Bund Inspection Data Sheets For inspection purposes only. Consent of copyright owner required for any other use. EPA Export 02-09-2017:03:04:36

Bund Inspection Data Sheets

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Bund Inspection Data Sheets

Bund Inspection Data Sheets

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 2: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 1 DMSO Break Tank

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Loca I/Rernote/torn bin ed/Portable): Local

~

Bund Dimensions: L=m; W=m; H=m Bund Construction Material:

Bund Lining Material: CRC 1.32111~ Bund Retention Volume:

Primary Vessel(s) - Materials of Construction: PV-50119 Stainless Steel Primary Vessel(s) -Total Storage Volume:

Primary Vessei(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) -25% of Total Storage Volume:

Reinforced Concrete 1.2m3

Deemed Practicable / Safe t o Conduct Hydrostatic Test? No If nogive reasons: Tank in operation

Qualification: BZc. Environmental Science MIEI

Signed: pk*

HYDROSTATIC TEST DETAILS:

Date: 16th June 2017

1 BS 8007:1!387 (Yes/No)? 1 Fifl Rate

Stabilisation Period

Duration of the Test

I Acceptance Criteria (Total permirisifib drop in water h e t ) Water Level Change in Reference Vessel

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund appears to be in good condition

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 3: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Site: Pfizer Grange Castle

Bund Ref. No.: 2 Trade Effluent Water (south lift station)

Bund Dimensions: L=m; W=m; H=m Bund Constructian Material: Reinforced Concrete Bund Lining Materiat: lacquer coating

Bund Retention Volume: Unknown

Licence Reg. No.: EPA IPPC no. 652 BundType (local/Remote/Combined/PoRable): local Primary Vessel(s) -Materials of Construction: a 5 ~ ~ - 8 7 5 0 1 Stainless Steet Primary Vessel(s) -Total Storage Volume: 45m3 Primary VesselIs) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume: 11.25rn3

BS 8007:1987 (Yes/No)?

Fill Rate

Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Qualification: BSc. Environmental Science MlEl

Signed:

Date and Time I Water tevel in 3und I Water Level in Reference Vessel I 1 1

Date: June 2017

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: lNSPECTION DESCRIPTION L(L RESULTS: The bund is in good condition

Result (PasslFaiI) 1 PASS

Recommendation(s): - Power wash the bund.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 4: Bund Inspection Data Sheets

RECORD SHEET FOR ~ U N D TESTING

Site: Pfizer Grange Castle

Bund Ref. No.: 3 Chemical Dosing Bund

Bund Dimensions:

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Local

Primary Vessel(s) -Materials of Construction: L=m; W=m; H=m Bund Construction Material:

1 Double contained polypropylene 1 Primary Vessel(s) -Total Storage Vofume:

Concrete Bund Lining Material:

17.2 /2.3/10.4m3 Primary Vessel(s) - 110% Volume of Largest Vessel:

CRC Bund Retention Volume:

HYDROSTATK TEST DETAILS:

0.022 m3 Primary Vessel(s) - 25% of Total Storage Volume:

B5 8007:1987 (YeslNa)?

Fill Rate Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water

Qualification: BSc. Environmental Science MlEI

Signed:

level) Water level Change in Reference Vessel

Date: 161h June 2017

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition

Result (Pass/Fail) PASS Recornmendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 5: Bund Inspection Data Sheets

Site: Pfizer Grange Castle

Bund Ref, No.: 4 CHP Chemicat Store Bund

Licence Reg. No.: EPA lPPt no. 652 Bund TVpe (Local/Rernote/Com bined/Portable): Local

Bund Dimensions: L=m; W=m; H=m

Bund €onstruction Material: themstore - Steel

NYDROSTATIC TEST DETAILS:

Primary Vessei(s) - Materials of Construction:

Primary Vessel(s)-Total Storage Votume:

858007:1987 (Yes/No)? I

Bund Lining Material: None

Bund Retention Volume:

Fill Rate

Stabilisation Period

Primary Veesselts) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume:

Duration of the Test I

QuaBfication: BSc. Environmental Science MIEt

Signed:

Acceptance Criteria (Total permissible drop in water level] Water Level Change in

