BUILDING MARKING SYSTEM. STRUCTURE / HAZARDS EVALUATION MARKING. Building Marking Systems. Structure Hazards Evaluation Form. MAP. TEAM NAME:. TX-TF1 SEARCH #1. DATE/TIME OF QUAKE:. SUN 23FEB92 110 HRS. N. CHURCH. GOOD MARKET. FIRST STREET. P.S. #1 SCHOOL K-6. A STREET. B STREET. - PowerPoint PPT Presentation
Citation preview
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
STRUCTURE / HAZARDS EVALUATION MARKING
Structure Hazards Evaluation Form
Building Marking Systems
FIRST STREET
A S
TR
EE
T
P.S. #1SCHOOL K-6
GOODMARKET
CHURCH
MAP TEAM NAME: DATE/TIME OF QUAKE:TX-TF1 SEARCH #1 SUN 23FEB92 110 HRS
N
B S
TR
EE
T
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure and Hazmat spec make a 2’ x 2’ box on building adjacent to accessible entry.
• Done after doing hazards assessment and filling out structure / hazards evaluation.
• Box is spray painted with using international orange (in TF cache)
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure relatively safe for SAR ops. There is little chance of further collapse. – Victims could be trapped by contents– Victim could be unconscious
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure is significantly damaged. Some areas may be relatively safe, but others may need shoring, bracing, removal, and/or monitoring of hazards– Building could be completely pancaked
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Structure is NOT SAFE for rescue ops and may be subject to sudden collapse. Remote search ops may proceed at significant risk. If rescue ops are undertaken, safe haven areas, & rapid evacuation routes (with structural monitoring) should be created.
Building Marking Systems
STRUCTURE / HAZARDS MARK
• Arrow next to Marking Box indicates the direction of Safest Entry to Structure
HM
Building Marking Systems
STRUCTURE / HAZARDS MARK
• HM indicates hazardous material condition in or adjacent to structure. SAR Ops normally will not be allowed until condition is better defined or eliminated.
STRUCTURE / HAZARDS MARK - SUMMARY
15JUN92
HM NATURAL GAS
OR-1
No entry until gas is turned off. When it’s mitigated, should line out the HM
mark and record new date and TF
Building Marking Systems
SEARCH ASSESSMENT MARKING
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
First slash madewhen entering
Crossing slash made as TF exits
15JUL921400 HR
RATS
3 DEAD
OR-1
2’x2’ X neareach entry
Building Marking Systems
SEARCH ASSESSMENT MARK
VICTIM LOCATION MARKING
BUILDING MARKING SYSTEMBUILDING MARKING SYSTEM
CA6
CONFIRMEDLIVE VICTIM
REMOVED VICTIM
CONFIRMEDDEAD VICTIM
POTENTIALVICTIM CA
6
CA6
CA6
VICTIM LOCATION MARKING
Building Marking Systems
USAR Marking System
INTERNATIONAL SEARCH AND RESCUE ADVISORYGROUP
VICTIM LOCATION MARKING
Go or No Go (G/N)
Team
Time/Date of Start
Time/Date of End
HAZARD INFORMATION
# LIVE VICTIMS REMOVED
# DEAD REMOVED
PERSONS UNACCOUNTED FOR LOCATION OF OTHER
VICTIMS
Note: A circle is drawn around the above box once thebuilding/structure has been completely searched.
Go
UKSAR 1
17/2/04 0830
17/2/04 1147
3 0
4
2 D
Open Shaft: Quad E
Potential VictimNumber and status unknown
V
CONFIRMED VICTIM LOCATIONArrow denotes confirmation
L or D denotes number of each
VL 2
ONLY DEAD BELOW !Arrow denotes confirmation
D denotes number of each
VD2
VICTIMS (all) ExtricatedCircle indicates that all located victims have been extricated
(including dead).
VL 2
D 1