CONCENTRIC TUBE HEAT EXCHANGER TEST SETUP AT CRYOLAB
CO2 FOR CMS TRACKER WEEK MEETING.
Theodoros Katopodis PH-CMX
2
Theodoro
s Kato
podis P
H-C
MX
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
A. CTHX theoretical considerations.
B. Cryolab’s restrictions and interior design.
C. Designing approach by using Catia.i. 3D models.ii. 2D models
D. CTHX construction procedure.i. Welding/Bending/Insulation at Gasgroup.ii. Transportation at Cryolab.iii. Insulation.
E. CTHX insulation.
F. CTHX installation.
G. Future tasks.
5/1
3/2
01
3
3
Theodoro
s Kato
podis P
H-C
MX
The concentric tube heat exchanger consists of two tubes that are concentrically arranged. One of the fluid (either hot or cold fluid) flows through the tube and the other through the annulus.
Heat is a form of energy that flows due to difference in temperature between two points that are located within a medium or in two different media. The transfer of heat occurs via one or any combination of the three modes of heat transfer - conduction, convection and radiation.
Similarly, the rate of heat transfer can be described by the following equations:
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
A simplified representation of heat transfer between two fluids through the walls of a CTHX .
The new CTHX is made of stainless steel in a two layers of insulation, trying to improve the system performance, reaching stable conditions : Tsupply=-40°C and Treturn=-20°C.
The CTHX will be tested at Cryolab (connected from the one side (cooling plant) directly to the other (four Loops mockup of Joao’s tests).
CTHX theoretical considerations.
4
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Cryolab’s restrictions and interior design.
Cryolab building 158 view before the removal of the scaffolding.
No space at all!!
5
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Cryolab’s restrictions and interior design.
The most candidate place where we could install the concentric tube pipes.
6
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Cryolab’s restrictions and interior design.
Cryolab building 158 view after the removal of the scaffolding .
Cooling Box (CMS 4 Layer mockup)
Cooling Plant
Horizontal P
ath
Vertic
al P
ath
5m
4m
7
Theodoro
s Kato
podis P
H-C
MX
The plan is to represent in a 3D simple drawing model the room space of Cryolab more or less precisely . 5
/13
/20
13
3D models
3D_Assembly connection between Cooling plant and CTHX.
3D_Cryolab room place.
3D_The CTHX.
3D_The CTHX view.
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
8
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
32D models
2D_Views of the CTHX.
2D_Assembly connection between Cooling plant and CTHX.
o Concentric Stainless Steel Tube i. Inside Tube ID=4mm and OD=6mm.ii. Outside Tube ID=10mm and
OD=12mm.
2D_ISO view of the CTHX.
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
o Armaflex Insulationi. First Layer ID=12mm and OD=35mm.ii. Second layer ID=35mm and
OD=100mm.
9
5/1
3/2
01
3Theodoro
s Kato
podis P
H-C
MX
Tubes arrived at CERN in bunches of 6m.
i. ID= 4mm and OD= 6mm (3x6m).
ii. ID= 10mm and OD= 12mm (3x6m).
Construction process Welding process (by using the orbital welding-a specialized area of welding whereby the
arc is rotated mechanically through 360° around a static work piece, an object such as a pipe, in a continuous process).
Small tube is placed inside the big. Cross unions tees were installed to the
marked points (where it is supposed to be located the PPT).
Subsequently the two tubes bended together ( by using the hand tube bender to different 6 points following a bend radius of 38 °).
Before the transportation the CTHX was insulated (by using the thin insulation of ID=12mm and OD=35mm).
Afterwards the 18m CTHX transported at Cryolab, in order to be adjusted on the correct position.
Holes opened on the wall (for the vertical path). Supporting brackets fixed on the wall, holding stable the CTHX to the horizontal path. Insulate the CTHX with the second layer of Armaflex ID=35mm and thickness of 32mm. Pressure transmitters installed.
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
CTHX construction procedure.
10
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
During the construction at Gasgroup . Installing at Cryolab at Cryolab.
CTHX transportation from Gasgroup workshop to Cryolab
Insulating with the first layer.
11
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
CTHX insulation.
Insulating with the second thick layer.Drilling holes, fixing supports and placing the CTHX.
During the insulation procedure.
Awaiting for the glue to dry out.
12
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Collier support Armafix ø 42/45 Kavec collier support.
Wall mounting brackets x 3, holding the CTHX on the horizontal path.
CTHX connection to four loops mockup.
CTHX connection cooling plant.
PTT_01CTHX installation.
PTT_02
13
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Horizontal path view.
CTHX installation.
14
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
CTHX installation.
CTXH to cooling box connection. Still needs to be insulated..
Cooling plant to CTXH connection. Still needs to be insulated.
CTHX view
15
Theodoro
s Kato
podis P
H-C
MX
5/1
3/2
01
3
CTHX PIPE TESTS CO2 FOR CMS TRACKER WEEK MEETING
Future tasks.
A. Insulate the CTHX assembly connections (cooling plant, box).
B. Fix the PTT_02.
C. All the connections should be well done tightened.
D. A possible pressure test.
E. Calculations about the CTHX performance.
F. Comparison to future measurements.
Many thanks to Joao and Abdel.
Acknowledgements
16
Theodoro
s Kato
podis P
H-C
MX
12
/20
/20
12