Date: June 2017

Reference Vessel I

Description / Comments of Hydrostatic Test: M/A

VtSUALTEST DETAILS: !NSPECTiON ~E5CRltTlOrU & RESULTS: The bund is in good condition

Result (PasdFail) Recomrnendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 6: Bund Inspection Data Sheets

RECORD SHEET FOR 8 U N D TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 5 Anti Foam Skid Bund

Bund Dimensions:

Bund Construction Material: Polypropylene Bund Lining Material: None Bund Retention Volume:

L=m; W=m; H=m

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Combined/Portable): Local

Primary Vessel(s) - Materials of Construction:

Primary Vesselts) -Total Storage Volume: 1.60m3 Primary Veasel(s) - iXO% Volume of Largest Vessel: N/A Primary Vessel(s) - 25% of Total Storage Volume:

ZSTA-87511

Deemed Practicable / Safe to Conduct Hydrostatic Test? No If no give reasons: Tank in operation

I- Date and Time Water Level in Bund

HYDROSTATICTEST DETAILS:

Water Level in Reference Vessel

6s 8007:1987 (Yes/No)?

Fit! Rate Stabitisation Period

Duration of the Test

Qualification: BSc. Environmental Science MlEi

Signed:

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Date: lbth June 2017

Description /Comments of Hydrostatic Test: M/A

VISUALTEST DETAJLS: INSPECTION DESCRIPTIQN & RESULTS: The bund wall lip is broken, however the integrity of the bund is still intact.

Result (Pass/Faif) pass Recommendation(s): The crack in bund lip should be repaired.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 7: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

3und Ref. No.: 6 pH Balance Tank #1

Licence Reg. No.: EPA IPPC no. 652 6und Type (LocaI/Remote/Cornbined/Portable): Local

3und Dimensions: F=m; W=m; H=m Bund Construction Material:

Bund Lining Material: CRC Bund Retention Volume: 218rn3

Reinforced Concrete

Fill Rate

Stabilisarion Period

Primary Vessel(s) - Materials of Construction: 05TA-87503 Stainless Steel Primary Vessel(s1 -Total Storage Volume: 20041~1~ Primary Vessel(s) - 110% Volume of Largest Vessel: 2200rn3 Primary Vessel(s) -25% of Total Storage Volume: 500rn3

Duration of the Test I

Date and Time

HYDROSTATIC TEST DETAILS:

Water Level in Bund Water Level in Reference Vessel

Acceptance Criteria {Total permissible drop in water

Qualification: BSc. Environmental Science MlEl

Signed:

level) I Water Level Change in Reference Vessel

Date: lQh June 2017

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 8: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 7 pH Balance Tank #2 Bund

Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Rernote/Cornbined/Portable): Local

Bund Dimensions: L=m; W=m; H=m Bund Construction Material:

Bund Lining Material:

Bund Retention Volume: mrn3

Reinforced Concrete

CRC

BS 8007:1987 (Yes/No)? 1 1

Primary Vessel(s) - Materials of Construction: 05TA-87509 Stainless Steel PrirnaryVessel{s) -Total Starage Volume:

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(sj -25% af Total Storage Volume: 500m3

2000m3

2 2 0 0 ~ ~

Fill Rate

Stabilisation Period

Date and Time

-

Duration of the Test

Acceptance Criteria {Total 1 I

Water Level in Bund Water Level in Reference Vessel

permissibre drop in water 1 I

Qualification: 6%. Environmental Science MlEt

Signed:

level) Water Level Change in

Date: 16th June 2017

Reference Vessel I t

HYDROSTATKTEST DETAILS:

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 9: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Bund Ref. No.: 8 Odour Abatement Bund Bund Type (Local/Remote/Combined/PortableJ: Local

Bund Dimensions: L=m; W=m; H=m Bund Construction Material:

Primary Vessel(s) - Materials of Construction: 05-Fl-87516 Polypropylene Primary Vessel(s) -total Storage Volume:

BS 8007:1987 (Yes/No]? I 1

Bund Lining Material: CRC

Bund Retention Volume:

FTI Rate

Stabilisation Period

Duration of the Test

Primary Vessetts) - 110% Volume of Largest Vessel:

Primary Vessal(s) - 25% of Total Storage Volume:

I Acceptance Criteria (Total permissible drop in water

Qualification: BSc. Environmental Science MtEf

Signed:

level) Water Level Change in Reference Vessel

Date: 16fh June 2017

Description / Comments of Hydrostatic Test: M/A

VfSUAL TEST DETAIi.5: lNSPECTlON DESCRIPTION & RESULTS: The bund is in good condition, however the previousty identified hairline cracks were not visible during the inspection which was probably due to the wet weather.

