HUAWEI TECHNOLOGIES CO., LTD. BTS3900E GSM V300R008&R009 Installation Guide Issue: 06 Date: 2011-05-10

BTS3900E GSM Installation Guide-(V300R008&R009_06)

  • Upload
    seringh

  • View
    409

  • Download
    2

Embed Size (px)

DESCRIPTION

BTS3900E Installation guide

Citation preview

Page 1: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 1/54

HUAWEI TECHNOLOGIES CO., LTD.

BTS3900E GSM

V300R008&R009

Installation Guide

Issue: 06Date: 2011-05-10

Page 2: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 2/541

Contents

Safety Information………………………………………………………………… 

Installation Tools…………………………………………………………………… 

Space Requirements for the DC BTS3900E……………………………………

 Installation Modes for the DC BTS3900E……………………………………… 

Installation Procedure for the DC BTS3900E ………………………… ……… 

Installation Components………………………………………………………… 

Installing the DC BTS3900E on a Metal Pole………………………………… 

Installing the DC BTS3900E on a Wall………………………………………… 

Installing the DC BTS3900E on a U-Steel……………………………………… 

Installing the DC BTS3900E on an Angle Steel………………………………… 

Installing the DC BTS3900E on a H-Shaped Stand……………………………

 Installing the DC BTS3900E Cables…………………………………………… 

Mounting and Grounding Requirements of the DC BTS3900E……………… 

Installing the Cables Between the APM30 and BTS3900E …………………… 

Installing the Cables Between the APM30H and BTS3900E ………………… 

Installing the Cables Between the PS4890 and BTS3900E…………………… 

Installing the Cables Between the EMU and the BTS3900E ………………… 

Installing the Cables Between the Power2000 and the BTS3900E… … … … 

Space Requirements for the AC BTS3900E…………………………

 …………

 Installation Modes for the AC BTS3900E………………………………………… 

Installing AC BTS3900E Cables………………………………………………… 

Installing the AC BTS3900E for Outdoors Scenarios………………………… 

Installing the Integrated Antennas of the BTS3900E ………………………… 

Powering On the BTS3900E……………………………………………………… 

 Appendix…………………………………………………………………………… 

Change History……………………………………………………………………… 

Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.

2

3

4

5

7

7

8

12

14

14

15

17

24

26

27

27

29

30

3131

32

37

41

43

43

52

Page 3: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 3/542

Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility

of accidents.

The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be

followed. They only provide the generic safety precautions for operations.When operating Huawei products and equipment, you must comply with safety precautions and special safety

instructions related to corresponding equipment provided by Huawei. The safety precautions in the document

are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of 

universal regulations for safety operations and safety codes on design, production, and equipment use.

Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the

documents are supplementary. You must comply with the local safety regulations.

Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating

methods and safety precautions before beginning work.

Symbols

Safety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage

power supply or contact through damp objects may result in fatal danger.

• Non-standard and improper high voltage operations may result in fire and electric shock.

• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel

tower and mast.

• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.

• Power off the device before performing operations on the power supply equipment.

• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna

on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all

parties to ensure that the transmitter antennas are shut down.

• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.

• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.

• When working at a height, be cautious about falling objects.

Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.

• The static electricity generated by the human body may damage the electrostatic sensitive components on

the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when

performing the operation.

• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.

The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.

• When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-

off state of the equipment is 24 hours during maintenance.

Safety Information

Indicates a hazard with a high level of risk, which if not avoided, will result in death or 

serious injury.DANGER

WARNING

CAUTION

TIP

NOTE

Indicates a hazard with a medium or low level of risk, which if not avoided, could result 

in minor or moderate injury.

Indicates a potentially hazardous situation, which if not avoided, could result in

equipment damage, data loss, performance degradation, or unexpected results.

Indicates a tip that may help you solve a problem or save time.

Provides additional information to emphasize or supplement important points of the

main text.

Page 4: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 4/543

Installation Tools

Phillips screwdriver 

(M2 to M6)Flat-head screwdriver 

(M2 to M6)

Knife Rubber mallet

Crimping pliers

for power cablesCleaner 

Wire cutter for 

power cables

Torque screwdriver 

(14 kgf·cm)Inner hexagon wrench Wire stripper 

Percussion drill (Ø14) Heat gun Level bar 

Multimeter Long measuring tape

Combination wrench

Marking pen

Wrench(with the diameter of at least 32 mm)

(21mm to 21mm) for pole installation

(17mm to17mm) for wall installation

Page 5: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 5/544

Space Requirements for the DC BTS3900E (Unit: mm) 

3. Minimum Clearance for a

Single DC BTS3900E

4. Clearance for Two Combined

DC BTS3900Es

5. Recommended Clearance for 

Multiple Centralized DC BTS3900Es

6. Minimum Clearance for 

Multiple Centralized DC

BTS3900Es

1. Dimensions of a Single DC

BTS3900E

2. Recommended Clearance for a

Single DC BTS3900E

Page 6: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 6/545

BTS3900E

 Angle steel

or U-steel

≤10° 

Installation Modes for the DC BTS3900E

On a metal pole

(standard installation) On an angle steelOn a U-steel

On a wall

(standard installation)

Only one BTS3900E can be installed on a U-steel or 

angle steel at the back. 

 As shown in the

figure, the angle

between the

vertical and the

angle steel or U-

steel where the

BTS3900E is

installed must be

less than 10

degrees.

The following figures describe the specifications of 

the metal pole, angle steel, and U-steel where the

BTS3900E is installed:

Metal

pole

 Angle

steel

U-steel

On a H-shaped stand

(standard installation)

Page 7: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 7/546

Installation Modes for the DC BTS3900E

Three BTS3900Es cannot be installed

on a wall in centralized mode.

Two BTS3900Es installed on a

metal pole (back-to-back)

Multiple BTS3900Es installed on a wall

 At the back  At the side

A maximum of two BTS3900Es can be installed on a

metal pole with the diameter of 60 mm to 76 mm, and theBTS3900Es must be installed on the back.

When two BTS3900Es are installed on a metal pole in

centralized mode, the diameter of the pole must range

from 76 mm to 114 mm.

When BTS3900Es are installed on a wall, the

specifications of the wall are as follows:

 The wall is able to bear weight four times that of the

BTS3900E. The weight of a DC BTS3900E is 13.5 kg. The

weight of an AC BTS3900E is 17 kg。 

When the BTS3900E is installed on the wall, the

fastening torque of the expansion bolt should be 30N•m.

