7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 1/54
HUAWEI TECHNOLOGIES CO., LTD.
BTS3900E GSM
V300R008&R009
Installation Guide
Issue: 06Date: 2011-05-10
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 2/541
Contents
Safety Information…………………………………………………………………
Installation Tools……………………………………………………………………
Space Requirements for the DC BTS3900E……………………………………
Installation Modes for the DC BTS3900E………………………………………
Installation Procedure for the DC BTS3900E ………………………… ………
Installation Components…………………………………………………………
Installing the DC BTS3900E on a Metal Pole…………………………………
Installing the DC BTS3900E on a Wall…………………………………………
Installing the DC BTS3900E on a U-Steel………………………………………
Installing the DC BTS3900E on an Angle Steel…………………………………
Installing the DC BTS3900E on a H-Shaped Stand……………………………
Installing the DC BTS3900E Cables……………………………………………
Mounting and Grounding Requirements of the DC BTS3900E………………
Installing the Cables Between the APM30 and BTS3900E ……………………
Installing the Cables Between the APM30H and BTS3900E …………………
Installing the Cables Between the PS4890 and BTS3900E……………………
Installing the Cables Between the EMU and the BTS3900E …………………
Installing the Cables Between the Power2000 and the BTS3900E… … … …
Space Requirements for the AC BTS3900E…………………………
…………
Installation Modes for the AC BTS3900E…………………………………………
Installing AC BTS3900E Cables…………………………………………………
Installing the AC BTS3900E for Outdoors Scenarios…………………………
Installing the Integrated Antennas of the BTS3900E …………………………
Powering On the BTS3900E………………………………………………………
Appendix……………………………………………………………………………
Change History………………………………………………………………………
Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.
2
3
4
5
7
7
8
12
14
14
15
17
24
26
27
27
29
30
3131
32
37
41
43
43
52
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 3/542
Following All Safety PrecautionsBefore any operation, read the instructions and precautions in this document carefully to minimize the possibility
of accidents.
The Danger, Caution, and Note items in the documents do not cover all the safety precautions that must be
followed. They only provide the generic safety precautions for operations.When operating Huawei products and equipment, you must comply with safety precautions and special safety
instructions related to corresponding equipment provided by Huawei. The safety precautions in the document
are related to only Huawei products. Huawei is not liable for any consequence that results from the violation of
universal regulations for safety operations and safety codes on design, production, and equipment use.
Complying with the Local Safety RegulationsWhen operating the device, comply with the local safety regulations. The safety precautions provided in the
documents are supplementary. You must comply with the local safety regulations.
Qualified Personnel OnlyThe personnel in charge of installation and maintenance must be trained and master the correct operating
methods and safety precautions before beginning work.
Symbols
Safety of Personnel• The high voltage power supply provides power for running the system. Direct contact with the high voltage
power supply or contact through damp objects may result in fatal danger.
• Non-standard and improper high voltage operations may result in fire and electric shock.
• In a thunderstorm, do not perform operations on high voltage and AC power supply facilities or on a steel
tower and mast.
• Ground the device before powering on the device. Otherwise, the personnel and device are in danger.
• Power off the device before performing operations on the power supply equipment.
• High power radio-frequency signals are harmful to human body. Before installing or maintaining an antenna
on a steel tower or mast with a large number of transmitter antennas, the operator should coordinate with all
parties to ensure that the transmitter antennas are shut down.
• When handling optical fibers, do not stand close to, or look into the optical fiber outlet with unaided eyes.• Protect yourself when drilling holes. Flying dust may hurt your eyes or you may inhale the dust.
• Power off the batteries before connecting the cables to the batteries. Otherwise, casualties may occur.
• When working at a height, be cautious about falling objects.
Device Safety• Check the electrical connection of the device before operation and ensure that the device is reliably grounded.
• The static electricity generated by the human body may damage the electrostatic sensitive components on
the circuit board, such as the large-scale integrated circuit (LIC). Wear an ESD wrist strap or ESD gloves when
performing the operation.
• When working on batteries, take measures to prevent short circuits in the batteries and electrolyte spill/loss.
The electrolyte may erode metal and boards, or even cause rust of the equipment or short circuits in the boards.
• When the equipment is unpacked, it must be powered on in 24 hours. The maximum duration of the power-
off state of the equipment is 24 hours during maintenance.
Safety Information
Indicates a hazard with a high level of risk, which if not avoided, will result in death or
serious injury.DANGER
WARNING
CAUTION
TIP
NOTE
Indicates a hazard with a medium or low level of risk, which if not avoided, could result
in minor or moderate injury.
Indicates a potentially hazardous situation, which if not avoided, could result in
equipment damage, data loss, performance degradation, or unexpected results.
Indicates a tip that may help you solve a problem or save time.
Provides additional information to emphasize or supplement important points of the
main text.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 4/543
Installation Tools
Phillips screwdriver
(M2 to M6)Flat-head screwdriver
(M2 to M6)
Knife Rubber mallet
Crimping pliers
for power cablesCleaner
Wire cutter for
power cables
Torque screwdriver
(14 kgf·cm)Inner hexagon wrench Wire stripper
Percussion drill (Ø14) Heat gun Level bar
Multimeter Long measuring tape
Combination wrench
Marking pen
Wrench(with the diameter of at least 32 mm)
(21mm to 21mm) for pole installation
(17mm to17mm) for wall installation
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 5/544
Space Requirements for the DC BTS3900E (Unit: mm)
3. Minimum Clearance for a
Single DC BTS3900E
4. Clearance for Two Combined
DC BTS3900Es
5. Recommended Clearance for
Multiple Centralized DC BTS3900Es
6. Minimum Clearance for
Multiple Centralized DC
BTS3900Es
1. Dimensions of a Single DC
BTS3900E
2. Recommended Clearance for a
Single DC BTS3900E
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 6/545
BTS3900E
Angle steel
or U-steel
≤10°
Installation Modes for the DC BTS3900E
On a metal pole
(standard installation) On an angle steelOn a U-steel
On a wall
(standard installation)
Only one BTS3900E can be installed on a U-steel or
angle steel at the back.
As shown in the
figure, the angle
between the
vertical and the
angle steel or U-
steel where the
BTS3900E is
installed must be
less than 10
degrees.