Result (Pass/Fail) PASS Recommendation{s):

Inspect the bund on a dry day to inspect previously noted hairline cracks.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 10: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Date and Time Water Level in Bund Water Level in Reference Vessel

I

Site: Pfizer Grange Castle I

Qualification: BSc. Environmental Science MIEI

Signed:

Bund Ref. No.: 9 Soft Water Store Bund I

Date: lSih June 2017

Bund Dimensions: C=m; W=m; H=m

Bund Construction Material: Reinforced Concrete Bund Lining Material: None Bund Retention Volume: Entire floor of building Deemed Practicabie / Safe to Conduct: Hydrosta If no give reasons: Tank in operation

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Locai/Remote/Combined/Partable): Combined with a building

Primary Vessel(s) - Materials of Construction: TAU-0304 SC TA-78611-00 Double contained polypropylene & GRP Primary Vesael{s) -Total Storage Volume: 4m3 PrimaryVesset(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume: 1 . 1 ~ ~

1m3 c Test? Ma

35 8OO7:1987 {Yes/No)? I 1 fill Rate

Stabilisation Period

Duration of the Test I I

HYDROSTATIC TEST DETAIW

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

VISUAL TEST DETAILS: INSPECTION DESCRiPTION & RESULTS: The bund is in good condition

I Result (PasslFail) I PASS

I Recommendation@):

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 11: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 10 Acid/Casustic Loading and unloading Bund

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material: None Bund Retention Volume:

Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Rernote/Combined/Portable): Local

Primary Vessel(s) - Materials of Construction: Loading pumps Primary Vessel(s) -Total Storage Volume:

Primary Vessel(s) - 110% Volume of largest Vessel:

Primary Vessel(s) - 25% of Totaf Storage Volume:

HYDROSTATICTEST DETAILS:

Qualification: BSc, Environmental Science MlEl

Signed:

BS 8007:1987 (Yes/No)?

Filt Rate

Stabilisation Period

Duration of the Test Acceptance Criteria (Total permissible drop in water level) Water level Change in Reference Vessel

Date: 16fh June 2017

Description / Comments of Hydrostatic Test: N/A

- VISUALTEST DETAILS: 1NSPECTtON DESCRIPTION & RESULTS:

The bund is in good condition.

Result (Pass/Fail) 1 PASS

Recammendation(s): None.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 12: Bund Inspection Data Sheets

RECURD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 1% Fuel Oil Tank Bund

Licence Reg. No.: EPA lPPC no. 652 Bund Type (Locai/Remote/Combined/Portatrle): Local

Bund Dimensions: L=m; W=m; H=m

Primary Vessel(s) -Materiais of Construction: ETA-825000 Steel

Deemed Practicable / Safe t o Canduct Hydrostatic Test? No If no give reasons: Tank in operation

HYDROSTATIC TEST DETAILS:

Bund Construction Material: Reinforced concrete

] BS 8807:1987 {Yes/No)? 1 1

Primary Vessel(s) -Total Storage Vohme: 200m3

Fill Rate Stabilisation Period

Bund Lining Material:

Bund Retention Volume: None

I Duration of the Test 1 I

Primary Vessei(s) -%IO% Volume of Largest Uessel:

Primary Vessel(sj - 25% of Total Storage Volume:

220m3

Acceptance Criteria (Total permissible drop in water ievel) Water Lwei Change in Reference Vessel

Qualification: BSc. Environmental Science MIEI

Signed:

I Date and Time I Water Level in Bund 1 Water Level in Reference Vessel I

Date: 16” June 2017

t

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: tNSPECTlON DESCRIPTION & RESULTS: A Concrete protective coating has been applied to the bund since the 2014 inspection. Overall the bund is in good condition.

