FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP ProgramType: BRIDGE PROGRAM DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $ FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - BRIDGE U22060333000 ENG 1 KANAWHA 9/5/2019 2020 CHELYAN-MONTGOMERY DESIGN REPT OP IMP $1,410,000 $360,000 S3065210100 ENG 2 CABELL 9/26/2019 2020 JAMES RIVER RD O/P REPLACE SUPERSTRUCTURE $795,000 $636,000 S3241300100 CON 10 MCDOWELL 10/21/2019 2020 GARY BRIDGE REPLACE BRIDGE $1,666,674 $1,333,339 S320606303800 CON 1 KANAWHA 10/23/2019 2020 35TH ST BR SE CONCRETE REPAIR $548,329 $438,663 S320606200000 CON 1 KANAWHA 10/23/2019 2020 36TH ST BR SE CONCRETE REPAIR $694,064 $555,251 U3506417500 CON 2 WAYNE 10/23/2019 2020 BROAD HOLLOW O/P BR EB & WB (AUTH REPLACE SUPERSTRUCTURE $6,399,581 $0 S32064575400 ENG 1 KANAWHA 11/27/2019 2020 CARTER BR - BROOKS ST I/C CLEAN & PAINT $10,000 $9,000 S317791289200 ENG 4 HARRISON 11/27/2019 2020 HORNER RUN OP BR NB SB CLEAN & PAINT $100,000 $9,000 S328460155700 ENG 10 MERCER 11/27/2019 2020 LANCE CRPL JUSTON THACKER CLEAN & PAINT $10,000 $8,000 S33035135900 ROW 2 MINGO 11/27/2019 2020 THE BAISDEN FAMILY MEMORIAL BRIDGE REPLACE BRIDGE $240,000 $192,000 S32810419300 CON 10 MERCER 12/11/2019 2020 BRICK STREET BRIDGE REPLACE SUPERSTRUCTURE $2,795,149 $2,236,119 S3066000200 ENG 2 CABELL 12/11/2019 2020 COL JUSTICE CHAMBERS BR REPLACE BRIDGE $1,051,875 $841,500 S310CMA2000 CON 9 FAYETTE 12/11/2019 2020 NEW RIVER GORGE BR APPLY CMA $183,120 $146,496 U3506417500 ROW 2 WAYNE 12/28/2019 2020 BROAD HOLLOW O/P BR EB & WB REPLACE SUPERSTRUCTURE $10,000 $9,000 S33035205100 CON 2 MINGO 1/15/2020 2020 JACOB/ELLEN VANCE MEM BR REPLACE BRIDGE $2,322,936 $1,858,349 S3241663000 CON 10 MCDOWELL 1/15/2020 2020 NEWHALL BR REPLACE BRIDGE $720,594 $576,475 S3028130000 CON 5 BERKELEY 1/16/2020 2020 MILL CREEK O/P NB & SB REPLACE BRIDGE $4,591,829 $4,132,646 T60652700200 ENG 2 CABELL 1/28/2020 2020 ROBERT C BYRD BR BRIDGE INSPECTION & GUSSET PLA $1,025,000 $560,000 T6192722100 ENG 5 JEFFERSON 2/28/2020 2020 BLOOMERY ROAD TUNNEL 6 YR INSPECTI 6YR BR INSPECTION $500,000 $400,000 S31360413500 ENG 9 GREENBRIER 2/28/2020 2020 CLIFFORD FAMILY MEMORIAL BR REPLACE BRIDGE $400,000 $320,000 T64064437900 ENG 1 PUTNAM 2/28/2020 2020 DONALD LEGG MEMORIAL BR 6YR BR INSPECTION $650,000 $585,000 T62064575000 ENG 1 KANAWHA 2/28/2020 2020 EUGENE A. CARTER MEMORIAL BRIDGE 6YR BR INSPECTION $900,000 $810,000 T6357004200 ENG 6 OHIO 2/28/2020 2020 FORT HENRY BRIDGE 6YR BR INSPECTION $750,000 $675,000 S3084600100 ENG 1 CLAY 2/28/2020 2020 JC CRUIKSHANK MEMORIAL BR REPLACE BRIDGE $500,000 $400,000 T652700300 ENG 6 WETZEL 2/28/2020 2020 KOREAN WAR VETERANS BR 6YR BR INSPECTION $625,000 $500,000 S344291304400 ENG 3 ROANE 2/28/2020 2020 OSBORNE MILLS BRIDGE REPLACE BRIDGE $200,000 $160,000 T65461800100 ENG 3 WOOD 2/28/2020 2020 PARKERSBURG - BELPRE BR 6YR BR INSPECTION $700,000 $560,000 T6231086500 ENG 2 LOGAN 2/28/2020 2020 SFC TERRANCE N GENTRY MEMORIAL B 6YR BR INSPECTION $550,000 $440,000 T6199135300 ENG 5 JEFFERSON 2/28/2020 2020 SHENANDOAH RIVER BR 6YR BR INSPECTION $550,000 $440,000 T63547000200 ENG 6 OHIO 2/28/2020 2020 VIETNAM VETERANS MEMORIAL BR 6 YR BR INSP $550,000 $495,000 S30652720000 CON 2 CABELL 3/28/2020 2020 5TH ST RITTER PARK +1 (8TH ST BR) REPLACE BRIDGES $5,500,000 $4,400,000 S30103647500 ENG 7 BARBOUR 3/28/2020 2020 CARROLLTON COVERED BRIDGE BRIDGE REPAIR $170,000 $136,000 A399E222000 CON 99 STATEWIDE 3/28/2020 2020 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $1,250,000 $1,000,000 A399E222000 CON 99 STATEWIDE 3/28/2020 2020 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $1,250,000 $1,000,000 A399E282000 CON 99 STATEWIDE 3/28/2020 2020 CAT 8A MAJOR C & P (NHS) MAJOR C & P $4,062,500 $3,187,500 A399E282000 CON 99 STATEWIDE 3/28/2020 2020 CAT 8A MAJOR C & P (STP) MAJOR C & P $1,562,500 $1,250,000 S33828199000 ROW 8 POCAHONTAS 3/28/2020 2020 GREENBANK BRIDGE REPLACE BRIDGE $380,000 $304,000 T60664174600 ENG 2 CABELL 3/28/2020 2020 GUYANDOTTE RIV O/P 6YR BR INSPECTION $750,000 $675,000 3/10/2020 Page 1 of 44 - PROJECT DELIVERY UNIT (Breakdown by GROUP)

Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - BRIDGE

U22060333000ENG1 KANAWHA 9/5/2019 2020 CHELYAN-MONTGOMERY DESIGN REPT OP IMP $1,410,000$360,000S3065210100ENG2 CABELL 9/26/2019 2020 JAMES RIVER RD O/P REPLACE SUPERSTRUCTURE $795,000$636,000S3241300100CON10 MCDOWELL 10/21/2019 2020 GARY BRIDGE REPLACE BRIDGE $1,666,674$1,333,339

S320606303800CON1 KANAWHA 10/23/2019 2020 35TH ST BR SE CONCRETE REPAIR $548,329$438,663S320606200000CON1 KANAWHA 10/23/2019 2020 36TH ST BR SE CONCRETE REPAIR $694,064$555,251U3506417500CON2 WAYNE 10/23/2019 2020 BROAD HOLLOW O/P BR EB & WB (AUTH REPLACE SUPERSTRUCTURE $6,399,581$0S32064575400ENG1 KANAWHA 11/27/2019 2020 CARTER BR - BROOKS ST I/C CLEAN & PAINT $10,000$9,000

S317791289200ENG4 HARRISON 11/27/2019 2020 HORNER RUN OP BR NB SB CLEAN & PAINT $100,000$9,000S328460155700ENG10 MERCER 11/27/2019 2020 LANCE CRPL JUSTON THACKER CLEAN & PAINT $10,000$8,000S33035135900ROW2 MINGO 11/27/2019 2020 THE BAISDEN FAMILY MEMORIAL BRIDGE REPLACE BRIDGE $240,000$192,000S32810419300CON10 MERCER 12/11/2019 2020 BRICK STREET BRIDGE REPLACE SUPERSTRUCTURE $2,795,149$2,236,119S3066000200ENG2 CABELL 12/11/2019 2020 COL JUSTICE CHAMBERS BR REPLACE BRIDGE $1,051,875$841,500S310CMA2000CON9 FAYETTE 12/11/2019 2020 NEW RIVER GORGE BR APPLY CMA $183,120$146,496U3506417500ROW2 WAYNE 12/28/2019 2020 BROAD HOLLOW O/P BR EB & WB REPLACE SUPERSTRUCTURE $10,000$9,000S33035205100CON2 MINGO 1/15/2020 2020 JACOB/ELLEN VANCE MEM BR REPLACE BRIDGE $2,322,936$1,858,349S3241663000CON10 MCDOWELL 1/15/2020 2020 NEWHALL BR REPLACE BRIDGE $720,594$576,475S3028130000CON5 BERKELEY 1/16/2020 2020 MILL CREEK O/P NB & SB REPLACE BRIDGE $4,591,829$4,132,646T60652700200ENG2 CABELL 1/28/2020 2020 ROBERT C BYRD BR BRIDGE INSPECTION & GUSSET PLA $1,025,000$560,000T6192722100ENG5 JEFFERSON 2/28/2020 2020 BLOOMERY ROAD TUNNEL 6 YR INSPECTI 6YR BR INSPECTION $500,000$400,000

S31360413500ENG9 GREENBRIER 2/28/2020 2020 CLIFFORD FAMILY MEMORIAL BR REPLACE BRIDGE $400,000$320,000T64064437900ENG1 PUTNAM 2/28/2020 2020 DONALD LEGG MEMORIAL BR 6YR BR INSPECTION $650,000$585,000T62064575000ENG1 KANAWHA 2/28/2020 2020 EUGENE A. CARTER MEMORIAL BRIDGE 6YR BR INSPECTION $900,000$810,000T6357004200ENG6 OHIO 2/28/2020 2020 FORT HENRY BRIDGE 6YR BR INSPECTION $750,000$675,000S3084600100ENG1 CLAY 2/28/2020 2020 JC CRUIKSHANK MEMORIAL BR REPLACE BRIDGE $500,000$400,000T652700300ENG6 WETZEL 2/28/2020 2020 KOREAN WAR VETERANS BR 6YR BR INSPECTION $625,000$500,000

S344291304400ENG3 ROANE 2/28/2020 2020 OSBORNE MILLS BRIDGE REPLACE BRIDGE $200,000$160,000T65461800100ENG3 WOOD 2/28/2020 2020 PARKERSBURG - BELPRE BR 6YR BR INSPECTION $700,000$560,000T6231086500ENG2 LOGAN 2/28/2020 2020 SFC TERRANCE N GENTRY MEMORIAL B 6YR BR INSPECTION $550,000$440,000T6199135300ENG5 JEFFERSON 2/28/2020 2020 SHENANDOAH RIVER BR 6YR BR INSPECTION $550,000$440,000T63547000200ENG6 OHIO 2/28/2020 2020 VIETNAM VETERANS MEMORIAL BR 6 YR BR INSP $550,000$495,000S30652720000CON2 CABELL 3/28/2020 2020 5TH ST RITTER PARK +1 (8TH ST BR) REPLACE BRIDGES $5,500,000$4,400,000S30103647500ENG7 BARBOUR 3/28/2020 2020 CARROLLTON COVERED BRIDGE BRIDGE REPAIR $170,000$136,000A399E222000CON99 STATEWIDE 3/28/2020 2020 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $1,250,000$1,000,000A399E222000CON99 STATEWIDE 3/28/2020 2020 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $1,250,000$1,000,000A399E282000CON99 STATEWIDE 3/28/2020 2020 CAT 8A MAJOR C & P (NHS) MAJOR C & P $4,062,500$3,187,500A399E282000CON99 STATEWIDE 3/28/2020 2020 CAT 8A MAJOR C & P (STP) MAJOR C & P $1,562,500$1,250,000S33828199000ROW8 POCAHONTAS 3/28/2020 2020 GREENBANK BRIDGE REPLACE BRIDGE $380,000$304,000T60664174600ENG2 CABELL 3/28/2020 2020 GUYANDOTTE RIV O/P 6YR BR INSPECTION $750,000$675,000

3/10/2020 Page 1 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 2: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPT63780700200ENG3 PLEASANTS 3/28/2020 2020 HI CARPENTER BR 6YR BR INSPECTION $812,820$480,000U30532316400CON6 BROOKE 3/28/2020 2020 LONG RUN BRIDGE REPLACE BRIDGE $1,200,000$960,000S325791320800CON4 MARION 3/28/2020 2020 MIDDLETOWN MALL OP BR MB CLEAN & PAINT $967,458$870,712S325791320800ENG4 MARION 3/28/2020 2020 MIDDLETOWN MALL OP BR MB CLEAN & PAINT $10,000$9,000T617505900100ENG4 HARRISON 3/28/2020 2020 NORTHVIEW OVERPASS HISTORICAL REPORT/MAPPING SUR $52,000$41,600S34371302400ROW3 RITCHIE 3/28/2020 2020 OTTERSLIDE TRUSS BR DEMO BRIDGE DEMO $1,000$800S3558540900ENG10 WYOMING 3/28/2020 2020 RALSTON BRANCH BR #2 REPLACE BRIDGE $80,000$64,000S33035135900ENG2 MINGO 3/28/2020 2020 THE BAISDEN FAMILY MEMORIAL BRIDGE REPLACE BRIDGE $250,000$200,000T6357008700ENG6 OHIO 3/28/2020 2020 WHEELING TUNNEL EB/WB 6YR BR INSPECTION $1,400,000$1,260,000T6183300200ENG3 JACKSON 3/28/2020 2020 WILLIAM S RITCHIE JR BR 6YR BR INSPECTION $1,040,000$560,000

S35516289700CON10 WYOMING 4/28/2020 2020 ALLEN JUNCTION ARCH BR REPLACE BRIDGE $1,390,000$1,112,000S3192700300CON5 JEFFERSON 4/28/2020 2020 BAKERTON RD BR REPLACE BR 28X46 DS EX LOC $1,250,000$1,000,000S33540131900CON6 OHIO 4/28/2020 2020 BEAR ROCK BR REPLACE BRIDGE $825,000$660,000S33035166500CON2 MINGO 4/28/2020 2020 BREEDEN TUNNEL BRIDGE REPLACE BRIDGE $1,575,000$1,260,000S324765800CON10 MCDOWELL 4/28/2020 2020 DAVY ARCH BRIDGE REPLACE BRIDGE $1,200,000$960,000

S3223743600CON2 LINCOLN 4/28/2020 2020 EAST FORK OF FOURTEEN MILE CR BR REPLACE BRIDGE $1,000,000$800,000S33540000400CON6 OHIO 4/28/2020 2020 ELBY'S BR O/L LMC OVERLAY $600,000$480,000S3314524200CON4 MONONGALIA 4/28/2020 2020 EVERETTVILLE BR REPLACE BRIDGE $500,000$400,000

U321FOURT100CON7 LEWIS 4/28/2020 2020 FOURTH STREET BEAM REPLACE BRIDGE $600,000$480,000S33828199000CON8 POCAHONTAS 4/28/2020 2020 GREENBANK BRIDGE REPLACE BRIDGE $3,800,000$3,040,000S32011466100CON1 KANAWHA 4/28/2020 2020 JERRY ALAN JONES MEM BR O/L CONCRETE O/L $1,100,000$880,000

S328460155700CON10 MERCER 4/28/2020 2020 LANCE CRPL JUSTON THACKER CLEAN & PAINT $895,000$716,000S341307700CON10 RALEIGH 4/28/2020 2020 MARSH FORK BR REN BR $5,000,000$4,000,000

S3555000400CON10 WYOMING 4/28/2020 2020 MILAM ARCH BR REPLACE BRIDGE $1,189,233$951,387S324118600ROW10 MCDOWELL 4/28/2020 2020 MOHAWK ARCH REPLACE BRIDGE $142,500$114,000