Ensure that the expansion bolt are properly tightened andthere is no crack on the wall.

Two BTS3900Es installed on a H-shaped

stand (back-to-back)

Page 8: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 8/547

准备说明 

Brackets for Installing

the BTS3900Ea Attachment Plate andCover Plateb

Cover plate  Attachment plate

Installation Procedure for the DC BTS3900E

Install the BTS3900E

on a metal pole

Install the BTS3900E

on a wall

Install the BTS3900E

on a U-steel

Install the BTS3900E

on an angle steel

Prepare for the installation

Start

End

Power on the BTS3900E

Install BTS3900E cables

Install the BTS3900E

on a H-shaped stand

准备说明 Installation Components

The brackets are used for installing the BTS3900Eon a metal pole, wall, U-steel, or angle steel.

Main

bracket

 Auxiliarybracket

Long bolt

Expansion

bolt

To protect the RF ports on the bottom of the BTS3900E,

remove the dustfree caps when installing RF cables.

Page 9: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 9/548

Installing a Single BTS3900E on a Metal Pole (at the Back)

Installing the DC BTS3900E on a Metal Pole

a

The screw is a non-

fixed one and can beneglected duringinstallation. It is only

used when the

BTS3900E is removed.

1. Install the main bracket. Then, install the auxiliary bracket between the nuts of the

dual-nut bolt assembly on the main bracket.

You can fit one end of the auxiliary bracket on one dual-

nut bolt assembly before installation and then the other 

end on the other dual-nut bolt assembly during

installation.

When installing the main bracket, ensure that the contact

piece on the bracket is securely fixed.

2. Use an adjustable wrench to tighten

the nut by the fastening torque 35N•m to40N•m. In this way, the main and

auxiliary brackets are secured on the

pole.

3. Mount the BTS3900E on the main

bracket. When you hear a click, you caninfer that the BTS3900E is in position.

Fasten the two dual-nut bolt assemblies alternatively. After 

the main and auxiliary brackets are secured, use a tape to

measure the spacing between the main bracket and the

auxiliary bracket at both sides and ensure that the spacingis the same.

The RF port at the bottom of the BTS3900E does not have

load capacity. Do not place the BTS3900E on the ground on

its bottom during installation.

When you perform this operation, you need to place the

foam pads or paper under the BTS3900E to avoid anydamage to the shell.

40N•m

1200mm~1600mm

Page 10: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 10/549

Installing the DC BTS3900E on a Metal Pole

Installing Two BTS3900Es in Back-to-Back Mode

1. Install a single BTS3900E. For details,

see page 8.

2. Install the main bracket of another 

BTS3900E and ensure that the main and

auxiliary brackets are securely fixed.

3. Reinstall the attachment plate on the back and cover plate on the front of the

second BTS3900E to interchange their positions.

4. Mount the second BTS3900E on the main bracket.

Cover 

plate

 Attachment

plateRF port

The RF port at the bottom of 

the BTS3900E does not have

load capacity. Do not place

the BTS3900E on theground on its bottom during

installation.

When two BTS3900Es are installed in back-to-backmode, their logo cover plates must face the same

direction.

BTS3900E

installation in

reverse mode

BTS3900E

installation in

ordinary mode

Logo cover 

plate on the

side

Fastening torque

48 kgf.cm 

Page 11: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 11/5410

Installing the DC BTS3900E on a Metal Pole

Installing Multiple BTS3900Es in Centralized Mode

1. Reinstall the attachment plate on the back and cover plate on the side of a BTS3900E

to interchange their positions.

2. Mount the BTS3900E on the main

bracket.

4. Mount the second BTS3900E on the main bracket.

3. Install the main bracket of the second

BTS3900E.

3.安装第二个主扣件。  The RF port at the bottom of the BTS3900E does not have load

capacity. Do not place the BTS3900E on the ground on its bottomduring installation.

When you perform this operation, you need to place the foam pads

or paper under the BTS3900E to avoid any damage to the shell.

Side-mountedinstallation mode is notrecommended for theinstallation of two

BTS3900Es on ametal pole.

Fastening torque

48 kgf.cm 

 Arrow pointingdown on the

main bracket

Page 12: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 12/5411

Installing the DC BTS3900E on a Metal Pole

5. Install the main bracket of the third BTS3900E.

6. Mount the third BTS3900E on the main bracket.

The layout of three BTS3900Es installed on ametal pole must be symmetrical.

Page 13: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 13/5412

Installing the DC BTS3900E on a Wall

Do not hammer the bolt into the expansion tube

completely and leave 20 mm to 30 mm of the bolt outsidethe wall.

It is recommended that the expansion bolts be 1200 mmto 1600 mm above the ground.

1. Place the auxiliary bracket on the wall at the installation position, adjust the

levelness of the bracket, and then mark the anchor points by using a marking pen.

2. Drill holes at the anchor points and install the expansion assemblies.

The wall is able to bear weight four times that of 

the BTS3900E. The weight of a DC BTS3900E is

13.5 kg. The weight of an AC BTS3900E is 17 kg .

When the BTS3900E is installed on the wall, the

fastening torque of the expansion bolt should be

30N•m. Ensure that the expansion bolt is not in spin

mode and the installation wall is not cracked or 

damaged.

52~60mm 

90° 

Ø14

20~30mm 

 After the expansion bolt

is removed, dispose of 

the plastic tube.

Bolt M10x65

Flat washer 10

Spring washer 10

Expansion tube

Plastic tube

Page 14: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 14/5413

Installing the DC BTS3900E on a Wall

3. Fix the auxiliary bracket on the wall securely.

4. Install the main bracket.

Fix the auxiliary bracket on theexpansion bolts and then tighten the bolts

by using a combination wrench (17-17).

The auxiliary bracket must be installedbetween the flat washer of the expansionbolt and the wall.

It is recommended that the bottom of theauxiliary bracket is 1200 mm to 1600mm

above the ground.

Choose standard or reverseinstallation mode according to sitesurvey. This figure is based on thestandard installation mode.

When the BTS3900E is installedon the wall, ensure that the anglebetween the BTS3900E and thewall is less than 2 degrees.

