Buoyant Tower Technology Scalable, Self-Installing, Multi-Purpose Offshore Platform December 2013 Bao Nguyen and Sanjai Jatar

Buoyant Tower Technology

Embed Size (px)

Citation preview

Page 1: Buoyant Tower Technology

Buoyant Tower Technology

Scalable, Self-Installing, Multi-Purpose Offshore Platform

December 2013

Bao Nguyen and Sanjai Jatar

Page 2: Buoyant Tower Technology

• 50/50 Joint Venture company

• Offers unique combination of expertise: Horton Wison Deepwater – unparalleled floating platform design and

engineering experience

GMC – extensive record of innovative engineering and project management solutions

WHO WE ARE

2

Page 3: Buoyant Tower Technology

Cell Spar Technology • Simple fabrication

• Scalable for multiple applications

BUOYANT TOWER DESIGN

3

• Cell redundancy for safe operations

• Small offshore footprint

• All mild steel (AH-36 50ksi yield or eq.)

Page 4: Buoyant Tower Technology

Fixed & Variable Ballast • Provides flexibility for drilling

and production operations

• Unconditionally stable

• Electronic and Manual Ballast Control

• Air-over-water for simplicity and safety

BUOYANT TOWER DESIGN

4

Buoyant Sections

Variable Ballast

Fixed Ballast

Compressed Air

Page 5: Buoyant Tower Technology

BUOYANT TOWER DESIGN

5

Compliant • Resilient to seismic activity

• Resilient to wave forces

• Sea floor accelerations distributed through hull reducing topside acceleration

Page 6: Buoyant Tower Technology

BUOYANT TOWER DESIGN

6

Suction Can Foundation • Proven technology for in-place

stability

• Ease of relocation

• Net downward force of 300MT

Main functions Prevent lateral movement

Prevent vertical movement

Prevent torsional movement

Allow tilt motion

Page 7: Buoyant Tower Technology

Simplified Installation • Single vessel for transportation

and installation

• Self-upending

• Cantilevered float-over

7

BUOYANT TOWER DESIGN

Page 8: Buoyant Tower Technology

JACKET & BUOYANT TOWER EARTHQUAKE RESPONSE

8

Page 9: Buoyant Tower Technology

EARTHQUAKE AND WAVE DESIGN

9

-25 -20 -15 -10 -5 0

-50

0

50

100

150

200

250

Minimum Bending Stress

50 yr

200 yr

2000 yr

Stress - ksi

Ele

va

tio

n - f

t

0 5 10 15 20 25

-50

0

50

100

150

200

250

Maximum Bending Stress

50 yr

200 yr

2000 yr

Stress - ksi

Ele

va

tio

n -

ft

• Not rigidly connected to the seafloor

• Tower base can move without transmitting high seismic loads

• Even in 2000 yr case the tower steel is not yielding unlike a

jacket which plastically deforms (unity ratio <0.5)

• Induced accelerations nearly half compared to Spars

• Suction can is designed for specific soil and metocean

conditions

Page 10: Buoyant Tower Technology

• Oil-Over-Water Storage (light oil, no wax)

• Driller Design

• Accommodation

• Variable Depth

• Integrated Topsides

BUOYANT TOWER DESIGN FLEXIBILITY

10

Page 11: Buoyant Tower Technology

Advantages • Makes use of

existing tender

assist assets

• Water depth

range of 50m -

250m

• Competitive

with other forms

of drilling such

as jack-ups

DRILLER DESIGN

11

Page 12: Buoyant Tower Technology

ACCOMMODATION DESIGN

12

Page 13: Buoyant Tower Technology

VARIABLE DEPTH

13

Advantages • Expands range of drilling

water depths

• Expands range of production

water depths

• Provides added flexibility for

heavy transportation

configurations

Page 14: Buoyant Tower Technology

INTEGRATED TOPSIDES

14

Advantages • Reduces offshore installation duration

Page 15: Buoyant Tower Technology

WORLD’S FIRST BUOYANT TOWER INSTALLATION

Customer: BPZ Energy Project: CX-15 Location: Peru Water Depth: 54 meters Year: 2012

CX-15 BUOYANT TOWER – BPZ PERU

15

Page 16: Buoyant Tower Technology

− TOPSIDES:

– Structure (approx. 800 MT)

– 3-levels with following deck dimensions:

• Drilling deck (36.6m x 30.5m)

• Production deck (36.6m x 30.5m)

• Cellar deck (30.5m and 13.7m)

– 24 Slots

− FACILITIES (APPROX. 500 MT)

– 12,200 BOPD, 12.8MMSCFD Gas, 3500BPD water injection

– Separation

– Treating

– Gas injection

– Water injection

– Power generation and utilities

− PIPELINES:

– 8” Oil Export

– 6” LP Gas

– 4” HP Gas

– 4” Water Injection

CX-15 – DRILLING & PRODUCTION

16

Page 17: Buoyant Tower Technology

FABRICATION CHINA

17

Page 18: Buoyant Tower Technology

SIMULTANEOUS HULL & TOPSIDE FABRICATION

18

Page 19: Buoyant Tower Technology

19

LOADOUT & TRANSPORTATION

Page 20: Buoyant Tower Technology

20

HULL LOADOUT

Page 21: Buoyant Tower Technology

TOPSIDE LOADOUT

21

Page 22: Buoyant Tower Technology

HULL & TOPSIDE TRANSPORTATION

22

Page 23: Buoyant Tower Technology

23

OFFSHORE INSTALLATION - PERU

Page 24: Buoyant Tower Technology

24

HULL FLOAT OFF

Page 25: Buoyant Tower Technology

25

HULL UPENDING

Page 26: Buoyant Tower Technology

26

FIXED BALLAST INSTALLATION

Page 27: Buoyant Tower Technology

27

HULL DOCKING

Page 28: Buoyant Tower Technology

28

TOPSIDE SKIDDING

Page 29: Buoyant Tower Technology

29

TOPSIDE MATING

Page 30: Buoyant Tower Technology

30

WET TOW TO LOCATION

Page 31: Buoyant Tower Technology

31

INSTALLED BUOYANT TOWER

Page 32: Buoyant Tower Technology

32

INSTALLED BUOYANT TOWER

Page 33: Buoyant Tower Technology

Additional Reference

Website: www.HortonGMC.net

Page 34: Buoyant Tower Technology

Thank You