S331192505500CON4 MONONGALIA 4/28/2020 2020 MORRIS BUILDERS BR +1 REPLACE BRIDGE $1,125,000$900,000S342219379200CON8 RANDOLPH 4/28/2020 2020 NEWLONS BR O/L +1 CONCRETE O/L $435,000$348,000

S323545200CON2 LOGAN 4/28/2020 2020 NORTH SHEGON BRIDGE REPLACE BRIDGE $570,000$456,000S3363354800CON8 PENDLETON 4/28/2020 2020 ONEGO BRIDGE REPLACE BRIDGE $2,500,000$2,000,000S3441374200CON3 ROANE 4/28/2020 2020 POCA RIVER TRUSS REPLACE BRIDGE $2,350,000$1,880,000S3125061300CON5 GRANT 4/28/2020 2020 STONY RIVER TRUSS BR REPLACE BRIDGE $4,000,000$3,200,000S320961900CON1 KANAWHA 4/28/2020 2020 TORNADO BR O/L LMC OVERLAY $300,000$240,000S316701500CON5 HARDY 4/28/2020 2020 TRUMBO FORD BR +1 REPLACE BRIDGE $4,538,000$3,630,400

S3281950400CON10 MERCER 4/28/2020 2020 WAR VETERANS OF MERCER CO CLEAN & PAINT $3,591,000$2,872,800S32081709500CON1 KANAWHA 4/28/2020 2020 WV 817 DRAINAGE REPLACE DRAINAGE $250,000$200,000U31021418000ROW9 FAYETTE 5/28/2020 2020 2ND AVE BRIDGE CONST NEW BRIDGE $5,000$4,000

S324712800CON10 MCDOWELL 5/28/2020 2020 BIG SANDY TRUSS BR REPLACE BRIDGE $2,975,000$2,380,000S326525601100CON6 MARSHALL 5/28/2020 2020 FOSTORIA AVE BRIDGE REPLACE BRIDGE $860,000$688,000S3084600100ROW1 CLAY 5/28/2020 2020 JC CRUIKSHANK MEMORIAL BR REPLACE BRIDGE $200,000$160,000S33628240700CON8 PENDLETON 5/28/2020 2020 MOUTH OF SENECA BR REPLACE BRIDGE $3,500,000$2,800,000S3183312500CON3 JACKSON 5/28/2020 2020 US ARMY CPL DAVID MICHAEL HOPKINS CONCRETE O/L $900,000$720,000S3281950400ENG10 MERCER 5/28/2020 2020 WAR VETEREANS OF MERCER CO CLEAN & PAINT $10,000$8,000

3/10/2020 Page 2 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 3: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS34347126100CON3 RITCHIE 6/28/2020 2020 BEATRICE BRIDGE REPLACE BRIDGE $1,500,000$1,200,000S30103647500CON7 BARBOUR 6/28/2020 2020 CARROLLTON COVERED BRIDGE BRIDGE REPAIR $1,000,000$800,000S32064575400ROW1 KANAWHA 6/28/2020 2020 CARTER BR-BROOKS ST I/C C&P CLEAN & PAINT $75,000$67,500

S313601463900CON9 GREENBRIER 6/28/2020 2020 HARTS RUN BR O/L +1 CONCRETE O/L $275,000$220,000S33968180500CON4 PRESTON 6/28/2020 2020 LAUREL RUN BR EB O/L +1 CONCRETE O/L $1,215,000$972,000S32064575400ROW1 KANAWHA 7/28/2020 2020 CARTER BR - BROOKS ST I/C CLEAN & PAINT $75,000$67,500S34225017200CON8 RANDOLPH 7/28/2020 2020 CHEAT BRIDGE REPLACE BRIDGE $1,500,000$1,200,000S34371302400ENG3 RITCHIE 7/28/2020 2020 OTTERSLIDE TRUSS BR DEMO BRIDGE DEMO $75,000$60,000S324753200ENG10 MCDOWELL 7/28/2020 2020 TWIN BRANCH TRUSS NO 2 (TPK BOND) REPLACE BRIDGE $700,000$560,000

S34215113400ROW8 RANDOLPH 7/28/2020 2020 VALLEY HEAD T-BEAM REPLACE BRIDGE $525,000$420,000S3231192604200CON2 LOGAN 8/28/2020 2020 MOUNT GAY DECK ARCH REPLACE BRIDGE $1,500,000$1,200,000S3231192603300CON2 LOGAN 8/28/2020 2020 NORTH WHITES ADDITION REPLACE BRIDGE $840,000$672,000S33035135900CON2 MINGO 8/28/2020 2020 THE BAISDEN FAMILY MEMORIAL BRIDGE REPLACE BRIDGE $1,600,000$1,280,000S324753200ROW10 MCDOWELL 8/28/2020 2020 TWIN BRANCH TRUSS NO 2 (TPK BOND) REPLACE BRIDGE $332,800$268,240

S3354066500CON6 OHIO 9/28/2020 2020 MONUMENT PLACE BR RENOVATE BRIDGE $5,200,000$4,160,000S317791289200CON4 HARRISON 4/28/2021 2020 HORNER RUN OP BR NB SB CLEAN & PAINT $506,000$455,400

$89,028,677 $118,281,962TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BOND PROJECT

S3357000100CON6 OHIO 1/28/2020 2020 I-70 BRIDGES (GO BOND) (DESIGN/BUILD) REPLACE 25 BRIDGES $219,600,000$0S310601200CON9 FAYETTE 2/28/2020 2020 EARL M VICKERS BR (TPK BOND) DECK REHAB $13,800,000$0

S31016305700CON9 FAYETTE 4/28/2020 2020 BIG CREEK BRIDGE (TPK BOND) REPLACE BRIDGE $1,200,000$0S3104150300CON9 FAYETTE 4/28/2020 2020 LAUREL BRIDGE (TPK BOND 2) REPLACE BRIDGE $2,300,000$0S3281186700CON10 MERCER 4/28/2020 2020 MONTCALM BRIDGE (TPK BOND) REPLACE BRIDGE $2,400,000$0S31331103500CON9 GREENBRIER 5/28/2020 2020 311 BRIDGE (TPK BOND) RENOVATE BRIDGE $2,765,000$0S3453321600CON9 SUMMERS 5/28/2020 2020 BRADSHAW CREEK BR (TPK BOND) REPLACE BRIDGE $1,300,000$0S34533223400CON9 SUMMERS 5/28/2020 2020 INDIAN CREEK BR (TPK BOND) REPLACE BRIDGE $2,800,000$0S32452307500CON10 MCDOWELL 5/28/2020 2020 LANDGRAFF BRIDGE (TPK BOND) RENOVATE BRIDGE $980,200$0S31061201900CON9 FAYETTE 5/28/2020 2020 MOSSY I/C BRIDGE (TPK BOND) REPLACE BRIDGE $3,154,000$0S3248394200CON10 MCDOWELL 5/28/2020 2020 RAYSAL ARCH BRIDGE (TPK BOND) REPLACE BRIDGE $840,000$0S35597227600CON10 WYOMING 6/28/2020 2020 PINEVILLE BRIDGE (TPK BOND) REPLACE BRIDGE $2,500,000$0S34119143500CON10 RALEIGH 6/28/2020 2020 PINEY CREEK BRIDGE (TPK BOND) REPLACE BRIDGE $3,600,000$0S3241694500CON10 MCDOWELL 7/28/2020 2020 BIG CREEK ARCH (DESIGN/BUILD) (TPK B REPLACE BRIDGE $2,000,000$0S31060003200CON9 FAYETTE 7/28/2020 2020 SMITHERS CREEK BRIDGE (TPK BOND) RENOVATE BRIDGE $1,200,000$0S3321292300CON9 MONROE 8/28/2020 2020 RED SULPHUR BR (DESIGN/BUILD) (TPK B REPLACE BRIDGE $3,000,000$0S31015161000CON9 FAYETTE 9/28/2020 2020 MAHAN BRIDGE (TPK BOND) REPLACE BRIDGE $1,500,000$0S32452245200CON10 MCDOWELL 9/28/2020 2020 SUPERIOR BRIDGE (DESIGN/BUILD) (TPK REPLACE BRIDGE $7,000,000$0

$0 $271,939,200TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BRIDGE

3/10/2020 Page 3 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 4: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS331791438100CON4 MONONGALIA 10/22/2019 2020 HALLECK RD OVERPASS (AC PAYBACK) REPLACE BRIDGE $13,300,000$11,970,000S331791438100CON4 MONONGALIA 3/28/2020 2020 HALLECK RD OVERPASS (AUTH AC PROJ REPLACE BRIDGE $13,300,000$0S3357000100ENG6 OHIO 3/28/2020 2020 I-70 BRIDGES (GO BOND) (AC PAYBACK) REPLACE 25 BRIDGES $12,768,480$11,914,784

U34433127600CON3 ROANE 4/28/2020 2020 COL RUBY BRADLEY BRIDGE (DESIGN/BU WIDEN BRIDGE $9,850,000$7,880,000S33525100600CON6 OHIO 5/28/2020 2020 WHEELING SUSPENSION BR PAINT, LIGHTING $8,000,000$6,400,000

$38,164,784 $57,218,480TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/16/2019 2020 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,917,914$4,917,914S399GARVE1702CON99 STATEWIDE 4/28/2020 2020 GARVEE 17 RESIDUAL SUPPLEMENTAL CN FUNDS $2,431,250$1,945,000

$6,862,914 $7,349,164TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2020 2020 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,625,250$7,625,250$7,625,250 $7,625,250TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - GARVEE 2019

U34119144707CON10 RALEIGH 6/28/2020 2020 STANAFORD RD - WV 41 UPGRADE (TPK RELOC HWY I/S & REPLACE BR $10,200,000$0$0 $10,200,000TOTAL:GROUP:

TOTAL: $141,681,625 $472,614,056BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - COMMUNITY DEVELO

U339BRUCE100CON4 PRESTON 11/25/2019 2020 BRUCETON MILLS SIDEWALK REPLACE SIDEWALK $399,000$319,000X384WVNRT100CON4 PRESTON 12/10/2019 2020 WV NORTHERN RAIL TRAIL ACQUISITION ACQUISITION OF CSX RAIL CORRIDO $617,043$558,943U320CEDAR200ENG1 KANAWHA 12/11/2019 2020 CEDAR GROVE SIDEWALK DESIGN SIDEWALK $55,035$55,031U320CHAS4700ENG1 KANAWHA 12/11/2019 2020 CHARLESTON SLACK PLAZA DESIGN SLACK PLAZA PROJECT $169,483$169,483U355MULLE100ENG10 WYOMING 12/11/2019 2020 MULLENS SIDEWALKS DESIGN/CONST SIDEWALK $67,885$67,885

S332300000CON9 MONROE 12/11/2019 2020 UNION NORTH ST PHASE III DESIGN/CONST ADA SIDEWALKS $7,000$5,600U338WATOG100ENG8 POCAHONTAS 12/16/2019 2020 WATOGA PARK TRAIL IMPROVEMENTS DESIGN/CONST TRAIL ADA REST $39,590$39,590U354VIENN200ENG3 WOOD 1/28/2020 2020 GRAND CENTRAL AVE SS DESIGN SIDEWALK $75,000$75,000U350HARVE100ENG2 WAYNE 1/28/2020 2020 HARVEY RD DEVELOP DETAILED DESIGN FOR AL $175,000$140,000U303MADIS200ENG1 BOONE 2/28/2020 2020 MADISON STATE ST STREETSCAPE RECONST SIDEWALK $100,251$100,251S351ADDIS100ENG7 WEBSTER 3/28/2020 2020 ADDISON MAIN ST SIDEWALK DESIGN SIDEWALK $125,000$125,000S306ALLPG100ENG2 CABELL 3/28/2020 2020 ALL INCLUSIVE PLAYGROUND DESIGN/PLAN PLAYGROUND $25,000$20,000U328ATHEN200ENG10 MERCER 3/28/2020 2020 ATHENS PARK TRAIL DESIGN/CONST TRAIL $12,000$12,000U310BABSP100ENG9 FAYETTE 3/28/2020 2020 BABCOCK STATE PARK TRAIL IMPROVEMENTS $39,000$39,000

3/10/2020 Page 4 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 5: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS3063RDAV100ENG2 CABELL 3/28/2020 2020 BIKE PEDESTRIAN CONNECTOR DESIGN BIKE PEDESTRIAN CONNEC $250,000$200,000U328BLUES100ENG10 MERCER 3/28/2020 2020 BLUESTONE RIVER WATER TRAIL DESIGN TRAIL $150,000$150,000U345BLUES100ENG9 SUMMERS 3/28/2020 2020 BLUESTONE SCENIC RIVER TRAIL INSTALL WATER CAUSEWAY $2,500$2,500U317HARRI800ENG4 HARRISON 3/28/2020 2020 BRIDGEPORT COMM CONNECTIVITY DESIGN/CONST TRAIL $30,000$30,000U347CANAA100ENG8 TUCKER 3/28/2020 2020 CAMP 70 RD OVERLOOK (GRANT) RECONST RD, PARKING AREA, OVER $600,000$480,000U319CHARL200ENG5 JEFFERSON 3/28/2020 2020 CHARLES TOWN AUGUSTINE AVE DESIGN PLAN BIKE/PED PATH $120,000$120,000U320CHAS4800ENG1 KANAWHA 3/28/2020 2020 CHARLESTON GREENBRIER ST DESIGN MULTI-MODAL PROJECT $150,000$150,000U320CHAS4900ENG1 KANAWHA 3/28/2020 2020 CHARLESTON QUARRIER & VA ST BIKE T DESIGN BIKE TRAIL $125,000$100,000U320CHAS202ROW1 KANAWHA 3/28/2020 2020 CHARLESTON WASHINGTON ST W STREE CONST SIDEWALK $317,000$253,600S306CITYS100ENG2 CABELL 3/28/2020 2020 CITY STREET - 14 ST W DESIGN 14TH ST W PATH $100,000$80,000S306ARLBV100ENG2 CABELL 3/28/2020 2020 CITY ST - ARLINGTON BLVD DESIGN PLANS DRAINAGE FACILITIE $200,000$160,000U306COLLE100ENG2 CABELL 3/28/2020 2020 COLLEGE AVE - MARTHA RD SIDEWALK IMPROVEMENTS $95,000$76,000U354COMIN100ENG3 WOOD 3/28/2020 2020 COMING PARK TRAIL ACQUISITION ACQUISITION OF CSX RAIL CORRIDO $50,000$50,000T606CENTR100ENG2 CABELL 3/28/2020 2020 COUNTY RT 31 - CENTRAL AVE DRAINAGE SYSTEM STUDY - CSX UN $125,000$100,000U338CRANB100ENG8 POCAHONTAS 3/28/2020 2020 CRANBERRY BOARDWALK REPL REPAIR / REPLACE BOARDWALK $100,000$80,000U331MONON604ENG4 MONONGALIA 3/28/2020 2020 DUNKARD AVE SIDEWALKS PHASE V CONSTRUCT SIDEWALK $60,000$60,000U325FAIRM100ENG4 MARION 3/28/2020 2020 FAIRMONT CONNECTING TRAIL DESIGN TRAIL $25,000$25,000U325FAIRM700ENG4 MARION 3/28/2020 2020 FAIRMONT SIDEWALK DESIGN/CONST SIDEWALK $100,000$100,000U325FAIRM900ENG4 MARION 3/28/2020 2020 FAIRMONT SRTS TRAFFIC CALMING INSTALL SAFETY FLASHERS $15,000$15,000T699NRT2000ENG99 STATEWIDE 3/28/2020 2020 FFY 20 REC TRAIL OH REC TRAIL O/H ( ADMIN & ED) $130,000$104,000