The following figures describe the specifications of
the metal pole, angle steel, and U-steel where the
BTS3900E is installed:
Metal
pole
Angle
steel
U-steel
On a H-shaped stand
(standard installation)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 7/546
Installation Modes for the DC BTS3900E
Three BTS3900Es cannot be installed
on a wall in centralized mode.
Two BTS3900Es installed on a
metal pole (back-to-back)
Multiple BTS3900Es installed on a wall
At the back At the side
A maximum of two BTS3900Es can be installed on a
metal pole with the diameter of 60 mm to 76 mm, and theBTS3900Es must be installed on the back.
When two BTS3900Es are installed on a metal pole in
centralized mode, the diameter of the pole must range
from 76 mm to 114 mm.
When BTS3900Es are installed on a wall, the
specifications of the wall are as follows:
The wall is able to bear weight four times that of the
BTS3900E. The weight of a DC BTS3900E is 13.5 kg. The
weight of an AC BTS3900E is 17 kg。
When the BTS3900E is installed on the wall, the
fastening torque of the expansion bolt should be 30N•m.
Ensure that the expansion bolt are properly tightened andthere is no crack on the wall.
Two BTS3900Es installed on a H-shaped
stand (back-to-back)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 8/547
准备说明
Brackets for Installing
the BTS3900Ea Attachment Plate andCover Plateb
Cover plate Attachment plate
Installation Procedure for the DC BTS3900E
Install the BTS3900E
on a metal pole
Install the BTS3900E
on a wall
Install the BTS3900E
on a U-steel
Install the BTS3900E
on an angle steel
Prepare for the installation
Start
End
Power on the BTS3900E
Install BTS3900E cables
Install the BTS3900E
on a H-shaped stand
准备说明 Installation Components
The brackets are used for installing the BTS3900Eon a metal pole, wall, U-steel, or angle steel.
Main
bracket
Auxiliarybracket
Long bolt
Expansion
bolt
To protect the RF ports on the bottom of the BTS3900E,
remove the dustfree caps when installing RF cables.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 9/548
Installing a Single BTS3900E on a Metal Pole (at the Back)
Installing the DC BTS3900E on a Metal Pole
a
The screw is a non-
fixed one and can beneglected duringinstallation. It is only
used when the
BTS3900E is removed.
1. Install the main bracket. Then, install the auxiliary bracket between the nuts of the
dual-nut bolt assembly on the main bracket.
You can fit one end of the auxiliary bracket on one dual-
nut bolt assembly before installation and then the other
end on the other dual-nut bolt assembly during
installation.
When installing the main bracket, ensure that the contact
piece on the bracket is securely fixed.
2. Use an adjustable wrench to tighten
the nut by the fastening torque 35N•m to40N•m. In this way, the main and
auxiliary brackets are secured on the
pole.
3. Mount the BTS3900E on the main
bracket. When you hear a click, you caninfer that the BTS3900E is in position.
Fasten the two dual-nut bolt assemblies alternatively. After
the main and auxiliary brackets are secured, use a tape to
measure the spacing between the main bracket and the
auxiliary bracket at both sides and ensure that the spacingis the same.
The RF port at the bottom of the BTS3900E does not have
load capacity. Do not place the BTS3900E on the ground on
its bottom during installation.
When you perform this operation, you need to place the
foam pads or paper under the BTS3900E to avoid anydamage to the shell.
40N•m
1200mm~1600mm
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 10/549
Installing the DC BTS3900E on a Metal Pole
Installing Two BTS3900Es in Back-to-Back Mode
1. Install a single BTS3900E. For details,
see page 8.
2. Install the main bracket of another
BTS3900E and ensure that the main and
auxiliary brackets are securely fixed.
3. Reinstall the attachment plate on the back and cover plate on the front of the
second BTS3900E to interchange their positions.
4. Mount the second BTS3900E on the main bracket.
Cover
plate
Attachment
plateRF port
The RF port at the bottom of
the BTS3900E does not have
load capacity. Do not place
the BTS3900E on theground on its bottom during
installation.
When two BTS3900Es are installed in back-to-backmode, their logo cover plates must face the same
direction.
BTS3900E
installation in
reverse mode
BTS3900E
installation in
ordinary mode
Logo cover
plate on the
side
Fastening torque
48 kgf.cm
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 11/5410
Installing the DC BTS3900E on a Metal Pole
Installing Multiple BTS3900Es in Centralized Mode
1. Reinstall the attachment plate on the back and cover plate on the side of a BTS3900E
to interchange their positions.
2. Mount the BTS3900E on the main
bracket.
4. Mount the second BTS3900E on the main bracket.
3. Install the main bracket of the second
BTS3900E.
3.安装第二个主扣件。 The RF port at the bottom of the BTS3900E does not have load
capacity. Do not place the BTS3900E on the ground on its bottomduring installation.
When you perform this operation, you need to place the foam pads
or paper under the BTS3900E to avoid any damage to the shell.
Side-mountedinstallation mode is notrecommended for theinstallation of two
BTS3900Es on ametal pole.
Fastening torque
48 kgf.cm
Arrow pointingdown on the
main bracket
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 12/5411
Installing the DC BTS3900E on a Metal Pole
5. Install the main bracket of the third BTS3900E.
6. Mount the third BTS3900E on the main bracket.
The layout of three BTS3900Es installed on ametal pole must be symmetrical.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 13/5412
Installing the DC BTS3900E on a Wall
Do not hammer the bolt into the expansion tube
completely and leave 20 mm to 30 mm of the bolt outsidethe wall.
It is recommended that the expansion bolts be 1200 mmto 1600 mm above the ground.
1. Place the auxiliary bracket on the wall at the installation position, adjust the
levelness of the bracket, and then mark the anchor points by using a marking pen.
2. Drill holes at the anchor points and install the expansion assemblies.
The wall is able to bear weight four times that of
the BTS3900E. The weight of a DC BTS3900E is
13.5 kg. The weight of an AC BTS3900E is 17 kg .
When the BTS3900E is installed on the wall, the
fastening torque of the expansion bolt should be
30N•m. Ensure that the expansion bolt is not in spin
mode and the installation wall is not cracked or
damaged.
52~60mm
90°
Ø14
20~30mm
After the expansion bolt
is removed, dispose of
the plastic tube.
