20
BTS3900A (Ver.C) Quick Installation Issue: 01 Date: 2011-04-30 HUAWEI TECHNOLOGIES CO., LTD. Guide

Bts3900a Ver.c Installation Guide

Embed Size (px)

Citation preview

Page 1: Bts3900a Ver.c Installation Guide

BTS3900A (Ver.C)Quick Installation

Issue: 01Date: 2011-04-30

HUAWEI TECHNOLOGIES CO., LTD.

Guide

Page 2: Bts3900a Ver.c Installation Guide

This document is applicable to GSM V100 or V300, SRAN V1In this document, the equipment appearance is for reference o

the figures.

Appearance of the Cabinets

APM30H TMC11H RFC

The main components of the BTS3900A are thIBBS200D, IBBS200T, and TMC11H.

Cabinet Dimensions and Clearance Re

The dimensions (W x H x D) of the APM30H, RFC, TMCIBBS200T (excluding the protecting hood for the TEC coomm x 480 mm.

The recommended distance between the cabinets is 40distance between the cabinets is 150 mmdistance between the cabinets is 150 mm.

If the Noise Reduction Module (NRM) is installed, the dcabinets is 150 mm.

480m>300mm

40mm

Cabinet

600mm 40mm600mm

Cabinet

Overview of the Cabinets

>800mm

Maximum 120°

APM30H

BBUR

RFC

R R R R REPU

Overview of the Cabinets

Fan boxJunction box

PMUSLPU

Ground-ing bar

DCDU-11A

1

BBU FU

FU

FU

FU

FU

FU

Ground-ing bar

g ba

00, and WCDMA V200.only. The actual equipment may differ from what is shown in

C IBBS200D IBBS200T

he APM30H and the RFC. Optional components are the

TEC l h d (D h 206 )

equirements

TEC cooler hood (Depth: 206 mm)

C11H, IBBS200D, or oler) are 600 mm x 700

0 mm, and the maximum

600mm480mm

istance between the 700mm

700mm

mm >300mm

>60mm600mmm

Cabinet

700mm

200mm

TMC11H (-48 V DC power supply)TMC11H

Junction box

DCDU-11CBBU

SLPU

Junction box

DCDU-11C

1Copyright © Huawei Technologies Co., Ltd. 2011. All rights reserved.

Grounding barGround-ing bar

Page 3: Bts3900a Ver.c Installation Guide

IBBS200D

Power

Overview of the Cabinets

CMUE

Power distribution box

Power box of the heating filmGrounding bar

Installing the BaseThe installation blocks are placed in the auxiliarymaterial package of the RFC.

Φ16

52-60 mm90°

Φ16

Base

Expansion

Flat washSpring waM12x60 B

Concrete plinth

Installing the Cabinets

Concrete plinth

Expansiontube

Remplat

1 Attaching the Cabinet to the BaseInstalling the Cabinets

2. TMC1. RFC

M12x30 Bolt (×2)

Gasketan oblohole

2

IBBS200T

Power

CMUE

Power distribution box

Grounding bar

Level bar

y

M12x40

Install two installation blocks on the base before installing only the RFC.

Remove the baffle plates from the both sides and the rear of the base.

Bolt (×2)Expansion bolt (x4)

n

herasher Bolt

Adjusting pad

n

move the front cover te from the base.

C11H/IBBS200T/IBBS200DBy attaching the IBBS200D as an example, attaching the TMC11H or the IBBS200T to the base is the same.

M12×30 Bolt(×4)

t with ong

Gasket with an oblong hole

2

Page 4: Bts3900a Ver.c Installation Guide

2 Stacking the CabinetsRemove the (x4) from thecabinet.

Remove the cover plates (×2) from the top of the lower cabinet.

To ensure the waterprof the cabinet, keep wplates for the round ho

Earth Grounding the CabinePrinciples for grounding the BTS3900A:

Cover plate

The upper cabinets are connected to the lower cabinets with equipotential cables.

