Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Embed Size (px)

Citation preview

Page 1: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Bulk Electric System Definition Task Force Update

Reliability Policy Issues CommitteeApril 28, 2010

Brian TheakerBESDTF Chair

Page 2: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Today’s Update

● FERC BES NOPR

● Proposals 4 & 5

● Material Impact Assessment

● Schedule

● Questions

1.2

Page 3: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

FERC BES NOPR

● NERC to modify BES definition to eliminate RE discretion

● Allow for NERC/FERC-approved facility exclusion

● Consistent with BESDTF direction

● Comments due 5/10 BESDTF will provide input to WECC comments Exemptions: Method vs. facility by facility

1.3

Page 4: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Proposal 4

● Comments focused on: Distribution Network exclusion

General support, but cannot define

Points of demarcation Support, want detailed examples

Exclusion for non-represented Elements Split, no consensus

1.4

Page 5: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Material Impact Assessment

● March 30 BES/TSS/WECC meeting

● Some progress:● General consensus around “significant” impact test

● Further thinking around “widespread” impact test● Electrical dispersion of indicator buses

● Additional work needed from TSS

● Consensus principles articulated

1.5

Page 6: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Schedule

● April 16: Response to comments on P4

● April 28-30: TSS recommendation on MIA

● May 7: Post P5 with MIA (45-day)

● June 10-11: Update to OC

● July/August: Additional proposal/comments

● September 21: Post proposal for OC approval

● October 21-22: OC consideration

● December 8-10: Board consideration

1.6

Page 7: Bulk Electric System Definition Task Force Update Reliability Policy Issues Committee April 28, 2010 Brian Theaker BESDTF Chair

Questions?

For every complex problem there is an answer that is clear, simple, and wrong.

H.L. Mencken

Things should be made as simple as possible, but not any simpler.

Albert Einstein

Brian TheakerChair, BESDTF

[email protected]