independent innovative influential Graham Kelly Associate BIM Academy (Enterprises) Ltd www.bimacademy.global [email protected] 27 September 2017 Building Intelligence 2017 – BIM Enabled FM

Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

  • Upload
    haphuc

  • View
    229

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

independentinnovativeinfluential

Graham KellyAssociate

BIM Academy (Enterprises) Ltdwww.bimacademy.global

[email protected]

27 September 2017

Building Intelligence 2017 – BIM Enabled FM

Page 2: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

To optimise the design, delivery and enjoyment of the built environment through smart processes and digital technologies

Why?

Page 3: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

A joint venture between Northumbria University and Ryder Architecture

Established 2010

Industry experience and academic expertise combined in a centre of excellence supporting BIM adoption

R&D, Education, Consultancy

Independent, impartial, innovative

Active in Australia, North America and Far East

Academic partners worldwide

About BIM Academy

Page 4: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Hong KongYu Yuet Lai Building43-55 Wyndham StreetCentralHong Kong

Newcastle upon TyneNorthumbria UniversityEllison buildingNorthumberland roadNewcastle upon TyneNE1 8ST

Cooper’s Studios14-18 Westgae RoadNewcastle upon TyneNE1 3NN

LondonPercy House33 Gresse StreetLondonW1T 1QUUnited Kingdom

LiverpoolInnovation Centre131 Mount PleasantLiverpoolL3 5TFUnited Kingdom

Glasgow221 West George StreetGlasgowG2 2NDUnited Kingdom

Vancouver003-1290 Homer StreetVancouverBritish ColumbiaV6B 2Y5Canada

PerthLevel 8, 251 Adelaide TerracePo Box 3105East Perth WA 6004

Melbourne29 Cromwell StreetPO Box 1140 Collingwood VIC 3066

SydneyLevel 1 137-141 Bridge RdPo Box 677Glebe NSW 2037

BarcelonaRambla de Catalunya 11Pral. 2ª 08007 Barcelona

BudapestNépliget Center, Budapest, Könyves Kálmán körút 11, 1097 Hungary

Locations

Page 6: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

BIM

Page 7: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

“An integrated digital process

providing coordinated, reliable

shareable data throughout all

project phases, from design

through construction and into

operation”

“An integrated digital process

providing coordinated, reliable

shareable data throughout all

project phases, from design

through construction and into

operation”

Page 8: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Building Information Modelling

Better Information Management

Page 9: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Sydney Opera House BIM4FM project

Page 10: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Background

Page 11: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Todd, Hall and Littlemore

Page 12: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Constant Change

Page 13: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

BIM at SOH

Page 14: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Research Analysis SpecificationConsultation Presentation

Methodological Approach

Page 15: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Initial concept

Existing Graphical Data

Master Revit Model

Unique Room Identifier

Existing Systems Linked

Rendered Model and Functionality

Page 16: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Stakeholder Review – Workshop

Page 17: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Stakeholder Review – Gap Analysis

• Technology• Process• People

The gap analysis was used to inform the framework for the BIM4FM interface and also any risks that could hinder the project.

Page 18: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Model Receipt Process

Operation

START - 1BIM received

3bOperational data

extracted from BIM

3aBIM returned to

external source for correction and resubmission

Reject

5aBIM archived

Accept

2BIM validation

process

Accept 4aOperational data

validation

Reject

5bData input to Operational

Systems

Accept

4bRecord model

Validation

FINISH – 5cModel entered to

Record model

Accept

Reject

Model Published to AIM

We recognise that buildings are continually changing and that models and data are only useful if they are up to date.

We have designed a process where new or up dated models can be validated and then inputted into the operational systems, in order to keep it up to date.

Model Update Process

Page 19: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Building on the concept

Unique Room and Asset Names

Retrieval of Information Added Modules

Page 20: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Developing a Framework – Base Functionality

Link to existing Active

directory

Linking Existing asset management

database

Linking and searching Technical document

database

Maintaining permissions

Model Viewer

Utilising handheld device

BIM4FM

Proprietary Modelling Software

Currently Revit

Updating Model

Legacy Document

Mangement SystemInput link

Capacity to add modules

Locations Database

Room Names

Asset Database

Asset numbers

SOH Modelling Solution

Page 21: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Stage 1 Framework - Retrieval of Information