Result (Pass/Fail) lpAss Recommendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 13: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfiaer Grange Castle

Bund Ref. No.: 12 Sulphuric Acid Tank Bund

Licence Reg. No.: EPA IPPC no. 652 3undType(Local/Rernote/Cornbined/Portable): Locat

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete

1 7.5m3 Deemed Practicable / Safe to Conduct Hydrostatic Test? No If no give reasons: Tank in operation

Primary Vessel(sj -Materials of Construction: 05TA-94520 Stainless Steel Primary Vessel(s) -Total Storage Voiume: 30m3

HYDROSTATIC TEST DETAILS:

Qualification: B5c. Environmental Science MIEI

Signed:

BS 8007:1987 (Yes/No)?

Fill Rate

Stabilisation Period Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Date: 16th June 2017

Date and Time I Water Level in Bund I Water Level in Reference Vessel I

Iescription / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: lNSPECTlON DESCRIPT~ON & RESULTS: The bund is in good condition and the previously identified remedial works have been undertaken.

Result (Pass/Fail) I PASS

Recommendation(s): None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 14: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.13 CIP Tank Bund

Licence Reg. No.: €PA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Local

3und Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material: None

Bund Retention Vofume: 51m’

1 BS 8007:1987 (YeslNo)? 1 1

Primary Vessel(a) - Materials of Construction: 05TA-95301 Polypropylene Primary Vessel(s) -Total Storage Volume: 42m3 Primary Vessel(s) - 110% Volume of largest Vessel:

Primary Vessel(s) -25% of Total Storage Volume:

Filt Rate

StabiIisation Period 1

Qualification: B5c. Environmental Science MIEi

Signed:

Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water level Change in Reference Vessel

Date: Sth June 2017

Date and Time 1 Water Level in Bund I Water Level in Reference Vessel

t

Description / Comments of Hydrostatic Test: N/A

VISUAL TEST DETAILS: INSPECTION DEsCRiPTtoN & RESULTS: The bund is in good condition. Previously noted hairline cracks were not noted, but this is probably due to the bund being wet from the weather.

Result (Pass/Fail) PASS Recornrnendation(s): - Hairline cracks to be monitored during the routine maintenance operations.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 15: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

loam3

Site: Pfizer Grange CasNe

10.5rn3

Bund Ref. No.: 14 Sodium Hydroxide & Reagent CausticStorage Bund

Bund Dimensions: t=m; W=m; H=rn Bund Construction Material: Reinforced Concrete Bund Lining Material: CRC

Qualification: 3Sc. Environmental Science MlEl

Signed:

1 Bund Retention Volume:

Date: Wh June 2017

Licence Reg. No.: €PA IPPC no. 552 Bund Type (LocaI/Remote/Combined/Portablef : LocaI

Primary Vessel(s) - Materials of Construction: 05TA-94530 & ETA-95304 Stainless Steel PrimaryVessel{s) -Total Storage Volume: 42m3 & 30m3 Primary Vesselfs) - 110% Volume of Largest Vessel: 46.1rn3 Primary Vessel(s) - 25% of Total Storage Volume:

HYDROSTATICTEST DETAILS:

BS 8007:1987 (Yes/No)?

Fili Rate

Stabilisation Period

Ouration of the Test

Acceptance Criteria (Total permissible drop in water levell

I

Water Level Change in Reference Vessel

Date and Time 1 Water Level in ~ u n d I I

I Water Level in Reference Vessel

Description / Comments of Hydrostatic Test: N/A

VfsUALTEst DETAILS: INSPECTION DESCRIPT~ON & RESULTS: The bund is in good condition and the previously identified remedial works have been undertaken.

Result ( ~ a s s / ~ a i ~ ) I PASS

Recommendation(s): - None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 16: Bund Inspection Data Sheets

RECORD SHEET FOR BLINDTESTING

Bund Ref. No.: 15 Ethanol Tank Bund

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete Bund Lining Material:

Site: Pfizer Grange Castle 1 Licence Reg. No.:

Bund Type (tocal/Remote/Cornbined/Portable): Locat

Primary Vessel(s) - Materials of Construction: 05fA-94500 Stainless steel Primary Vessel( s) -Total Storage Volume: 30m3 Primary Vesset(s) - 110% Volume of Largest Vessel:

