    HUAWEI

    Whole Network StudyOverseas radio network planning department

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    2/37

    General IdeaStep by Step

    Huawei G18 co -locate with Nok ia G9

    Count utilization of all G9 and G18 Co-location cells

    Compare utilization of Huawei and Nokia cell

    Find out reason of lopsided utilization

    Provide possible solution

    Huawei Util. Nokia Util. General Solution

    Low Low Remove G9 or G18TRX if abnormal

    Low High Remove G18 TRX or check

    High Low Remove G9 or Add G18 TRX

    High High New Site or Expansion

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    3/37

    General IdeaStep by Step

    No Huawei G18 co-locate wit h Nokia G9

    Count utilization of all G9 cells excluding co-located site

    Check those cells with high or low utilization

    Provide possible solution

    Nokia General Solution

    Low Y Remove G9 if abnormal

    Low N Check reason if abnormal

    High Y New G9 or G18 Site or Expansion

    High N Expansion

    TRX >= 4

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    4/37

    Distribution of Utilization

    Huawei G1800

    13 14 15 16

    100%

    9 10 11 12

    80%

    5 6 7 8

    40%

    1 2 3 4

    0 40% 80% 100% Nokia G900

    No HW Site A B C D

    HW Site noton Service

    E F G H

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    5/37

    Major Solution

    Parameter G18

    Remove TRX G18

    Add TRX G18

    Change direction G18

    Change feed or antenna

    Add new site G18

    Remove Site G18

    Parameter G9

    Remove TRX G9

    Add TRX G9

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    6/37

    CN Region

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    7/37

    11

    0

    No G1800 88 392 40

    0 1 0G18 not on

    service

    33 7

    0 40% 80% 100% Ericsson G900

    4 2

    80%

    5 109 20 740%

    3 67

    HuaweiG1800

    1 0

    100%

    0 36

    0 1

    Distribution of Utilization(CN)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    8/37

    Detailed Solutions(CN)

    Parameter G18 Add TRX G18 Remove TRX G18 Change feed or antenna Remove Site G18

    34 27 43 26 3

    Parameter G9 Add TRX G9 Remove TRX G9 Change direction G18 Add new site G18

    47 26 18 3 13

    Solution fo r Each Cel l:

    Br ie f of Equipm ent Regulat ion:

    Item Quantity Remark

    Add TRX G18 31 -Remove TRX G18 -48 -

    Sub-Total -17

    Add TRX G9 26 -

    Remove TRX G9 -20 -

    Sub-Total 6

    Add new site G18 8 Add 4 new sites and 4 new cells

    Remove Site G18 3 Remove 3 cells

    *Negative value means remove.

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    9/37

    Case Study 1

    - Change parameter of G9

    *Change parameter of LAST3 to get more traffic from TLCS1 and

    NGBK2, the same solution is applied in some areas without G18

    sites.

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    10/37

    Case Study 1

    - Change parameter of G9Cell BSC Type Top 4 Define_Ch Capacity %Utilizaion Colocation

    BCUG1 BSCRST4 Macro G9 8.13 14 9.73 83.60 N

    BMRH1 BSCRST3 Macro G9 2.46 14 9.73 25.32 NCAMP2 BSCRST4 Macro G9 3.64 14 9.73 37.40 N

    CSRD2 BSCRST5 Macro G9 18.75 22 17.10 109.66 N

    EGLR1 BSCRST5 Macro G9 11.01 38 32.60 33.79 N

    HYHN2 BSCRST5 Macro G9 2.81 14 9.73 28.88 N

    KOPP2 BSCRST5 Macro G9 1.93 14 9.73 19.82 N

    KSAYB BSCRST2 Micro G9 5.66 22 17.10 33.13 N

    KSPU3 BSCRST2 Macro G9 3.58 14 9.73 36.77 N

    . . . . . . . .

    . . . . . . . .

    . . . . . . . .