Bolt M10x65
Flat washer 10
Spring washer 10
Expansion tube
Plastic tube
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 14/5413
Installing the DC BTS3900E on a Wall
3. Fix the auxiliary bracket on the wall securely.
4. Install the main bracket.
Fix the auxiliary bracket on theexpansion bolts and then tighten the bolts
by using a combination wrench (17-17).
The auxiliary bracket must be installedbetween the flat washer of the expansionbolt and the wall.
It is recommended that the bottom of theauxiliary bracket is 1200 mm to 1600mm
above the ground.
Choose standard or reverseinstallation mode according to sitesurvey. This figure is based on thestandard installation mode.
When the BTS3900E is installedon the wall, ensure that the anglebetween the BTS3900E and thewall is less than 2 degrees.
Wall
BTS3900E
≤2°
5. Mount the BTS3900E.
Standard
installation
Arrow pointing up on the
auxiliary bracket
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 15/5414
Installing the DC BTS3900E on a U-Steel
Installing the DC BTS3900E on an Angle Steel
Plan view
Plan view
The procedure for installing the BTS3900E on a U-steel is the same
as that on a metal pole.
When the BTS3900E is installed on a U-steel, the main bracket canbe installed on only plane A, B, C, or D.
The procedure for installing the BTS3900E on an angle steel is the
same as that on a metal pole.
The main bracket can be installed on only the position as shown inthe previous figure.
U-steel
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 16/5415
Installing the DC BTS3900E on a H-Shaped Stand
3. Assembling the horizontal
beam
1. Installing the stand 2. Adjusting the stand
Pretightening
the screw
Fixing the screw
The installation procedure for the
horizontal beam on the opposite
side is the same.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 17/5416
Installing the DC BTS3900E on a H-Shaped Stand
4. Install the main bracket. 5. Mount the BTS3900E on the main bracket.
6. Install a single BTS3900E in standard
installation mode.
7. Install two BTS3900Es back-to-back.
Install two BTS3900Eswith the cabling cavities
facing the same direction.
Therefore, you must
interchange the installation
position for the cover plate
and that for the attachmentplate when installing a
second BTS3900E. For
details, see page 9.
A maximum of two
BTS3900Es can be installed
on an H-shaped stand.
Cabling cavity
If the expansion bolt assembly is used for fixing the main bracket, remove the expansion tube and plastic tube first.
Use the expansion bolt delivered with the installation kit. Do not use other types of expansion bolts.
When the BTS3900E is installed on the H bracket, the angle between the BTS3900E and the H bracket cannot
exceed two degrees.
H-Shaped
Stand
BTS3900E
≤2°
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 18/5417
Installing the DC BTS3900E Cables
Cable Connections of a Single DC BTS3900E
MON E1/T1RET/TST
Bottom
Install the PGND cable
Install the RF jumper
(interconnect jumper is optional)
Install the power cable
Install the CPRI optical cable
Install the alarm cable(optional)
Install the AISG multi-wire cable
and extension cable(optional)
Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the E1cable all at once.
When installing the power cable, you must insulate the bare wires and screwdriver if the power cable must be led
through the power cabinet of the operator. This prevents short circuit caused by the contact of the bare wire or screwdriver
and other equipment.When opening maintenance cavity, do not impose pressure on the cover of the maintenance cavity.
a. Alarm cable
b. Ethernet cable (for
transmission)
c. DC power cable
d. Ethernet cable (for
maintenance)
e. RF jumper
f. Feeder
g. PGND cable
h. E1 cable
i. USB
External power system
External device
Transmission device
a
USB
b
c
d
e
f
gh
i
A n t enn a
USB
Maintenance
PC
1. Cable Connections of a DC BTS3900E
Sequence of Installing the Cables
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 19/5418
Waterproof tapePVC insulating
tape
Installing the DC BTS3900E Cables
View of the DC BTS3900E Cablesb
2. Cable Connections of Combined
DC BTS3900Es
Press the strap on the exposed shielding layer of the power cable
tightly. The OT terminal is pressed under the copper bar. Ensure thatthe lower edge of the exposed shielding layer does not exceed the
position shown in the figure.
The shielding layer of the other end of the power cable should begrounded.
To avoid sharp bending, the optical cable must be pressed by the
strap next to the power cable during the optical cable installation.
The tape is wrapped spirally upwards, downwards, and then
upwards again in three layers. For every two adjacent tape layers,
the tape on the upper layer overlaps about half the width of the
tape on the lower layer. When removing the SFP high-speed cable, you need to gentlypull or push the puller according to the terminal type.
Shielding layer of
the power cable
Power cable
Wrap the joint
with the
waterproof
tape and thenwith PVC
insulating tape.
Waterproof tape
RF jumper
Power cascading can be used for BTS3900Es. A
maximum of three BTS3900Es can be cascaded in the
chain topology.
1. RF jumper
2. Signal cable for combined DC BTS3900E
3. DC power cable
4. PGND cable
5. PGND cable for cascaded BTS3900Es
A n t enn a
External power system
A n t enn a
When installing the signal cables for combined cabinets,ensure that port SFP0 of the main cabinet is connected toport SFP0 of the extension cabinet, or port SFP1 of the
main cabinet of is connected to port SFP0 of the
extension cabinet.
Port SFP0 of the main cabinet is preferentially used.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 20/5419
Installing the DC BTS3900E Cables
Cable Connections of the DC BTS3900E Installed on a H-Shaped Stand
Grounding bar
RF jumper
Alarm cable and E1 cable
Power cable
Plan view
Alarm cable and E1 cable
RF cable
Power cable
Signal cable for
combined BTS3900E
PGND cable
The power cables and other cables must be separately
routed along two sides of the H-shaped stand.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 21/5420
Installing the DC BTS3900E Cables
CPRI Optical Cable: Connect the connectors
labeled with 1A and 1B to port SFP0 or port SFP1
on the cabling cavity of the main cabinet.
SFP High Speed Signal Cable:SFP0 or SFP1 port
in the cabling cavity of the BTS3900E
Inter-BTS3900E signal
cable
CPRI Optical Cable: Connect the connectors
labeled with 1A and 1B to port SFP0 or port SFP1
on the cabling cavity of the main cabinet.
SFP High Speed Signal Cable: SFP0 or SFP1
port in another cabling cavity of the BTS3900E
Wiring post on the external power system
ANT_TX/RX port and ANTB_RX port at thebottom of the BTS3900E
PGND cable: Wiring post on the protection
grounding bar.
