16
THE LINK Volume 15 Issue 1 July 2017 Note from the President 2 Paulson Slide 3 Children’s Hospital 4 Nanoose Bay Drain 5 Kelly #2 Bridge 5 Quesnel Windstorm 6 Snow Slide Area 12 6 Community Support 7 New Employees 8 New Arrivals 8 Retirements 9 Training 10 Camp Creek Bridge 11 Emcon Ontario 12 Crushing 13 Bridges 14 Alaska Highway 15 Safety Note 16 Inside this issue: We are pleased that the City of Timmins , Ontario has awarded the winter maintenance contract for the arterial roads to Emcon Services Inc. This four year, plus two year extension contract conƟnues our growth into the Ontario market . We look forward to starƟng this new contract in October of this year. CongratulaƟons to our team for their eorts to date! Breaking New Ground In Ontario! Timmins, Ontario Breaking ground for our new shop building on ScoƩ Street in Dryden, Ontario! On July 6, 2017 we started our new shop build. July 9, 2017 we were seƫng up the forms for the pour.

Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

  

 

THE LINK

Volume 15 Issue 1 

July 2017 

 

Note from the President 2

Paulson Slide 3

Children’s Hospital 4

Nanoose Bay Drain 5

Kelly #2 Bridge 5

Quesnel Windstorm 6

Snow Slide Area 12 6

Community Support 7

New Employees 8

New Arrivals 8

Retirements 9

Training 10

Camp Creek Bridge 11

Emcon Ontario 12

Crushing 13

Bridges 14

Alaska Highway 15

Safety Note 16

Inside this issue:

We are pleased  that  the City of Timmins  , Ontario has awarded  the winter maintenance contract  for  the arterial roads  to Emcon Services  Inc. This  four year, plus two year extension contract con nues our growth into the Ontario market . We look forward to star ng this new contract in October of this year. Congratula ons to  our team for their efforts to date! 

Breaking New Ground In Ontario!

Timmins, Ontario

Breaking ground for our new shop building 

on Sco  Street  in Dryden, Ontario! On July 

6, 2017 we started our new shop build. July 

9,  2017 we were  se ng up  the  forms  for 

the pour. 

Page 2: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

A Note From the President Frank Rizzardo 

 

What a challenging  me we are in . As I write this memo in BC we are surrounded by the largest fire evacua on on record , with some 14,000 residents 

being impacted to surrounding communi es of Prince George and Kamloops (this may grow by 10,000 if the town of Williams lake is evacuated ). 

 

As to our ac vi es in BC, we have been concentra ng on the Nego a ons with our Union the BCGEU to secure agreements to ensure that successorship 

is carried into the next round of RFP contracts expected to start early this fall .This will allow a level playing field to all bidders . To date we have success‐

fully nego ated four of the agreements with areas 2 and 3  being ra fied and areas 9 and 12 going for votes the week of July 19th. Our area 18 nego a‐

ons were set aside due to the fires in the central interior and the difficulty of travel, as well as the possible risk to employees residences .  

 

We are ac vely busy on several tender fronts , with posi ve results in our Arterial Maintenance contract in Timmins, Ontario .We are also fortunate to 

be preferred contractor in the Sudbury Area maintenance contract with the MTO in Ontario that will start September 2018 . We par cipated on a re‐

sponse to a RFQ on a 25 Year Design Build Operate Finance and maintain contract in the Government of the Northwest Territories.  . Our team is also 

bidding on the 930Km tender of the Alaska Highway put out by the  Public Works and Government Access Canada. We have had members a end at the 

Niagara and Hamilton Contract areas to ascertain the possibility of bidding the two highly urban  areas . All this while our ac vi es con nue to strength‐

en our opera ons base in Dryden with our new building which saw the foo ngs poured during the week of July 9.  

 

In our Dryden contracts we have successfully transi oned from some subcontracted ac vi es to  in house,   providing much needed summer hours to 

staff . We have consistently posted pictures of our ac vi es on our Facebook site . We have a trainer in Ontario from BC on our crushing opera on . We 

are progressing with mowing and brushing ac vi es as well as our shoulder maintenance and asphalt patching . We are doing a lot of basic training to 

ensure safe opera on of our crews for summer programs . We will be con nuing in the fall with the training of winter ac vi es , like opera ng the Tow 

plow and B train equipment . We con nue to put more emphasis on yard and building maintenance , elimina ng hazards at every turn. There is no rea‐

son why our yards cannot be safe places to work for our staff. Hopefully this theme is growing at our sites and housekeeping is heightened to the point 

where we do not have to have a regular splurge and it is part of the daily rou ne . 

 

Our efforts at con nued improvement con nue with the introduc on of an improved asphalt repair product imported from the UK . Tes ng and possi‐

ble sales are ongoing . Anything we can do to improve reliability of our patches is a plus for both our company and the province as the owner . 

 

We con nue  to  look  for employee candidates  for our growing organiza on  , we encourage you  to  take  the opportunity when offered and meet  the 

varied challenges  that are out  there  . We need quality people at all  levels  in  the company  .Should you have a  referral or are  interested  in an open‐

ing  please contact or pass the name along to our  HR staff . 