The lower cabinets are connected to the RFCs.The RFCs are connected to the grounding

busbar with PGND cables.

the BTS3900A:

APM

R

3

PGND cable (25 mm2)Equipotential cable (25 mm2)

plastic screws e top of the lower

Stack the cabinets, and attach the cabinets with the bolts(×4).

G k t ithGasket with an oblong hole

M12x30

roof performance well the cover ole of the cabinet.

Gasket with an oblong

etsThe PGND cable and signal cable cannot be bound or entangled. A certain distance must be reserved between them to prevent interference from each other

M12x30 Blot (x4)

an oblong hole

interference from each other.

Grounding bar

APM30HM30H

RFCRFC

3

Grounding busbar

Page 5: Bts3900a Ver.c Installation Guide

Installing the Cables

In this section, the color of the cables and the equipment appeIf the signal cable between the cabinets is redundant coil and

1 Connecting the Power CablesaPrinciples for routing the power cables

1 The -48 V power cable and PGND cable must be b

2 The power cable must be separately bundled and

If the signal cable between the cabinets is redundant, coil and

-48 V DC Power Supply Scenarioa

p p yMultiple power cables must be bundled when route

3 If the length of the power cable is insufficient, replajoints to lengthen the cable.

If the TMC11H (-48 V DC power supply) is required, then it is thethe next.

Connect the input power cable for the RFC.

4

earance are for reference only. d tie the extra length of the cable in the base

bundled together.

cannot be bundled together with other cables anywhere.

d tie the extra length of the cable in the base.

g yed.

ace the cable rather than adding connectors or soldering

e -48 V DC power supply scenario. if not, skip this section to

4

Page 6: Bts3900a Ver.c Installation Guide

1 Connecting the Power CablesAC Power Supply Scenariob

1. Connect the input power cable for the APMRemove the AC protecting cap, open the AC input pow

Recover the AC protecting cap, close the AC input pow220 V three-phase AC mode 220 V single-phas

L1 wire

Remove

L2 wire L3 wire N wire

2. Connect the power cables between the AP2. Connect the power cables between the APInput power cable for the TMC11H

5

M30H Connect the APM30H AC input power cable.wer box.

110 V AC modewer box.

se AC mode

L wire PE wire N wire L2 wire L1 wire

N wire PE wire

M30H and the TMC11HM30H and the TMC11H Power cable for the junction box in the TMC11H

5

Page 7: Bts3900a Ver.c Installation Guide

1 Connecting the Power CablesAC Power Supply Scenario

3. Connect the power cable between the APM(APM:IBBS=1:2)

b

(APM:IBBS=1:2)

This chapter is applicable to the scenario where the number of configured APM30Hs is half that of configured IBBS200Ds or IBBS200Ts.

Power cables for the IBBS200Ds or IBBS200Ts

IBBS200Ts.Either the IBBS200D or

the IBBS200T is installed.

Power cables for the fans in the IBBS200Ds

6

M30H and IBBS200D or IBBS200T

6

Page 8: Bts3900a Ver.c Installation Guide

1 Connecting the Power CablesAC Power Supply Scenario

3. Connect the power cable between the APM(APM:IBBS=1:2)

b

Power cables for the heating filmsin the IBBS200Ds

Prevent the wires from exposing out of the power box of the heating film

(APM:IBBS=1:2)

From L2/N2

The power box of the heating film

of the heating film.

Must route the power cables

From L1/N1

pfor the heating films in the IBBS200Ds into the power box of the heating film from the top down.

The power

FrLO

Power cables for the TECs in the IBBS200Ts

pbox of the heating film

FrLO

7

M30H and IBBS200D or IBBS200T

rom OAD3

rom OAD2

7

Page 9: Bts3900a Ver.c Installation Guide

1 Connecting the Power CablesAC Power Supply Scenario

4. Connect the power cable between the APM(APM:IBBS=1:1)

b

This chapter is applicable to the scenario where the number of configured APM30Hs equals that of configured IBBS200Ds or IBBS200Ts

(APM:IBBS=1:1)

Power cables for the IBBS200Ds or IBBS200Ts

IBBS200Ts.Either the IBBS200D or

the IBBS200T is installed.