CRC Bund Retention Vofurne: 83m3

33m3 Primary Vessel(s) - 25% of Total Storage Volume: 7.5m3

Deemed Practicabte / Safe to Conduct Hydrostatic Test? No If no give reasons: This bund is not in operation

HYDROSTATIC TEST DETAILS:

Qualification: BSc. Environmental Science MIEI

Signed:

Fill Rate

Stabilkation Period

Duration of the Test

Date: 16Ih June 2017

Acceptance Criteria (Total permissible drop in water level] Water Level Change in Reference Vessel

1 Date and Time 1 Water Level in Bund 1 Water Level in Reference Vessel 1

Description / Comments of Hydrostatic Test: N/A

VISUAL TEST DETAILS: hJSPECTlON DESCRIPTION & RESULTS: While this Bund is currently not in operation it does appear to be in a good condition.

Result (Pass/Fail) lPASS Recornmendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 17: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Site: Pfizer Grange Castle

Bund Ref. No.: 16 West Drum Store Bund

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): Combined with a buitding

Bund Dimensions: t=m; W=m; H=m

Bund Construction Material: Reinforced Concrete Bund Lining Materiak CRC Bund Retention Volume: S.5/3.7/3.7m3

Fil l Rate Stabilisation Period 1

Primary Vesselts) - Materials of Construction:

Primary Vessel(s) -Total Storage Vohme: 26/14.8/14.8m3 Primary Vessel(s) - 110% Volume of Largest Vessel: l . l m 3 Primary Vessel(s) - 25% of Total Storage Volume: 3.6/3.7.3.7rn

Date and Time Water Level in Bund

Description / Comments of Hydrostatic Test: N/A

VlslJAL TEST DETAILS: frUSPECTlON DESCRIPTION & RESULTS: The bund is in good condition

Result (Pass/Fail) pSS Recornmendation(s):

None

Water Level in Reference Vessel

Qualification: BSc. Environmental Science MtEt

Signed: Date: 16th June 2017

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 18: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Site: Pfizer Grange Castle

Bund Ref. No.: 17 Spill Containment Bund

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: HDPE Bund Lining Material:

Bund Retention Volume:

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Combined/Portable): tocal

Primary Vessel(s) - Materials of Construction: None Primary Vessel(s) -Total Storage Volume:

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume:

HYDROSTATICTEST DETAILS:

Qualification: BSc. Environmental Science MIEI

Signed:

1 BS 8007:2987 (Yes/No]? I

Date: lSth June 2017

Fill Rate Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Date and Time 1 Water Level in 6und 1 Water level in Reference VesseI t

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: hSPECTtUN DESCRIPTION- & RESULTS: The bund i s in good condition and the previously identified remedial works have been undertaken.

Result (Pass/fail) lPASs Recommendation(s):

+ None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 19: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Site: Pfizer Grange Castle

Bund Ref. No.: 18 East Drum Store Bund

Bund Dimensions: t=m; W=m; H=m

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Rernote/Corn bined/Portable): Combined with a building

Primary Vessel(sf - Materials of Construction:

Bund Construction Material: Floor trenches and sprilldecks Bund Lining Material: CRC

Primary Vessel(s) -Total Storage Volume: N/A Primary Wessel(sJ - 110% Volume of Largest Vessel: N /A

HYDROSTATIC TEST DETAILS:

Bund Retention Votume; 4.3/0.8/2.6m3

BS 8007:1987 (Yes/No)? 1 Fill Rate I

Primary Vessel(s) - 25% of Total Storage Volume: N/A

Stabitisation Period

Duration of the Test

Date and Time

Acceptance Criteria (Total permissible drop in water levell

Water Level in Bund Water Level in Reference Vessel

Water Level Change in Reference Vessel

Qualification: BSc. Environmental Science MlEl

Signed: Date: 16th June 2017

Description / Comments of Hydrostatic Test: N/A

V~SUALTEST DETAILS: INSPECTiON DESCRIPTION & RESULTS: This bund is in good condition

Result (Pass/FaiI) lPASS Recommendation(s): None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 20: Bund Inspection Data Sheets

RECORD SHEET FOR 8UND TESTING

Date and Time

We: Pfizer Grange Castle

Water Level in Bund Water Level in Reference Vessel

Bund Ref. No.: 19 Utility Water Dosing Unit Bund

Qualification: BSc. Environmental Science MI€[

Eigned:

