Green & Black Belt Financial Impact Analysis 1 By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San Antonio, Texas

By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

Green & Black Belt Financial Impact Analysis

1

By: Dr. Alberto A. Yáñez Moreno (TMAC)

March 27, 2014

San Antonio, Texas

Page 2: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

2

Agenda TMAC Background

Certification Requirements

Financial Impact

Aggregate Financial Impact by Industry & Type of project

Comparisons Between GB & BB projects

GB & BB Financial Impact by Industry & Type of project

Keys to Project Completion

Q & A Session

Page 3: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

3

TMAC is hosted at the University of Texas in Arlington • Started delivering Lean Six Sigma training in 2003 • Yellow, Green, Black & Master Black Belt training • Training takes place in the form of open enrollment or as a

dedicated class • Classes typically vary from 8 to 24 students • Sponsor & Champion workshop • Coaching to belts and management • Our Engineers can lead & facilitate Kaizen events

TMAC Background

Page 4: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

4

Green Belts • Attend 2 weeks course and pass final exam (80% passing

grade) • Submit a full DMAIC project or 2 Kaizen events Black Belts • Attend 4 weeks course and pass final exam (80% passing

grade) • Submit two full DMAIC projects or 1 full DMAIC project and 2

Kaizen events

Certification Requirements

Page 5: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

5

• GB & BB have 1 year to submit a completed project after training is completed

• Completed projects are submitted, via a Power-Point file, to our MBB’s for review

• We also ask for a letter of support from the project Sponsor

Certification Requirements Cont.

Page 6: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

6

• There is no minimum financial impact toward certification • TMAC does NOT have the capability to audit the financial

impact submitted for each project • A few companies require the financial manager to review the

project’s financial impact • For most projects, the financial impact is calculated by the

belts • The financial impact is a combination of Soft & Hard Savings • Submitted projects encompass years 2009 to 2013

Financial Impact

Page 7: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

7

Company Segments Company Segments

Examples

Aerospace Machining, Structures, Seats, etc.

Continuous/Batch Chemical Process, Paper Mill, Plywood, Dry-Wall, Paint Booth, Reactors, etc.

Discrete Process Clothing, Assembly, Manufacturing, Machining, etc.

Food & Beverage Soda Drinks, Sausage, etc.

Healthcare IT

Hospitals, Labs, Equipment Fabrication, Blood Center, etc.

Logistics Transportation

Oil Industry Assembly, Machining, Chemical Process, Drill Bits, etc.

Service Insurance, Banking, Electric Utilities, Cities, etc.

Page 8: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

8

Aggregate (GB & BB) Financial Impact

$ 6,000,000$ 4,500,000$ 3,000,000$ 1,500,000$ 0

Median

Mean

$ 700,000$ 600,000$ 500,000$ 400,000$ 300,000$ 200,000$ 100,000

1st Quartile 46000Median 1500003rd Quartile 487396Maximum 7200000

422881 759459

101000 200469

1155308 1394479

A-Squared 41.35P-Value < 0.005

Mean 591170StDev 1263604Variance 1.59670E+12Skewness 3.4741Kurtosis 12.1820N 219

Minimum 0

Anderson-Darling Normality Test

95% Confidence Interval for Mean

95% Confidence Interval for Median

95% Confidence Interval for StDev95% Confidence Intervals

Aggregate (GB & BB) Financial Impact

Distribution not Normal. Median $150,000 & Mean $591,170

Page 9: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

9

Aggregate Box-Plot Financial Impact By Industry Type

Page 10: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

10

Aggregate Pareto Chart By Industry Type Financial Impact Thousand of Dollars

Page 11: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

11

Aggregate Box-Plot Financial Impact By Project Type

Page 12: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

12

Aggregate Box-Plot Financial Impact By Project Type

Page 13: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

13

Box-Plot Financial Impact Between GB & BB Last

Page 14: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

14

GB Financial Impact

Distribution not Normal. Median $100,000 & Mean $511,282

Page 15: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

15

GB Box-Plot Financial Impact By Industry Type

Page 16: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

16

GB Pareto Chart By Industry Type Financial Impact In Dollars

Page 17: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

17

GB Box-Plot Financial Impact By Project Type

Page 18: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

18

GB Box-Plot Financial Impact By Project Type

Page 19: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

19

BB Financial Impact

Distribution not Normal. Median $160,000 & Mean $659,548

Page 20: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

20

BB Box-Plot Financial Impact By Industry Type

Page 21: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

21

BB Pareto Chart By Industry Type Financial Impact In Thousand of Dollars

Page 22: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

22

BB Box-Plot Financial Impact By Project Type

Page 23: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

23

BB Box-Plot Financial Impact By Project Type

Page 24: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

Keys to Project Completion Sponsor & Champion Training

Right SCOPE

Projects prioritization & create a backlog of projects

Coaching to GB, BB & Managers

Establish a formal GB/BB selection process & determine percentage of time to LSS

Projects linked to corporate goal/dashboard metrics

Include finance personnel to estimate project financial impact

Preferred sequence: Kaizen, Lean, Six-Sigma & DFLSS

Project mix: Lean (55%), Six-Sigma (35%) & DFLSS (10%)

24

Page 25: By: Dr. Alberto A. Yáñez Moreno (TMAC) March 27, 2014 San ... - Home - Lean Six Sigmatexasleansixsigma.com/wp-content/uploads/2016/12/LSS-142... · 2016-12-13 · 3 TMAC is hosted

Questions & Answers Session

25

Thank You

TMAC Dr. Alberto Yáñez-Moreno [email protected] Phone: 817-602-4005