PGND cable between cascaded BTS3900Es:
Grounding bolt at the bottom of another
cascaded BTS3900E.
Grounding screw at the bottom of the
BTS3900E
List of Cables
Connected toConnector TypeCable
OT terminal
OT terminalPGND cable (PGNDcable between
cascaded BTS3900Es)
Feeder or antennaDIN male connector
DIN male connector
Antenna jumper
OT terminal for the blue wire to NEG0(-) port in
the cabling cavity of the BTS3900E and OT
terminal for the black wire to the RTN0(+) portTwo OT terminalsDC power cable
Bar wires
CPRI Optical Cable: DLC
connector
SFP High Speed Signal Cable:
SFP200 male connector
CPRI Optical Cable: DLC
connector
SFP High Speed Signal Cable:
SFP200 male connector
(CPRI Optical Cable)
(SFP High Speed SignalCable)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 22/5421
Installing the DC BTS3900E Cables
MON port at the bottom of the BTS3900E
Bar wires
E1/T1 port on the BTS3900E
Corresponding auxiliary devices
Bar wires Alarm signal port on the external device
DB9 female connector
Ethernet cable
RJ-45 connector
RJ-45 connector
Transmission: FE port in the cabling cavity of the BTS3900E
Maintenance: ETH port in the cabling cavity of the BTS3900E
PoE power supply: the FE port in the cabling cavity of the
BTS3900E
Transmission: port on the corresponding transmission device
Maintenance: Ethernet port on the PC where the SMT is installed
PoE power supply: microwave transmission device
Connected toConnector TypeCable
DB15 male connector Alarm cable
Inter-BTS3900E signal cable should be connected to the corresponding port after the extra length of the cable is cut.
E1 cable
(75 ohm/120 ohm)
DC power cable
for cascaded
modules
OT terminal
OT terminal
Connect the OT terminal of the blue cable to the NEG1(-) port
and the OT terminal of the black cable to the RTN1(+) port on
the cabling cavity of the upper-level BTS3900E.
Connect the OT terminal of the blue cable to the NEG0(-) port
and the OT terminal of the black cable to the RTN0(+) port on
the cabling cavity of the lower-level BTS3900E.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 23/5422
Cabling cavity
Cover plate of
the cabling cavity
Label for makingpower cables
Cable trough for power cables
Installing the DC BTS3900E Cables
d
e
Opening and Closing the Cover Plate of the Cabling Cavity
1.Open the cover plate of the cabling cavity. 2. Close the cover plate of the cabling
cavity.
The screw on the cover plate is tighteneduntil the fastening torque is 14 kgf •cm.
The screws on the cover plate are tightened
in the order shown in the preceding figure.
Introduction to the Cabling Cavity
Make power cables by referring to the
label on the cover plate of the cabling cavity.For details, see page 45.
When opening maintenance cavity,
do not impose pressure on the cover of
the maintenance cavity.
After the cables are installed, thewaterproof filler should be installed in
the unused cable trough.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 24/5423
安装线缆
75-ohm 120-ohm T1 Extension cabinet
OFF
OFF
OFFOFF
ON
Installing the DC BTS3900E Cables
Setting DIP Switchesf
ON
SwitchDescription
1 2
Main cabinet,75-ohm E1 mode
Main cabinet,120-ohm E1 mode
Main cabinet,T1 mode
Extension cabinet mode
ONON
OFF
OFF
ON
Status Description
3
4
Channel 2 of 75-ohm E1,RX end grounded
ON
Switch
Channel 2 of 75-ohm E1, RX end not grounded
Channel 1 of 75-ohm E1,RX end grounded
Channel 1 of 75-ohm E1, RX end not grounded
When a 75-ohm cable is used for the BTS3900E, the RX end is
not grounded by default, as shown in the figure on the left.
Bits 1 and 2 are used to specify whether the BTS3900E is a
basic module or an extension module and the transmission mode.
When bits 1 and 2 are set to ON, bits 3 and 4 can be used to
specify the grounding state of the 75-ohm E1 transmission.
Status
Settings of DIP switches on the BTS3900E
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 25/5424
If Huawei does not provide the transmission devices, the interconnection ports of
the transmission devices should meet the following requirements:
The surge protection level of the FE port should be greater than or equal to 7.5
kA (8/20 us) in all-to-ground common mode. Otherwise, a surge protection unit
should be installed near the FE port.
The surge protection level of the E1 port should be greater than or equal to 3kA in pair-to-ground differential mode or 5 kA in pair-to-ground common mode.
Otherwise, a surge protection unit should be installed near the E1 port.
Tower Mountinga
The shielding layer of a DC cable must be grounded properly to the maintenance cavity of the BTS3900E. Therefore, external grounding isnot required on the tower.The shielding layers of the E1 cable and alarm cable are grounded on the BTS side with connectors. Therefore, grounding clips are notrequired on the tower. If cable clips, cable ties, or pig tail clips are used to ground the cables on the power supply device and transmission device side,grounding clips are not required.
3. Grounding Requirements of External Cables
1. Requirements of BTS3900E Installation and Port Surge Protection
The BTS3900E and its auxiliary devices must be installed within the 45º protection
angle of the lightning rod. The BTS3900E must be grounded to the nearest grounding point on the tower
(within 1.5 m from where the BTS3900E is installed).
None of the external ports of the BTS3900E require external surge protection units.
The BTS3900E and its transmission and power supply devices must be connected
to the same grounding system and share the grounding grid of the site.
2. Recommendations for Transmission Device Protection
Mounting and Grounding Requirements of the DC BTS3900E
Grounding Point (Power Supply
Device and Transmission Device
Located in the Equipment Room)
Grounding Point (Power Supply
Device and Transmission Device
Sharing an Outdoor Cabinet)
Description
FE cable Points 1 and 3 Points 1 and 4 At points 1 and 2, use grounding clips to ground
the shielding layer of a cable by connecting the
PGND cable to the nearest grounding bar of the
tower.
At point 3, use grounding clips to ground the
shielding layer of a cable by connecting the PGND
cable to the nearest grounding bar of the feeder
window.
At point 4, use grounding clips to ground the
shielding layer of a cable by connecting the PGND
cable to the nearest grounding bar of the cabinet.
For details about how to install grounding clips,
see page 51.
Point 2 (The distance between the
equipment room and the tower is
more than 10 m.)