Wall

BTS3900E

≤2° 

5. Mount the BTS3900E.

Standard

installation

 Arrow pointing up on the

auxiliary bracket

Page 15: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 15/5414

Installing the DC BTS3900E on a U-Steel

Installing the DC BTS3900E on an Angle Steel

Plan view

Plan view

The procedure for installing the BTS3900E on a U-steel is the same

as that on a metal pole.

When the BTS3900E is installed on a U-steel, the main bracket canbe installed on only plane A, B, C, or D.

The procedure for installing the BTS3900E on an angle steel is the

same as that on a metal pole.

The main bracket can be installed on only the position as shown inthe previous figure.

U-steel

Page 16: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 16/5415

Installing the DC BTS3900E on a H-Shaped Stand

3. Assembling the horizontal

beam

1. Installing the stand 2. Adjusting the stand

Pretightening

the screw

Fixing the screw

The installation procedure for the

horizontal beam on the opposite

side is the same.

Page 17: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 17/5416

Installing the DC BTS3900E on a H-Shaped Stand

4. Install the main bracket.  5. Mount the BTS3900E on the main bracket. 

6. Install a single BTS3900E in standard

installation mode.

7. Install two BTS3900Es back-to-back. 

Install two BTS3900Eswith the cabling cavities

facing the same direction.

Therefore, you must

interchange the installation

position for the cover plate

and that for the attachmentplate when installing a

second BTS3900E. For 

details, see page 9. 

A maximum of two

BTS3900Es can be installed

on an H-shaped stand.

Cabling cavity

If the expansion bolt assembly is used for fixing the main bracket, remove the expansion tube and plastic tube first.

Use the expansion bolt delivered with the installation kit. Do not use other types of expansion bolts.

When the BTS3900E is installed on the H bracket, the angle between the BTS3900E and the H bracket cannot

exceed two degrees.

H-Shaped

Stand

BTS3900E

≤2° 

Page 18: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 18/5417

Installing the DC BTS3900E Cables

Cable Connections of a Single DC BTS3900E

MON E1/T1RET/TST

Bottom

Install the PGND cable

Install the RF jumper 

(interconnect jumper is optional)

Install the power cable

Install the CPRI optical cable

Install the alarm cable(optional)

Install the AISG multi-wire cable

and extension cable(optional)

 

Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1cable all at once.

When installing the power cable, you must insulate the bare wires and screwdriver if the power cable must be led

through the power cabinet of the operator. This prevents short circuit caused by the contact of the bare wire or screwdriver 

and other equipment.When opening maintenance cavity, do not impose pressure on the cover of the maintenance cavity.

a. Alarm cable

b. Ethernet cable (for 

transmission)

c. DC power cable

d. Ethernet cable (for 

maintenance)

e. RF jumper 

f. Feeder 

g. PGND cable

h. E1 cable

i. USB

External power system

External device

Transmission device

a

USB

b

c

d

e

gh

i

A n t   enn a

USB

Maintenance

PC

1. Cable Connections of a DC BTS3900E

Sequence of Installing the Cables

Page 19: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 19/5418

Waterproof tapePVC insulating

tape

Installing the DC BTS3900E Cables

View of the DC BTS3900E Cablesb

2. Cable Connections of Combined

DC BTS3900Es

Press the strap on the exposed shielding layer of the power cable

tightly. The OT terminal is pressed under the copper bar. Ensure thatthe lower edge of the exposed shielding layer does not exceed the

position shown in the figure.

The shielding layer of the other end of the power cable should begrounded.

To avoid sharp bending, the optical cable must be pressed by the

strap next to the power cable during the optical cable installation.

The tape is wrapped spirally upwards, downwards, and then

upwards again in three layers. For every two adjacent tape layers,

the tape on the upper layer overlaps about half the width of the

tape on the lower layer. When removing the SFP high-speed cable, you need to gentlypull or push the puller according to the terminal type.

Shielding layer of 

the power cable

Power cable

Wrap the joint

with the

waterproof 

tape and thenwith PVC

insulating tape.

Waterproof tape

RF jumper 

Power cascading can be used for BTS3900Es. A

maximum of three BTS3900Es can be cascaded in the

chain topology.

1. RF jumper 

2. Signal cable for combined DC BTS3900E

3. DC power cable

4. PGND cable

5. PGND cable for cascaded BTS3900Es

A n t   enn a

External power system

A n t   enn a

When installing the signal cables for combined cabinets,ensure that port SFP0 of the main cabinet is connected toport SFP0 of the extension cabinet, or port SFP1 of the

main cabinet of is connected to port SFP0 of the

extension cabinet.

Port SFP0 of the main cabinet is preferentially used.

Page 20: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 20/5419

Installing the DC BTS3900E Cables

Cable Connections of the DC BTS3900E Installed on a H-Shaped Stand

Grounding bar 

RF jumper 

 Alarm cable and E1 cable

Power cable

Plan view

 Alarm cable and E1 cable

RF cable

Power cable

Signal cable for 

combined BTS3900E

PGND cable

The power cables and other cables must be separately

routed along two sides of the H-shaped stand. 

Page 21: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 21/5420

Installing the DC BTS3900E Cables

CPRI Optical Cable: Connect the connectors

labeled with 1A and 1B to port SFP0 or port SFP1

on the cabling cavity of the main cabinet.

SFP High Speed Signal Cable:SFP0 or SFP1 port

in the cabling cavity of the BTS3900E

Inter-BTS3900E signal

cable

CPRI Optical Cable: Connect the connectors

labeled with 1A and 1B to port SFP0 or port SFP1

on the cabling cavity of the main cabinet.

SFP High Speed Signal Cable: SFP0 or SFP1

port in another cabling cavity of the BTS3900E

Wiring post on the external power system

 ANT_TX/RX port and ANTB_RX port at thebottom of the BTS3900E

PGND cable: Wiring post on the protection

grounding bar.

PGND cable between cascaded BTS3900Es:

Grounding bolt at the bottom of another 

cascaded BTS3900E.

