Upload
rabindranath-hendy-tagore
View
221
Download
0
Embed Size (px)
Citation preview
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
1/55
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
2/55
2
1. Company presentation
2. BIOTEC biogas technology
3. BIOTEC POM biogas project references
4. BIOTEC systems of organic matter management
Company presentation for Sungai Budi Group (7thof June 2012)
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
3/55
3
Organisation Structure
Established in 1984 in Belgium
Headquarters in Belgium
Office in Columbia to serve the Latin America Market
Bionexus Company in Malaysia to serve the South East Asian Market
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
4/55
4
Main Objectives
Integrated management: water & organic matter
Adapt technologies for wastewater treatment in Tropical regions
Work with agro-industries
Process sub-products: energy source & agro-inputs
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
5/55
5
Our Technologies
Anaerobic digesters: BIOGAS production
Organic Liquid Fertilization withtreated effluent and anaerobic sludge
Co-composting of sub-products: ORGANIC FERTILIZER
.INTERGRATED MANAGEMENT
OF ORGANIC MATTER
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
6/55
6
BIOTEC system for palm oil mills
POME TREATMENT- Biodigesters: Covered lagoons & tanks
BIOGAS PRODUCTION
- Electricity generation- Fossil fuel substitution
- Biomass replacement + clean boiler emissions
ORGANIC FERTILIZER PRODUCTION
- Ferti-irrigation of treated effluent- Co-composting of EFB
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
7/55
7
BIOTEC INTERNATIONAL GROUP IS:
11 large biogas projects implemented in palm oil sector since 1989
7 projects currently in implementation in Latin America (3), Asia (2) and
Africa (2) 5 MW of electricity generation installed in different projects
10 boilers adaptation to biogas (mill & refineries)
More than 32 GWh generated
More than 15 millions of litres of diesel saved
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
8/55
8
BIOTEC system for palm oil mills
CDM registration, monitoring and CERs issuance
- 6 projects registered
- 4 projects issuing CERs
- 268 000 CERs verified in 4 years
- 131 300 CERs issued in 4 years
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
9/55
9
BIOTEC scope of work
ENGINEERING (Feasibility Study, Design, Project management)
CONSTRUCTION (Procurement, Supervision, Commissioning)
OPERATION & MAINTENANCE (During CDM registration period)
CDM MONITORING (For new and existing projects)
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
10/55
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
11/55
11
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
12/55
12
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
13/55
13
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
14/55
14
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
15/55
15
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
16/55
16
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
17/55
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
18/55
18
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
19/55
19
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
20/55
20
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
21/55
21
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
22/55
22
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
23/55
23
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
24/55
24
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
25/55
25
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
26/55
26
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
27/55
27
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
28/55
28
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
29/55
29
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
30/55
30
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
31/55
31
BIOMASS BOILERADAPTATION & GASTRANSPORT SYSTEM
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
32/55
32
GAS BURNERS &COMBUSTION
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
33/55
33
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
34/55
34
PALMAR SANTA ELENA
BIOGAS in dual fuel engine
Concrete tanks
1989, COLOMBIA
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
35/55
35
PALMAS DEL LLANO
BIOGAS in dual fuel engine
Concrete tanks
1992, COLOMBIA
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
36/55
36
PALMEIRAS
BIOGAS for electricity generation
First covered lagoon in POM
1999, COLOMBIA
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
37/55
37
EECOPALSA
BIOGAS for electricity generation: national grid (1,2 MW)
First CDM biogas POM registered project in the world
First CDM biogas POM project to issue CERs
2006, HONDURAS
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
38/55
38
EL ESPINO
BIOGAS for two package boiler, 1 biomass boiler
CDM registered in 2007
Successfully completed 2 verifications
2007, PERU
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
39/55
39
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
40/55
40
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
41/55
41
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
42/55
42
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
43/55
43
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
44/55
44
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
45/55
45
BIOTEC POM biogas projects in the world
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
46/55
46
LIQUID ORGANIC FERTILIZATION: sludge + treated water
Anaerobic sludge + treated effluent
200 ha under intensive organic fertilization
1,5 ha fertilized per day
System CDM compliant (SCADA monitoring + GIS)
Semi mobile system
Low investment cost (< 1,500 USD per ha)
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
47/55
47
FERTILIZING VALUE OF SLUDGE
DM ~ 5 to 7%
N ~ 1,3 kg / m3 of sludge
P2O5 ~ 0,35kg / m3 of sludge
K2O ~ 1,5kg / m3 of sludge
Rich in marco (CaO, MgO, SO4) and micro nutrients (MnO, CuO, BO3)
Easily pumpable and spread on EFB or estate
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
48/55
48
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
49/55
49
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
50/55
50
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
51/55
51
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
52/55
52
SOLID ORGANIC FERTILIZATION: Co-COMPOSTING
1. Covered or open composting
2. Turning machine or air injection
3. Recycling of sludge and treated effluent
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
53/55
53
Enclosed composting plant zero discharge system
General overview principle
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
54/55
54
Enclosed composting plant zero discharge system
General overview principle
Biotec International Asia Sdn. Bhd
7/30/2019 BK11-C42 (Biotec Presentation June 12-12
55/55
55
Web: www.bio-tec.net
Tel: +60 3 87 37 37 00
Email: [email protected]
http://www.bio-tec.net/mailto:[email protected]:[email protected]:[email protected]:[email protected]://www.bio-tec.net/http://www.bio-tec.net/http://www.bio-tec.net/