U319FLOSP100ENG5 JEFFERSON 3/28/2020 2020 FLOWING SPRINGS PARK TRAIL DESIGN/CONST TRAIL $80,000$80,000U311GLENV200ENG7 GILMER 3/28/2020 2020 GLENVILLE SIDEWALK REHAB DESIGN SIDEWALK $60,000$60,000U307GRANT200ENG3 CALHOUN 3/28/2020 2020 GRANTSVILLE HIGH ST SS DESIGN/CONST ADA SIDEWALKS $52,500$52,500U322HAMLI102ENG2 LINCOLN 3/28/2020 2020 HAMLIN SW CONN DESIGN SIDEWALK $100,000$100,000U324HATFI300ENG10 MCDOWELL 3/28/2020 2020 HATFIELD-MCCOY-MCDOWELL CO TRAIL CONST 60 MILES TRL SYSTEM $20,000$20,000S35030100100ENG2 WAYNE 3/28/2020 2020 HUNTINGTON TRI STATE AIRPORT DESIGN PARKING STRUCTURE $650,000$520,000U313LEWIS600ENG9 GREENBRIER 3/28/2020 2020 LEWISBURG ELEM SCHL 2014 CONSTRUCT SIDEWALK $24,000$24,000U313LEWIS700ENG9 GREENBRIER 3/28/2020 2020 LEWISBURG FEAMSTER RD 2014 CONST SIDEWALK $54,000$54,000U317LOST100ENG4 HARRISON 3/28/2020 2020 LOST CREEK DEPOT RENO 201 LOST CREEK DEPOT IMPRVMNT $14,000$14,000U338MARLI600ENG8 POCAHONTAS 3/28/2020 2020 MARLINTON RANGER DISTRICT DESIGN/CONST TRAIL $5,000$5,000U302MARTI700ENG5 BERKELEY 3/28/2020 2020 MARTINSBURG TRN STA CORR CONST SIDEWALK $42,500$42,500U328PRINC700ENG10 MERCER 3/28/2020 2020 MERCER ELEM SCHOOL SAFE RT 2013 CONST SIDEWALK $21,401$17,121

U331MONRV100ENG4 MONONGALIA 3/28/2020 2020 MON RIVER RAIL TRL MNT EQ EQUIPMENT PURCHASE $60,000$48,000U316MOORE300ENG5 HARDY 3/28/2020 2020 MOOREFIELD LEVEE TRAIL CONST TRAIL LEVEE $5,000$4,000U338NARRO100ENG8 POCAHONTAS 3/28/2020 2020 NARROW GUAGE TRAIL RESTOR DESIGN TRAIL $33,000$26,400U31016000100ENG9 FAYETTE 3/28/2020 2020 NEW RIVER REC TRAIL ACCESS TO REC ACTIVITIES $20,000$16,000

T631NORTH100ENG4 MONONGALIA 3/28/2020 2020 NORTH CENTRAL RAIL TRAIL MAP UPDAT UPDATE & PRINT TRAIL BROCHURE $26,000$20,800U310OAKHI600ENG9 FAYETTE 3/28/2020 2020 OAK HILL MAIN CENTRAL CONNECTOR DESIGN BIKE LANE $60,000$60,000U313RAINE700ENG9 GREENBRIER 3/28/2020 2020 RAINELLE - KANAWHA AVE SS DESIGN DESIGN STREETSCAPE $75,000$75,000U319RANSO100ENG5 JEFFERSON 3/28/2020 2020 RANSON 5TH AVE COMPLETE S DESIGN/CONST SIDEWALK $62,500$62,500U340RHODA100ENG1 PUTNAM 3/28/2020 2020 RHODA HIGH SCHOOL AVE 3RD CONST ADA SIDEWALKS $88,800$71,040U313GREEN700ENG9 GREENBRIER 3/28/2020 2020 RONCEVERTE MAIN STREET SIDEWALK DESIGN SIDEWALK $80,000$80,000

3/10/2020 Page 5 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 6: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU317SHINN800ENG4 HARRISON 3/28/2020 2020 SHINNSTON DOWNTOWN SIDEWALKS DESIGN/CONST SIDEWALK $48,000$48,000U317SHINN900ENG4 HARRISON 3/28/2020 2020 SHINNSTON SIDEWALK CONST SIDEWALK $52,220$41,776U306HUNTI200ENG2 CABELL 3/28/2020 2020 ST CLOUD COMMONS DESIGN PLAYGROUND $25,000$20,000S399MITIG200ENG99 STATEWIDE 3/28/2020 2020 STATEWIDE CRAYFISH MITIGATION CRAYFISH MITIGATION STUDY $177,800$142,240

U328PRINC1000ENG10 MERCER 3/28/2020 2020 STRALEY AVE & N 8TH ST DESIGN SIDEWALK $40,000$32,000U313LEWIS100ENG9 GREENBRIER 3/28/2020 2020 US 219 S LAFAYETTE DESIGN/CONST ADA SIDEWALKS $80,000$80,000

U313LEWSW100ENG9 GREENBRIER 3/28/2020 2020 US 60 S LAFAYETTE DESIGN/CONST ADA SIDEWALKS $80,000$80,000U305WEIRT500ENG6 BROOKE 3/28/2020 2020 WEIRTON PANHANDLE RAIL TRAIL DESIGN TRL US BIKE RT 50 $20,000$16,000U309WESTU200ENG4 DODDRIDGE 3/28/2020 2020 WEST UNION SIDEWALKS DESIGN SIDEWALK $40,000$40,000U313ALDER403CON9 GREENBRIER 4/28/2020 2020 ALDERSON ENHANCEMENT 2011 REPLACE BRIDGE; REHAB TRAIN DE $300,000$240,000S342ALLEG100CON8 RANDOLPH 4/28/2020 2020 ALLEGHENY HIGHLAND TRAIL REPAIR (S REP DR, RESURF $600,480$600,480S342ALLEG100CON8 RANDOLPH 4/28/2020 2020 ALLEGHENY HIGHLAND TRAIL REPAIR (S REP DR, RESURF $160,120$160,120U310BABCO100ENG9 FAYETTE 4/28/2020 2020 BABCOCK STATE PARK TRAIL EQUIP EQUIPMENT PURCHASE $37,700$37,700U306BARBO400CON2 CABELL 4/28/2020 2020 BARBOURSVILLE PARK EQUESTRIAN DESIGN/CONST TRAIL $600,500$480,400U305BEECH200CON6 BROOKE 4/28/2020 2020 BEECH BOTTOM SIDEWALK IMP CONST SIDEWALK $135,000$108,000U333BERSP100CON5 MORGAN 4/28/2020 2020 BERKELEY SPRG ST PARK IMP DESIGN SIDEWALK $376,000$300,800U333BERKE100CON5 MORGAN 4/28/2020 2020 BERKELEY SPRINGS TRAIN DEPOT RENOVATE INTERIOR $288,200$230,560U317BRIDG700CON4 HARRISON 4/28/2020 2020 BRIDGEPORT ROUTE 58 PED WALKWAY 2 CONST SIDEWALK $137,500$110,000U339CHEAT100CON4 PRESTON 4/28/2020 2020 CHEAT RIVER RAIL TRAIL CONST TRAIL $187,500$150,000U331COLLI100CON4 MONONGALIA 4/28/2020 2020 COLLINS FERRY CONNECTOR T CONSTRUCT TRAIL $56,000$44,800

U331DECKE200CON4 MONONGALIA 4/28/2020 2020 DECKERS CREEK TRAIL RESURFACING PAVE TRAIL $80,000$64,000U320DUNBA400CON1 KANAWHA 4/28/2020 2020 DUNBAR 12TH ST STREETSCAPE CONST SIDEWALK $332,834$245,543U320DUNBA300CON1 KANAWHA 4/28/2020 2020 DUNBAR 12TH ST STRSCPE 2014 CONST SIDEWALK $201,344$161,075U331FOUND100CON4 MONONGALIA 4/28/2020 2020 FOUNDRY ST LINKAGE TRAIL CONSTRUCT TRAIL $30,320$24,256U338GREEN400CON8 POCAHONTAS 4/28/2020 2020 GREENBRIER RIVER TRAIL TRAIL RESURFACE $150,000$120,000U313GREEN800CON9 GREENBRIER 4/28/2020 2020 GREENBRIER RIVER TRAIL FACILITIES FACILITY RESTORATION $53,000$42,400U313GREEN600CON9 GREENBRIER 4/28/2020 2020 GREENBRIER RIVER TRAIL RESURFACIN RESURF TRAIL $72,309$57,847U317HARRI600CON4 HARRISON 4/28/2020 2020 HARRISON CO NORTH RAIL TRL PHASE 1 DEVELOP TRL HEADS MNTNCE SAFE $108,500$86,800U303HATFI200ENG1 BOONE 4/28/2020 2020 HATFIELD MCCOY BOONE CO EQUIP EQUIPMENT PURCHASE $100,000$80,000S322HATFI100ENG2 LINCOLN 4/28/2020 2020 HATFIELD MCCOY LINCOLN CO EQUIP EQUIPMENT PURCHASE $150,000$120,000U328HATFI100CON10 MERCER 4/28/2020 2020 HATFIELD MCCOY POCAHONTAS MAINTE MAINT TRAIL $65,000$16,250

U350HATFI30000CON2 WAYNE 4/28/2020 2020 HATFIELD MCCOY WAYNE CO T INSTALL PREFAB BLDG $50,000$40,000U330HATFI200CON2 MINGO 4/28/2020 2020 HATFIELD-MCCOY BUFFALO MOUNTAIN- MAINT TRAIL $131,250$105,000U324HATFI200CON10 MCDOWELL 4/28/2020 2020 HATFIELD-MCCOY INDIAN RIDGE-MCDOW MAINT TRAIL $131,250$105,000U303HATFI100ENG1 BOONE 4/28/2020 2020 HATFIELD-MCCOY-BOONE CO TRAILHEA CONST TRAILHEAD FACILITY $62,500$62,500U324HATFI300CON10 MCDOWELL 4/28/2020 2020 HATFIELD-MCCOY-MCDOWELL CO TRAIL CONST 60 MILES TRL SYSTEM $42,500$34,000

U350HATFI20000CON2 WAYNE 4/28/2020 2020 HMT EAST LYNN LAKE TRAIL CONST TRAIL $100,000$80,000U324HMTIN100CON10 MCDOWELL 4/28/2020 2020 HMT INDIAN RIDGE & POCAHONTAS TRL MAINT TRAIL $100,000$80,000U323HMTRH100CON2 LOGAN 4/28/2020 2020 HMT ROCKHOUSE AND PINNACLE CRK T TRL MAINTENACE $100,000$80,000U340HOMET100CON1 PUTNAM 4/28/2020 2020 HOMETOWN PARK/VALLEY PARKS SBW I INST RESTROOM FACILITY $55,760$44,608U306HUNTM100CON2 CABELL 4/28/2020 2020 HUNTINGTON TMA-TAP BIKE/PED IMPROVEMENTS $199,000$159,200U340HURRI900CON1 PUTNAM 4/28/2020 2020 HURRICANE MAIN ST SIDEWALKS CONSTRUCT SIDEWALK $116,000$92,800

3/10/2020 Page 6 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 7: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU313LEWIS600CON9 GREENBRIER 4/28/2020 2020 LEWISBURG ELEM SCHL 2014 CONSTRUCT SIDEWALK $76,000$60,800U313LEWIS500CON9 GREENBRIER 4/28/2020 2020 LEWISBURG FEAMSTER ROAD SIDEWALK CONST SIDEWALK, CURBS, DR, SIGN $177,000$141,600U313LEWIS403CON9 GREENBRIER 4/28/2020 2020 LEWISBURG US 219 NORTH SIDEWALKS 2 CONST SIDEWALK, LIGHTING $318,750$255,000U302MARTI1100CON5 BERKELEY 4/28/2020 2020 MARTINSBURG TRAIN STATION DESIGN STREETSCAPE $846,903$677,522U327MASON600CON1 MASON 4/28/2020 2020 MASON SIDEWALKS 2014 ADA CURB CUTS $180,976$144,781U316MOORE200CON5 HARDY 4/28/2020 2020 MOOREFIELD SIDEWALKS 2013 CONST SIDEWALK, CURBS, DR $100,000$80,000

U331MORGA1800CON4 MONONGALIA 4/28/2020 2020 MORGANTOWN BICYCLE SIGNAGE PURCHASE BICYCLE SIGNAGE $120,000$96,000U331MORGA2000CON4 MONONGALIA 4/28/2020 2020 MORGANTOWN MULTIUSE PATH DESIGN/CONST TRAIL $375,000$300,000U354MOUNT200CON3 WOOD 4/28/2020 2020 MOUNTWOOD PARK ATV TRAIL REST AREA, TRAIL IMPROV $124,362$124,362U310MTHOP200CON9 FAYETTE 4/28/2020 2020 MT HOPE STREETSCAPE CONST SIDEWALK $83,899$67,119U383NORTH100CON3 STATEWIDE 4/28/2020 2020 NORTH BEND RAIL TRAIL COMFORT COMFORT STATIONS $38,200$30,560U347NORTH100CON8 TUCKER 4/28/2020 2020 NORTH FORK BLACKWATER RESTORE DEVELOPMENT TRAIL SYS $92,797$74,238U310OAKHI503CON9 FAYETTE 4/28/2020 2020 OAK HILL VIRGINIA STREET SIDEWALKS 2 CONST SIDEWALK $215,864$215,864U343PENNS200CON3 RITCHIE 4/28/2020 2020 PENSBORO STREETSCAPE DESIGN SIDEWALK $400,000$400,000U354RAYON100CON3 WOOD 4/28/2020 2020 RAYON DR SIDEWALK DESIGN/CONST SIDEWALK $225,000$180,000U317SHINN700CON4 HARRISON 4/28/2020 2020 RESTORATION SHINNSTON ARE RESTORE TRL $180,205$144,164U338REDRU100CON8 POCAHONTAS 4/28/2020 2020 RIGHT FORK/RED RUN CONN TRAIL REPR REPAIR EXISTING TRAIL $40,000$32,000U314ROMSW100CON5 HAMPSHIRE 4/28/2020 2020 ROMNEY MAIN ST SW DESIGN/CONST SIDEWALK $460,123$460,123U313RUPER200CON9 GREENBRIER 4/28/2020 2020 RUPERT SIDEWALK IMPROVEMENTS 201 CONST SIDEWALK, CURBS, CROSSW $94,531$75,625U319SHEPH800CON5 JEFFERSON 4/28/2020 2020 SHEPHERDSTOWN BIKE PATH (SPLIT FU DEV & CONST MULTI-USE PATH $93,400$93,400U317SHINN500CON4 HARRISON 4/28/2020 2020 SHINNSTON ROUTE 19 ACTIVITIES PARK CONST TRAIL $53,770$43,016U337STMAR200CON3 PLEASANTS 4/28/2020 2020 ST MARYS SIDEWALK IMPRVMN REPLACE SIDEWALK $148,000$118,400U340TEAYS100CON1 PUTNAM 4/28/2020 2020 TEAYS VALLEY SIDEWALKS 2015 CONSTRUCT SIDEWALK $300,000$240,000U384CHEAT100CON99 STATEWIDE 4/28/2020 2020 UPPER CHEAT WATER TRAIL ADA CONST WATER TRAIL ACCESS SITE $30,000$24,000U340VALE300CON1 PUTNAM 4/28/2020 2020 VALLEY PARK - COUNTY PARK TRAIL EXT VARIOUS IMPROVEMENTS $24,500$19,600

U350WAYNE400CON2 WAYNE 4/28/2020 2020 WAYNE SIDEWALKS DESIGN/CONST SIDEWALK $121,415$102,820U310WHITE100CON9 FAYETTE 4/28/2020 2020 WHITE OAK RAIL TRAIL LIGHTING DESIGN INSTALL LIGHTING $144,000$144,000U313WHITE300CON9 GREENBRIER 4/28/2020 2020 WHITE SULPHER SPRINGS MAIN DESIGN/CONST SIDEWALK $216,200$216,200U354WILLI502CON3 WOOD 4/28/2020 2020 WILLIAMSTOWN SIDEWALK IMP 2012 CONST SIDEWALK $212,500$170,000U333BATH400CON5 MORGAN 6/28/2020 2020 BATH STREETSCAPE PHASE IV DESIGN STREETSCAPE $475,000$380,000