Grounding screw at the bottom of the

BTS3900E

List of Cables

Connected toConnector TypeCable

OT terminal

OT terminalPGND cable (PGNDcable between

cascaded BTS3900Es)

Feeder or antennaDIN male connector 

DIN male connector 

 Antenna jumper 

OT terminal for the blue wire to NEG0(-) port in

the cabling cavity of the BTS3900E and OT

terminal for the black wire to the RTN0(+) portTwo OT terminalsDC power cable

Bar wires

CPRI Optical Cable: DLC

connector 

SFP High Speed Signal Cable:

SFP200 male connector 

CPRI Optical Cable: DLC

connector 

SFP High Speed Signal Cable:

SFP200 male connector 

(CPRI Optical Cable) 

(SFP High Speed SignalCable) 

Page 22: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 22/5421

Installing the DC BTS3900E Cables

MON port at the bottom of the BTS3900E

Bar wires

E1/T1 port on the BTS3900E

Corresponding auxiliary devices

Bar wires  Alarm signal port on the external device

DB9 female connector 

Ethernet cable

RJ-45 connector 

RJ-45 connector 

Transmission: FE port in the cabling cavity of the BTS3900E

Maintenance: ETH port in the cabling cavity of the BTS3900E

PoE power supply: the FE port in the cabling cavity of the

BTS3900E

Transmission: port on the corresponding transmission device

Maintenance: Ethernet port on the PC where the SMT is installed

PoE power supply: microwave transmission device

Connected toConnector TypeCable

DB15 male connector  Alarm cable

Inter-BTS3900E signal cable should be connected to the corresponding port after the extra length of the cable is cut.

E1 cable

(75 ohm/120 ohm)

DC power cable

for cascaded

modules

OT terminal 

OT terminal 

Connect the OT terminal of the blue cable to the NEG1(-) port

and the OT terminal of the black cable to the RTN1(+) port on

the cabling cavity of the upper-level BTS3900E.

Connect the OT terminal of the blue cable to the NEG0(-) port

and the OT terminal of the black cable to the RTN0(+) port on

the cabling cavity of the lower-level BTS3900E.

Page 23: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 23/5422

Cabling cavity

Cover plate of 

the cabling cavity

Label for makingpower cables 

Cable trough for power cables 

Installing the DC BTS3900E Cables

d

e

Opening and Closing the Cover Plate of the Cabling Cavity

1.Open the cover plate of the cabling cavity. 2. Close the cover plate of the cabling

cavity.

The screw on the cover plate is tighteneduntil the fastening torque is 14 kgf •cm.

The screws on the cover plate are tightened

in the order shown in the preceding figure.

Introduction to the Cabling Cavity

Make power cables by referring to the

label on the cover plate of the cabling cavity.For details, see page 45. 

When opening maintenance cavity,

do not impose pressure on the cover of 

the maintenance cavity.

After the cables are installed, thewaterproof filler should be installed in

the unused cable trough.

Page 24: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 24/5423

安装线缆 

75-ohm 120-ohm T1 Extension cabinet

OFF

OFF

OFFOFF

ON

Installing the DC BTS3900E Cables

Setting DIP Switchesf

ON

SwitchDescription

1 2

Main cabinet,75-ohm E1 mode

Main cabinet,120-ohm E1 mode

Main cabinet,T1 mode

Extension cabinet mode

ONON

OFF

OFF

ON

Status Description

3

4

Channel 2 of 75-ohm E1,RX end grounded

ON

Switch

Channel 2 of 75-ohm E1, RX end not grounded

Channel 1 of 75-ohm E1,RX end grounded

Channel 1 of 75-ohm E1, RX end not grounded

When a 75-ohm cable is used for the BTS3900E, the RX end is

not grounded by default, as shown in the figure on the left.

Bits 1 and 2 are used to specify whether the BTS3900E is a

basic module or an extension module and the transmission mode.

When bits 1 and 2 are set to ON, bits 3 and 4 can be used to

specify the grounding state of the 75-ohm E1 transmission.

Status

Settings of DIP switches on the BTS3900E

Page 25: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 25/5424

If Huawei does not provide the transmission devices, the interconnection ports of 

the transmission devices should meet the following requirements:

The surge protection level of the FE port should be greater than or equal to 7.5

kA (8/20 us) in all-to-ground common mode. Otherwise, a surge protection unit

should be installed near the FE port.

The surge protection level of the E1 port should be greater than or equal to 3kA in pair-to-ground differential mode or 5 kA in pair-to-ground common mode.

Otherwise, a surge protection unit should be installed near the E1 port.

Tower Mountinga

The shielding layer of a DC cable must be grounded properly to the maintenance cavity of the BTS3900E. Therefore, external grounding isnot required on the tower.The shielding layers of the E1 cable and alarm cable are grounded on the BTS side with connectors. Therefore, grounding clips are notrequired on the tower. If cable clips, cable ties, or pig tail clips are used to ground the cables on the power supply device and transmission device side,grounding clips are not required.

3. Grounding Requirements of External Cables

1. Requirements of BTS3900E Installation and Port Surge Protection

The BTS3900E and its auxiliary devices must be installed within the 45º protection

angle of the lightning rod. The BTS3900E must be grounded to the nearest grounding point on the tower 

(within 1.5 m from where the BTS3900E is installed).

None of the external ports of the BTS3900E require external surge protection units.

The BTS3900E and its transmission and power supply devices must be connected

to the same grounding system and share the grounding grid of the site.

2. Recommendations for Transmission Device Protection

Mounting and Grounding Requirements of the DC BTS3900E

Grounding Point (Power Supply

Device and Transmission Device

Located in the Equipment Room)

Grounding Point (Power Supply

Device and Transmission Device

Sharing an Outdoor Cabinet)

Description

FE cable Points 1 and 3 Points 1 and 4 At points 1 and 2, use grounding clips to ground

the shielding layer of a cable by connecting the

PGND cable to the nearest grounding bar of the

tower.

At point 3, use grounding clips to ground the

shielding layer of a cable by connecting the PGND

cable to the nearest grounding bar of the feeder 

window.

At point 4, use grounding clips to ground the

shielding layer of a cable by connecting the PGND

cable to the nearest grounding bar of the cabinet.

For details about how to install grounding clips,

see page 51.

Point 2 (The distance between the

equipment room and the tower is

more than 10 m.)

Point 2 (The distance between the

cabinet and the tower is more than

10 m.)

DC power 

cable

Point 3 Point 4

Point 2 (The distance between the

equipment room and the tower is

more than 10 m.)

Point 2 (The distance between the

cabinet and the tower is more than

10 m.)