    KSRG3 BSCRST5 Macro G9 24.29 30 24.80 97.93 N

    NYAO3 BSCRST3 Macro G9 5.80 21 16.20 35.79 N

    PANT3 BSCRST5 Macro G9 3.87 14 9.73 39.74 N

    PTAG1 BSCRST4 Macro G9 2.79 14 9.73 28.68 N

    SBTD1 BSCRST3 Macro G9 2.91 14 9.73 29.87 N

    SJCC3 BSCRST3 Macro G9 1.09 6 2.96 36.67 NSLYI1 BSCRST5 Macro G9 9.06 13 8.83 102.58 N

    TAL11 BSCRST5 Macro G9 6.70 22 17.10 39.16 N

    TKWG3 BSCRST3 Macro G9 3.76 14 9.73 38.60 N

    TMPG1 BSCRST3 Macro G9 2.93 14 9.73 30.12 N

    TPPV1 BSCRST3 Macro G9 2.12 14 9.73 21.76 N

    WKKG3 BSCRST5 Macro G9 12.25 16 11.50 106.50 N

    WRBN3 BSCRST2 Macro G9 21.69 29 23.80 91.15 N

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    11/37

    *Change the direction of NKTB2 from 210to 60

    Case Study 2

    - Change direction of G18

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    12/37

    Case Study 2

    - Change direction of G18

    Cell Top 4 Define_Ch Capacity %Utilizaion Cell Top 4 Define_Ch Capacity %Utilizaion

    NKTB2 3.70 14 9.73 37.99 NKTB7 2.16 14 9.73 22.15

    TAL11 6.70 22 17.10 39.16

    WKKG8E 2.81 14 9.73 28.87

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    13/37

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    14/37

    Case Study 3

    Reduce 1 cell of G18

    Cell Top 4 Define_Ch Capacity %Utilizaion Cell Top 4 Define_Ch Capacity %Utilizaion

    TLLG1 3.73 14 9.73 38.37 TLLG6 1.42 14 9.73 14.54

    TWRT1 5.73 14 9.73 58.93 TWRT6 0.97 14 9.73 9.93

    WTIT3 4.63 14 9.73 47.56 WTIT8 1.31 14 9.73 13.44

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    15/37

    Add one new cell co-located with SPKA1

    Case Study 4

    Add 1 cell of G18

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    16/37

    Case Study 4

    Add 1 cell of G18

    Cell Top 4 Define_Ch Capacity %Utilizaion

    PATA1 25.41 30 24.80 102.45

    RPHT1 20.51 30 24.80 82.71

    SPKA1 24.27 29 23.80 101.98

    WTNR3 17.46 30 24.80 70.39

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    17/37

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    18/37

    Case Study 5

    Add new site in the city

    Cell Top 4 Define_Ch Capacity %UtilizaionIBR12 16.20 21 16.20 100.01

    KCKC1 28.92 38 32.60 88.71

    NGBK1 30.66 30 24.80 123.62

    NGBK2 20.94 30 24.80 84.43

    NRMR2 19.02 30 24.80 76.69

    NRMR3 23.19 30 24.80 93.52TLCS1 20.00 30 24.80 80.65

    TLCS3 22.58 30 24.80 91.06

    WSKS2 14.03 21 16.20 86.59

    WSKS3 27.33 36 30.70 89.01

    WSTT1 13.70 22 17.10 80.10

    WSTT2 20.93 30 24.80 84.40WTTG1 14.22 22 17.10 83.16

    WTTG2 7.55 13 8.83 85.46

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    19/37

    SPNN S2/2/2 S2/3/3

    Add more TRX in SPNN2 and SPNN3

    Case Study 6

    Add TRX of G9

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    20/37

    Case Study 6

    Add TRX of G9Cell Top 4 Define_Ch Capacity %Utilizaion Cell Top 4 Define_Ch Capacity %Utilizaion