U306HALGR100CON2 CABELL 6/28/2020 2020 COLUMBIA AVE HAL GREER BLVD PEDESTRIAN CROSSING $750,000$750,000U310BABSP100CON9 FAYETTE 8/28/2020 2020 BABCOCK STATE PARK TRAIL IMPROVEMENTS $111,000$111,000U317CLARK1400ENG4 HARRISON 8/28/2020 2020 CLARKSBURG CONNECTOR ACQUISITION OF CSX RAIL CORRIDO $50,000$50,000U647BICYC100 CON8 TUCKER 8/28/2020 2020 COR H REC TRAIL #1 CONST BICYCLE TRAIL $868,000$694,400U347BICYC300 CON8 TUCKER 8/28/2020 2020 COR H REC TRAIL #3 CONST BICYCLE TRAIL $434,000$347,200

U310FAYET100ENG9 FAYETTE 8/28/2020 2020 FAYETTE CO CLIMBING ACCESS STABILIZATION BR BUTRESS $16,000$16,000U319FLOSP100CON5 JEFFERSON 8/28/2020 2020 FLOWING SPRINGS PARK TRAIL DESIGN/CONST TRAIL $251,443$251,443U322GUYAN100ENG2 LINCOLN 8/28/2020 2020 GUYANDOTTE WATER TRAIL ACCESS DESIGN/CONST TRL ACCESS $18,750$18,750U323HATFI400ENG2 LOGAN 8/28/2020 2020 HATFIELD-MCCOY LOGAN CO TRAIL SYST TRAIL SYSTEM CONST $20,000$20,000U313WHITE102ENG9 GREENBRIER 8/28/2020 2020 HOWARDS CREEK HIKE/BIKE TRAIL & PE HOWARDS CREEK HIKE/BIKE TRAIL & $100,000$100,000U313LEWIS700CON9 GREENBRIER 9/28/2020 2020 LEWISBURG FEAMSTER RD 2014 CONST SIDEWALK $187,500$150,000U317LOST100CON4 HARRISON 9/28/2020 2020 LOST CREEK DEPOT RENO 201 LOST CREEK DEPOT IMPRVMNT $36,000$28,800

3/10/2020 Page 7 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 8: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU328PRINC700CON10 MERCER 9/28/2020 2020 MERCER ELEM SCHOOL SAFE RT 2013 CONST SIDEWALK $47,081$37,665U338NARRO100CON8 POCAHONTAS 9/28/2020 2020 NARROW GUAGE TRAIL RESTOR DESIGN TRAIL $117,000$93,600U319RANSO100CON5 JEFFERSON 9/28/2020 2020 RANSON 5TH AVE COMPLETE S DESIGN/CONST SIDEWALK $187,500$150,000U340RHODA100CON1 PUTNAM 9/28/2020 2020 RHODA HIGH SCHOOL AVE 3RD CONST ADA SIDEWALKS $351,200$280,960U313LEWIS100CON9 GREENBRIER 9/28/2020 2020 US 219 S LAFAYETTE DESIGN/CONST ADA SIDEWALKS $100,000$80,000

U338WATOG100CON8 POCAHONTAS 9/28/2020 2020 WATOGA PARK TRAIL IMPROVEMENTS DESIGN/CONST TRAIL ADA REST $117,000$93,600U338LINWO100ENG8 POCAHONTAS 12/16/2020 2020 LINWOOD ALIVE PROJECT DESIGN SIDEWALK $85,605$85,605

$18,850,116 $21,974,549TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2000CON99 STATEWIDE 3/28/2020 2020 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $10,345,000$8,246,000A399CMAQM2000CON99 STATEWIDE 3/28/2020 2020 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,040,000

$11,286,000 $14,145,000TOTAL:GROUP:

TOTAL: $30,136,116 $36,119,549ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - LOCALIZED MOBILIT

S31363105400CON9 GREENBRIER 12/11/2019 2020 FORT SPRING - RONCEVERTE RD SLIDE REPAIR $539,163$431,331S33145115000ROW4 MONONGALIA 3/28/2020 2020 RIVER ROAD SLIDES BRIDGE REPAIR $1,475,000$1,180,000S3441444200CON3 ROANE 4/28/2020 2020 BARRS - DEPUE SLIP REPAIR SLIDE REPAIR $150,000$120,000U3268600000CON6 MARSHALL 4/28/2020 2020 GLENDALE HEIGHTS STORMWATER REPLACE 18" CMP $400,000$320,000S32210278100CON2 LINCOLN 4/28/2020 2020 LINCOLN CHURCH OF GOD PIPE REPLACE DRAINAGE $600,000$480,000S33525009400CON6 OHIO 4/28/2020 2020 SOUTH WHEELING-18TH ST JOINT REP, DRAINAGE IMPR, ADA CU $4,230,000$3,384,000A399D302000CON99 STATEWIDE 7/28/2020 2020 3R MAJOR SLIDES-NHS SLIDE REPAIR $2,025,000$1,300,000S3403576500ROW1 PUTNAM 7/28/2020 2020 TUCKERS BRANCH SLIDE SLIDE REPAIR $50,000$40,000S33145115000CON4 MONONGALIA 9/28/2020 2020 RIVER ROAD SLIDES SLIDE REPAIR $6,000,000$4,800,000

$12,055,331 $15,469,163TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - PLANNING AND WOR

T20660125700ENG2 CABELL 3/28/2020 2020 PEL STUDY PLANNING/ENVIR STUDY $250,000$125,000$125,000 $250,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - RESURFACING

U30610171800ENG2 CABELL 3/28/2020 2020 HAL GREER BLVD CONSTRUCT STREET IMPROVE $1,500,000$1,200,000$1,200,000 $1,500,000TOTAL:GROUP:

3/10/2020 Page 8 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 9: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NON GROUPABLE - LOCALIZED MO

S31821342300CON3 JACKSON 4/28/2020 2020 LOCKHART - WISEBURG SLIP REPAIR SLIDE REPAIR $300,000$240,000$240,000 $300,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BOND PROJECT

U3522116600CON6 WETZEL 2/11/2020 2020 WV 2 PROCTOR - KENT (GO BOND 2)(SPLI UPGR TO 4 LN $109,517,000$0U3522116600CON6 WETZEL 2/11/2020 2020 WV 2 PROCTOR - KENT (INFRA GRANT)(S UPGR TO 4 LN $9,400,000$7,520,000U30664144900CON2 CABELL 4/28/2020 2020 29TH ST TO GUYANDOTTE (GO BOND 3) WIDEN TO 6 LN, REPLACE BRIDGES $117,000,000$0U326245003CON6 MARSHALL 4/28/2020 2020 KENT - FRANKLIN RD (GO BOND 2) UPGR TO 4 LN $30,000,000$0

S32064555700CON1 KANAWHA 4/28/2020 2020 MONTROSE - OAKWOOD (GARVEE 2019) REPLACE DRAINAGE STRUCTURES $2,400,000$0U3443334905CON3 ROANE 4/28/2020 2020 SCOTT MILLER HILL BP (GO BOND 3) RELOCATE ROADWAY, UPDATE PLA $70,000,000$0U31934000000CON5 JEFFERSON 4/28/2020 2020 VA LINE-CHARLES TOWN RD (GO BOND 2) UPGR TO 4 LN $78,100,000$0U3505258000ROW2 WAYNE 6/28/2020 2020 WV 75 - PRICHARD (GO BOND 3) DESIGN 4 LANE HIGHWAY $1,000,000$800,000

$8,320,000 $417,417,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - PAVEMENT

U331191410CON4 MONONGALIA 4/28/2020 2020 BOYERS AVE / US 19 IMPROVEMENTS WIDEN, TURN LANE, TRAFFIC SIGNA $577,000$461,600U326250107200CON6 MARSHALL 4/28/2020 2020 CAMERON RD WIDENING WIDEN, RESURF $2,600,000$2,080,000

$2,541,600 $3,177,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - REGIONAL MOB

U3443334906ENG3 ROANE 1/28/2020 2020 SCOTT MILLER HILL BP WETLAND MITIGA COMPENSATORY MITIGATION $12,000,000$9,600,000U31934000001ENG5 JEFFERSON 3/28/2020 2020 VA LINE-CHARLES TOWN RD MITIGATION COMPENSATORY MITIGATION $310,000$248,000

X341ZWAY62203ENG10 RALEIGH 6/28/2020 2020 BEAVER-S EISENHOWER DR MITIGATION COMPENSATORY MITIGATION $1,800,000$1,440,000$11,288,000 $14,110,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - RESURFACING

S33570119503CON6 OHIO 1/13/2020 2020 I-70 MINING PROJECT PANELS 17 & 18 MINE SUBSIDENCE REPAIR $8,170,340$7,353,306U33167118600ROW4 MONONGALIA 1/28/2020 2020 WEST RUN ROAD (GO BOND 4) IMPROVE I/S & WIDEN $5,000,000$4,000,000U331191410ROW4 MONONGALIA 3/28/2020 2020 BOYERS AVE / US 19 IMPROVEMENTS WIDEN, TURN LANE, TRAFFIC SIGNA $1,000$800U331191410ENG4 MONONGALIA 3/28/2020 2020 BOYERS AVE / US 19 IMPROVEMENTS WIDEN, TURN LANE, TRAFFIC SIGNA $5,000$4,000

U326250107200ROW6 MARSHALL 3/28/2020 2020 CAMERON RD WIDENING WIDEN, RESURF $500,000$400,000U3021013800ROW5 BERKELEY 3/28/2020 2020 ROCK CLIFF I/S IMPROVEMENTS CONSTR ROUNDABOUT $390,000$312,000

U334220000000CON9 NICHOLAS 4/28/2020 2020 GAULEY RIVER ACCESS RD +1 ACCESS RD UPGRADE $635,000$317,500X303119151502ROW1 BOONE 5/28/2020 2020 ROCK CREEK I/C - NEW INTERCHANGE CONSTRUCT NEW INTERCHANGE $1,500,000$1,200,000U30664180000CON2 CABELL 8/28/2020 2020 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $9,067,500$7,254,000U30664180000CON2 CABELL 8/28/2020 2020 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $14,125,000$11,300,000

3/10/2020 Page 9 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 10: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$32,141,606 $39,393,840TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - SAFETY

S3422900100CON8 RANDOLPH 4/28/2020 2020 GANDY CREEK ROAD PHASE 2 IMPR SIGHT DIST, PAVE $1,000,000$500,000U354141615100CON3 WOOD 4/28/2020 2020 ROSEMAR RD LT +2 CONST LTL $1,000,000$800,000

$1,300,000 $2,000,000TOTAL:GROUP:

TOTAL: $69,211,537 $493,617,003ITY IMPROVEMENT PROGRAM

ProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - PLANNING AND WOR

T699WVSHP2000OTHER99 STATEWIDE 1/28/2020 2020 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524T699FMIS5100ENG99 STATEWIDE 3/28/2020 2020 FMIS 5.0 MODERNIZATION FMIS 5 $318,049$254,440T699SPR50000OTHER99 STATEWIDE 3/28/2020 2020 GRANTS WEB APP CREATE WEB APP FOR GRANTS $500,000$400,000T619MARC100ENG5 JEFFERSON 3/28/2020 2020 MARC STRATEGIC RIDERSHIP PLAN PREP/IMPROVEMENT $150,000$150,000T699NHIT100ENG99 STATEWIDE 3/28/2020 2020 NATIONAL HIGHWAY INSTITUTE TRAINING $21,000$16,800T699SPR2100OTHER99 STATEWIDE 3/28/2020 2020 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000T699SPR2100OTHER99 STATEWIDE 3/28/2020 2020 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $9,462,204$6,700,000A699RES2100OTHER99 STATEWIDE 3/28/2020 2020 SPR RESEARCH ALLOCATION HWY PLANNING $1,800,000$1,800,000

T699SUMME1800OTHER99 STATEWIDE 3/28/2020 2020 SUMMER 2018 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699USACE2000OTHER99 STATEWIDE 3/28/2020 2020 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFWS2000OTHER99 STATEWIDE 3/28/2020 2020 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699SUMME2000OTHER99 STATEWIDE 4/28/2020 2020 SUMMER 2020 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042

T699DBE2000OTHER99 STATEWIDE 6/28/2020 2020 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2000OTHER99 STATEWIDE 6/28/2020 2020 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$12,033,826 $15,114,563TOTAL:GROUP:

TOTAL: $12,033,826 $15,114,563CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BOND PROJECT

X324121200509ROW10 MCDOWELL 3/28/2020 2020 WELCH - PUNCHEON CAMP (TPK BOND) CONST NEW ROAD $5,500,000$4,400,000U325791317200CON4 MARION 4/28/2020 2020 S FAIRMONT - PLEASANT VALLEY (GO BO ADD LANES / REPL BRIDGES $90,000,000$0U333522119202CON5 MORGAN 6/28/2020 2020 US 522 - BERKELEY SPRINGS BYPASS (G RELOCATE AND ADD TRAVEL LANES $75,000,000$0X324121200510CON10 MCDOWELL 9/28/2020 2020 WELCH - WV 16 I/C (TPK BOND) CONST NEW ROAD $170,000,000$0

$4,400,000 $340,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BRIDGE

3/10/2020 Page 10 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 11: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPX342H402108CON8 RANDOLPH 7/28/2020 2020 CHEAT RIVER BRIDGE (AUTH AC PROJEC CONST NEW BRIDGE $40,000,000$0

$0 $40,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - PAVEMENT

U34035190105CON1 PUTNAM 1/28/2020 2020 US 35 / WV 869 I/C CONSTRUCT INTERCHANGE $25,000,000$20,000,000S3317915400CON4 MONONGALIA 4/28/2020 2020 MYLAN PARK BRIDGE APPROACH REALIGN APPROACHES $1,000,000$900,000

$20,900,000 $26,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - REGIONAL MOB

U3522116601ENG6 WETZEL 1/28/2020 2020 PROCTOR - KENT WETLAND MITIGATION COMPENSATORY MITIGATION $2,000,000$1,600,000X324121200511ENG10 MCDOWELL 5/28/2020 2020 WELCH - WV 16 I/C MITIGATION COMPENSATORY MITIGATION $8,500,000$6,800,000

$8,400,000 $10,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - RESURFACING

X316H1251600ENG5 HARDY 2/28/2020 2020 HARDY CO 23/12-VA STATE LI CONST 4 LN $14,400,000$11,520,000S3317915400ENG4 MONONGALIA 3/28/2020 2020 MYLAN PARK BRIDGE APPROACH REALIGN APPROACHES $100,000$90,000U3028181600ROW5 BERKELEY 3/28/2020 2020 TABLER STATION I/C IMPROVEMENTS WIDEN NB AND SB RAMPS $100,000$90,000X342H402105ROW8 RANDOLPH 3/28/2020 2020 WV 72 I/C-PARSONS (AC PAYBACK) GR, DR, PAVE $3,300,000$3,300,000U3028181600CON5 BERKELEY 4/28/2020 2020 TABLER STATION I/C IMPROVEMENTS WIDEN NB AND SB RAMPS $4,000,000$3,600,000X342H402106CON8 RANDOLPH 8/28/2020 2020 KERENS-WV 72 I/C (AUTH AC PROJECT) B PAVE - Section 1 $20,000,000$0X342H402102CON8 RANDOLPH 10/28/2020 2020 KERENS-US 219 CONN (AC PAYBACK)(SP GR, DR, BRS $19,449,938$19,449,938

$38,049,938 $61,349,938TOTAL:GROUP:

