BTS3900A (Ver.C)Quick Installation
Issue: 01Date: 2011-04-30
HUAWEI TECHNOLOGIES CO., LTD.
Guide
This document is applicable to GSM V100 or V300, SRAN V1In this document, the equipment appearance is for reference o
the figures.
Appearance of the Cabinets
APM30H TMC11H RFC
The main components of the BTS3900A are thIBBS200D, IBBS200T, and TMC11H.
Cabinet Dimensions and Clearance Re
The dimensions (W x H x D) of the APM30H, RFC, TMCIBBS200T (excluding the protecting hood for the TEC coomm x 480 mm.
The recommended distance between the cabinets is 40distance between the cabinets is 150 mmdistance between the cabinets is 150 mm.
If the Noise Reduction Module (NRM) is installed, the dcabinets is 150 mm.
480m>300mm
40mm
Cabinet
600mm 40mm600mm
Cabinet
Overview of the Cabinets
>800mm
Maximum 120°
APM30H
BBUR
RFC
R R R R REPU
Overview of the Cabinets
Fan boxJunction box
PMUSLPU
Ground-ing bar
DCDU-11A
1
BBU FU
FU
FU
FU
FU
FU
Ground-ing bar
g ba
00, and WCDMA V200.only. The actual equipment may differ from what is shown in
C IBBS200D IBBS200T
he APM30H and the RFC. Optional components are the
TEC l h d (D h 206 )
equirements
TEC cooler hood (Depth: 206 mm)
C11H, IBBS200D, or oler) are 600 mm x 700
0 mm, and the maximum
600mm480mm
istance between the 700mm
700mm
mm >300mm
>60mm600mmm
Cabinet
700mm
200mm
TMC11H (-48 V DC power supply)TMC11H
Junction box
DCDU-11CBBU
SLPU
Junction box
DCDU-11C
1Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.
Grounding barGround-ing bar
IBBS200D
Power
Overview of the Cabinets
CMUE
Power distribution box
Power box of the heating filmGrounding bar
Installing the BaseThe installation blocks are placed in the auxiliarymaterial package of the RFC.
Φ16
52-60 mm90°
Φ16
Base
Expansion
Flat washSpring waM12x60 B
Concrete plinth
Installing the Cabinets
Concrete plinth
Expansiontube
Remplat
1 Attaching the Cabinet to the BaseInstalling the Cabinets
2. TMC1. RFC
M12x30 Bolt (×2)
Gasketan oblohole
2
IBBS200T
Power
CMUE
Power distribution box
Grounding bar
Level bar
y
M12x40
Install two installation blocks on the base before installing only the RFC.
Remove the baffle plates from the both sides and the rear of the base.
Bolt (×2)Expansion bolt (x4)
n
herasher Bolt
Adjusting pad
n
move the front cover te from the base.
C11H/IBBS200T/IBBS200DBy attaching the IBBS200D as an example, attaching the TMC11H or the IBBS200T to the base is the same.
M12×30 Bolt(×4)
t with ong
Gasket with an oblong hole
2
2 Stacking the CabinetsRemove the (x4) from thecabinet.
Remove the cover plates (×2) from the top of the lower cabinet.
To ensure the waterprof the cabinet, keep wplates for the round ho
Earth Grounding the CabinePrinciples for grounding the BTS3900A:
Cover plate
The upper cabinets are connected to the lower cabinets with equipotential cables.
The lower cabinets are connected to the RFCs.The RFCs are connected to the grounding
busbar with PGND cables.
the BTS3900A:
APM
R
3
PGND cable (25 mm2)Equipotential cable (25 mm2)
plastic screws e top of the lower
Stack the cabinets, and attach the cabinets with the bolts(×4).
G k t ithGasket with an oblong hole
M12x30
roof performance well the cover ole of the cabinet.
Gasket with an oblong
etsThe PGND cable and signal cable cannot be bound or entangled. A certain distance must be reserved between them to prevent interference from each other
M12x30 Blot (x4)
an oblong hole
interference from each other.
Grounding bar
APM30HM30H
RFCRFC
3
Grounding busbar
Installing the Cables
In this section, the color of the cables and the equipment appeIf the signal cable between the cabinets is redundant coil and
1 Connecting the Power CablesaPrinciples for routing the power cables
1 The -48 V power cable and PGND cable must be b
2 The power cable must be separately bundled and
If the signal cable between the cabinets is redundant, coil and
-48 V DC Power Supply Scenarioa
p p yMultiple power cables must be bundled when route
3 If the length of the power cable is insufficient, replajoints to lengthen the cable.
If the TMC11H (-48 V DC power supply) is required, then it is thethe next.