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: HOPE

Date: lQh June 2017

Bund Lining Materia#:

Bund Retention Volume: 1.98m3

Licence Reg. No.: EPA IPPC no. 652 Bund Type (CocaI/Remote/Cornbined/Portablej: Local

Primary Vessel(s) - Materials of Construction: TA-05 1 l694B HD PE Primary Uessel(s) -Total Storage Vokme:

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) -25% of Total Storage Volume:

Deemed Practicable /Safe to Conduct Hydrostatic Test? Na If no give reasons: Tank in operation

HYDROSTATIC TEST DETAILS:

B5 8007:1987 (Yes/No)? Fill Rate Stabilization Period

I Duration of the Test t I Acceptance Criteria (Total permissibk drop in water level) Water leve Change in Reference Vessel.

VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition.

Result (Pass/Fait) lPASS Recommendationts):

+ None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 21: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Chemstore Reel Bund Lining Material:

Bund Retention Vofume:

Site: Pfizer Grange Castle

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) -25% af Total Storage Volume:

Bund Ref, No.: 20 Decanting Chemical Store Bund

Bund Dimensions: L=m; W=m; H=m Bund Construction Material:

Date and Time Water Level in Bund

Licence Reg. No.: EPA IPPC no. 652 Bund Type (LocaI/Remote/Combined/Portable): Local

Water Level in Reference Vessel

Primary Vessel(5) -Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:

_ _ fill Rate

Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 22: Bund Inspection Data Sheets

RECORD SHEET FUR BUND TESTING

L=m; W=m; H=m Bund Construction Material:

Site: Pfizer Grange Castk

Steel/ptastic Primary Vessel(s) -Total Storage Volume:

I Bund Dimensions:

HDPE Tray Inserts Bund Lining Material: None

Licence Reg. No.: EPA IPPC no. 652 Bund Type I: Local/Rernote/Corn bined/Partable): Combined with Racking

Primary Vessel(s) - Materials of Construction:

Primary Vessells) - 110% Volume of Largest Vessel:

Qualification: BSc. Environmental Science MlEI

Signed: p , p Date: 16th June 2017

1 Deemed Practicabfe / Safe to Conduct HydrostaticTest? No If no give reasons: Racking in operation

HYDROSTATICTEST DETAILS:

B5 8007:1987 (Yes/No)?

Fill Rate

Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Date and Time I Water Level in Bund I Water Level in Reference Vessel

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 23: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle

Bund Ref. No.: 22 MRO Chemical Store Bund store

Bund Dimensions: t=m; W=m; H=m Bund Construction Material: Chemstore Steel Bund Lining Material:

Bund Retention Volume:

Licence Reg. No.: EPA IPPC no. 652 Bund Type (Local/Remote/Comt3ined/Portable): Local

Primary Vesset(s) - Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume:

IfYDROSTATICTEST DETAILS:

Date and Time Water tevel in Bund Water Level in Reference Vessel

t

BS 8007:1987 (Yes/Na)?

Fill Rate

Stabilisation Period

Duration of the Test

Acceptance Criteria (Total permissible drop in water fevel) Water Level Change in Reference Vessel

Qualification : BSc. Environmental Science MlEl

Signed: Date: 16rh June 2017

Description / Comments of Hydrostatic Test: N/A

VISUAL TEST DETAILS: lNSPECTtON DESCRIPTION & RESULTS: The bund is in good condition

Result (Pass/Fail) lpASS Recommendation(s): None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 24: Bund Inspection Data Sheets

Site: Pfizer Grange Castle

Bund Ref. No.: 23 Oil Storage Bund

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Chemstore - Steel Bund Lining Material:

Bund Retention Volume:

If no give reasons: Tank in operation

Licence Reg. No.: EPA iPPC no. 652 Bund Type (Local/Remote/Com bined/Portable): local

Primary Vessel(s) - Materials of Construction: Steel/plastic Primary Vessel(s) -Total Storage Volume:

Primary VesseI(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Total Storage Volume:

HYDROSTATIC TEST DETAILS:

Qualification: BSc. Environmental Science MfEt

Signed:

BS 8007:1987 IYes/Nol? I

Date: June 2017

FilI Rate Stabilization Period Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water teve Change in Reference Vessel.