TOTAL: $71,749,938 $478,349,938EGIONAL MOBILITY PROGRAM

ProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - RESURFACING

S350152249800CON2 WAYNE 11/20/2019 2020 ECHO - PATRICK CREEK RESURFACE $470,270$376,216S306258100CON2 CABELL 12/11/2019 2020 HUNTINGTON - LESAGE RESURFACE $1,082,370$865,896

S347219131200CON8 TUCKER 1/16/2020 2020 MACKEYVILLE - HIGH SCHOOL RESURF (1.5") $792,454$633,963S3021100000CON5 BERKELEY 1/16/2020 2020 VA LINE - BUNKER HILL RESURF $908,001$726,401S35015200000CON2 WAYNE 1/30/2020 2020 MOSES FORK MOUNTAIN RESURF OTHER FED-STP $494,512$395,610S3342005900CON9 NICHOLAS 1/30/2020 2020 SNOW HILL - CARL ROAD RESURF (1.5") $1,345,904$1,076,723A399D112000CON99 STATEWIDE 3/28/2020 2020 APD RESURFACING-NHPP RESURF APD-NHPP $18,750,000$15,000,000S3061700000CON2 CABELL 3/28/2020 2020 BLUE SULPHUR RESURF OTHER FED-STP $236,000$188,800S33439483600ENG9 NICHOLAS 3/28/2020 2020 DAIN STREET RAISE AND PAVE ROADWAY $25,000$20,000S3132000000CON9 GREENBRIER 3/28/2020 2020 FAYETTE CL - RAINELLE RD RESURF (1.5") $1,063,000$850,400

S336220140000CON8 PENDLETON 3/28/2020 2020 FRANKLIN - US 33 RESURF (1.5") $725,000$580,000

3/10/2020 Page 11 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 12: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS33828328100CON8 POCAHONTAS 3/28/2020 2020 US 250 - THORNWOOD RD RESURF (1.5") $218,000$174,400S34479254900CON3 ROANE 4/28/2020 2020 AMMA - CO 29 O/P RESURFACE $14,000,000$12,600,000

S317791177800CON4 HARRISON 4/28/2020 2020 ANNMORE - MEADOWBROOK RD RESURFACE $5,900,000$5,310,000S3276230900CON1 MASON 4/28/2020 2020 ARBUCKLE - LEON RESURF(1.5") $1,100,000$880,000S30885106700CON1 BOONE 4/28/2020 2020 BALD KNOB - BARRETT RESURF(1.5") $780,000$624,000S30619300600CON2 CABELL 4/28/2020 2020 BARBOURSVILLE - OHIO RESURFACE $3,200,000$2,560,000S3406252800CON1 PUTNAM 4/28/2020 2020 BLACK BETSY - ELEANOR RESURF(1.5") $945,000$756,000

S341641330000CON10 RALEIGH 4/28/2020 2020 BRAGG - SANDSTONE RD RESURFACE $3,000,000$2,400,000S32852092100CON10 MERCER 4/28/2020 2020 BRUSHFORK - BLUEFIELD RD RESURF (1.5") $893,000$714,400S3231600100CON2 LOGAN 4/28/2020 2020 BUFFALO CREEK RESURF OTHER FED-STP $462,000$369,600

S331857104400CON4 MONONGALIA 4/28/2020 2020 CHEAT ROAD RESURF(2") $529,400$423,520S31750154600CON4 HARRISON 4/28/2020 2020 CHURCH ST - EAST PIKE ST RESURFACE - CONCRETE $1,250,000$1,000,000S35037303900CON2 WAYNE 4/28/2020 2020 EAST LYNN-KIASVILLE RESURF OTHER FED-STP $697,000$557,600

S325791366900CON4 MARION 4/28/2020 2020 EAST PARK - EAST FAIRMONT RESURFACE $2,800,000$2,520,000S33065231300CON2 MINGO 4/28/2020 2020 ELK CREEK-DELBARTON RESURF OTHER FED-STP $314,000$251,200S3044000000CON7 BRAXTON 4/28/2020 2020 ELK RIVER RD RESURF (1.5") $560,000$448,000

S326250300900CON6 MARSHALL 4/28/2020 2020 FIRST STREET RESURF(2") $677,000$541,600S3025118000CON5 BERKELEY 4/28/2020 2020 GERRARDSTOWN - INWOOD RESURF (2") $780,000$624,000S3213327300CON7 LEWIS 4/28/2020 2020 GLENVILLE - WESTON RD RESURF (1.5") $1,020,000$816,000S35414148400CON3 WOOD 4/28/2020 2020 GRAND CENTRAL AVE RESURFACE $3,145,000$2,516,000

S342219150300CON8 RANDOLPH 4/28/2020 2020 HAMILTON CABIN - CATHOLIC FARM RESURF (1.5") $525,000$420,000S3223416000CON2 LINCOLN 4/28/2020 2020 HAMLIN-BOWLES RESURF OTHER FED-STP $474,000$379,200U3052231700CON6 BROOKE 4/28/2020 2020 HARMON CREEK - PENNSYLVANNIA STAT JOINT REPAIR, GDRL, DRAINAGE $6,810,000$5,448,000S3357000700CON6 OHIO 4/28/2020 2020 I-70 EB RESURFACE $162,000$145,800S3357000600CON6 OHIO 4/28/2020 2020 I-70 WB RESURFACE $145,000$145,000S3412100000CON10 RALEIGH 4/28/2020 2020 KANAWHA ST +1 RESURF(1.5") $1,650,000$1,320,000

S347450400000CON8 TUCKER 4/28/2020 2020 LANEVILLE RD RESURFACE $750,000$375,000S30816183000CON1 CLAY 4/28/2020 2020 MAIN STREET RESURF(1.5") $255,000$204,000S31228129900CON5 GRANT 4/28/2020 2020 MAIN STREET - PETERSBURG RESURF(2") $420,000$336,000S34874000000CON6 TYLER 4/28/2020 2020 MOUNTAIN DRIVE RESURF(2") $1,000,000$800,000S3158000000CON6 HANCOCK 4/28/2020 2020 NEW CUMBERLAND - ROLLING ACRES RESURF(1") $900,000$720,000S3234491400CON2 LOGAN 4/28/2020 2020 OMAR-CHAUNCEY RESURF OTHER FED-STP $476,000$380,800S31720297300CON4 HARRISON 4/28/2020 2020 PETERS RUN - LITTLE ELK CREEK RESURF (1.5") $1,122,200$897,760S3281920900CON10 MERCER 4/28/2020 2020 PRINCETON AVE +2 RESURF (1.5") $630,000$504,000S3292877000CON5 MINERAL 4/28/2020 2020 SHORT GAP - SCENIC LANE RESURF (1.5") $850,000$680,000S348290800CON6 TYLER 4/28/2020 2020 SISTERSVILLE RESURFACE $725,000$580,000

S33926000000CON4 PRESTON 4/28/2020 2020 SOUTH PRESTON HIGHWAY RESURF $1,895,400$1,516,320S3113311800CON7 GILMER 4/28/2020 2020 STUMPTOWN - NORMANTOWN RD RESURF (1.5") $804,000$643,200S3323191700CON9 MONROE 4/28/2020 2020 UNION - KEENAN ROAD RESURF (1.5") $787,000$629,600S3354013500CON6 OHIO 4/28/2020 2020 WHEELING HILL ADA DESIGN BUILD ADA RAMPS $420,000$336,000S30811195700CON1 CLAY 4/28/2020 2020 WIDEN - DILLE RESURF(2") $380,000$304,000U335221300CON6 OHIO 4/28/2020 2020 WV 2, WHEELING LIGHTING;SIDEWALKS; RESURF $8,700,000$5,440,000

3/10/2020 Page 12 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 13: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS31923015000CON5 JEFFERSON 4/28/2020 2020 WV 230 - SHEPHERDSTOWN PIKE RESURF $342,000$273,600S3231000000CON2 LOGAN 4/28/2020 2020 WYOMING CO LINE - CLAYPOOL RESURFACE $1,000,000$800,000S33419287300CON9 NICHOLAS 6/28/2020 2020 BIRCH RIVER - BRAXTON CO LINE RESURFACE $1,750,000$1,400,000S30664202900CON2 CABELL 6/28/2020 2020 EAST MALL RD - CSX OP RESURFACE $1,700,000$1,530,000S30281157000CON5 BERKELEY 6/28/2020 2020 EXIT 16 RAMP REPAIR RESURFACE $2,900,000$2,610,000

$85,618,609 $105,735,511TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BOND

S341641207000CON10 RALEIGH 4/28/2020 2020 I-77-AIRPORT RD (GO BOND 1) SLAB REPAIR, DIAMOND GRINDING $5,800,000$0$0 $5,800,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - BOND PROJECT

U333522119202ROW5 MORGAN 1/28/2020 2020 US 522 - BERKELEY SPRINGS BYPASS (G RELOCATE AND ADD TRAVEL LANES $31,000,000$24,800,000U331791545000CON4 MONONGALIA 4/28/2020 2020 STAR CITY I/C IMPROVEMENTS (GO BON RECONSTRUCT I/C $66,000,000$0U3281000002CON10 MERCER 6/28/2020 2020 KEGLEY - WYOMING CO LINE (TPK BOND) WIDEN, SHLDRS, RESURF, REHAB 5 $20,100,000$0

$24,800,000 $117,100,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/16/2019 2020 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654S399GARVE1702CON99 STATEWIDE 4/28/2020 2020 GARVEE 17 RESIDUAL SUPPLEMENTAL CN FUNDS $10,568,750$8,455,000

$28,166,654 $30,280,404TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - SAFETY

S34035124300CON1 PUTNAM 11/25/2019 2020 BUFFALO BR HFST HFST TREATMENT $191,751$191,751U31750107200CON4 HARRISON 4/28/2020 2020 DAVISSON RUN RD EB HFST HFST TREATMENT $384,000$345,600S3153011900CON6 HANCOCK 4/28/2020 2020 LINCOLN HIGHWAYS HFST +1 RESURFACE (HFST) $507,000$456,300S3363321600CON8 PENDLETON 6/28/2020 2020 ALLEGHENY DR HFST +4 HFST TREATMENT $764,000$687,600

$1,681,251 $1,846,751TOTAL:GROUP:

TOTAL: $140,266,514 $260,762,666RESURFACING PROGRAM

ProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: GROUPABLE - TRAFFIC

U3287700200CON10 MERCER 10/21/2019 2020 E RIVER MTN LIGHTING RENOVATE LIGHTING $2,768,395$2,768,395S341BECK100CON10 RALEIGH 11/20/2019 2020 DOWNTOWN BECKLEY SIGNAL SYSTEM RENOVATE TRAFFIC SIGNAL $3,650,087$2,920,070U31750123000ENG4 HARRISON 11/27/2019 2020 CLARKSBURG EXP LIGHTING UPGRADE LIGHTING $400,000$320,000

T699RRINV2000ENG99 STATEWIDE 12/16/2019 2020 HIGHWAY RR GADE XING INVENTORY INVENTORY CROSSINGS $250,000$225,000

3/10/2020 Page 13 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 14: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPT699AUXSI100ENG99 STATEWIDE 1/2/2020 2020 AUXILLARY STRUCTURE INSPECTION PILOT PROJ STRUCTURE INSP $500,000$400,000

U399CROSS100CON99 STATEWIDE 1/14/2020 2020 CROSSBUCK MOD KANAWHA RIVER INSTALL YIELD SIGNS $12,084$10,876U30451101800CON7 BRAXTON 1/28/2020 2020 5TH STREET BURNSVILLE RR XX UPGRADE SIGNALS TO LED $92,000$82,800T699LIGHT100ENG99 STATEWIDE 3/28/2020 2020 2019 LIGHTING STANDARDS & SPECS REVIEW HIGHWAY LIGHTING $500,000$225,000

T699NAVIG1900ENG99 STATEWIDE 3/28/2020 2020 2019 NAVIGATION LIGHTING REVIEW BRIDGE LIGHTING $300,000$240,000U3406018000ENG1 PUTNAM 3/28/2020 2020 MIDLAND TRAIL TRAFFIC SIGNAL INST TRAF SIG, CONST LT LN $15,000$12,000S328BLUE200CON10 MERCER 4/28/2020 2020 BLUEFIELD CBD SIGNAL SYSTEM RENOVATE TRAFFIC SIGNAL $2,100,000$1,680,000

U399CROSS200CON99 STATEWIDE 4/28/2020 2020 CROSSBUCK MOD NORFOLK SOUTHERN INSTALL YIELD SIGNS $71,280$71,280U350525804600CON2 WAYNE 4/28/2020 2020 CRUM ELEMENTARY RD RR XX UPGRADE SIGNALS TO LED, INSTALL $92,000$82,800U350525800200CON2 WAYNE 4/28/2020 2020 CRUM ELEMENTARY SCHOOL RR XX UPGRADE CROSSING SURFACE, REL $400,000$360,000S381RECAL2000CON1 BOONE 4/28/2020 2020 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2000CON10 MCDOWELL 4/28/2020 2020 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2000CON2 CABELL 4/28/2020 2020 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2000CON3 CALHOUN 4/28/2020 2020 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2000CON4 DODDRIDGE 4/28/2020 2020 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2000CON5 BERKELEY 4/28/2020 2020 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2000CON6 BROOKE 4/28/2020 2020 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2000CON7 BARBOUR 4/28/2020 2020 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2000CON8 PENDLETON 4/28/2020 2020 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2000CON9 FAYETTE 4/28/2020 2020 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S348181100200CON6 TYLER 4/28/2020 2020 DIAMOND ST RR XX LIGHTS, GATES, RELOCATE CABINET $175,000$140,000U32810423600CON10 MERCER 4/28/2020 2020 LOCUST ST TRAFFIC SIGNAL INSTALL TRAFFIC SIGNAL $240,000$192,000U3406018000CON1 PUTNAM 4/28/2020 2020 MIDLAND TRAIL TRAFFIC SIGNAL INST TRAF SIG, CONST LT LN $465,000$372,000

S381STRIP2000CON1 BOONE 4/28/2020 2020 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805S390STRIP2000CON10 MCDOWELL 4/28/2020 2020 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2000CON2 CABELL 4/28/2020 2020 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2000CON3 CALHOUN 4/28/2020 2020 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2000CON4 DODDRIDGE 4/28/2020 2020 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2000CON5 BERKELEY 4/28/2020 2020 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2000CON6 BROOKE 4/28/2020 2020 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021S387STRIP2000CON7 BARBOUR 4/28/2020 2020 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2000CON8 PENDLETON 4/28/2020 2020 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181S389STRIP2000CON9 FAYETTE 4/28/2020 2020 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978U31952006200CON5 JEFFERSON 4/28/2020 2020 SHEPHERDSTOWN +5 RR XX UPGRADE SIGNALS TO LED $270,000$243,000

U340SOLAR100CON1 PUTNAM 4/28/2020 2020 SOLAR POWERED RADAR SIGNS PURCHASE SOLAR RADAR SIGNS & $34,200$27,360U3406006600CON1 PUTNAM 4/28/2020 2020 SYCAMORE RD TRAFFIC SIGNAL INSTALL TRAFFIC SIGNAL $200,000$180,000

S350WSTHU100CON2 WAYNE 4/28/2020 2020 WEST HUNTINGTON SIGNAL SYSTEM RENOVATE TRAFFIC SIGNAL $2,000,000$1,600,000U33419127400CON9 NICHOLAS 5/28/2020 2020 WEST WEBSTER RD TRAFFIC SIGNAL INSTALL TRAFFIC SIGNAL $800,000$640,000U34920257700CON7 UPSHUR 7/28/2020 2020 NORTH LOCUST ST RR XX UPGRADE CROSSING SURFACE $220,000$198,000

A399RHCH?????CON99 STATEWIDE 8/28/2020 2020 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $403,080$363,636A399RHPD?????CON99 STATEWIDE 8/28/2020 2020 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $727,778$655,000