 

I cannot end without asking all our staff to remember the challenges of the displaced fire residents , there will be a lot of people needing assistance and I 

know we can help . The Floren ne seniors residence in Merri  that we are connected to has accommodated 36 seniors from the Ashcro  and 100 Mile 

areas as an example . We are in the background in Quesnel providing traffic control and offering up water hauling capacity . (Rock creek and Grand Forks 

fires are brought to mind ) .  

Page 3: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

Paulson Slide

Paulson road slide in Grand Forks. Crews  working  to  build  back  up from  below  the  road  way!  Our crews combined with quality sub‐contractors did an excellent job! 

Paulson Slide Completion

Our  Grand  Forks  team 

worked really hard and got 

the  Paulson  Slide  all  fixed 

up!  Road  is  looking  really 

good  now.  Good  job  to 

everyone  for  your  hard 

work! 

Page 4: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

Emcon  did  it’s  annual  BC  Children’s  Hospital  fund‐raiser's. Every area raised money by hos ng a BBQ, having  a  bake  sale  and  some  by  simply  asking  for dona ons.  We  raised  $2500.00,  which  Frank  will match! So our grand total is $5000.00! 

All our areas together 

raised  $2500.00! 

Some of the raffle prizes from Emcon Corporates 

BBQ. 

The  beau ful Unicorn  cake was made  by  Fallon 

Fosbery   and  the Rainbow  ski les  jar was made 

by Vicki Geier! 

The  Cumberland  admin  staff  with  help  from  other 

crews and their families held a bake sale every Monday 

for a month.  

Page 5: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

Nanoose Bay Drain

  

Area 9 Kelly #2 Bridge

  

 

 

A small spring along Powder Point Road  in Nanoose Bay  in Area 2 has 

been a bit of a problem for a few years, in that water was con nuously 

pumping  through  the  road making a wet and some mes  icy spot.   To 

try and resolve the issue, a French drain was installed.  Here are some 

photos of the crews installing that drain. 

Area 9 started off  the season with a bridge replacement at Kelly 2. This 

bridge  is  located  in  Fruitvale,  on Webster  Road.  The  crew was  able  to 

complete  the project one week ahead of  the scheduled date. The users 

now have a much more dependable crossing of  the creek  involved. We 

did a similar bridge last fall which we were able to complete early as well. 

Page 6: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

Quesnel Windstorm  

On May 4, 2017 15km   south of Revelstoke on airport way . Snow slide came down the Greenslide avalanche chute. 

Area 12

 

Crews in the Quesnel area were busy cleaning up 

tree debris from the May 23rd, 2017 windstorm. 

“ Looks like winter took a last swipe at our morale” 

Page 7: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

Emcon Supporting the Community

CURE Foundation On May 16, 2017 our areas par cipated 

in the CURE founda ons Na onal Denim 

Day! With a suggested dona on of $5.00 

a person we raised  $588.00! 

Thank you to everyone who par cipated! 

Page 8: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

JR Financial Analyst 

           Corporate   

Tyler Rigby

Admin—Ontario 

Ali  Boyko

 

Job Cos ng 

  SA 9   

Pheigh Newton

New Arrivals!

Two  members  of  our  Emcon team welcomed grandsons! 

Le :    Rick  wright’s  grandson Wya   Richard  Krogstad. Weighing in at 10.2 lbs.! 

 

Right:  AEL’s  Mike  Davison’s grandson  Michael  Chase La er. 

Congratula ons to the parents and Rick and Mike! 

Welcome! Say Hello to Some New Names at Emcon

Benny Espesor—AP—SA 9        Darla Duguid—Admin—SA 18 

Doug Durham—JR Road Sup—Ontario    Danny LeCain—JR Road Sup—SA 2 

Admin—Alaska Highway 

Laani Trei

Page 9: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

A er a long term career of service with Emcon, Holly has re red from the Grand Forks Office. 

Holly began her career with Emcon in 1999, and over the past 18 years  she has played a key role in the day to day success of the Grand Forks division. 

We want to thank Holly for her many years with us and wish her the best on what re rement brings for her! 

Retirement Announcement!

Mike Mintz elected  to  re re at  the end of 

April this year. 

Mike began his career with Emcon as a Divi‐

sion Office Manager  in  Service  Area  13  in 

1993    and  a er  a  brief  exit  came  back  to 

the company as a Financial Analyst. In 1997 

Mike accepted the role of Division Manager  

for  Service Area 11. Mike  then  came back 

to  the Corporate Office as Senior Financial 

Analyst  un l  2003,  when  he  agreed  to 

move  to Parksville  as Opera ons Manager 

for Service Area 2. Mike then  succeeded in 

to  the Division Manager’s    role  for Service 

Area 2 and 3. 

We want to thank Mike for his many years 

of dedicated  service  and   wish him  all  the 

best in re rement! 

 

Page 10: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

10 

Training  

 

 

Ryan Shaw, Leigh Hale, Daryl Williams  

Chainsaw training in District of West Kelowna 

Pierre presen ng  Will Westwood with his Heavy Duty 

Mechanic Trades Appren ceship  cer ficate  in Grand 

Forks.  