E1 cable

and alarm

cable

Point 3 Point 4

Grounding points description

Point 1: within 1 m of where the BTS3900E is installed

Point 2: within 1 m of the bend in the cable leading

away from the tower 

Point 3: over the grounding bar in front of the feeder 

window

Point 4: at the inlet of an outdoor cabinet or inside thecabinet

Page 26: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 26/5425

If Huawei does not provide the transmission devices, the interconnection

ports of the transmission devices should meet the following requirements:

The surge protection level of the FE port should be greater than or equal to 7.5 kA (8/20 us) in all-to-ground common mode. Otherwise, a

surge protection unit should be installed near the FE port.

The surge protection level of the E1 port should be greater than or 

equal to 3 kA in pair-to-ground differential mode or 5 kA in pair-to-ground

common mode. Otherwise, a surge protection unit should be installed

near the E1 port.

Rooftop Mountingb

The shielding layer of a DC cable must be grounded properly to the maintenance cavity of the BTS3900E. Therefore, external grounding isnot required on the rooftop. The shielding layers of the E1 cable and alarm cable are grounded on the BTS side with connectors. Therefore, grounding clips are notrequired on the rooftop. Insulating tapes or L-shaped plastic pipes must be used to protect cables from damage. If cable clips, cable ties, or pig tail clips are used to ground the cables on the power supply device and transmission device side,grounding clips are not required.

3. Grounding Requirements of External Cables

1. Requirements of BTS3900E Installation and Port Surge Protection

The BTS3900E and its auxiliary devices must be installed within the 45º

protection angle of the lightning rod. The BTS3900E must be grounded to the nearest metal pole or rooftop

surge protection belt (within 1.5 m from where the BTS3900E is installed).

None of the external ports of the BTS3900E require external surge

protection units.

The BTS3900E and its auxiliary devices are installed on the same rooftop.

External cables must be routed in lightning-free areas and cannot beshort-circuited to the surge protection belt on the rooftop or to the external

conductors on the building.

2. Recommendations for Transmission Device Protection

Mounting and Grounding Requirements of the DC BTS3900E

Grounding Point (Power 

Supply Device and

Transmission Device

Located in the Equipment

Room)

Grounding Point (Power 

Supply Device and

Transmission Device

Sharing an Outdoor 

Cabinet on the Rooftop)

Description

FE cable Points 1 and 3 Points 1 and 4 At points 1 and 5, use grounding clips to ground the

shielding layer of a cable by connecting the PGND cable

to the nearest surge protection belt on the rooftop.

At point 3, use grounding clips to ground the shielding

layer of a cable by connecting the PGND cable to the

nearest grounding bar of the feeder window.

At point 4, use grounding clips to ground the shielding

layer of a cable by connecting the PGND cable to the

nearest grounding bar of the cabinet.

For details about how to install grounding clips, see

page 51.

Point 5 (The length of the cable

routed horizontally on the

rooftop is more than 20 m.)

-

DC power cable,

E1 cable, and

alarm cable

Point 3 Point 4

Point 5 (The length of the cable

routed horizontally on the

rooftop is more than 20 m.)

-

Grounding points descriptionPoint 1: within 1 m of where the BTS3900E is installed

Point 3: over the grounding bar in front of the feeder windowPoint 4: at the inlet of an outdoor cabinet or inside the cabinet

Point 5: on the roof edge within 1 m of the bend of the cable ladder 

Page 27: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 27/5426

 APMI

PDU

USLP2

Installing the Cables Between the APM30 and BTS3900E

Strip the jacket of the power cable for a small

part, press the exposed shielding layer on the

strap, and then connect the PGND cable on the

strap to the nearest grounding bolt on the side

in the APM30.

1. Power cable

2. Alarm cable

The power cable is connected to one of the LOAD4 to

LOAD9 terminals of the PDU.

Cable connections:

Shielding layer 

for the power 

cable (25mm)

Page 28: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 28/5427

PDU

Installing the Cables Between the APM30H and BTS3900E

 Add RJ-45 connectors to the four wires labeled PSU485 TX-, PSU485

TX+, PSU485 RX-, and PSU485 TX- of the alarm cable and cut off 

other wires. Then, link the RJ-45 connectors to the COM_IN port on

the HEUA or on the CMUA.

HEUA COM_IN

USLP2

APM30H(Ver.A)+BTS3900Ea

APM30H(Ver.B)+BTS3900Eb

COM_IN

LOAD 4~9

Strip the jacket of thepower cable for a

small part, press the

exposed shielding

layer on the strap.

For details, see page

26.

EPS

LOAD8~13

1. Power cable

2. Alarm cable

Cable connections:

Page 29: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 29/5428

Installing the Cables Between the PS4890 and BTS3900E

PS4890+BTS3900Ea

BTS3900E

Shielding layer 

for the power 

cable

LOAD0

PS4890+ USLP2 Board+ BTS3900Ea

LOAD0

Shielding layer 

for the power 

cable

Power Cable

 Alarm cable

Power cable

 Alarm cable

USLP2

PMU

PMU

Page 30: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 30/5429

Installing the Cables Between the EMUA and the BTS3900E

Pin on the

DB15

Connector 

Wire Type Wire Color Signal

Type

X1.11 Twisted pair 

cable

Red TX-

X1.12 Blue TX+

X1.13 Twisted pair 

cable

Red RX-

X1.14 Orange RX+

Pin on the DB9

Connector 

Wire

Type

Wire

Color 

Signal

Type

X1.7 Twisted pair 

cable

Orange TX-

X1.2 White and

orange

TX+

X1.6 Twisted pair 

cable

White and

blue

RX-

X1.1 Blue RX+

DB15 connector 

DB9 connector 

DDF

For the description of the pin on the

DB15 connector, see page 47.

1. BTS3900E alarm cable

2. EMUA alarm cable

Cable connections:

Page 31: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 31/5430

Installing the Cables Between the Power2000 and the BTS3900E

Ensure that all the MCBs are set to

OFF before the cable connection.

The four wires of the BTS3900E alarm cable marked with PSU 485 are connected to the J18 port

according to the cable sequence in the preceding figure.

2. The signal cables of the BTS3900E alarm cable marked with SWITCH and GND can be

connected to the door status monitoring cable or other dry contact alarm cables through

interconnection terminals.