U3052200100CON6 BROOKE 8/28/2020 2020 US 22 SIGNING RENOVATE SIGNING $1,500,000$1,500,000

3/10/2020 Page 14 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 15: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS34064340000CON1 STATEWIDE 9/28/2020 2020 I-64 SIGNING HURRICANE-DUNBAR (SPLIT RENOVATE SIGNING $600,000$540,000S34064340000CON1 STATEWIDE 9/28/2020 2020 I-64 SIGNING HURRICANE-DUNBAR (SPLIT RENOVATE SIGNING $600,000$540,000

$24,746,867 $33,374,282TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - PAVEMENT

U320119158500CON1 KANAWHA 4/28/2020 2020 OAKWOOD I/S IMPROVEMENTS CONSTRUCT 2 U-TURN I/S $4,800,000$3,840,000$3,840,000 $4,800,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2020 GROUP: NOT GROUPABLE - SAFETY

T699ITS300CON99 STATEWIDE 1/28/2020 2020 ITS, SIGNAL SYSTEMS, LIGHTING & STRU IDIQ $1,012,471$809,977T699ITS400ENG99 STATEWIDE 3/28/2020 2020 2019 ITS PROGRAM ITS UPDATE REVIEW $250,000$200,000

S327RDWAY100ENG1 MASON 3/28/2020 2020 2019 RDWY DEPART IMPROV PROJ A+8 RDWAY DEPARTURE ASSESSMENT $240,000$216,000S303RDWAY100ENG1 BOONE 3/28/2020 2020 2019 RDWY DEPART IMPROV PROJ B+2 RDWAY DEPARTURE ASSESSMENT $240,000$216,000S317RDWAY100ENG4 HARRISON 3/28/2020 2020 2019 RDWY DEPART IMPROV PROJ C+10 RDWAY DEPARTURE ASSESSMENT $240,000$216,000S336RDWAY100ENG6 PENDLETON 3/28/2020 2020 2019 RDWY DEPART IMPROV PROJ D+1 RDWAY DEPARTURE ASSESSMENT $240,000$216,000S328RDWAY100ENG10 MERCER 3/28/2020 2020 2019 RDWY DEPART IMPROV PROJ E+5 RDWAY DEPARTURE ASSESSMENT $240,000$216,000T620TMCOP100OTHER1 KANAWHA 3/28/2020 2020 2020 TMC OPERATING BUDGET OPERATING BUDGET 2020-2021 $2,160,000$1,944,000

U3211300000CON7 LEWIS 3/28/2020 2020 BERLIN ROAD INSTALL GDRL $300,000$270,000T699CURVE100ENG99 STATEWIDE 3/28/2020 2020 CURVE ANALYSIS US AND WV CURVE EVALUATION $750,000$675,000T681RORAS100ENG99 STATEWIDE 3/28/2020 2020 D1 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $25,000$22,500T690RORAS100ENG99 STATEWIDE 3/28/2020 2020 D10 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $20,000$18,000T682RORAS100ENG99 STATEWIDE 3/28/2020 2020 D2 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $10,000$9,000U317RDWAY100ENG4 HARRISON 3/28/2020 2020 D4 RDWY DEPART IMPROV PROJ +8 SAFETY IMPROVEMENTS $1,900,000$1,710,000T684RORAS100ENG99 STATEWIDE 3/28/2020 2020 D4 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $30,000$27,000T686RORAS100ENG99 STATEWIDE 3/28/2020 2020 D6 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $25,000$22,500U317RDWAY100ENG4 HARRISON 3/28/2020 2020 RDWY DEPART IMPROV PROJ +8 SAFETY IMPROVEMENTS $1,900,000$1,710,000T699RDWA2000ENG99 STATEWIDE 3/28/2020 2020 RDWY DEPARTURE ASSESSMENT A IMPROVE RDWY DEPARTURES $250,000$225,000T699RDWB2000ENG99 STATEWIDE 3/28/2020 2020 RDWY DEPARTURE ASSESSMENT B IMPROVE RDWY DEPARTURES $250,000$225,000T699RDWC2000ENG99 STATEWIDE 3/28/2020 2020 RDWY DEPARTURE ASSESSMENT C IMPROVE RDWY DEPARTURES $250,000$225,000T699RDWD2000ENG99 STATEWIDE 3/28/2020 2020 RDWY DEPARTURE ASSESSMENT D IMPROVE RDWY DEPARTURES $250,000$225,000T699RDWE2000ENG99 STATEWIDE 3/28/2020 2020 RDWY DEPARTURE ASSESSMENT E IMPROVE RDWY DEPARTURES $250,000$225,000T699RDWAY400OTHER99 STATEWIDE 3/28/2020 2020 ROADWAY DEPARTURE REVIEW ROADWAY DEPARTURE REVIEW $200,000$180,000S399RPM2000CON99 STATEWIDE 4/28/2020 2020 2020 RPM RPM $470,000$376,000U3317362000ROW4 MONONGALIA 4/28/2020 2020 BROOKHAVEN ROAD IMPROVEMENTS INSTALL TRAVEL LANES; SIGNAL $15,000$12,000U3317362000CON4 MONONGALIA 4/28/2020 2020 BROOKHAVEN ROAD IMPROVEMENTS INSTALL TRAVEL LANES; SIGNAL $475,000$380,000U32179908600CON7 LEWIS 4/28/2020 2020 BURNSVILLE GUARDRAIL INSTALL GDRL $1,993,000$1,793,700U320BIKE100CON1 KANAWHA 4/28/2020 2020 CHARLESTON BIKE SIGNALS INSTALL SIGNS & MARKINGS $16,025$14,423S3031700000CON1 BOONE 4/28/2020 2020 CLOTHIER SIGNING SIGNING $62,000$62,000U3542275600ROW3 WOOD 4/28/2020 2020 CORBITT HILL RD TURN LANE ADD TURN LANE $60,000$48,000U3542275600CON3 WOOD 4/28/2020 2020 CORBITT HILL RD TURN LANE ADD TURN LANE $1,100,000$880,000

3/10/2020 Page 15 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 16: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS390RDWAY100CON10 STATEWIDE 4/28/2020 2020 D10 RDWAY DEPARTURE +5 SIGNING $990,000$891,000S383RDWAY100CON9 STATEWIDE 4/28/2020 2020 D3 RDWAY DEPARTURE SIGNING $1,000,000$900,000T683RORAS100ENG99 STATEWIDE 4/28/2020 2020 D3 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $20,000$18,000S385RDWAY100CON5 STATEWIDE 4/28/2020 2020 D5 RDWAY DEPARTURE +9 SIGNING $1,599,000$1,439,100S386RDWAY100CON9 STATEWIDE 4/28/2020 2020 D6 RDWAY DEPARTURE SIGNING $500,000$450,000S387RDWAY100CON7 STATEWIDE 4/28/2020 2020 D7 RDWAY DEPARTURE +5 SIGNING $764,000$687,600T687RORAS100ENG99 STATEWIDE 4/28/2020 2020 D7 ROR CR ASSESSMENT RDWY DEPARTURE ASSESSMENT $10,000$9,000S388RDWAY100CON5 STATEWIDE 4/28/2020 2020 D8 RDWAY DEPARTURE SIGNING $3,000,000$2,700,000S389RDWAY100CON9 STATEWIDE 4/28/2020 2020 D9 RDWAY DEPARTURE +9 SIGNING $1,688,000$1,519,200

U3402112200CON1 PUTNAM 4/28/2020 2020 GRANDVIEW RIDGE GDRL INSTALL GDRL $128,000$115,200U399ADAIM1700CON99 STATEWIDE 4/28/2020 2020 GREENBRIER ST & KANAWHA BLVD UPGRADE PEDESTRIAN SIGNALS $350,000$350,000U33110010200CON4 MONONGALIA 4/28/2020 2020 I/S WV 100 & DENTS RUN IMPROVEMENT IMPROVE TURNING RADIUS/INTERSE $150,000$150,000U32179940001CON7 LEWIS 4/28/2020 2020 I-79 SIGNING NORTH (SPLIT FUNDED) RENOVATE SIGNING $800,000$720,000U32179940001CON7 LEWIS 4/28/2020 2020 I-79 SIGNING NORTH (SPLIT FUNDED) RENOVATE SIGNING $400,000$320,000S3507500000CON2 WAYNE 4/28/2020 2020 KENOVA SIGNING +1 SIGNING $230,000$230,000S399LEDLI100CON99 STATEWIDE 4/28/2020 2020 LED LIGHT UPGRADE NS PHASE UPGRADE FLASHING LIGHT SIGNAL $284,699$256,229U3353126200CON6 OHIO 4/28/2020 2020 TUNNEL RIDGE PORTAL WID $1,320,000$1,056,000U33167100000CON4 MONONGALIA 4/28/2020 2020 WEST RUN ROAD WIDEN ROAD $2,400,000$2,400,000U32179940002CON7 LEWIS 9/28/2020 2020 I-79 SIGNING NORTH (SPLIT FUNDED) RENOVATE SIGNING $400,000$320,000U32179940002CON7 LEWIS 9/28/2020 2020 I-79 SIGNING NORTH (SPLIT FUNDED) RENOVATE SIGNING $800,000$720,000U34411951200CON3 ROANE 9/28/2020 2020 US 119 TRUCK LANE EX EXTEND TRUCK LANE $5,502,000$4,401,600

$33,022,029 $37,559,195TOTAL:GROUP:

TOTAL: $61,608,896 $75,733,477TRAFFIC PROGRAM

TOTAL: $526,688,452 $1,832,311,2522020

3/10/2020 Page 16 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 17: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - BRIDGE

S3512635900ENG7 WEBSTER 10/28/2020 2021 BERGOO ROAD ARCH REPLACE BRIDGE $160,000$128,000S3451212100ENG9 SUMMERS 10/28/2020 2021 BRADSHAW CREEK BRIDGE REPLACE BRIDGE $30,000$24,000S31450310200CON5 HAMPSHIRE 10/28/2020 2021 CAPON BRIDGE RENOVATE BRIDGE $3,500,000$2,800,000S355678900ENG10 WYOMING 10/28/2020 2021 CLEAR FORK ARCH NO 3 REPLACE BRIDGE $100,000$80,000

S31360413500ROW9 GREENBRIER 10/28/2020 2021 CLIFFORD FAMILY MEMORIAL BR REPLACE BRIDGE $387,000$309,000S3271604200ENG1 MASON 10/28/2020 2021 CROOKED CREEK BR REPLACE BRIDGE $60,000$48,000

U320DAVIS100CON1 KANAWHA 10/28/2020 2021 DAVIS CREEK BR +3 REPLACE BRIDGE $1,825,000$1,460,000S324118600CON10 MCDOWELL 10/28/2020 2021 MOHAWK ARCH REPLACE BRIDGE $950,000$760,000

S3558540900ROW10 WYOMING 10/28/2020 2021 RALSTON BRANCH BR #2 REPLACE BRIDGE $120,000$96,000A399E222100CON99 STATEWIDE 11/28/2020 2021 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $2,500,000$2,000,000A399E302100CON99 STATEWIDE 11/28/2020 2021 CAT 10 LMC O/L STATEWIDE STATEWIDE LMC OVERLAY $3,750,000$3,000,000A399E222100CON99 STATEWIDE 11/28/2020 2021 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $1,250,000$1,000,000A399E222100CON99 STATEWIDE 11/28/2020 2021 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $2,500,000$2,000,000A399E242000ENG99 STATEWIDE 11/28/2020 2021 CAT 4 BR INSPECTION BRIDGE INSPECTION $3,750,000$3,000,000

S350371319700ENG2 WAYNE 11/28/2020 2021 PETER CAVE ARCH REPLACE BRIDGE $150,000$120,000U34932128400CON7 UPSHUR 12/28/2020 2021 ALTON DECK GIRDER REPLACE BRIDGE $1,200,000$960,000S3066000200ROW2 CABELL 12/28/2020 2021 COL JUSTICE CHAMBERS BR REPLACE BRIDGE $50,000$40,000

S321N167000200ROW7 LEWIS 12/28/2020 2021 FOURTH STREET ARCH BR REPLACE BRIDGE $234,000$187,200S34818737800CON6 TYLER 12/28/2020 2021 LEMASTERS BRIDGE DEMO BRIDGE DEMO $250,000$200,000S3044178600CON7 BRAXTON 12/28/2020 2021 UPPER GASSAWAY BR REPLACE BRIDGE $4,760,000$3,808,000

99 STATEWIDE 1/28/2021 2021 GROUPABLE BUCKET DELTA - BRIDGE $12,538,086$10,030,469S317505900100ROW4 HARRISON 1/28/2021 2021 NORTHVIEW OVERPASS REPLACE BRIDGE $390,000$312,000U31021418000CON9 FAYETTE 2/28/2021 2021 2ND AVE BRIDGE CONST NEW BRIDGE $700,000$560,000S3084600100CON1 CLAY 2/28/2021 2021 JC CRUIKSHANK MEMORIAL BR REPLACE BRIDGE $3,800,000$3,040,000S34215113400CON8 RANDOLPH 2/28/2021 2021 VALLEY HEAD T-BEAM REPLACE BRIDGE $3,500,000$2,800,000S3267437200ENG6 MARSHALL 3/28/2021 2021 BIG TRIBBLE BRIDGE REPLACE BRIDGE $100,000$80,000S3267437200ROW6 MARSHALL 4/28/2021 2021 BIG TRIBBLE BRIDGE REPLACE BRIDGE $150,000$120,000S33547001300ROW6 OHIO 4/28/2021 2021 I-470 BR APPR RENOVATE BRIDGE $55,556$50,000S34411974900ROW3 ROANE 5/28/2021 2021 MCKOWN CREEK ARCH BR REPLACE BRIDGE $225,000$180,000S3025193400ENG5 BERKELEY 5/28/2021 2021 MIDDLEWAY BRIDGE REPLACE BRIDGE $450,000$360,000S3451212100ROW9 SUMMERS 6/28/2021 2021 BRADSHAW CREEK BRIDGE REPLACE BRIDGE $45,000$36,000S31363213700ROW9 GREENBRIER 6/28/2021 2021 CALDWELL BR (TPK BOND) REPLACE BRIDGE $20,000$16,000S3271604200ROW1 MASON 6/28/2021 2021 CROOKED CREEK BR REPLACE BRIDGE $90,000$72,000

S321100824200ROW7 LEWIS 6/28/2021 2021 FREEMANSBURG ARCH REPLACE BRIDGE $75,000$60,000S314290087300CON5 HAMPSHIRE 6/28/2021 2021 SEDAN BRIDGE (GARVEE 2019) REPLACE BRIDGE $4,337,500$0S3512635900ROW7 WEBSTER 7/28/2021 2021 BERGOO ROAD ARCH REPLACE BRIDGE $216,000$172,800

S350371319700ROW2 WAYNE 7/28/2021 2021 PETER CAVE ARCH REPLACE BRIDGE $225,000$180,000S338250131600CON8 POCAHONTAS 9/28/2021 2021 MABEL BURNER BR REPLACE BRIDGE $4,500,000$3,600,000

3/10/2020 Page 17 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 18: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$43,689,469 $58,943,142TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BOND PROJECT

S345847003600CON9 SUMMERS 11/28/2020 2021 INDIAN CREEK BR (TPK BOND 3) REPLACE BRIDGE $1,000,000$0S32416295400CON10 MCDOWELL 11/28/2020 2021 MCDOWELL STREET BRIDGE (TPK BOND) REHAB BRIDGE $189,000$0S3241665000CON10 MCDOWELL 11/28/2020 2021 NEWHALL ARCH #2 (TPK BOND 3) REPLACE BRIDGE $650,000$0