Mike Davidson put on a few traffic 

control  courses  over  the  last  few 

months.  This  is  from  one  of  the 

courses in Golden. 

Emcon is always looking for possible employees to 

join our group. If you know of someone pass their 

name on or recommend that they contact us. 

Page 11: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

11 

 

 

 

Area 12 Camp Creek Bridge

  

June 8th 2017 started out with the standard forecast from Environment Canada predic ng thunder showers  later  in the a ernoon for the Revel‐

stoke and surroundings areas. At approximately 5 pm, Gabriel Nava Lander started  to  receive  reports of water and debris on  the highway,  just 

West of Victor Lake (13km West of Revelstoke on the Trans‐Canada Highway). Gabe proceeded to the site and found the creek had increased flow 

and had compromised the culvert, causing water and debris to flow onto the Highway. The decision was made to bring  in some help. Gabe re‐

ceived another call that there was water and debris on the road down by Greenslide, approximately 12 km south of Revelstoke. Equipment was on 

scene within the hour to deal with the plugged culverts.  

   

We  had thought the situa ons were under control un l a passing motorist advised Gabe that there was water star ng to flow across the Highway 

at Camp Creek Bridge. A patrol was dispatched and found the creek, with the con nuing heavy rainfall  in the area, had decided to bring a huge 

amount of debris down from the upper slopes and had plugged the underside of the Camp Creek Bridge. The obstruc on under the Bridge caused 

the creek to run over the Highway, crea ng a hazard and pu ng the traveling public at risk. With close consulta on with the MOTI Area Manager, 

it was decided to close the Trans‐Canada Highway west of Revelstoke.  

 

Calls were being placed to local contractors to supply equipment to assist in opening of the Highway. Thank you to Speers Construc on, Sure Haul 

Transport, Kootenay Gradall, Kepex Trucking, Silver p Avia on and   Revelstoke Equipment Rental for their  immediate response to supply equip‐

ment and manpower. 

 

The commitment and work done by our own employees was outstanding. There were many involved right from the beginning to the ongoing re‐

build of the creek bed with rip rap. We cannot forget the administra on staff in the Revelstoke office (Joy, Jessica and Lee Ann) for taking care of 

the paper work and the tracking of all the costs that are associated with such an event. Also the mechanical staff in Revelstoke was on the money 

when tasked with ge ng equipment serviced and ready for the massive cleanup that was required. 

 

Let’s hope Mother Nature is kind to us for the rest of freshet season and we transi on into the summer months with ease. 

Page 12: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

12 

 

Emcon Ontario  

 

Recently  Emcon  par cipated  in  the  Ear Falls Family Safety Night. The Ontario staff had an excellent display of equipment and promoted  Emcon  in  the  community  in general. 

Members of the Ontario 

Crew  take part in boom 

truck training with their 

sign truck. 

Page 13: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

13 

 

Crushing Crews Keep Busy

 

 

 

Crushing crew  

Dale, Taylor, 

Jeremy, Kayla 

Crushing crew 

Jordan, Seamus, Aidan, Dean 

Crushing crew returning on 

the Revelstoke ferry. 

 

Crew all set up at Weldon Pit 

Wells B.C. 

Crushing has started in the Dryden, Ontario area, 

producing 9.5 mm spec winter sand.  

 

Page 14: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

14 

Crews  in  Area  9  responded  to  emergency  work    on  the 

weekend of May 5‐7, 2017. Water was a  raging  torrent of 

water that brought  large trees and debris down the rivers. 

At Carmi, there were over 100 trees stuck on the piers from 

bank to bank. 

We  spent  several hours on  the City of Grand Forks Bridge 

with the same scenario, large trees against bridge piers. We 

managed  to  release 90% of  this one un l dark  took over. 

Crews  returned  the  next  morning  to  complete  the  job. 

 

The Mid Island Bridge Crew repaired 

one of the concrete corner posts at 

French Creek Bridge on Highway 19A . 

The damage was done by a recent 

motor vehicle incident. 

 

The Mid  Island Bridge Crew, along with MOTI 

and  McLehanney  Engineering  department, 

performed  an  inspec on  on  #  0436  French 

Creek Bridge   on Highway19A.   The crew was 

on  site performing miscellaneous  repairs and 

detailed  inspec on of  the 70 year old bridge.       

 

Bridge Crews

Page 15: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

15 

Alaska Highway

Our Alaska Hwy crews have been busy  stocking up their sheds with sand for our winter opera ons. 

 

 

Summer opera ons are in full swing on the Alaska Highway ! Seal  coa ng  or  bituminous  surface  treatment.  At  Bolugie Creek Hill in the Fort Nelson contact area.  

Page 16: Breaking New Ground In Ontario! - emconservices.ca 2017 Newsletter.pdf · 2017-12-08 · 2 A Note From the President Frank Rizzardo What a challenging me we are in . As I write this

16 

Road & Bridge Maintenance Contractors 

105—1121 McFarlane Way  Merri , BC V1K 1B9 

Phone : 250‐378‐4176   Fax: 250‐378‐4106 

www.emconservices.ca