    ADSN2 21.09 30 24.80 85.03

    BGSI2 15.76 22 17.10 92.15

    BGZI1 14.00 22 17.10 81.88

    BGZI3 14.70 21 16.20 90.74

    BHNA1 9.93 14 9.73 102.02

    BKNG3 8.16 14 9.73 83.90

    BMNW2 8.19 14 9.73 84.18 BMNW7 3.22 14 9.73 33.09

    BPWI1 17.27 22 17.10 100.99

    BUCM1 9.72 14 9.73 99.85 BUCM6 1.85 14 9.73 19.00

    KATM2 16.11 22 17.10 94.22 KATM7 4.20 14 9.73 43.20

    KWPC2 8.20 14 9.73 84.31

    LSTI1 15.14 21 16.20 93.47 LSTI6 4.16 14 9.73 42.78

    NRAI1 14.90 22 17.10 87.13

    NRAI2 12.71 20 15.30 83.08

    PCHI1 7.28 13 8.83 82.47

    PCHI2 10.21 13 8.83 115.67

    PTA11 13.99 21 16.20 86.37

    SPNN2 12.01 14 9.73 123.40 SPNN7 3.41 14 9.73 35.02

    SPNN3 11.01 14 9.73 113.11 SPNN8 2.36 14 9.73 24.28

    TAL12 20.35 29 23.80 85.50

    TMNO1 9.99 14 9.73 102.69

    TMPG3 11.02 14 9.73 113.24 TMPG8 2.62 14 9.73 26.97

    TPMK3 13.45 21 16.20 83.02

    TWG12 14.04 21 16.20 86.66

    WTBN2 9.26 14 9.73 95.17

    YCPK1 8.37 14 9.73 86.02 YCPK6 5.71 14 9.73 58.71

    C S

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    21/37

    BTSG S2/2/2 S2/3/2 Add one TRX

    KGNG S0/2/0 S0/4/0 Add two TRX

    Case Study 7

    Add TRX of G18

    C S d 7

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    22/37

    Case Study 7

    Add TRX of G18Cell Top 4 Define_Ch Capacity %Utilizaion Cell Top 4 Define_Ch Capacity %Utilizaion