Point 2 (The distance between the
cabinet and the tower is more than
10 m.)
DC power
cable
Point 3 Point 4
Point 2 (The distance between the
equipment room and the tower is
more than 10 m.)
Point 2 (The distance between the
cabinet and the tower is more than
10 m.)
E1 cable
and alarm
cable
Point 3 Point 4
Grounding points description
Point 1: within 1 m of where the BTS3900E is installed
Point 2: within 1 m of the bend in the cable leading
away from the tower
Point 3: over the grounding bar in front of the feeder
window
Point 4: at the inlet of an outdoor cabinet or inside thecabinet
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 26/5425
If Huawei does not provide the transmission devices, the interconnection
ports of the transmission devices should meet the following requirements:
The surge protection level of the FE port should be greater than or equal to 7.5 kA (8/20 us) in all-to-ground common mode. Otherwise, a
surge protection unit should be installed near the FE port.
The surge protection level of the E1 port should be greater than or
equal to 3 kA in pair-to-ground differential mode or 5 kA in pair-to-ground
common mode. Otherwise, a surge protection unit should be installed
near the E1 port.
Rooftop Mountingb
The shielding layer of a DC cable must be grounded properly to the maintenance cavity of the BTS3900E. Therefore, external grounding isnot required on the rooftop. The shielding layers of the E1 cable and alarm cable are grounded on the BTS side with connectors. Therefore, grounding clips are notrequired on the rooftop. Insulating tapes or L-shaped plastic pipes must be used to protect cables from damage. If cable clips, cable ties, or pig tail clips are used to ground the cables on the power supply device and transmission device side,grounding clips are not required.
3. Grounding Requirements of External Cables
1. Requirements of BTS3900E Installation and Port Surge Protection
The BTS3900E and its auxiliary devices must be installed within the 45º
protection angle of the lightning rod. The BTS3900E must be grounded to the nearest metal pole or rooftop
surge protection belt (within 1.5 m from where the BTS3900E is installed).
None of the external ports of the BTS3900E require external surge
protection units.
The BTS3900E and its auxiliary devices are installed on the same rooftop.
External cables must be routed in lightning-free areas and cannot beshort-circuited to the surge protection belt on the rooftop or to the external
conductors on the building.
2. Recommendations for Transmission Device Protection
Mounting and Grounding Requirements of the DC BTS3900E
Grounding Point (Power
Supply Device and
Transmission Device
Located in the Equipment
Room)
Grounding Point (Power
Supply Device and
Transmission Device
Sharing an Outdoor
Cabinet on the Rooftop)
Description
FE cable Points 1 and 3 Points 1 and 4 At points 1 and 5, use grounding clips to ground the
shielding layer of a cable by connecting the PGND cable
to the nearest surge protection belt on the rooftop.
At point 3, use grounding clips to ground the shielding
layer of a cable by connecting the PGND cable to the
nearest grounding bar of the feeder window.
At point 4, use grounding clips to ground the shielding
layer of a cable by connecting the PGND cable to the
nearest grounding bar of the cabinet.
For details about how to install grounding clips, see
page 51.
Point 5 (The length of the cable
routed horizontally on the
rooftop is more than 20 m.)
-
DC power cable,
E1 cable, and
alarm cable
Point 3 Point 4
Point 5 (The length of the cable
routed horizontally on the
rooftop is more than 20 m.)
-
Grounding points descriptionPoint 1: within 1 m of where the BTS3900E is installed
Point 3: over the grounding bar in front of the feeder windowPoint 4: at the inlet of an outdoor cabinet or inside the cabinet
Point 5: on the roof edge within 1 m of the bend of the cable ladder
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 27/5426
APMI
PDU
USLP2
Installing the Cables Between the APM30 and BTS3900E
Strip the jacket of the power cable for a small
part, press the exposed shielding layer on the
strap, and then connect the PGND cable on the
strap to the nearest grounding bolt on the side
in the APM30.
1. Power cable
2. Alarm cable
The power cable is connected to one of the LOAD4 to
LOAD9 terminals of the PDU.
Cable connections:
Shielding layer
for the power
cable (25mm)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 28/5427
PDU
Installing the Cables Between the APM30H and BTS3900E
Add RJ-45 connectors to the four wires labeled PSU485 TX-, PSU485
TX+, PSU485 RX-, and PSU485 TX- of the alarm cable and cut off
other wires. Then, link the RJ-45 connectors to the COM_IN port on
the HEUA or on the CMUA.
HEUA COM_IN
USLP2
APM30H(Ver.A)+BTS3900Ea
APM30H(Ver.B)+BTS3900Eb
COM_IN
LOAD 4~9
Strip the jacket of thepower cable for a
small part, press the
exposed shielding
layer on the strap.
For details, see page
26.
EPS
LOAD8~13
1. Power cable
2. Alarm cable
Cable connections:
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 29/5428
Installing the Cables Between the PS4890 and BTS3900E
PS4890+BTS3900Ea
BTS3900E
Shielding layer
for the power
cable
LOAD0
PS4890+ USLP2 Board+ BTS3900Ea
LOAD0
Shielding layer
for the power
cable
Power Cable
Alarm cable
Power cable
Alarm cable
USLP2
PMU
PMU
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 30/5429
Installing the Cables Between the EMUA and the BTS3900E
Pin on the
DB15
Connector
Wire Type Wire Color Signal
Type
X1.11 Twisted pair
cable
Red TX-
X1.12 Blue TX+
X1.13 Twisted pair
cable
Red RX-
X1.14 Orange RX+
Pin on the DB9
Connector
Wire
Type
Wire
Color
Signal
Type
X1.7 Twisted pair
cable
Orange TX-
X1.2 White and
orange
TX+
X1.6 Twisted pair
cable
White and
blue
RX-
X1.1 Blue RX+
DB15 connector
DB9 connector
DDF
For the description of the pin on the
DB15 connector, see page 47.
1. BTS3900E alarm cable
2. EMUA alarm cable
Cable connections:
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 31/5430
Installing the Cables Between the Power2000 and the BTS3900E
Ensure that all the MCBs are set to
OFF before the cable connection.
The four wires of the BTS3900E alarm cable marked with PSU 485 are connected to the J18 port
according to the cable sequence in the preceding figure.