Power cables for the fans in the IBBS200Ds

8

M30H and IBBS200D or IBBS200T

8

Page 10: Bts3900a Ver.c Installation Guide

1 Connecting the Power CablesAC Power Supply Scenario

4. Connect the power cable between the APM(APM:IBBS=1:1)

b

Power cables for the heating films in the IBBS200Ds

Prevent the wires from exposing out of the power box of the heating film.

(APM:IBBS=1:1)

The power box of the heating film

g

Must route the power cables for the heating films in the IBBS200Ds into the power box of the heating film from the top down.

The power box of the heating film

Power cables for the TECs in the IBBS200Ts

9

M30H and IBBS200D or IBBS200T

9

Page 11: Bts3900a Ver.c Installation Guide

2 Connecting the Transmission CablesPrinciples for routing the transmission cables

1 The transmission cables cannot cross the power cablthe spacing between them must be greater than 30 m

2 Extra length of transmission cables must be reserved

The E1/T1 cable or FE/GE cable can be used for data transmission acctransmission mode can be supported by the base station working in thebase station working in the UMTS standard.

SLPU

UELP

Connecting the E1 Cable (Alternative 1)a

Or

UELP

Connecting the FE Cable (Alternative 2)b

Ensure that both ends of the E1 cablebare wires at one end of the E1 cable

SLPU

UFLP

Connecting the FE Cable (Alternative 2)b

O

BBU

1

s

e, PGND cable, or RF cable when routed. Otherwise, mm.

d when they are curved.

cording to the transmission mode of the base station. Only one GSM standard, and two transmission modes can be supported by the

UELP

SLPU

UELP

e are disconnected. Then, weld all connectors to the e at one time.

UFLP

SLPU

Or

WMPT

0

Page 12: Bts3900a Ver.c Installation Guide

3 Installing the Monitoring Signal Cable-48 V DC Power Supply Scenariosa

1. Scheme 1: TMC11H + 2 RFC

The installation procedure for connecting the monitoring signal cable to the IBBS200D

1. Scheme 1:APM30H + RFC + TMC11H + IBAC Power Supply Scenariosb

or IBBS200T is the same. The only difference is that the position of the CMUA in the IBBS200D differs from the position of the CMUA in the IBBS200T.

IBBD200T

CMUE

I

1

e

2. Scheme 2: 2 TMC11H + 2 RFC

BBS200D (IBBS200T)

IBBD200D

CMUE

1

Page 13: Bts3900a Ver.c Installation Guide

3 Installing the Monitoring Signal CableAC Power Supply Scenariosb

2. Scheme 2:2 APM30H + 2 RFC + 2 IBBS20

UEIU

3. Scheme 3:APM30H + RFC + TMC11H +2 IB

1

e

00D (IBBS200T)

BBS200D (IBBS200T)

2

Page 14: Bts3900a Ver.c Installation Guide

3 Installing the Monitoring Signal CableAC Power Supply Scenariosb

4. Scheme 4:2 APM30H + 2 RFC + TMC11H +

4 Connect the RFU Cables1. (Optional) Connect inter-RFU RF signal ca

RFU

RX_INRX_OUT

Inter-RFU RF signal cable

5 A

4. Connect the RF jumper.

During the installation, do not rotate the DIN male elbow connector. This prevents any damage to the connector.

5. A6. I

Rubb

OrInter-RFU RF signal

1

Tighte

cable

e

+ 4 IBBS200D (IBBS200T)

ble. 2. Add the DIN connectors to the RF jumpers.

3. Route the RF jumper through the base into the RFC.

For details, see the instruction guide contained in the DIN connector package.

Ensure that the DIN male elbow connector is perpendicular to the RFU.

Front RFC RFCor

Attach the color rings see “Appendix 2”Attach the color rings, see Appendix 2 .Install the seal modules for the RF jumpers.

ber cap OrRF Jumper

Install the seal modules.