$0 $1,839,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BRIDGE

T699NBIS2100ENG99 STATEWIDE 10/28/2020 2021 FY 21 SF BR INSPECT BRIDGE INSPECTION BY SF $10,000,000$8,000,000S32064575400CON1 KANAWHA 2/28/2021 2021 CARTER BR-BROOKS ST I/C C&P (AUTH A CLEAN & PAINT $9,700,000$8,730,000S32064575400CON1 KANAWHA 4/28/2021 2021 CARTER BR - BROOKS ST I/C (SPLIT FUN CLEAN & PAINT $11,222,500$10,170,000S32064575400CON1 KANAWHA 4/28/2021 2021 CARTER BR - BROOKS ST I/C (SPLIT FUN CLEAN & PAINT $6,277,500$5,580,000S3065210100CON2 CABELL 8/28/2021 2021 JAMES RIVER RD O/P REPLACE SUPERSTRUCTURE $10,600,000$8,480,000

$40,960,000 $47,800,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2020 2021 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,927,914$4,927,914$4,927,914 $4,927,914TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2021 2021 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,623,000$7,623,000$7,623,000 $7,623,000TOTAL:GROUP:

TOTAL: $97,200,383 $121,133,056BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - COMMUNITY DEVELO

U389ARCTR100ENG9 FAYETTE 10/28/2020 2021 ARC POWER S WV BIKE TRL N DESIGN/CONST REC TRAIL NETWOR $150,000$45,000U331CAPER300ENG4 MONONGALIA 10/28/2020 2021 CAPERTON TRAIL LIGHTING INSTALL LIGHTING $25,000$25,000U320CHAS202CON1 KANAWHA 10/28/2020 2021 CHARLESTON WASHINGTON ST W STREE CONST SIDEWALK $245,772$196,618U325FAIRM700CON4 MARION 10/28/2020 2021 FAIRMONT SIDEWALK DESIGN/CONST SIDEWALK $400,000$320,000T699NRT2100ENG99 STATEWIDE 10/28/2020 2021 FFY 21 REC TRAIL OH REC TRAIL O/H ( ADMIN & ED) $130,000$104,000

U317HARRI700CON4 HARRISON 10/28/2020 2021 HARRISON CO SOUTHERN RAIL TRL DESIGN/CONST TRAIL $500,800$380,800U320HATFI200CON1 KANAWHA 10/28/2020 2021 HATFIELD-MCCOY-KANAWHA CO TRAILH CONST TRAILHEAD FACILITY $75,000$60,000U313WHITE102CON9 GREENBRIER 10/28/2020 2021 HOWARDS CREEK HIKE/BIKE TRAIL & PE HOWARDS CREEK HIKE/BIKE TRAIL & $380,000$304,000U325PLEAS400CON4 MARION 10/28/2020 2021 PLEASANT VALLEY SIDEWALK 2014 CONSTRUCT SIDEWALK $156,000$124,800

3/10/2020 Page 18 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 19: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU338MARLI600CON8 POCAHONTAS 11/28/2020 2021 MARLINTON RANGER DISTRICT DESIGN/CONST TRAIL $15,000$12,000U328ATHEN200CON10 MERCER 12/28/2020 2021 ATHENS PARK TRAIL DESIGN/CONST TRAIL $36,126$28,901U317HARRI800CON4 HARRISON 12/28/2020 2021 BRIDGEPORT COMM CONNECTIVITY DESIGN/CONST TRAIL $90,000$72,000U313LEWIS404CON9 GREENBRIER 12/28/2020 2021 LEWISBURG US 219 SOUTH SIDEWALKS 2 DESIGN/CONST SIDEWALK $200,000$160,000U354COMIN100ROW3 WOOD 1/28/2021 2021 COMING PARK TRAIL ACQUISITION ACQUISITION OF CSX RAIL CORRIDO $25,000$20,000U331MONON604CON4 MONONGALIA 1/28/2021 2021 DUNKARD AVE SIDEWALKS PHASE V CONSTRUCT SIDEWALK $240,000$240,000U313ALDER402CON9 GREENBRIER 2/28/2021 2021 ALDERSON MEM BR REPLACE BRIDGE $100,000$80,000U347BLACK200ENG8 TUCKER 2/28/2021 2021 BLACKWATER FALLS EQUIPMENT EQUIPMENT PURCHASE $64,000$64,000U320CHAS300CON1 KANAWHA 2/28/2021 2021 CHARLESTON SIDEWALKS SOUTH CONSTRUCT SIDEWALK $156,000$124,800

U354PARKE1400CON3 WOOD 2/28/2021 2021 GIHON ELEM SCHOOL SIDEWALK CONST SIDEWALK $60,920$57,874U342GLEND100ENG8 RANDOLPH 2/28/2021 2021 GLENDALE PARK TRAIL & EQUIP PURCHA TRL RESURF, EQUP PURCHASE $28,000$22,400U350HATFI400ENG2 WAYNE 2/28/2021 2021 HATFIELD MCCOY WAYNE CO EQUIP EQUIPMENT PURCHASE $150,000$120,000U320HATFI200ENG1 KANAWHA 2/28/2021 2021 HATFIELD-MCCOY-KANAWHA CO TRAILH CONST TRAILHEAD FACILITY $30,000$30,000U321JANE400CON7 LEWIS 2/28/2021 2021 JANE LEW MAIN STREETSCAPE CONST SIDEWALK $196,000$186,200U313LEWIS800CON9 GREENBRIER 2/28/2021 2021 LEWISBURG US 219 SOUTH SIDEWALKS CONST SIDEWALK $233,250$186,600U313MEADO400ENG9 GREENBRIER 2/28/2021 2021 MEADOW RIVER TRAIL PHASE DESIGN/CONST TRAIL $50,000$50,000U341PINEY100ENG10 RALEIGH 2/28/2021 2021 PINEY CREEK TRAIL CONST TRAIL $25,000$25,000U317SHINN800CON4 HARRISON 2/28/2021 2021 SHINNSTON DOWNTOWN SIDEWALKS DESIGN/CONST SIDEWALK $188,300$188,300U317SHINN900CON4 HARRISON 2/28/2021 2021 SHINNSTON SIDEWALK CONST SIDEWALK $188,881$179,437

U313LEWSW100CON9 GREENBRIER 2/28/2021 2021 US 60 S LAFAYETTE DESIGN/CONST ADA SIDEWALKS $100,000$80,000U317WESTM100CON4 HARRISON 2/28/2021 2021 WEST MILFORD SCHOOL ST SI CONST SIDEWALK $104,000$98,800U324BRADS100CON10 MCDOWELL 3/28/2021 2021 BRADSHAW SIDEWALK REHAB DESIGN/CONST SIDEWALK $112,500$112,500U317CLARK1400CON4 HARRISON 3/28/2021 2021 CLARKSBURG CONNECTOR ACQUISITION OF CSX RAIL CORRIDO $94,000$75,200

U308CLAY600CON1 CLAY 3/28/2021 2021 CLAY SIDEWALK CONST SIDEWALK $196,000$196,000U330GILBE300CON2 MINGO 3/28/2021 2021 GILBERT SIDEWALK PHASE I DESIGN SIDEWALK $643,000$643,000U307GRANT200CON3 CALHOUN 3/28/2021 2021 GRANTSVILLE HIGH ST SS DESIGN/CONST ADA SIDEWALKS $297,500$297,500S303HATFI300CON1 BOONE 3/28/2021 2021 HATFIELD MCCOY TRAIL SYSTEM CONST TRAIL $100,000$80,000U303HATFI100CON1 BOONE 3/28/2021 2021 HATFIELD-MCCOY-BOONE CO TRAILHEA CONST TRAILHEAD FACILITY $150,000$120,000U323HATFI500CON2 LOGAN 3/28/2021 2021 HATFIELD-MCCOY-LOGAN CO TRAIL CONST TRAIL $62,500$50,080U324IAEGE100CON10 MCDOWELL 3/28/2021 2021 IAEGER SIDEWALK REHAB DESIGN/CONST SIDEWALK $244,000$244,000U319LOUDO100CON5 JEFFERSON 3/28/2021 2021 LOUDOUN HEIGHTS AT RELOCATION CONST TRAIL $50,000$40,000U303MADIS200CON1 BOONE 3/28/2021 2021 MADISON STATE ST STREETSCAPE RECONST SIDEWALK $300,753$300,753U355MULLE100CON10 WYOMING 3/28/2021 2021 MULLENS SIDEWALKS DESIGN/CONST SIDEWALK $187,500$187,500U325PLEAS500CON4 MARION 3/28/2021 2021 PLEASANT VALLEY SIDEWALKS CONSTRUCT SIDEWALK $90,000$72,000U328PRINC900CON10 MERCER 3/28/2021 2021 PRINCETON MAIN ST SIDEWALK DESIGN/CONST SIDEWALK $125,950$125,950U340WINFI200CON1 PUTNAM 3/28/2021 2021 WINFIELD DOWNTOWN STREETSCAPE DESIGN/CONST SIDEWALK $294,650$294,650U301ALUM100CON7 BARBOUR 4/28/2021 2021 ALUM CAVE TRAIL PHASE II DESIGN/CONST TRAIL $120,000$96,000

U313ANTHO100CON9 GREENBRIER 4/28/2021 2021 ANTHONY BOAT LAUNCH DESIGN/CONST BOAT LAUNCH $28,700$22,750U310BABCO200CON9 FAYETTE 4/28/2021 2021 BABCOCK STATE PARK SEWELL TRL RESTORE RAILWAY $112,500$112,500U345BLUES100CON9 SUMMERS 4/28/2021 2021 BLUESTONE SCENIC RIVER TRAIL INSTALL WATER CAUSEWAY $7,500$7,500

U343CAIRO40000CON3 RITCHIE 4/28/2021 2021 CAIRO SIDEWALK IMP PHASE CONSTRUCT SIDEWALK $407,346$407,346U340TEAYS200CON1 PUTNAM 4/28/2021 2021 GREAT TEAYS BLVD SIDEWALK CONSTRUCT SIDEWALK $210,000$210,000

3/10/2020 Page 19 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 20: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU313GREEN600CON9 GREENBRIER 4/28/2021 2021 GREENBRIER RIVER TRAIL RESURFACIN RESURF TRAIL $63,693$63,693U320HATFI100CON1 KANAWHA 4/28/2021 2021 HATFIELD MCCOY KNWHA CO TRL SYSYE CONST TRAIL $100,000$80,000U382HATFI100CON2 LOGAN 4/28/2021 2021 HATFIELD-MCCOY ROCKHOUSE HOLLOW MAINT TRAIL $131,250$105,000

U323BEARW100CON2 LOGAN 4/28/2021 2021 HMT BEARWALLOW & BUFFALO MTN TRL MAINT TRAIL $100,000$80,000U340HURRI800CON1 PUTNAM 4/28/2021 2021 HURRICANE SIDEWALKS CONSTRUCT SIDEWALK $200,000$200,000U309NBEND200CON4 DODDRIDGE 4/28/2021 2021 NORTH BEND RAIL TRAIL MAINT REPAIR TRAIL $100,000$80,000U354PARKE1300CON3 WOOD 4/28/2021 2021 PBURG POND RUN TRL & BR (SPLIT FUND CONST PED BR $125,000$100,000U354PARKE1300CON3 WOOD 4/28/2021 2021 PBURG POND RUN TRL & BR (SPLIT FUND CONST PED BR $500,000$493,750U344SPENC105CON3 ROANE 4/28/2021 2021 SPENCER STREETSCAPE 2014 CONSTRUCT SIDEWALK $250,038$200,030U331STARC800CON4 MONONGALIA 4/28/2021 2021 STAR CITY TRAIL CONNECTOR CONSTRUCT TRAIL $92,000$73,600

A399TAPTMA2100CON99 STATEWIDE 4/28/2021 2021 TAP-TMA ALLOCATION VARIOUS IMPROVEMENTS $209,542$167,634U313WHITE200CON9 GREENBRIER 4/28/2021 2021 WHITE SLPHR SPRNGS W END CONST SIDEWALK $255,200$204,160

U349BUCKH1500CON7 UPSHUR 5/28/2021 2021 BUCKHANNON GATEWAY WEST PHASE 3 CONST SIDEWALK $213,623$170,898U310FAYET100CON9 FAYETTE 5/28/2021 2021 FAYETTE CO CLIMBING ACCESS STABILIZATION BR BUTRESS $64,000$64,000U319HARPE200CON5 JEFFERSON 5/28/2021 2021 HARPERS FERRY HIGH ST DESIGN SIDEWALK $400,000$320,000U302MARTI700CON5 BERKELEY 5/28/2021 2021 MARTINSBURG TRN STA CORR CONST SIDEWALK $150,000$120,000U313RUPER300CON9 GREENBRIER 5/28/2021 2021 RUPERT SIDEWALKS 2014 CONST SIDEWALK $91,855$73,484U320STALB1000CON1 KANAWHA 5/28/2021 2021 ST ALBANS STREETSCAPE 2014 CONST SIDEWALK $241,000$192,800U333BATH402CON5 MORGAN 6/28/2021 2021 BATH STREETSCAPE CONST SIDEWALK, LIGHTING $408,750$327,000U353ELIZA400CON3 WIRT 6/28/2021 2021 ELIZABETH SCHOOL VIEW STREET SIDE CONST SIDEWALK $122,375$97,900

U342GLEND100CON8 RANDOLPH 7/28/2021 2021 GLENDALE PARK TRAIL & EQUIP PURCHA TRL RESURF, EQUP PURCHASE $21,451$17,161U313LEWIS404ENG9 GREENBRIER 7/28/2021 2021 LEWISBURG US 219 SOUTH SIDEWALKS 2 DESIGN/CONST SIDEWALK $50,000$50,000U389ARCTR100ROW9 FAYETTE 8/28/2021 2021 ARC POWER S WV BIKE TRL N DESIGN/CONST REC TRAIL NETWOR $100,963$30,289U331CAPER200CON4 MONONGALIA 8/28/2021 2021 CAPERTON TRAIL DRAINAGE DESIGN/UPGRADE DRAINAGE $39,250$31,400U331CAPER300CON4 MONONGALIA 8/28/2021 2021 CAPERTON TRAIL LIGHTING INSTALL LIGHTING $125,000$100,000U354COMIN100CON3 WOOD 8/28/2021 2021 COMING PARK TRAIL ACQUISITION ACQUISITION OF CSX RAIL CORRIDO $204,000$163,200U325FAIRM100ROW4 MARION 8/28/2021 2021 FAIRMONT CONNECTING TRAIL DESIGN TRAIL $125,000$100,000U325FAIRM900CON4 MARION 8/28/2021 2021 FAIRMONT SRTS TRAFFIC CALMING INSTALL SAFETY FLASHERS $27,267$21,814

A399TRAIL?????CON99 STATEWIDE 8/28/2021 2021 NATIONAL REC TRAIL VARIOUS IMPROVEMENTS $1,518,131$1,214,505U31016000100CON9 FAYETTE 8/28/2021 2021 NEW RIVER REC TRAIL ACCESS TO REC ACTIVITIES $302,687$242,150U31016000100ROW9 FAYETTE 8/28/2021 2021 NEW RIVER REC TRAIL ACCESS TO REC ACTIVITIES $89,545$71,636

U322GUYAN100CON2 LINCOLN 9/28/2021 2021 GUYANDOTTE WATER TRAIL ACCESS DESIGN/CONST TRL ACCESS $106,250$106,250U338LINWO100CON8 POCAHONTAS 9/28/2021 2021 LINWOOD ALIVE PROJECT DESIGN SIDEWALK $300,000$300,000U341PINEY100CON10 RALEIGH 9/28/2021 2021 PINEY CREEK TRAIL CONST TRAIL $283,671$226,937

$13,171,050 $15,288,989TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2100CON99 STATEWIDE 2/28/2021 2021 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $12,666,000$10,132,800A399CMAQM2100CON99 STATEWIDE 2/28/2021 2021 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,800,000

$13,932,800 $16,466,000TOTAL:GROUP:

3/10/2020 Page 20 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 21: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPTOTAL: $27,103,850 $31,754,989ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - LOCALIZED MOBILIT