3. The interconnection terminals are placed in Power 2000.

Drycontact

Page 32: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 32/5431

Space Requirements for the AC BTS3900E (Unit: mm)

4. Recommended and Minimum

Clearance for Multiple Centralized AC

BTS3900Es

2. Recommended and Minimum

Clearance for a Single AC BTS3900E

Recommended clearance Minimum clearance

Recommended clearance Minimum clearance

The installation scenarios and modes of the AC BTS3900E are the same as those of the DC BTS3900E. For 

details, see pages 5 to 14.

3. Minimum Clearance for a Single

AC BTS3900E

1. Dimensions of a Single AC BTS3900E

Installation Modes for the AC BTS3900E 

Page 33: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 33/5432

Installing the AC BTS3900E Cables

Cable Connections of a Single AC BTS3900E

MON E1/T1RET/TST Port for ACpower input

RF port Bottom

1. Cable Connections of a AC BTS3900E

Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the

E1 cable all at once. 

When installing the power cable, you must insulate the bare wires and screwdriver if the power cable must be ledthrough the power cabinet of the operator. This prevents short circuit caused by the contact of the bare wire or 

screwdriver and other equipment.

When opening maintenance cavity, do not impose pressure on the cover of the maintenance cavity.

a. Alarm cable

b. Ethernet cable (for transmission)

c. AC power cable

d. Ethernet cable (for maintenance)

e. RF jumper 

f. Feeder 

g. PGND cable

h. E1 cable

i. USB

USB

External power system

A n t   en

n a

Maintenance

PC

 Alarm device

Transmission device

Surge protection box

a

b

c

d

e

gh

i

Install the PGND cable

Install the RF jumper 

(interconnect jumper is optional)

Install the power cable

Install the CPRI optical cable

Install the alarm cable(optional)

Install the AISG multi-wire cable

and extension cable(optional)

 Sequence of Installing the Cables

Page 34: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 34/5433

Installing the AC BTS3900E Cables

View of the AC BTS3900E Cables

2. Cable Connections of Combined

AC BTS3900Es

a. RF jumper 

b. Inter-BTS3900E signal cable 

c. DC power cable

d. PGND cable

e. Equipotential cable 

The combined AC BTS3900Es do notsupport cascading through power cables.

When the BTS3900E is installed outdoors,

the surge protection box for AC power is

required. 

Press the strap on the exposed shielding layer of the power 

cable tightly. Ensure that the lower edge of the exposedshielding layer does not exceed the position shown in the

figure.

The shielding layer of the other end of the power cable

should be grounded.

The two antenna ports and AC input power port on the AC

BTS3900E must be wrapped with waterproof tape and PVC

insulating tape. For details, see page 18. 

Wrap the joint with the waterproof tape and

then with PVC insulating tape.

Waterproof tape

RF jumper 

External power system

A n t   enn a

A n t   enn a

Surge protection box

a bc

d

e

Page 35: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 35/5434

Installing AC BTS3900E Cables

3-pin round connector  AC power cable

(outdoor AC BTS3900E) 

List of Cables

Equipotential cable

(outdoor AC BTS3900E)

Grounding bar on the surge protection box

 AC surge protection box

PWR port at the bottom of the BTS3900E

Connected toConnector TypeCable

OT terminal

OT terminalPGND cable (PGND

cable between

cascaded BTS3900Es)

OT terminal

OT terminal

Feeder or antennaDIN male connector 

 ANT_TX/RXA port or ANT_RXB port on the

BTS3900E

DIN male connector 

 Antenna jumper 

OT terminal

PGND cable: Wiring post on the protection

grounding bar.

PGND cable between cascaded BTS3900Es:

Grounding bolt at the bottom of another 

cascaded BTS3900E.

Grounding screw at the bottom of theBTS3900E

Grounding screw at the bottom of the

BTS3900E

Page 36: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 36/5435

Installing AC BTS3900E Cables

E1 cable

(75 ohm/120 ohm)

Ethernet cableRJ-45 connector 

RJ-45 connector 

Connected toConnector TypeCable

DB15 male connector  Alarm cable

Bar wires

Bar wires

DB9 female connector 

Transmission: port on the corresponding transmission device

Maintenance: Ethernet port on the PC where the SMT is

installed

PoE power supply: microwave transmission device

Transmission: FE port in the cabling cavity of the BTS3900E

Maintenance: ETH port in the cabling cavity of the BTS3900E

PoE power supply: the FE port in the cabling cavity of the

BTS3900E

 Alarm signal port on the external device

MON port at the bottom of the BTS3900E

E1/T1 port on the BTS3900E

Corresponding auxiliary devices

PWR port at the bottom of the BTS3900E3-pin round connector 

Bar wires

 AC power cable

(indoor AC

BTS3900E)External power system

Page 37: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 37/5436

Installing AC BTS3900E Cables

Inter-

BTS3900E

signal cable

The installation method of the

cabling cavity of the AC

BTS3900E and the settings of DIP

switches on the AC BTS3900E are

similar to those of the DC

BTS3900E. For details, see pages

19 and 20.

Connected toConnector TypeCable

Inter-BTS3900E cable should be connected to the corresponding port after the extra length of the cable is cut.

Waterproof filler 

Cabling cavity

Cover plate of 

the cabling cavity

View of the Cabling Cavity of the AC BTS3900Ed

CPRI Optical Cable: Connect the connectors

labeled with 1A and 1B to port SFP0 or port

SFP1 on the cabling cavity of the main cabinet.

SFP High Speed Signal Cable:SFP0 or SFP1

port in the cabling cavity of the BTS3900E

CPRI Optical Cable: Connect the connectors

labeled with 1A and 1B to port SFP0 or port

SFP1 on the cabling cavity of the main cabinet.

SFP High Speed Signal Cable: SFP0 or SFP1

port in another cabling cavity of the BTS3900E

CPRI Optical Cable :

DLC connector 

SFP High Speed Signal

Cable: SFP200 male

connector 

CPRI Optical Cable :

DLC connector 

SFP High Speed Signal

Cable: SFP200 male

connector 

( CPRI Optical Cable) 

(SFP High Speed

Signal Cable) 

Page 38: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 38/5437

Installing the AC BTS3900E for Outdoors Scenarios 

Space Requirements for the Surge Protection Box in Outdoor 

Scenarios (Unit: mm)

Surge protection box

Hoop iron

1. Installation of the surge protection box

2. Dimensions of the surge

protection box (unit: mm): 

3. Minimal/Recommended clearance for 

the surge protection box: 

Page 39: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 39/5438

Installing the AC BTS3900E for Outdoors Scenarios 

b

M4

2. Open the cover of the surge protection box

1. Install the surge protection box on the metal pole.

As shown in the figure, unfasten the screw on the loop iron.