I Date and Time 1 Water Level in Bund I Water tevet in Reference Vessel

VISUAL TEST DETAlw: INSPECTION DESCRWTION & RESULTS: 'he bund is in a good condition..

Result (Pass/Fail) pSS Recommendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 25: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING

Site: Pfizer Grange Castle

Bund Ref, No.: 24Trade Effluent Water (North lift station) containment kerb Local

Bund Dimensions: L=m; W=m; H=m Bund Construction Material: Reinforced Concrete 45m3 Bund Lining Material: Lacquer coating 49.5m3 Bund Retention Volume: 49.5m3 Deemed Practicable / Safe to Conduct Hydrostatic Test? No I f no give reasons: Tank in use

Licence Reg. No.: EPA IPPC no. 652 BundType(Loeal/Remote/Combined/Po~~b~e):

Primary Vessel(s1- Materiafs of Construction: 05TA-87500 Stainless Steel Primary Vessel(s) -Totaf Storage Volume:

Primary Vessel(s) - 110% Volume of Largest Vessel:

Primary Vessel(s) - 25% of Totaf Storage Volume:

~~

HYDROSTATIC TEST DETAICS:

BS 8007:1987 (Yes/NoJ?

Fill Rate Stahilisation Period I Duration of the Test

Acceptance Criteria (Total permissible drop in water level) Water Level Change in Reference Vessel

Date and Time Water Level in Bund 1 Water Level in Reference Vessel

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is I good condition and the previously identified remedial works have been undertaken.

Result fPass/Fait) I PASS

Recommendationfs): Power wash bund and remove debris.

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 26: Bund Inspection Data Sheets

RECORD SHEET FUR BUND TESTING

Bund Ref. No.: 25 Fire Fighting Foam Bund EPA tPPC no. 652 Bund Type {tocal/Remote/Combined/Portable): Local

Bund Dimensions: L=m; W=m; H=rn

HYDROSTATIC TEST DETAILS:

Primary Vessel($) - Materials of Construction: Steel/ptastic

I BS8007:1987 (Yes/No)? 1

Bund Construction Material: Chernstore Steel

Fill Rate

Stabilisation Period

Primary Vessel(sj -Total Storage Volume:

1 Duration of the Test I 1

Bund Retention Volume:

Acceptance Criteria (Total permissible drop in water

Primary Vessel(s) -25% of Total Storage Volume:

fevsl) Water Level Change in Reference Vessel

Qualification: BSc. Environmental Science MlEl

Signed:

I Date and Time I Water Level in Bund I Water Level in Reference Vessel t

Date: 16'h June 2017

Description / Comments of Hydrostatic Test: N/A

VtSUAL TEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition

Result (Pass/Fail) IpASs Recommendation(r):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36

Page 27: Bund Inspection Data Sheets

RECORD SHEET FOR BUND TESTING Site: Pfizer Grange Castle Licence Reg. No.:

€PA lPPC no. 652

Bund Retention Volume: 1 Primary Vessel(s) - 25% of Totat Storage Volume:

Bund Lining Material:

Deemed Practicable / Safe to Conduct: HydrostaticTest? No If no give reasons: Bund was locked and not in use on the day of inspection

Primary Vessel(s) - 110% VoIume of Largest Vessel:

HYDROSTATICTEST DETAILS:

Date and Time

BS 8007:1987 (Yes/No)?

fifl Rate

Water Level in Bund Water Level in Reference Vessel

Stabilisation Period I

Qualification: BSc. Environmental Science MlEl

Signed:

Duration of the Test I

Date: 16" June 2017

Acceptance Criteria (Totat permissible drop in water levell Water Level Change in Reference Vessel I

Description / Comments of Hydrostatic Test: N/A

VISUALTEST DETAILS: INSPECTION DESCRIPTION & RESULTS: The bund is in good condition.

Result (Pass/Fail) PASS Recommendation(s):

None

For

insp

ectio

n pur

pose

s only

.

Conse

nt of

copy

right

owne

r req

uired

for a

ny ot

her u

se.

EPA Export 02-09-2017:03:04:36