Connect the input power cable for the RFC.
4
earance are for reference only. d tie the extra length of the cable in the base
bundled together.
cannot be bundled together with other cables anywhere.
d tie the extra length of the cable in the base.
g yed.
ace the cable rather than adding connectors or soldering
e -48 V DC power supply scenario. if not, skip this section to
4
1 Connecting the Power CablesAC Power Supply Scenariob
1. Connect the input power cable for the APMRemove the AC protecting cap, open the AC input pow
Recover the AC protecting cap, close the AC input pow220 V three-phase AC mode 220 V single-phas
L1 wire
Remove
L2 wire L3 wire N wire
2. Connect the power cables between the AP2. Connect the power cables between the APInput power cable for the TMC11H
5
M30H Connect the APM30H AC input power cable.wer box.
110 V AC modewer box.
se AC mode
L wire PE wire N wire L2 wire L1 wire
N wire PE wire
M30H and the TMC11HM30H and the TMC11H Power cable for the junction box in the TMC11H
5
1 Connecting the Power CablesAC Power Supply Scenario
3. Connect the power cable between the APM(APM:IBBS=1:2)
b
(APM:IBBS=1:2)
This chapter is applicable to the scenario where the number of configured APM30Hs is half that of configured IBBS200Ds or IBBS200Ts.
Power cables for the IBBS200Ds or IBBS200Ts
IBBS200Ts.Either the IBBS200D or
the IBBS200T is installed.
Power cables for the fans in the IBBS200Ds
6
M30H and IBBS200D or IBBS200T
6
1 Connecting the Power CablesAC Power Supply Scenario
3. Connect the power cable between the APM(APM:IBBS=1:2)
b
Power cables for the heating filmsin the IBBS200Ds
Prevent the wires from exposing out of the power box of the heating film
(APM:IBBS=1:2)
From L2/N2
The power box of the heating film
of the heating film.
Must route the power cables
From L1/N1
pfor the heating films in the IBBS200Ds into the power box of the heating film from the top down.
The power
FrLO
Power cables for the TECs in the IBBS200Ts
pbox of the heating film
FrLO
7
M30H and IBBS200D or IBBS200T
rom OAD3
rom OAD2
7
1 Connecting the Power CablesAC Power Supply Scenario
4. Connect the power cable between the APM(APM:IBBS=1:1)
b
This chapter is applicable to the scenario where the number of configured APM30Hs equals that of configured IBBS200Ds or IBBS200Ts
(APM:IBBS=1:1)
Power cables for the IBBS200Ds or IBBS200Ts
IBBS200Ts.Either the IBBS200D or
the IBBS200T is installed.
Power cables for the fans in the IBBS200Ds
8
M30H and IBBS200D or IBBS200T
8
1 Connecting the Power CablesAC Power Supply Scenario
4. Connect the power cable between the APM(APM:IBBS=1:1)
b
Power cables for the heating films in the IBBS200Ds
Prevent the wires from exposing out of the power box of the heating film.
(APM:IBBS=1:1)
The power box of the heating film
g
Must route the power cables for the heating films in the IBBS200Ds into the power box of the heating film from the top down.
The power box of the heating film
Power cables for the TECs in the IBBS200Ts
9
M30H and IBBS200D or IBBS200T
9
2 Connecting the Transmission CablesPrinciples for routing the transmission cables
1 The transmission cables cannot cross the power cablthe spacing between them must be greater than 30 m
2 Extra length of transmission cables must be reserved
The E1/T1 cable or FE/GE cable can be used for data transmission acctransmission mode can be supported by the base station working in thebase station working in the UMTS standard.
SLPU
UELP
Connecting the E1 Cable (Alternative 1)a
Or
UELP
Connecting the FE Cable (Alternative 2)b
Ensure that both ends of the E1 cablebare wires at one end of the E1 cable
SLPU
UFLP
Connecting the FE Cable (Alternative 2)b
O
BBU
1
s
e, PGND cable, or RF cable when routed. Otherwise, mm.
d when they are curved.
cording to the transmission mode of the base station. Only one GSM standard, and two transmission modes can be supported by the
UELP
SLPU
UELP
e are disconnected. Then, weld all connectors to the e at one time.
UFLP
SLPU
Or
WMPT
0
3 Installing the Monitoring Signal Cable-48 V DC Power Supply Scenariosa
1. Scheme 1: TMC11H + 2 RFC
The installation procedure for connecting the monitoring signal cable to the IBBS200D
1. Scheme 1:APM30H + RFC + TMC11H + IBAC Power Supply Scenariosb
or IBBS200T is the same. The only difference is that the position of the CMUA in the IBBS200D differs from the position of the CMUA in the IBBS200T.
