNO scale factors. - PowerPoint PPT Presentation

Citation preview

Page 1: CAL DQM Report

CAL DQM Report

June 2nd – June 9th

Page 2: CAL DQM Report

June 2nd Upadate B.C’s

Checkout Runs: QINJ 17966 0(0) 12(1) 1(0) UNO 17967 0(0) 1(0) 0(0) PED 17968 0(0) 0(0) 0(0) Version 3587 311 b.c.’s 2 holes (B2,B22) Updated UNO scale factors

Page 3: CAL DQM Report

Version 3587

Total number of CAL bad channels for version 3587 is 311 They break down as follows: FCAL BCAL RCAL Total FEC 28 3 4 35 UNO 75 124 25 224 Qinj 12 16 2 30 PED 17 5 0 22Total 132 148 31 311 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid Code Message b 15 5 18 4262 2 7 1 0 3005 DSP Qinj mean too

low b 15 5 24 4263 2 7 1 1 4001 UNO mean is high b 5 7 3 6A34 22 4 2 0 4006 UNO RMS is too big b 5 7 9 6A35 22 4 2 1 4005 UNO mean is too low 2 holes

Total number of SRTD bad channels for version 3587 is 5Ca Crt Crd Chn PMT Code Message r 6 14 1 944 22 Pipeline pedestal spread r 6 14 2 958 65 Nonlinearity r 6 14 3 96C 22 Pipeline pedestal spread r 6 14 4 980 65 Nonlinearity r 6 14 11 8EA 65 NonlinearityTotal number of FNC bad channels for version 3587 is 0Total number of PRES bad channels for version 3587 is 1Ca Crt Crd Chn PMT Code Message r 11 2 43 10E0 65 NonlinearityTotal number of PRT bad channels for version 3587 is 0Total number of LED bad channels for version 3587 is 0Total number of BPRE bad channels for version 3587 is 0Total number of TDI bad channels for version 3587 is 0

Page 4: CAL DQM Report

Hole in B2

Page 5: CAL DQM Report

Hole in B22

Page 6: CAL DQM Report

June 3rd Access day

FEC EC-1 EC-5 17999-18004 FEC v. 3588 74 b.c.’s 0 holes Update time offsets v. 208 UNO 18007 71(0) 273(81) 31(0) B26 off! calhvon UNO 18008 75(0) 119(0) 30(0) B26 on!

Page 7: CAL DQM Report

B26 hv off!

Page 8: CAL DQM Report

B26 hv on

Page 9: CAL DQM Report

June 3rd continued

Trimming UNO 18011 75(0) 118(1) 30(0) UNO 18012 53(0) 117(0) 25(0) UNO 18013 48(0) 113(0) 25(0) UNO 18014 50(0) 113(0) 24(0)

QINJ 18015 7(0) 3(0) 2(0) PED 18016 24(0) 8(0) 1(0) Version 3590 290b.c.’s 0 holes Update UNO scale factors

Page 10: CAL DQM Report

June 4-8th

Isabell used CAL quick calibs to update b.c’s Isabell did Auto ADC to volt on Monday.

Page 11: CAL DQM Report

June 9th

Update b.c’s with CAL quick calib 50218 QINJ 0(0) 0(0) 0(0) UNO 0(0) 4(0) 2(0) PED 1(0) 0(0) 0(0) Version 3598 307 b.c.’s 0 holes Tried to change version, got errors:

ccv: could not get lock: file /var/tmp/locks/ccv.lock already exists

Didn’t change version, didn’t main

Page 12: CAL DQM Report

Version 3598

Total number of CAL bad channels for version 3598 is 307

They break down as follows: FCAL BCAL RCAL Total FEC 34 36 4 74 UNO 53 121 26 200 Qinj 8 4 3 15 PED 13 5 0 18Total 108 166 33 307 The total number of holes in the CAL are: Ca Crt Crd Chn Poser Mod Tow Typ Sid

Code Message0 holes

Total number of SRTD bad channels for version 3598 is 1

Ca Crt Crd Chn PMT Code Message r 6 14 11 8EA 42 Pipeline gain spreadTotal number of FNC bad channels for

version 3598 is 0Total number of PRES bad channels for

version 3598 is 1Ca Crt Crd Chn PMT Code Message r 11 2 43 10E0 65 NonlinearityTotal number of PRT bad channels for

version 3598 is 0Total number of LED bad channels for

version 3598 is 0Total number of BPRE bad channels for

version 3598 is 0Total number of TDI bad channels for

version 3598 is 0

Page 13: CAL DQM Report

UNO B5

Page 14: CAL DQM Report

QINJ B5

Page 15: CAL DQM Report

Problems/Calls from ZCR

June 3rd 11:30 pm Slow control warnings

SRTD-FLTvolt south channel 4 Fixed by logging into teucer and using command: srtdfltlv

on/ srtdfltlv off until all the voltages looked normal Pow_CAL in RCAL, BCAL etc.

Ping monitor shows hc3control is unreachable Go to 6th floor and reset computer

June 6th 8:30 pm Slow control problem with PRES-deputy missed

instructions to email Isabell

Page 16: CAL DQM Report

Problems/calls continued

June 7th

GFLT histos show CAL pipeline jump Called Allesandro, called John L. (this is a CFLTP prob.)

June 9th Cal in undefined offline state, can’t include CAL in

runs. Called Allesandro

Page 17: CAL DQM Report

DQMCOC

Trouble getting plots off caldaq…