Lead the loop iron through the opening between the back plate

of the surge protection box and the surge protection box.

Circle the loop iron around the metal pole, and then tighten the

screw on the loop iron with the torque of 48 kg f•cm.  

.

Installing the surge protectionbox on the wall

The procedure for installing the

surge protection box on the wall is

the same as that for installing the

BTS3900E on the wall. For details,see page 12.

Installing the Surge Protection Box (for Outdoor Scenarios)

Page 40: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 40/5439

Installing the AC BTS3900E for Outdoors Scenarios 

6. Close the cover of the surge protection box, and then tighten the screws. (You should

tighten the screws in the order shown in the figure with the torque of 14 kg f•cm).

3. Lead the external AC power cable through the PG connector labeled IN. The L, N, and PE wires

of the power cable are connected to the Lin, Nin, and PE terminals on the surge protection box.

4. Lead the power cable between the BTS3900E and the surge protection box through the PG connector 

labeled OUT. The L, N, and PE wires of the power cable are connected to the Lout, Nout, and PE

terminals on the surge protection box.

5. Tighten the PG connector, and then use a wrench to further tighten the connector for one or two

laps to ensure its waterproofing capability.

(The cable led through the PG connector labeled OUT is the power cable between the BTS3900E and the

surge protection box, and the cable led through the PG connector labeled IN is the external AC power cable.)

M4

Install the corrugated pipes for the AC power cables

before installing the BTS3900E AC power cables. For details, see page 49.

Nout Nin Lout Lin

PG connector  

OUT

IN

Lead the cable through the removed thread-lock

sealing nut of the PG connector, and then lead the

cable through the PG connector.

The removed thread-lock sealing nut of the PG

connector cannot be replaced with the thread-lock

sealing nuts of other surge protection boxes.

Ensure that the case of the cable shielding layer is

tightly pressed by the strap.

Page 41: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 41/5440

Installing the AC BTS3900E for Outdoors Scenarios 

Connect the PGND cable between the surge protection box and the BTS3900E.

Connect the external PGND cable between the surge protection box and the grounding point.

7. Connect the PGND cable

8. Connect the power cable between the surge protection box and the BTS3900E

Install the corrugated pipes for the AC power cablesbefore installing the BTS3900E AC power cables.

For details, see page 49.

OUT

PWR

Page 42: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 42/5441

Installing the Integrated Antennas of the BTS3900E

Installing Directional Antennas

 ANTA_TX/RX

M63.0

45N•m

M30

Page 43: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 43/5442

Installing Omni-Directional Antennas

 ANTA_TX/RX

45N•m

M30

M63.0

Page 44: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 44/5443

Powering on the BTS3900E

Appendix

Binding the BTS3900E and Installation Components

Power on the BTS3900E

Start

End

Check whether the status of the RUN

LED is 1s ON, 1s OFF and that of ALM

LED is OFF?

Rectify the fault

Yes

No

When the BTS3900E is unpacked, it must be powered on

within 24 hours. Each time the BTS3900E is maintained

after being put into use, the power-off duration cannot

exceed 24 hours.

1. Bind the BTS3900E by leading the lifting rope along the lower part of the adapting piece and through the

handle, bind the main and auxiliary brackets with the lifting rope, and then bind the steering rope with the

handle of the BTS3900E, as shown in the following figures.

When lifting the BTS3900E and installation components up to the tower, prevent the BTS3900E from colliding with

the tower.

The cross-sectional area of the lifting rope and steering rope is around 20 mm, not more than 25 mm. In addition, the

ropes can bear the weight four times more than that of the BTS3900E.

Lifting Rope

Steering Rope

Page 45: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 45/5444

Procedure:

1. Cut off a 200 mm long corrugated pipe with the

diameter of 25 mm.

2. Lead the fiber tails labeled 1A and 1B of the

optical cable into the corrugated pipe by 160 mm.

3. Wrap the corrugated pipe and optical cable

with the color tape.4. For the tower made of steel pipes, tie the black

 jacket to the corrugated pipe at the position 150

mm away from the color tape, and then lift the

optical cable up to the tower.

5. For the tower made of angle steel girders,

carry the optical cable onto the tower when

climbing up to the tower.

6. After the optical cable is lifted up to the tower,

remove the color tape and corrugated pipe before

installing the optical cable.

Color tape

Corrugated

pipe

3. Lift the CPRI optical cable up to the tower.

Installers A climb onto the tower. Then, installer A fixes

the pulley to the support of the tower platform and leads

the lifting rope through the fixed pulley.

Installer C uses a lifting rope to bind the BTS3900Eand installation components as shown in the preceding

figure and then tie a knot in the steering rope at the

handle of the BTS3900E.

Installer B pulls the lifting rope, and at the same time,installer C pulls the steering rope away from the tower to

prevent the BTS3900E and installation components from

colliding with the tower.

Installers A hold the BTS3900E and installationscomponents and untie the ropes.

When lifting the BTS3900E up to the tower, bind theE1 cable, FE cable, and alarm cable with outdoor black

anti-ultraviolet cable ties.

The AC BTS3900E does not support installation on a

tower, whereas the DC BTS3900E can be installed on a

tower of 50 m.

During the installation, installers cannot stand rightunder the BTS3900E to avoid being hit by dropping

equipment. In addition, installer A on the tower must be

careful in catching the equipment and untying the ropes

to prevent the equipment from dropping off.

2. Lift the BTS3900E and Installation components up

to the tower.

Fixedpulley

Steering

ropeLifting rope

Appendix

Page 46: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 46/5445

 Add two OT terminals to the end of the power cable.

Making OT Terminals by Using a Wire Stripper (Recommended)

-48V DC power cable-48V DC power wire

GND wireShielding layer 

OT terminals

Determine lengths of power cables for differentoperations according to the scales on the inner side

of the cover plate of the cabling cavity.

Based on the determined length, remove the jacket

and shielding layer from the power cable.

 Add an OT terminal to each wire.

Strip a 15 mm jacket off the power cable to reveal

the shielding layer of the power cable.

Remove the jacket from each wire.

The assembling of OT terminals to the power cable

must be complete before the BTS3900E is installed

on a metal pole.