IBBD200T
CMUE
I
1
e
2. Scheme 2: 2 TMC11H + 2 RFC
BBS200D (IBBS200T)
IBBD200D
CMUE
1
3 Installing the Monitoring Signal CableAC Power Supply Scenariosb
2. Scheme 2:2 APM30H + 2 RFC + 2 IBBS20
UEIU
3. Scheme 3:APM30H + RFC + TMC11H +2 IB
1
e
00D (IBBS200T)
BBS200D (IBBS200T)
2
3 Installing the Monitoring Signal CableAC Power Supply Scenariosb
4. Scheme 4:2 APM30H + 2 RFC + TMC11H +
4 Connect the RFU Cables1. (Optional) Connect inter-RFU RF signal ca
RFU
RX_INRX_OUT
Inter-RFU RF signal cable
5 A
4. Connect the RF jumper.
During the installation, do not rotate the DIN male elbow connector. This prevents any damage to the connector.
5. A6. I
Rubb
OrInter-RFU RF signal
1
Tighte
cable
e
+ 4 IBBS200D (IBBS200T)
ble. 2. Add the DIN connectors to the RF jumpers.
3. Route the RF jumper through the base into the RFC.
For details, see the instruction guide contained in the DIN connector package.
Ensure that the DIN male elbow connector is perpendicular to the RFU.
Front RFC RFCor
Attach the color rings see “Appendix 2”Attach the color rings, see Appendix 2 .Install the seal modules for the RF jumpers.
ber cap OrRF Jumper
Install the seal modules.
3
Insert the metal chip,
en the screw.
1 D i ti f th S l M d l
Sealing TreatmentRecover the cable holes with protecting caps
RFC1 Description of the Seal Modules
TMC1
The seal modules for the cable holes in the IBBSIt is not necessary to install the seal modules in It is not necessary to install the seal modules in IBBS200T is stacked on the other IBBS200D or
2 Sealing the Cable Holes in the CabineInstall the cable according to the size of the modules in RFC as an example).
id
1
idwcaTighten
the screw.
or covers which are removed from the equipments before.
C
1H
S200D or the IBBS200T are the same as that in the TMC11H.the TMC11H, when the TMC11H is stacked on the RFC.the IBBS200D or IBBS200T, when the IBBS200D or IBBS200T.
et with the Seal Modules
Lead the cable through the cable hole that matches the cross-sectional area of the cable in order that the sealing is
cable hole (The following takes the seal
Seal the dle holes
effective.
4
dle holes with rubber aps
3 Sealing the Base2. Seal the fireproof cl
PVC
1. Close the cable holes on both sides and at the rear of the base.
Baffle plate corrugated pipe
B ffl
Baffle plate
1 Installing the BatteriesInstalling the Batteries
Baffle plate Fireproof clayBaffle piece
During the installation of the batteries, use insulated tools such as wrenches and screwdrivers, and do not reversely connect the positive and negative poles Otherwise the batteries may burn
Before installing storage batteries, set the circuit breaker labeled BAT on the EPU in the APM30H cabinet and two circuit breakers labeled BAT on the PDB in the battery cabinet to OFF. This prevents high current.
APM30H IBBS200D/T
negative poles. Otherwise, the batteries may burn, and the operations may cause human injuries.
2 Installing the Power Cables for the B
Remove the protecting hood.
1
Install the neg
cable holes with ay.
3. Install the front panel on the front of the base.
FireproofFireproof clay
Check whether the paint on the cabinet surface is damaged. If the paint is damaged, repair the damaged paint.The PVC corrugated pipe is recommended for the cable led out of the cabinet.The fireproof clay can be used
Fireproof clayto seal the cable holes of the base. It cannot be used to seal the cable holes of the cabinet.
Push the baffle plate upwards until it is contact with the screws, and then
atteries
tighten the screws.
Install the copper bar for series connections.
5
gative cable. Install the positive cable.
Checking the Power-on Sta
This chapter describes only the power-on check of the equip
Start
This takes the power-on check procedure in the AC power suas an example. For details about the procedure in the DC powescenario, see the following procedure.
Ensure that the external power supply is normal before poweall the MCBs in the cabinet are set to OFF.
base station must be powered on in seven days after installatio
Are the LEDs on the PSU/PMU
normal?
Power on the BTS3900A Clear the fault
No
Yes
Is the voltage of the EPU DC output
power normal?
Are the LEDs on the CMUE
No
No
Yes
Yes
normal?
Are the LEDs on the BBU
normal?