2. The signal cables of the BTS3900E alarm cable marked with SWITCH and GND can be
connected to the door status monitoring cable or other dry contact alarm cables through
interconnection terminals.
3. The interconnection terminals are placed in Power 2000.
Drycontact
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 32/5431
Space Requirements for the AC BTS3900E (Unit: mm)
4. Recommended and Minimum
Clearance for Multiple Centralized AC
BTS3900Es
2. Recommended and Minimum
Clearance for a Single AC BTS3900E
Recommended clearance Minimum clearance
Recommended clearance Minimum clearance
The installation scenarios and modes of the AC BTS3900E are the same as those of the DC BTS3900E. For
details, see pages 5 to 14.
3. Minimum Clearance for a Single
AC BTS3900E
1. Dimensions of a Single AC BTS3900E
Installation Modes for the AC BTS3900E
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 33/5432
Installing the AC BTS3900E Cables
Cable Connections of a Single AC BTS3900E
MON E1/T1RET/TST Port for ACpower input
RF port Bottom
1. Cable Connections of a AC BTS3900E
Ensure that both ends of the E1 cable are disconnected. Then, weld connectors to the bare wires at one end of the
E1 cable all at once.
When installing the power cable, you must insulate the bare wires and screwdriver if the power cable must be ledthrough the power cabinet of the operator. This prevents short circuit caused by the contact of the bare wire or
screwdriver and other equipment.
When opening maintenance cavity, do not impose pressure on the cover of the maintenance cavity.
a. Alarm cable
b. Ethernet cable (for transmission)
c. AC power cable
d. Ethernet cable (for maintenance)
e. RF jumper
f. Feeder
g. PGND cable
h. E1 cable
i. USB
USB
External power system
A n t en
n a
Maintenance
PC
Alarm device
Transmission device
Surge protection box
a
b
c
d
e
f
gh
i
Install the PGND cable
Install the RF jumper
(interconnect jumper is optional)
Install the power cable
Install the CPRI optical cable
Install the alarm cable(optional)
Install the AISG multi-wire cable
and extension cable(optional)
Sequence of Installing the Cables
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 34/5433
Installing the AC BTS3900E Cables
View of the AC BTS3900E Cables
2. Cable Connections of Combined
AC BTS3900Es
a. RF jumper
b. Inter-BTS3900E signal cable
c. DC power cable
d. PGND cable
e. Equipotential cable
The combined AC BTS3900Es do notsupport cascading through power cables.
When the BTS3900E is installed outdoors,
the surge protection box for AC power is
required.
Press the strap on the exposed shielding layer of the power
cable tightly. Ensure that the lower edge of the exposedshielding layer does not exceed the position shown in the
figure.
The shielding layer of the other end of the power cable
should be grounded.
The two antenna ports and AC input power port on the AC
BTS3900E must be wrapped with waterproof tape and PVC
insulating tape. For details, see page 18.
Wrap the joint with the waterproof tape and
then with PVC insulating tape.
Waterproof tape
RF jumper
External power system
A n t enn a
A n t enn a
Surge protection box
a bc
d
e
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 35/5434
Installing AC BTS3900E Cables
3-pin round connector AC power cable
(outdoor AC BTS3900E)
List of Cables
Equipotential cable
(outdoor AC BTS3900E)
Grounding bar on the surge protection box
AC surge protection box
PWR port at the bottom of the BTS3900E
Connected toConnector TypeCable
OT terminal
OT terminalPGND cable (PGND
cable between
cascaded BTS3900Es)
OT terminal
OT terminal
Feeder or antennaDIN male connector
ANT_TX/RXA port or ANT_RXB port on the
BTS3900E
DIN male connector
Antenna jumper
OT terminal
PGND cable: Wiring post on the protection
grounding bar.
PGND cable between cascaded BTS3900Es:
Grounding bolt at the bottom of another
cascaded BTS3900E.
Grounding screw at the bottom of theBTS3900E
Grounding screw at the bottom of the
BTS3900E
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 36/5435
Installing AC BTS3900E Cables
E1 cable
(75 ohm/120 ohm)
Ethernet cableRJ-45 connector
RJ-45 connector
Connected toConnector TypeCable
DB15 male connector Alarm cable
Bar wires
Bar wires
DB9 female connector
Transmission: port on the corresponding transmission device
Maintenance: Ethernet port on the PC where the SMT is
installed
PoE power supply: microwave transmission device
Transmission: FE port in the cabling cavity of the BTS3900E
Maintenance: ETH port in the cabling cavity of the BTS3900E
PoE power supply: the FE port in the cabling cavity of the
BTS3900E
Alarm signal port on the external device
MON port at the bottom of the BTS3900E
E1/T1 port on the BTS3900E
Corresponding auxiliary devices
PWR port at the bottom of the BTS3900E3-pin round connector
Bar wires
AC power cable
(indoor AC
BTS3900E)External power system
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 37/5436
Installing AC BTS3900E Cables
Inter-
BTS3900E
signal cable
The installation method of the
cabling cavity of the AC
BTS3900E and the settings of DIP
switches on the AC BTS3900E are
similar to those of the DC
BTS3900E. For details, see pages
19 and 20.
Connected toConnector TypeCable
Inter-BTS3900E cable should be connected to the corresponding port after the extra length of the cable is cut.
Waterproof filler
Cabling cavity
Cover plate of
the cabling cavity
View of the Cabling Cavity of the AC BTS3900Ed
CPRI Optical Cable: Connect the connectors
labeled with 1A and 1B to port SFP0 or port
SFP1 on the cabling cavity of the main cabinet.
SFP High Speed Signal Cable:SFP0 or SFP1
port in the cabling cavity of the BTS3900E
CPRI Optical Cable: Connect the connectors
labeled with 1A and 1B to port SFP0 or port
SFP1 on the cabling cavity of the main cabinet.
SFP High Speed Signal Cable: SFP0 or SFP1
port in another cabling cavity of the BTS3900E
CPRI Optical Cable :
DLC connector
SFP High Speed Signal
Cable: SFP200 male
connector
CPRI Optical Cable :
DLC connector
SFP High Speed Signal
Cable: SFP200 male
connector
( CPRI Optical Cable)
(SFP High Speed
Signal Cable)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 38/5437
Installing the AC BTS3900E for Outdoors Scenarios
Space Requirements for the Surge Protection Box in Outdoor
Scenarios (Unit: mm)
Surge protection box
Hoop iron
1. Installation of the surge protection box
2. Dimensions of the surge
protection box (unit: mm):
3. Minimal/Recommended clearance for
the surge protection box:
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 39/5438
Installing the AC BTS3900E for Outdoors Scenarios
b
M4
2. Open the cover of the surge protection box
1. Install the surge protection box on the metal pole.
As shown in the figure, unfasten the screw on the loop iron.