Appendix

Page 47: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 47/5446

Making OT terminals at the input end of the power cable by using a knife as follows:

Appendix

1  2  3 

4  5  6 

7  8  9 

10  11  12 

Do not damage theshielding layer of the

power cable when

cutting the jacket.

Page 48: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 48/5447

Pin Assignment for the Wires of the Alarm Cable

Binding Waterproof Labelsc

Attach waterproof labels to corresponding cables.

The default position for attaching a waterproof label is 2

cm away from the connector. In special scenarios, the

label can be attached at another position to avoid abend of a cable or a position where installation is

difficult. Generally speaking, all the waterproof labels

should be attached neatly and consistently. 

Waterproof label

Cable tie

One end of a

cable with aconnector 

Both ends of a cable near connectors should be

attached with waterproof labels, and the silkscreen on

the label should be in consistent with the corresponding

cable. For details, see the left figure.

Appendix

Silkscreen on the

Waterproof Label Cable

PWR Power cable

SFP Signal cable for 

combined

BTS3900Es

 ALM Alarm cable

E1 E1 cable

FE FE cable

 ANTA RF jumper 

 ANTB

GND PGND cable

Mapping of waterproof labels and cables

Wire Type LabelWire Color WireDB15 Connector 

GNDX1.8

X1.3

Twisted pair X1.1

X1.6 GND

SWITCH_H1

X1.2

X1.7 GND

SWITCH_H2

SWITCH_H3

X1.9

X1.4

GND

SWITCH_H4

X1.11

X1.12

PSU485 TX-

PSU485 TX+

X1.13

X1.14

PSU485 RX-

PSU485 RX+

White

Blue

White

Orange

White

Green

White

Brown

Blue

Red

Orange

Red

Twisted pair 

Twisted pair 

Twisted pair 

Twisted pair 

Twisted pair 

X2.1

X2.3

X2.5

X2.7

X2.6

X2.2

X2.4

X2.8

X2.9

X2.10

X2.11

X2.12

Page 49: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 49/5448

Pin Assignment for E1 Cablee

Pin of the DB9 female

connector 

Wire type Coaxial Series

NO.

Signal Description

X1.1 Tip 2 R0 -

X1.2 Ring -

X1.3 Tip 4 R1 -

X1.4 Ring -

X1.6 Tip 1 T0 -

X1.7 Ring Start X1.Shell

X1.8 Tip 3 T1 -

X1.9 Ring Start X1.Shell

75-ohm E1 cable: 

Pin of the DB9 female

connector 

Color Wire type Signal Label

X1.1 White Twisted pair R0 R0+

X1.2 Orange R0-

X1.3 White Twisted pair R1 R1+

X1.4 Brown R1-

X1.6 White Twisted pair T0 T0+

X1.7 Blue T0-

X1.8 White Twisted pair T1 T1+

X1.9 Green T1-

120-ohm E1 cable: 

Appendix

Page 50: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 50/5449

Appendix

After the corrugated pipe is installed, wrap both ends of thepower cable with waterproof tapes by referring to the following

figure.

Wrap the joint spirally upward, downward, and then upward

again. That is, the joint is wrapped by three layers of the tape.

Ensure that two adjacent layers overlap with each other abouthalf the width of the tape.

f Installing the corrugated pipes of AC power cable

Power 

system

Connector for 

corrugated pipes

Corrugated pipesCorrugated pipes

Waterproof tapes

Appendix

g Appearance of the Cables Installed in the BTS3900E

Transmission device

 Alarm device

External power supply system

1. Appearance of the BTS3900E installed

on the wall

Cascaded SFP cables

Cascaded optical fiber 

Main cabinet

Extension cabinet

When the spacing between the main

cabinet and the extension cabinet is less than

2 m, the cascaded SFP cable should be used.If the spacing between the main cabinet and

the extension cabinet is within the range from

2 m to 10 m, the cascaded optical fiber 

should be used.

Bending radius of the cables should meet

the specifications.

Page 51: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 51/5450

Appendix

g Appearance of the Cables Installed in the BTS3900E

2. Installing the BTS3900E on the pole 3. Installing the BTS3900E on the H-Shaped

Stand

Power cable RF jumper 

PGND cable

 Alarm CableTransmission cable

Cascaded signal cable

Uplink cable : RF jumper 

Downlink cable:Power cablePGND cable

 Alarm Cable

Transmission cable

Cascaded signal

cable

 A certain distance

should be

reserved between

the AC power cable and other 

cables.

Page 52: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 52/5451

Selecting the installation position of the grounding clip and stripping off thecable sheath with electric knife without any damage to the shielding layer.

Fixing the grounding clip and waterproofing it.

The angle resulting from the grounding wire of the clip and the cable should

not be larger than 15 degrees. When the cable is vertically routed, thegrounding wire of the clip should be led downwards.

Appendix

h Installing the Grounding Clip

Page 53: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 53/5452

Change History

This describes the changes in the BTS3900E Installation Guide. 

06 (2011-05-10)

This is the sixth commercial release.

Compared with issue 05 (2010-05-15):

1. This document is optimized in diagrams.2. The mounting and grounding requirements of the DC BTS3900E is added.

3. The description of grounding points of the cables of the BTS39000E mounted 15 m to 50 m high is deleted.

05 (2010-05-15)

This is the fifth commercial release.

Compared with issue 04 (2010-01-15):

1. The description of grounding points of the cables of the BTS39000E mounted 15 m to 50 m high is added.

2. The description of installing the grounding clip is added.

04 (2010-01-15)

This is the fourth commercial release.

Compared with issue 03 (2009-07-30):

1. The installation description of cables between the PS4890/APM30H (ver.B)/Power2000 and the BTS3900E is

added.

2. The installation description of the matching antennas of the BTS3900E is added.

03 (2009-07-30)

This is the third commercial release.

Compared with issue 02 (2009-05-06):

1. The graphic of the AC surge protection box is updated.

2. The graphic for the installation of the cables in typical scenario is added.

02 (2009-05-06)

This is the second commercial release.

Compared with issue 01 (2009-04-07), this document is optimized in diagrams.

01 (2009-04-07)

This is the first commercial release.

Page 54: BTS3900E GSM Installation Guide-(V300R008&R009_06)

7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)

http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 54/54

HUAWEI TECHNOLOGIES CO LTD