No
Yes
Yes
Power on DCDU Clear the fault
Is the voltage of the DCDU DC output power
normal?
Yes
No
Are the LEDs on the CMUE (RFC)
normal?
Are the LEDs on the RFU
Yes
No
No
DCD
1
normal?
Yes
End
teThe normal status of the indicators on the PMU:
RUN indicator: Blinkingpment. The ALM indicator: OFF
The normal status of the indicators on the PSU:
Power indicator: Steady greenProtection indicator: OFFFault indicator: OFF
The normal voltage range of the output power to the EPUis from:
-43.2 V DC to -57 V DCThe normal status of the
upply scenario er supply
er on, and that
on.
The normal status of the indicators on the CMUE:
RUN indicator: BlinkingALM indicator: OFF
The normal status of the indicators on the boards of the BBU:Indicators on the GTMU and WMPT
RUN indicator: BlinkinggALM indicator:ON for 1s and
then OFFIndicators on the UPEU
RUN indicator: ONIndicators on the FAN
STATE indicator: BlinkingThe normal voltage range of the DC output power to the DCDU-01 is from:
38 4 V DC t 57 V DC-38.4 V DC to -57 V DCThe normal status of the indicators on the RFU:
RUN indicator: BlinkingALM indicator: ON for 1s and then
OFFACT indicator: ON
After the power-on check is complete, close the cover of the case, and the cabinet door.
LockPSUPMU
CMUE
BBU
Tighten the screw to fix the locking
Locking piece
CMUE(RFC)
BBU
DU-11A
6
gpiece to prevent the lock from rusting.
RFU
Appendix1 Disconnecting the CPRI Cable from t
Push
P d t 2Product 1
Pull
Product 2Product 1
P
Push
2 Attaching the Color Rings
Product 4 Product 5
Pull
System Sector
System 1 1 Main antenna: two red rings
If main and diversity are not distinguished, the RF signals tranby default, and the RF signals transmitted from the right RF unit
If an antenna system serves six sectors, the colors of the ringsrespectively.
Diversity antenna: one red ring
2 Main antenna: two yellow rings
Diversity antenna: one yellow rin
3 Main antenna: two blue rings
Diversity antenna: one blue ringDiversity antenna: one blue ring
System 2 1 Main antenna: one white ring an
Diversity antenna: one white rin
2 Main antenna: one white ring an
Diversity antenna: one white rin
1
3 Main antenna: one white ring an
Diversity antenna: one white rin
the CPRI Port
Pull
Push Push
P d t 3
Pull
Product 3
Pull
Push
Color Ring
nsmitted from the left RF unit are regarded as the main signals are regarded as the diversity signals. s for sectors 4, 5, and 6 are purple, orange, and green
ng
gg
nd two red rings
g and one red ring
nd two yellow rings
g and one yellow ring
7
nd two blue rings
g and one blue ring
3 Replacing the Fuse
1. Remove the extraction tool.
2. Obtain the fuse from the case.
Fuse
Reby ext
I t
1
Insert
3. Replace the fuse by using the p y gextraction tool.
EPU
Align the bulge on the
Fuse
extraction tool with the hole on the fuse
emove the fuse using the traction tool
t f
8
t a new fuse
4 Pin Assignment for the Wires of the E1. Pin assignments for the wires of the 75-ohm E1 coaxial cable
21
X1 Wi T C i l SNX1 Wire Type Coaxial SN Label
1 Tip1 RX1
2 Ring
3 Tip3 RX2
4 Ring
5 Tip5 RX35 RX3
6 Ring
7 Tip7 RX4
8 Ring
19 Tip2 TX1
20 Ring
21 Tip21 Tip4 TX2
22 Ring
23 Tip6 TX3
24 Ring
25 Tip8 TX4
26 Ring
HU
1
E1 Cable
O / hitBlue/white
2. Pin assignments for the wires of the 120-ohm E1 twisted pair cable
X1 Wi C l Wi T
Green/whiteBrown/whiteGray/whiteBlue/redOrange/redGreen/red
Orange/white
X1 Wire Color Wire Type Label
1 BlueTwisted pair RX1
2 White
3 OrangeTwisted pair RX2
4 White
5 GreenT i t d i RX3Twisted pair RX3
6 White
7 BrownTwisted pair RX4
8 White
19 GrayTwisted pair TX1
20 White
21 Blue21 BlueTwisted pair TX2
22 Red
23 OrangeTwisted pair TX3
24 Red
25 GreenTwisted pair TX4
26 Red
UAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang
Sh h 518129
9
Shenzhen 518129People’s Republic of China
www.huawei.com