    BNLN2 23.04 30 24.80 92.89 BNLN7 7.93 14 9.73 81.46

    BTSG1 21.93 29 23.80 92.15 BTSG6 7.45 14 9.73 76.54

    CVCT2 17.48 30 24.80 70.50 CVCT7 7.86 14 9.73 80.74

    KBRC1 18.73 22 17.10 109.52 KBRC6 5.25 14 9.73 53.98

    KGNG2 31.55 36 30.70 102.78 KGNG7 9.95 14 9.73 102.26

    KSYD2 6.95 14 9.73 71.44 KSYD7 8.75 14 9.73 89.94

    KSYD3 8.66 14 9.73 89.04 KSYD8 7.41 14 9.73 76.16

    LKRR1 31.76 45 39.60 80.20 LKRR6 13.85 21 16.20 85.48

    NBPI3 25.60 30 24.80 103.21 NBPI8 12.06 21 16.20 74.43

    NLG13 19.54 29 23.80 82.10 NLG18 7.47 14 9.73 76.76

    NMG13 10.13 14 9.73 104.11 NMG18 4.12 14 9.73 42.30

    NSRN2 30.51 45 39.60 77.04 NSRN7 14.31 21 16.20 88.35

    PIPA2 4.32 6 2.96 145.97 PIPA7 5.29 14 9.73 54.32

    PIPA3 4.07 6 2.96 137.40 PIPA8 5.05 14 9.73 51.85

    PPIR3 30.73 45 39.60 77.61 PPIR8 8.32 14 9.73 85.51

    SMBD1 17.63 21 16.20 108.80 SMBD6 4.76 13 8.83 53.85

    SNBS1 21.77 21 16.20 134.38 SNBS6 12.91 29 23.80 54.25

    SPKA2 42.68 37 31.60 135.05 SPKA7 9.17 14 9.73 94.19

    SPKA3 28.73 45 39.60 72.54 SPKA8 9.29 14 9.73 95.44

    SRI23 13.08 22 17.10 76.49 SRI28 9.00 14 9.73 92.45

    TARA2 23.00 21 16.20 142.00 TARA7 8.96 14 9.73 92.06

    TKLQ1 24.07 30 24.80 97.06 TKLQ6 9.30 14 9.73 95.59

    TKLQ3 19.76 30 24.80 79.68 TKLQ8 8.38 14 9.73 86.13

    WHCG1 24.66 38 32.60 75.65 WHCG6 8.97 14 9.73 92.19

    WTNR1 12.73 22 17.10 74.46 WTNR6 9.78 14 9.73 100.54

    WTNR2 9.57 14 9.73 98.34 WTNR7

    YBPI3 19.40 30 24.80 78.23 YBPI8 13.13 21 16.20 81.06

    C St d 8

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    23/37

    KCKC S5/5/3 S5/5/2 reduce one TRX

    Case Study 8

    Reduce TRX of G9

    C St d 8

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    24/37

    One new site will be built near KSYD1,so reduce one TRX of

    KSYD1

    Case Study 8

    Reduce TRX of G9

    C St d 8

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    25/37

    SMKO located at open area,antenna high 62m

    Change antenna from 15.5dBi to 18.5dBi

    Case Study 8

    Reduce TRX of G9

    C St d 8

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    26/37

    Case Study 8

    Reduce TRX of G9Cell Top 4 Define_Ch Capacity %Utilizaion

    ADSN1 13.74 46 40.50 33.91

    BKNG1 1.66 14 9.73 17.05BMNW1 0.94 14 9.73 9.69

    BSLP2 0.30 14 9.73 3.04

    CMKK1 6.54 22 17.10 38.24

    KACW1 6.64 22 17.10 38.84

    KCKC3 2.10 22 17.10 12.27

    MLK23 6.60 22 17.10 38.61

    NMG11 12.44 38 32.60 38.16

    NYAO1 6.27 22 17.10 36.66

    PKBL2 1.78 14 9.73 18.26

    PKDC2 9.26 30 24.80 37.35

    TMPG2 1.78 14 9.73 18.33

    TPPV2 1.65 14 9.73 16.95

    WHRJ2 1.84 14 9.73 18.90WHRJ3 1.72 14 9.73 17.67

    WKPS2 6.76 22 17.10 39.51

    WSNN3 2.28 14 9.73 23.41

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    27/37

    West

    Region

    Di t ib ti f Utili ti (W t)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    28/37

    Distribution of Utilization(West)

    Huawei

    G18000 4 1 1

    100%

    5 16 4 9

    80%

    25 78 37 20

    40%

    16 23 15 20

    0 40% 80% 100% Nokia G900

    No G1800 121 238 83 112

    44G18 not on

    service

    5 15 19

    D t il d S l ti (W t)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    29/37

    Detailed Solutions(West)

    Parameter G18 Add TRX G18 Remove TRX G18 Change feed or antenna Remove Site G18

    52 45 13 0 2

    Parameter G9 Add TRX G9 Remove TRX G9 Change direction G18 Add new site G18

    77 69 27 0 5

    Solution fo r Each Cel l:

    Br ie f of Equipm ent Regulat ion:

    Item Quantity Remark

    Add TRX G18 48 -Remove TRX G18 -15 -

    Sub-Total 33 -

    Add TRX G9 83 -

    Remove TRX G9 -32 -

    Sub-Total 51 -

    Add new site G18 5 -

    Remove Site G18 1 Remove 2 cells of 1 sites

    *Negative value means remove.

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    30/37

    SouthRegion

    Distrib tion of Utili ation(So th)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    31/37

    Distribution of Utilization(South)

    0 0

    HuaweiG1800

    1 2

    100%

    4 7 1 2

    80%

    17 11 1 440%

    22 11 0 4

    0 40% 80% 100% NOKIA G900

    82

    3

    No G1800 184 328 58

    6 1 2G18 not on

    service

    Detailed Solutions(South)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    32/37

    Detailed Solutions(South)

    Parameter G18 Add TRX G18 Remove TRX G18 Change feed or antenna Remove Site G18

    22 4 12 0 9

    Parameter G9 Add TRX G9 Remove TRX G9 Change direction G18 Add new site G18

    39 57 131 0 10

    Solution fo r Each Cel l:

    Br ie f of Equipm ent Regulat ion:

    Item Quantity Remark

    Add TRX G18 4 -Remove TRX G18 -12 -

    Sub-Total -8 -

    Add TRX G9 57 -

    Remove TRX G9 -131 -

    Sub-Total -74 -

    Add new site G18 5 -

    Remove Site G18 1 Remove 2 cells of 1 sites

    *Negative value means remove.

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    33/37

    NorthRegion

    Distribution of Utilization(North)

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    34/37

    Distribution of Utilization(North)

    Huawei G1800

    23 18 3 1

    100%

    19 32 2 1

    80%

    56 85 13 7

    40%

    17 49 17 15

    0 40% 80% 100% Nokia G900

    48

    G18 not on

    service5 20 9 24

    No G1800 104 186 44

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    35/37

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    36/37

    Suggestion

  • 8/13/2019 C42 Technical Case Study and Proposal-20020812-B-1.0

    37/37

    Thank You