3

Insert the metal chip,

en the screw.

Page 15: Bts3900a Ver.c Installation Guide

1 D i ti f th S l M d l

Sealing TreatmentRecover the cable holes with protecting caps

RFC1 Description of the Seal Modules

TMC1

The seal modules for the cable holes in the IBBSIt is not necessary to install the seal modules in It is not necessary to install the seal modules in IBBS200T is stacked on the other IBBS200D or

2 Sealing the Cable Holes in the CabineInstall the cable according to the size of the modules in RFC as an example).

id

1

idwcaTighten

the screw.

or covers which are removed from the equipments before.

C

1H

S200D or the IBBS200T are the same as that in the TMC11H.the TMC11H, when the TMC11H is stacked on the RFC.the IBBS200D or IBBS200T, when the IBBS200D or IBBS200T.

et with the Seal Modules

Lead the cable through the cable hole that matches the cross-sectional area of the cable in order that the sealing is

cable hole (The following takes the seal

Seal the dle holes

effective.

4

dle holes with rubber aps

Page 16: Bts3900a Ver.c Installation Guide

3 Sealing the Base2. Seal the fireproof cl

PVC

1. Close the cable holes on both sides and at the rear of the base.

Baffle plate corrugated pipe

B ffl

Baffle plate

1 Installing the BatteriesInstalling the Batteries

Baffle plate Fireproof clayBaffle piece

During the installation of the batteries, use insulated tools such as wrenches and screwdrivers, and do not reversely connect the positive and negative poles Otherwise the batteries may burn

Before installing storage batteries, set the circuit breaker labeled BAT on the EPU in the APM30H cabinet and two circuit breakers labeled BAT on the PDB in the battery cabinet to OFF. This prevents high current.

APM30H IBBS200D/T

negative poles. Otherwise, the batteries may burn, and the operations may cause human injuries.

2 Installing the Power Cables for the B

Remove the protecting hood.

1

Install the neg

cable holes with ay.

3. Install the front panel on the front of the base.

FireproofFireproof clay

Check whether the paint on the cabinet surface is damaged. If the paint is damaged, repair the damaged paint.The PVC corrugated pipe is recommended for the cable led out of the cabinet.The fireproof clay can be used

Fireproof clayto seal the cable holes of the base. It cannot be used to seal the cable holes of the cabinet.

Push the baffle plate upwards until it is contact with the screws, and then

atteries

tighten the screws.

Install the copper bar for series connections.

5

gative cable. Install the positive cable.

Page 17: Bts3900a Ver.c Installation Guide

Checking the Power-on Sta

This chapter describes only the power-on check of the equip

Start

This takes the power-on check procedure in the AC power suas an example. For details about the procedure in the DC powescenario, see the following procedure.

Ensure that the external power supply is normal before poweall the MCBs in the cabinet are set to OFF.

base station must be powered on in seven days after installatio

Are the LEDs on the PSU/PMU

normal?

Power on the BTS3900A Clear the fault

No

Yes

Is the voltage of the EPU DC output

power normal?

Are the LEDs on the CMUE

No

No

Yes

Yes

normal?

Are the LEDs on the BBU

normal?

No

Yes

Yes

Power on DCDU Clear the fault

Is the voltage of the DCDU DC output power

normal?

Yes

No

Are the LEDs on the CMUE (RFC)

normal?

Are the LEDs on the RFU

Yes

No

No

DCD

1

normal?

Yes

End

teThe normal status of the indicators on the PMU:

RUN indicator: Blinkingpment. The ALM indicator: OFF

The normal status of the indicators on the PSU:

Power indicator: Steady greenProtection indicator: OFFFault indicator: OFF

The normal voltage range of the output power to the EPUis from:

-43.2 V DC to -57 V DCThe normal status of the

upply scenario er supply

er on, and that

on.