BIM4FMStage 1

Proprietary Modelling Software

Currently Revit

BIMCD Locations Database

PermissionsSystem: LDAP

Hand Held FunctionalitySystem: BIM4FM

Searching AssetsSystem: Mainpac

Searching DocumentsSystem: TDOC

Searching Asbestos and Penetrations

System: TDOC

Specification for Live Data

Viewing ModelSystem: BIM4FM

Room Names

TRIM

Input link into TRIM

Updating Model

Adding Databases

Managing Information

Mainpac Asset numbers

Asset numbers

SOH Modelling Solution

Page 22: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Stage 2 Framework – Additional Modules

Wayfinding

Linking Live data

Dimensioning in Viewer

Creating Views

Training and Inductions

Active Timeline

Visual analytics

Feedback

BIM4FM Stage 1+2

Proprietary Modelling Software

Currently Revit

Updating Model

BIMCD Locations Database

Room Names

Mainpac Asset numbers

Asset numbers

SOH Modelling Solution

Page 23: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

SOH Solution

Page 24: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Building Information Model (BIM)Autodesk Revit, Bentley AECOsim, Graphisoft ArchiCAD, IFCs

Geographical Information System (GIS)ESRI ArcGIS, Google Maps, Oracle Spatial

Building Automation System (BAS)Honeywell EBI, Siemens Apogee, Schneider Electric StruxureWare, OPC, BACnet, etc.

Maintenance Management (CMMS)IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks, IFS, Anacle, etc.

Integration of Information

Space Management (CAFM)ARCHIBUS, Planon, etc.

Project Management (PM)Oracle Unifier, PMWeb, Trimble Proliance,Autodesk BIM 360, Prolog, e-Builder, etc.

Page 25: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Integration of Information

Page 26: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Primary purpose of phase one is to implement an integrator platform, EcoDomus, which acts as the visual centre piece of the system.

EcoDomus is designed to federate information from a large range of sources, including many bespoke systems.

A number of key pieces of information have been chosen to federate within EcoDomus:

• The asset models developed by the Building Strategy Team as the geometric record of the building –Revit.

• The current room database –BIMCD.

• The technical documentation database – BIMM-SQL (TDOC)

• O&M and asbestos records database.

• The asset management system –Mainpac.

• The existing SOH user accounts system – LDAP.

User Accounts

Asset maintenance

System

Technical Documentati

on

O&M and Asbestos Records

Geometric Record

Room Database

Phase One Systems

Page 27: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Following deployment of EcoDomus, a significant piece of work exists for the Building Strategy team to clean and develop data on the building.

Currently Building Strategy has a large amount of data, developed over many years, from a range of sources. Before this system was in place there was limited linking of data.

As such all the existing data is being cleaned and rationalised.

This process is expected to take potentially 18 months.

Additionally there are a range of projects completed, ongoing and planned that will have their data fed into the systems.

Verifying 45,000+ assets within Mainpac

Modelled 61,000+ objects within Revit

Updating 16,500 Records in BIMM-SQL (TDOCS)

Current Progress

Page 28: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

A phased plan exists to then gradually and incrementally integrate more systems currently in use at the Opera House.

Key systems that to be integrated include:

• The Building Management System for live metering and control.

• A wayfinding system to support work orders.

User Accounts

Asset maintenance

System

Technical Documentati

on

O&M and Asbestos Records

Live Metering

Building Management

System

Production Assets

Scheduling System

Marketing Materials

Seat Visualisation and Booking

Incidents and Reporting

Geometric Record

Room Database

Asset Collecting

and Artefacts

Security Control

Wayfinding Visitor Guide

Room Occupation

Venue Utilisation

Asset Lifecycle

Financial Data

Heatmap

Condition Heatmaps

New Design Optimisation

Lighting PlanContract

Handover

And More

As Built Records

Fire and Emergency

Planning

The Future

Page 29: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

BIM4FM System

Page 30: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

Further Projects

Page 31: Building Intelligence 2017 BIM Enabled FM€¦ · Building Intelligence 2017 –BIM Enabled FM. To optimise the design, ... IBM Maximo, Oracle eAM, FSI, TMA, AssetWorks,

• As an industry existing building information for operation is generally very poor

• Systems used to manage the building are poorly maintained and do not link together

• Clients rarely define what handover information they want and the format they want it in

• Clients want to better understand their buildings, but don’t have the managed information

• Clients accept incomplete handover information as it is difficult to validate

• Clients often appoint a third party to manage their buildings which entails additional cost and loss of control

• The majority of clients have no way of updating drawn information when a building is in use

• BIM software companies have raised uninformed expectations

Lessons Learnt