Lead the loop iron through the opening between the back plate
of the surge protection box and the surge protection box.
Circle the loop iron around the metal pole, and then tighten the
screw on the loop iron with the torque of 48 kg f•cm.
.
Installing the surge protectionbox on the wall
The procedure for installing the
surge protection box on the wall is
the same as that for installing the
BTS3900E on the wall. For details,see page 12.
Installing the Surge Protection Box (for Outdoor Scenarios)
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 40/5439
Installing the AC BTS3900E for Outdoors Scenarios
6. Close the cover of the surge protection box, and then tighten the screws. (You should
tighten the screws in the order shown in the figure with the torque of 14 kg f•cm).
3. Lead the external AC power cable through the PG connector labeled IN. The L, N, and PE wires
of the power cable are connected to the Lin, Nin, and PE terminals on the surge protection box.
4. Lead the power cable between the BTS3900E and the surge protection box through the PG connector
labeled OUT. The L, N, and PE wires of the power cable are connected to the Lout, Nout, and PE
terminals on the surge protection box.
5. Tighten the PG connector, and then use a wrench to further tighten the connector for one or two
laps to ensure its waterproofing capability.
(The cable led through the PG connector labeled OUT is the power cable between the BTS3900E and the
surge protection box, and the cable led through the PG connector labeled IN is the external AC power cable.)
M4
Install the corrugated pipes for the AC power cables
before installing the BTS3900E AC power cables. For details, see page 49.
Nout Nin Lout Lin
PG connector
OUT
IN
Lead the cable through the removed thread-lock
sealing nut of the PG connector, and then lead the
cable through the PG connector.
The removed thread-lock sealing nut of the PG
connector cannot be replaced with the thread-lock
sealing nuts of other surge protection boxes.
Ensure that the case of the cable shielding layer is
tightly pressed by the strap.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 41/5440
Installing the AC BTS3900E for Outdoors Scenarios
Connect the PGND cable between the surge protection box and the BTS3900E.
Connect the external PGND cable between the surge protection box and the grounding point.
7. Connect the PGND cable
8. Connect the power cable between the surge protection box and the BTS3900E
Install the corrugated pipes for the AC power cablesbefore installing the BTS3900E AC power cables.
For details, see page 49.
OUT
PWR
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 42/5441
Installing the Integrated Antennas of the BTS3900E
Installing Directional Antennas
ANTA_TX/RX
M63.0
45N•m
M30
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 43/5442
Installing Omni-Directional Antennas
ANTA_TX/RX
45N•m
M30
M63.0
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 44/5443
Powering on the BTS3900E
Appendix
Binding the BTS3900E and Installation Components
Power on the BTS3900E
Start
End
Check whether the status of the RUN
LED is 1s ON, 1s OFF and that of ALM
LED is OFF?
Rectify the fault
Yes
No
When the BTS3900E is unpacked, it must be powered on
within 24 hours. Each time the BTS3900E is maintained
after being put into use, the power-off duration cannot
exceed 24 hours.
1. Bind the BTS3900E by leading the lifting rope along the lower part of the adapting piece and through the
handle, bind the main and auxiliary brackets with the lifting rope, and then bind the steering rope with the
handle of the BTS3900E, as shown in the following figures.
When lifting the BTS3900E and installation components up to the tower, prevent the BTS3900E from colliding with
the tower.
The cross-sectional area of the lifting rope and steering rope is around 20 mm, not more than 25 mm. In addition, the
ropes can bear the weight four times more than that of the BTS3900E.
Lifting Rope
Steering Rope
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 45/5444
Procedure:
1. Cut off a 200 mm long corrugated pipe with the
diameter of 25 mm.
2. Lead the fiber tails labeled 1A and 1B of the
optical cable into the corrugated pipe by 160 mm.
3. Wrap the corrugated pipe and optical cable
with the color tape.4. For the tower made of steel pipes, tie the black
jacket to the corrugated pipe at the position 150
mm away from the color tape, and then lift the
optical cable up to the tower.
5. For the tower made of angle steel girders,
carry the optical cable onto the tower when
climbing up to the tower.
6. After the optical cable is lifted up to the tower,
remove the color tape and corrugated pipe before
installing the optical cable.
Color tape
Corrugated
pipe
3. Lift the CPRI optical cable up to the tower.
Installers A climb onto the tower. Then, installer A fixes
the pulley to the support of the tower platform and leads
the lifting rope through the fixed pulley.
Installer C uses a lifting rope to bind the BTS3900Eand installation components as shown in the preceding
figure and then tie a knot in the steering rope at the
handle of the BTS3900E.
Installer B pulls the lifting rope, and at the same time,installer C pulls the steering rope away from the tower to
prevent the BTS3900E and installation components from
colliding with the tower.
Installers A hold the BTS3900E and installationscomponents and untie the ropes.
When lifting the BTS3900E up to the tower, bind theE1 cable, FE cable, and alarm cable with outdoor black
anti-ultraviolet cable ties.
The AC BTS3900E does not support installation on a
tower, whereas the DC BTS3900E can be installed on a
tower of 50 m.
During the installation, installers cannot stand rightunder the BTS3900E to avoid being hit by dropping
equipment. In addition, installer A on the tower must be
careful in catching the equipment and untying the ropes
to prevent the equipment from dropping off.
2. Lift the BTS3900E and Installation components up
to the tower.
Fixedpulley
Steering
ropeLifting rope
Appendix
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 46/5445
Add two OT terminals to the end of the power cable.
Making OT Terminals by Using a Wire Stripper (Recommended)
-48V DC power cable-48V DC power wire
GND wireShielding layer
OT terminals
Determine lengths of power cables for differentoperations according to the scales on the inner side
of the cover plate of the cabling cavity.
Based on the determined length, remove the jacket
and shielding layer from the power cable.
Add an OT terminal to each wire.
Strip a 15 mm jacket off the power cable to reveal
the shielding layer of the power cable.
Remove the jacket from each wire.
