www.hauff-technik.de
Always. Reliable. Tight.
RWE POWER PLANT HAMM-UENTROP
CABLE ENTRY SYSTEMS HSI 150 AND KES-M 150
22
Laying of cable ducts Hateflex 14150
Cable ducts for KES-M 150, will later be covered by 6 m of concrete Wall inserts HSI 150 installed as package
Spacers allow fixation and positioning of cable ducts
August 2008 – Starting point for the construction of a new hard coal-fired power plant in Hamm-Uentrop in Westphalia by RWE Power.The total investment by RWE Power for this new power plant will be € 2 billion. The first of the two 800-megawatt units should be commissioned in 2011. The challenge: Creating flexible, pressure-tight and well-coordinated connections of cable ducts. The solution: Connecting Hauff cable entry system KES-M 150 to the HSI 150-system. Cable duct system KES-M 150 is the combination of a flexible Hateflex spiral hose with smooth inner surface for gentle cable insertion with a multitude of possible options for connection and sealing. The numerous possibilities to combine various products offer the perfect connection and sealing solution for each application. Cable entry system HSI 150 can be sealed after the cables have been laid using individual split press seals HRD 150/160.
LAYING OF CABLE ENTRY SYSTEMS KES-M 150
Hauff-Technik GmbH & Co. KG
Robert-Bosch-Straße 989568 Hermaringen, GERMANY
Tel. +49 7322 1333-0Fax +49 7322 1333-999
www.hauff-technik.de
The
info
rmat
ion
in t
his
pam
ph
let
is b
ased
on
ou
r cu
rren
t te
chn
ical
kn
ow
led
ge
and
exp
erie
nce
. Th
is d
oes
no
t re
leas
e p
roce
sso
rs a
nd
use
rs f
rom
th
e re
spo
nsi
bili
ty o
f co
nd
uct
ing
th
eir
ow
n c
hec
ks a
nd
tra
ils d
ue
to t
he
nu
mb
er o
f p
oss
ible
infl
uen
ces
in t
he
pro
cess
ing
an
d u
se o
f o
ur
pro
du
cts.
We
will
rep
lace
all
par
ts t
hat
are
un
usa
ble
bec
ause
of
def
ecti
ve m
ater
ials
. No
rep
lace
men
t fo
r d
efec
ts a
risi
ng
du
rin
g t
ran
spo
rt o
r st
ora
ge
or
du
e to
imp
rop
er in
stal
lati
on
an
d t
hei
r co
nse
qu
ence
s.kw
_ham
m_u
entr
op
_en
_180
313
Project information and Solutions provided by Hauff-Technik
FACTS
PROJECT INFORMATION
Customer RWE Kraftwerk, Hamm-Uentrop, Deutschland
Application flexibles Kabeleinführungssystem KES-M 150 und Kabeldurchführungen HSI 150
The challenge gas- und druckwasserdichtes sowie mechanisch druckbelastbares Kabeleinführungssystem
EPC contractor SAG Essen
Supplier ALPINE-Bau Dortmund/Fatheuer, Hamm
SOLUTIONS PROVIDED BY HAUFF-TECHNIK
Specification wasserdichtes Kabeleinführungssystem
The solution cable entry system wall inserts HSI 150cable entry system KES-M 150
Products used approx. 10 km cable duct system KES-M 150300 units double wall inserts HSI 150-K2300 units individual press seals HRD 150/160
mailto:office%40hauff-technik.de?subject=