The normal status of the indicators on the CMUE:

RUN indicator: BlinkingALM indicator: OFF

The normal status of the indicators on the boards of the BBU:Indicators on the GTMU and WMPT

RUN indicator: BlinkinggALM indicator:ON for 1s and

then OFFIndicators on the UPEU

RUN indicator: ONIndicators on the FAN

STATE indicator: BlinkingThe normal voltage range of the DC output power to the DCDU-01 is from:

38 4 V DC t 57 V DC-38.4 V DC to -57 V DCThe normal status of the indicators on the RFU:

RUN indicator: BlinkingALM indicator: ON for 1s and then

OFFACT indicator: ON

After the power-on check is complete, close the cover of the case, and the cabinet door.

LockPSUPMU

CMUE

BBU

Tighten the screw to fix the locking

Locking piece

CMUE(RFC)

BBU

DU-11A

6

gpiece to prevent the lock from rusting.

RFU

Page 18: Bts3900a Ver.c Installation Guide

Appendix1 Disconnecting the CPRI Cable from t

Push

P d t 2Product 1

Pull

Product 2Product 1

P

Push

2 Attaching the Color Rings

Product 4 Product 5

Pull

System Sector

System 1 1 Main antenna: two red rings

If main and diversity are not distinguished, the RF signals tranby default, and the RF signals transmitted from the right RF unit

If an antenna system serves six sectors, the colors of the ringsrespectively.

Diversity antenna: one red ring

2 Main antenna: two yellow rings

Diversity antenna: one yellow rin

3 Main antenna: two blue rings

Diversity antenna: one blue ringDiversity antenna: one blue ring

System 2 1 Main antenna: one white ring an

Diversity antenna: one white rin

2 Main antenna: one white ring an

Diversity antenna: one white rin

1

3 Main antenna: one white ring an

Diversity antenna: one white rin

the CPRI Port

Pull

Push Push

P d t 3

Pull

Product 3

Pull

Push

Color Ring

nsmitted from the left RF unit are regarded as the main signals are regarded as the diversity signals. s for sectors 4, 5, and 6 are purple, orange, and green

ng

gg

nd two red rings

g and one red ring

nd two yellow rings

g and one yellow ring

7

nd two blue rings

g and one blue ring

Page 19: Bts3900a Ver.c Installation Guide

3 Replacing the Fuse

1. Remove the extraction tool.

2. Obtain the fuse from the case.

Fuse

Reby ext

I t

1

Insert

3. Replace the fuse by using the p y gextraction tool.

EPU

Align the bulge on the

Fuse

extraction tool with the hole on the fuse

emove the fuse using the traction tool

t f

8

t a new fuse

Page 20: Bts3900a Ver.c Installation Guide

4 Pin Assignment for the Wires of the E1. Pin assignments for the wires of the 75-ohm E1 coaxial cable

21

X1 Wi T C i l SNX1 Wire Type Coaxial SN Label

1 Tip1 RX1

2 Ring

3 Tip3 RX2

4 Ring

5 Tip5 RX35 RX3

6 Ring

7 Tip7 RX4

8 Ring

19 Tip2 TX1

20 Ring

21 Tip21 Tip4 TX2

22 Ring

23 Tip6 TX3

24 Ring

25 Tip8 TX4

26 Ring

HU

1

E1 Cable

O / hitBlue/white

2. Pin assignments for the wires of the 120-ohm E1 twisted pair cable

X1 Wi C l Wi T

Green/whiteBrown/whiteGray/whiteBlue/redOrange/redGreen/red

Orange/white

X1 Wire Color Wire Type Label

1 BlueTwisted pair RX1

2 White

3 OrangeTwisted pair RX2

4 White

5 GreenT i t d i RX3Twisted pair RX3

6 White

7 BrownTwisted pair RX4

8 White

19 GrayTwisted pair TX1

20 White

21 Blue21 BlueTwisted pair TX2

22 Red

23 OrangeTwisted pair TX3

24 Red

25 GreenTwisted pair TX4

26 Red

UAWEI TECHNOLOGIES CO., LTD.Huawei Industrial Base Bantian Longgang

Sh h 518129

9

Shenzhen 518129People’s Republic of China

www.huawei.com