The assembling of OT terminals to the power cable
must be complete before the BTS3900E is installed
on a metal pole.
Appendix
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 47/5446
Making OT terminals at the input end of the power cable by using a knife as follows:
Appendix
1 2 3
4 5 6
7 8 9
10 11 12
Do not damage theshielding layer of the
power cable when
cutting the jacket.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 48/5447
Pin Assignment for the Wires of the Alarm Cable
Binding Waterproof Labelsc
Attach waterproof labels to corresponding cables.
The default position for attaching a waterproof label is 2
cm away from the connector. In special scenarios, the
label can be attached at another position to avoid abend of a cable or a position where installation is
difficult. Generally speaking, all the waterproof labels
should be attached neatly and consistently.
Waterproof label
Cable tie
One end of a
cable with aconnector
Both ends of a cable near connectors should be
attached with waterproof labels, and the silkscreen on
the label should be in consistent with the corresponding
cable. For details, see the left figure.
Appendix
Silkscreen on the
Waterproof Label Cable
PWR Power cable
SFP Signal cable for
combined
BTS3900Es
ALM Alarm cable
E1 E1 cable
FE FE cable
ANTA RF jumper
ANTB
GND PGND cable
Mapping of waterproof labels and cables
Wire Type LabelWire Color WireDB15 Connector
GNDX1.8
X1.3
Twisted pair X1.1
X1.6 GND
SWITCH_H1
X1.2
X1.7 GND
SWITCH_H2
SWITCH_H3
X1.9
X1.4
GND
SWITCH_H4
X1.11
X1.12
PSU485 TX-
PSU485 TX+
X1.13
X1.14
PSU485 RX-
PSU485 RX+
White
Blue
White
Orange
White
Green
White
Brown
Blue
Red
Orange
Red
Twisted pair
Twisted pair
Twisted pair
Twisted pair
Twisted pair
X2.1
X2.3
X2.5
X2.7
X2.6
X2.2
X2.4
X2.8
X2.9
X2.10
X2.11
X2.12
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 49/5448
Pin Assignment for E1 Cablee
Pin of the DB9 female
connector
Wire type Coaxial Series
NO.
Signal Description
X1.1 Tip 2 R0 -
X1.2 Ring -
X1.3 Tip 4 R1 -
X1.4 Ring -
X1.6 Tip 1 T0 -
X1.7 Ring Start X1.Shell
X1.8 Tip 3 T1 -
X1.9 Ring Start X1.Shell
75-ohm E1 cable:
Pin of the DB9 female
connector
Color Wire type Signal Label
X1.1 White Twisted pair R0 R0+
X1.2 Orange R0-
X1.3 White Twisted pair R1 R1+
X1.4 Brown R1-
X1.6 White Twisted pair T0 T0+
X1.7 Blue T0-
X1.8 White Twisted pair T1 T1+
X1.9 Green T1-
120-ohm E1 cable:
Appendix
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 50/5449
Appendix
After the corrugated pipe is installed, wrap both ends of thepower cable with waterproof tapes by referring to the following
figure.
Wrap the joint spirally upward, downward, and then upward
again. That is, the joint is wrapped by three layers of the tape.
Ensure that two adjacent layers overlap with each other abouthalf the width of the tape.
f Installing the corrugated pipes of AC power cable
Power
system
Connector for
corrugated pipes
Corrugated pipesCorrugated pipes
Waterproof tapes
Appendix
g Appearance of the Cables Installed in the BTS3900E
Transmission device
Alarm device
External power supply system
1. Appearance of the BTS3900E installed
on the wall
Cascaded SFP cables
Cascaded optical fiber
Main cabinet
Extension cabinet
When the spacing between the main
cabinet and the extension cabinet is less than
2 m, the cascaded SFP cable should be used.If the spacing between the main cabinet and
the extension cabinet is within the range from
2 m to 10 m, the cascaded optical fiber
should be used.
Bending radius of the cables should meet
the specifications.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 51/5450
Appendix
g Appearance of the Cables Installed in the BTS3900E
2. Installing the BTS3900E on the pole 3. Installing the BTS3900E on the H-Shaped
Stand
Power cable RF jumper
PGND cable
Alarm CableTransmission cable
Cascaded signal cable
Uplink cable : RF jumper
Downlink cable:Power cablePGND cable
Alarm Cable
Transmission cable
Cascaded signal
cable
A certain distance
should be
reserved between
the AC power cable and other
cables.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 52/5451
Selecting the installation position of the grounding clip and stripping off thecable sheath with electric knife without any damage to the shielding layer.
Fixing the grounding clip and waterproofing it.
The angle resulting from the grounding wire of the clip and the cable should
not be larger than 15 degrees. When the cable is vertically routed, thegrounding wire of the clip should be led downwards.
Appendix
h Installing the Grounding Clip
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 53/5452
Change History
This describes the changes in the BTS3900E Installation Guide.
06 (2011-05-10)
This is the sixth commercial release.
Compared with issue 05 (2010-05-15):
1. This document is optimized in diagrams.2. The mounting and grounding requirements of the DC BTS3900E is added.
3. The description of grounding points of the cables of the BTS39000E mounted 15 m to 50 m high is deleted.
05 (2010-05-15)
This is the fifth commercial release.
Compared with issue 04 (2010-01-15):
1. The description of grounding points of the cables of the BTS39000E mounted 15 m to 50 m high is added.
2. The description of installing the grounding clip is added.
04 (2010-01-15)
This is the fourth commercial release.
Compared with issue 03 (2009-07-30):
1. The installation description of cables between the PS4890/APM30H (ver.B)/Power2000 and the BTS3900E is
added.
2. The installation description of the matching antennas of the BTS3900E is added.
03 (2009-07-30)
This is the third commercial release.
Compared with issue 02 (2009-05-06):
1. The graphic of the AC surge protection box is updated.
2. The graphic for the installation of the cables in typical scenario is added.
02 (2009-05-06)
This is the second commercial release.
Compared with issue 01 (2009-04-07), this document is optimized in diagrams.
01 (2009-04-07)
This is the first commercial release.
7/15/2019 BTS3900E GSM Installation Guide-(V300R008&R009_06)
http://slidepdf.com/reader/full/bts3900e-gsm-installation-guide-v300r008r00906 54/54
HUAWEI TECHNOLOGIES CO LTD