S3403576500CON1 PUTNAM 12/28/2020 2021 TUCKERS BRANCH SLIDE SLIDE REPAIR $800,000$640,000S319340157800ROW5 JEFFERSON 2/28/2021 2021 US 340 ROCK SLIDE INVESTIGATION SLIDE REPAIR $40,000$32,000A399D302100CON99 STATEWIDE 7/28/2021 2021 3R MAJOR SLIDES-NHS SLIDE REPAIR $2,910,000$2,328,000A399D302100CON99 STATEWIDE 7/28/2021 2021 3R MAJOR SLIDES-STP SLIDE REPAIR $5,000,000$4,000,000

$7,000,000 $8,750,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - RESURFACING

U30610171800CON2 CABELL 4/28/2021 2021 HAL GREER BLVD CONSTRUCT STREET IMPROVE $6,000,000$4,800,000$4,800,000 $6,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - AC PAYBACK

X30522300000CON6 BROOKE 12/28/2020 2021 WELLSBURG BR (DESIGN/BUILD)(AC PAY CONST BRIDGE $10,407,607$8,326,086$8,326,086 $10,407,607TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BOND PROJECT

X341ZWAY62202CON10 RALEIGH 6/28/2020 2021 BEAVER-S EISENHOWER DR (DESIGN/BUI ZWAY SEGMENT 8 $51,000,000$0U3315900000ROW4 MONONGALIA 10/28/2020 2021 VAN VOORHIS RD WIDENING WIDEN, IMPROVE DRAINAGE, ADD SI $5,000,000$4,000,000U30664316500CON2 CABELL 6/28/2021 2021 CULLODEN INTERCHANGE (GO BOND 4) CONST NEW I/C & CONNECTORS $50,000,000$0U3542231107CON3 WOOD 6/28/2021 2021 PARKERSBURG - ST MARYS RD (GO BON UPGRADE TO 5 LANE $36,000,000$0U3315900000CON4 MONONGALIA 6/28/2021 2021 VAN VOORHIS RD WIDENING WIDEN, IMPROVE DRAINAGE, ADD SI $15,000,000$12,000,000U33167118600CON4 MONONGALIA 6/28/2021 2021 WEST RUN ROAD (GO BOND 4) IMPROVE I/S & WIDEN $13,000,000$0U33119132400CON4 MONONGALIA 8/28/2021 2021 BEECHURST AVE @ 6TH (GO BOND 4) IMPROVE I/S & WIDEN $8,000,000$0

X341ZWAY10002CON10 RALEIGH 8/28/2021 2021 SHADY SPRINGS TO BEAVER (TPK BOND) WIDEN & REALIGN SEG 1 $35,000,000$0U3505258000CON2 WAYNE 8/28/2021 2021 WV 75 - PRICHARD (GO BOND 3) DESIGN 4 LANE HIGHWAY $150,000,000$0

$16,000,000 $363,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - GARVEE 2019

S32525042000CON4 MARION 11/28/2020 2021 HOLBERT RD ROCKFALL (GARVEE 2019) ROCKFALL MITIGATION $3,500,000$0$0 $3,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - RESURFACING

U3021013800CON5 BERKELEY 10/28/2020 2021 ROCK CLIFF I/S IMPROVEMENTS CONSTR ROUNDABOUT $1,084,000$867,200

3/10/2020 Page 21 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 22: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU30245145100CON5 BERKELEY 11/28/2020 2021 WV 45 APPLE HARVEST DR WIDENING WIDEN & ADD ADDITIONAL LANES $5,633,333$4,590,000X303119151502CON1 BOONE 12/28/2020 2021 ROCK CREEK I/C - NEW INTERCHANGE CONSTRUCT NEW INTERCHANGE $18,000,000$14,400,000X303119151503CON1 BOONE 3/28/2021 2021 ROCK CREEK I/C - NEW ACCESS RD CONSTRUCT NEW ACCESS RD $6,500,000$5,200,000U30664180000CON2 CABELL 8/28/2021 2021 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $14,125,000$11,300,000U30664180000CON2 CABELL 8/28/2021 2021 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $9,067,500$7,254,000

$43,611,200 $54,409,833TOTAL:GROUP:

TOTAL: $79,737,286 $446,067,440ITY IMPROVEMENT PROGRAM

ProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - PLANNING AND WOR

T699SPR2100OTHER99 STATEWIDE 10/28/2020 2021 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $9,462,204$6,700,000T699SPR2100OTHER99 STATEWIDE 10/28/2020 2021 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000A699RES2200OTHER99 STATEWIDE 10/28/2020 2021 SPR RESEARCH ALLOCATION HWY PLANNING $2,200,000$2,200,000

T699USACE2100OTHER99 STATEWIDE 10/28/2020 2021 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFS2100OTHER99 STATEWIDE 10/28/2020 2021 USFS INTERAGENCY USFS INTERAGENCY POSITION $143,500$114,800

T699USFWS2100OTHER99 STATEWIDE 10/28/2020 2021 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699WVSHP2100OTHER99 STATEWIDE 10/28/2020 2021 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524

A699???2000ENG99 STATEWIDE 11/28/2020 2021 TRANSPORTATION MANAGEMENT AREA HWY PLANNING $4,251,530$3,401,224T699LTAP2100ENG99 STATEWIDE 1/28/2021 2021 CY LTAP 21 DEVELOPMENT AND DISTRIBUTION $300,000$150,000

T699SUMME2100OTHER99 STATEWIDE 4/28/2021 2021 SUMMER 2021 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699DBE2100OTHER99 STATEWIDE 6/28/2021 2021 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2100OTHER99 STATEWIDE 6/28/2021 2021 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$15,220,568 $19,162,502TOTAL:GROUP:

TOTAL: $15,220,568 $19,162,502CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BOND PROJECT

U34064413700CON1 PUTNAM 11/28/2020 2021 US35/I-64 I/C - NITRO I/C (D/B)(GO BOND)( UPGR TO 6 LNS $10,800,000$10,800,000U33119132400ROW4 MONONGALIA 1/28/2021 2021 BEECHURST AVE @ 6TH (GO BOND 4) IMPROVE I/S & WIDEN $3,000,000$2,400,000X342H402104CON8 RANDOLPH 8/28/2021 2021 US 219 CONN-WV 72 I/C (DESIGN/BUILD) ( GR, DR, BRS $26,000,000$26,000,000

$39,200,000 $39,800,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BRIDGE

X342H402108CON8 RANDOLPH 9/28/2021 2021 CHEAT RIVER BRIDGE (AC PAYBACK) GO CONST NEW BRIDGE $100,000,000$0$0 $100,000,000TOTAL:GROUP:

3/10/2020 Page 22 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 23: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - OTHER

X354D70012CON3 WOOD 6/28/2021 2021 CORRIDOR D, E+S REPAIRS SEEDING & MULCHING, BANK STABIL $2,400,000$1,920,000$1,920,000 $2,400,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - RESURFACING

X342H402105ROW8 RANDOLPH 10/28/2020 2021 WV 72 I/C-PARSONS (AC PAYBACK) GR, DR, PAVE $47,000,000$47,000,000S32310193904CON2 LOGAN 12/28/2020 2021 WV 17 CONNECTOR (AUTH AC PROJECT) UPGR TO 4 LN, BR $17,500,000$4,000,000

X331791560000CON4 MONONGALIA 7/28/2021 2021 WV 7 OP INTERCHANGE (AUTH AC PROJE CONST NEW I/C AND ACCESS RD $5,000,000$4,000,000X331791560000CON4 MONONGALIA 7/28/2021 2021 WV 7 OP INTERCHANGE (AUTH AC PROJE CONST NEW I/C AND ACCESS RD $20,000,000$16,000,000X316H1251600ROW5 HARDY 8/28/2021 2021 HARDY CO 23/12-VA STATE LI CONST 4 LN $8,640,000$6,912,000X342H402106CON8 RANDOLPH 10/28/2021 2021 KERENS-WV 72 I/C (AC PAYBACK) PAVE - Section 1 $10,000,000$10,000,000

$87,912,000 $108,140,000TOTAL:GROUP:

TOTAL: $129,032,000 $250,340,000EGIONAL MOBILITY PROGRAM

ProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - RESURFACING

S34064346000CON1 PUTNAM 10/28/2020 2021 HURRICANE REST AREA (EB) CONSTRUCT RESTROOMS, REN FACI $3,000,000$3,000,000S34064345000CON1 PUTNAM 10/28/2020 2021 HURRICANE REST AREA (WB) CONSTRUCT RESTROOMS, REN FACI $3,000,000$3,000,000A399D112100CON99 STATEWIDE 12/28/2020 2021 APD RESURFACING-NHPP (SPLIT FUNDE RESURF APD-NHPP $19,500,000$15,600,000A399F112000CON99 STATEWIDE 12/28/2020 2021 FAI-4R ALLOCATION-NHPP (SPLIT FUNDE RESURF FAI-NHPP $29,500,000$23,550,000A399D122100CON99 STATEWIDE 12/28/2020 2021 FED AID OTHER PAVING ALLOCATION-NH RESURF OTHER FED-NHPP $4,000,000$3,200,000A399D122100CON99 STATEWIDE 12/28/2020 2021 FED AID OTHER PAVING ALLOCATION-ST RESURF OTHER FED-STP $22,500,000$18,000,000

99 STATEWIDE 1/28/2021 2021 GROUPABLE BUCKET DELTA - RESURFAC $35,971,682$28,777,346S399SEAL2101CON99 STATEWIDE 5/28/2021 2021 APD PAVEMENT SEALING 2021 PAVE CRACK SEAL $1,845,000$1,476,000S399SEAL2102CON99 STATEWIDE 5/28/2021 2021 I PAVEMENT SEALING 2021 PAVE CRACK SEAL $3,150,000$2,835,000

$99,438,346 $122,466,682TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - BOND PROJECT

U32062219600ROW1 KANAWHA 12/28/2020 2021 WV 622 - CROSS LANES (GO BOND 4) WIDEN ROADWAY $5,000,000$4,000,000U32062219600ENG1 KANAWHA 12/28/2020 2021 WV 622 - CROSS LANES (GO BOND 4) WIDEN ROADWAY $1,500,000$1,200,000U3363314300CON8 PENDLETON 3/28/2021 2021 ALLEGHANY TRUCK ESCAPE RAMP (GO B TRUCK ESCAPE RAMP $17,450,000$0

$5,200,000 $23,950,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2020 2021 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654

3/10/2020 Page 23 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 24: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$19,711,654 $19,711,654TOTAL:GROUP:

TOTAL: $124,350,000 $166,128,336RESURFACING PROGRAM

ProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: GROUPABLE - TRAFFIC

U3287700100CON10 MERCER 10/28/2020 2021 I-77 SIGNING (SPLIT FUND) RENOVATE SIGNING $401,700$401,700S399LEDLI200CON99 STATEWIDE 10/28/2020 2021 LED LIGHT UPGRADE NS PHASE UPGRADE FLASHING LIGHT SIGNAL $262,629$236,366U32061214500CON1 KANAWHA 10/28/2020 2021 MACCORKLE AVENUE LIGHTING REPLACE LIGHTING $800,000$800,000S32846000000CON10 MERCER 10/28/2020 2021 US 460 SIGNING RENOVATE SIGNING $1,500,000$1,500,000S32179982100CON7 LEWIS 10/28/2020 2021 WESTON I/C LIGHTING RENOVATE LIGHTING $1,000,000$1,000,000

S335WHEEL1800CON6 OHIO 10/28/2020 2021 WHEELING CBD SIGNAL SYSTEM RENOVATE TRAFFIC SIGNAL $3,500,000$2,800,000S333522133700CON5 MORGAN 11/28/2020 2021 BERKELEY SPRINGS TRAFFIC SIGNAL RENOVATE TRAFFIC SIGNAL $230,000$207,000U31750123000CON4 HARRISON 11/28/2020 2021 CLARKSBURG EXP LIGHTING UPGRADE LIGHTING $6,000,000$4,800,000

A399?????CON99 STATEWIDE 1/28/2021 2021 DT SIGNING ALLOCATION SIGNS PE & CON $2,598,300$2,598,30099 STATEWIDE 1/28/2021 2021 GROUPABLE BUCKET DELTA - TRAFFIC $1,498,124$1,198,499

U3028100200CON5 BERKELEY 1/28/2021 2021 I-81 LIGHTING UPGRADE LIGHTING $8,000,000$7,200,000S381STRIP2100CON1 BOONE 1/28/2021 2021 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805S390STRIP2100CON10 MCDOWELL 1/28/2021 2021 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2100CON2 CABELL 1/28/2021 2021 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2100CON3 CALHOUN 1/28/2021 2021 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2100CON4 DODDRIDGE 1/28/2021 2021 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2100CON5 BERKELEY 1/28/2021 2021 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2100CON6 BROOKE 1/28/2021 2021 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021S387STRIP2100CON7 BARBOUR 1/28/2021 2021 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2100CON8 PENDLETON 1/28/2021 2021 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181S389STRIP2100CON9 FAYETTE 1/28/2021 2021 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978S381RECAL2100CON1 BOONE 2/28/2021 2021 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2100CON10 MCDOWELL 2/28/2021 2021 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2100CON2 CABELL 2/28/2021 2021 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2100CON3 CALHOUN 2/28/2021 2021 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2100CON4 DODDRIDGE 2/28/2021 2021 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2100CON5 BERKELEY 2/28/2021 2021 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2100CON6 BROOKE 2/28/2021 2021 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2100CON7 BARBOUR 2/28/2021 2021 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2100CON8 PENDLETON 2/28/2021 2021 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2100CON9 FAYETTE 2/28/2021 2021 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000A399RHCH?????CON99 STATEWIDE 8/28/2021 2021 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $1,080,862$972,775A399RHPD?????CON99 STATEWIDE 8/28/2021 2021 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $1,080,863$972,776

$32,845,066 $41,940,856TOTAL:GROUP:

3/10/2020 Page 24 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 25: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2021 GROUP: NOT GROUPABLE - SAFETY

U3287700100CON10 MERCER 10/28/2020 2021 I-77 SIGNING (SPLIT FUND) RENOVATE SIGNING $401,700$401,700U399RPM2100CON99 STATEWIDE 12/28/2020 2021 2021 RPM RPM $610,000$549,000

T699RDWA2000CON99 STATEWIDE 2/28/2021 2021 RDWY DEPARTURE ASSESSMENT A IMPROVE RDWY DEPARTURES $1,076,000$968,400T699RDWB2000CON99 STATEWIDE 2/28/2021 2021 RDWY DEPARTURE ASSESSMENT B IMPROVE RDWY DEPARTURES $895,000$805,500T699RDWC2000CON99 STATEWIDE 2/28/2021 2021 RDWY DEPARTURE ASSESSMENT C IMPROVE RDWY DEPARTURES $947,000$852,300T699RDWD2000CON99 STATEWIDE 2/28/2021 2021 RDWY DEPARTURE ASSESSMENT D IMPROVE RDWY DEPARTURES $876,000$788,400T699RDWE2000CON99 STATEWIDE 2/28/2021 2021 RDWY DEPARTURE ASSESSMENT E IMPROVE RDWY DEPARTURES $713,000$641,700A399HSIP2000CON99 STATEWIDE 9/28/2021 2021 HSIP ALLOCATION HIGHWAY SAFETY IMPROVEMENT P $29,105,659$23,284,527

$28,291,527 $34,624,359TOTAL:GROUP:

TOTAL: $61,136,593 $76,565,215TRAFFIC PROGRAM

TOTAL: $533,780,680 $1,111,151,5382021

3/10/2020 Page 25 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 26: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - BRIDGE

S355678900ROW10 WYOMING 10/28/2021 2022 CLEAR FORK ARCH NO 3 REPLACE BRIDGE $150,000$120,000S3527118400ROW6 WETZEL 10/28/2021 2022 HUFF BRIDGE REPLACE BRIDGE $225,000$180,000S31015136100ROW9 FAYETTE 10/28/2021 2022 MILBURN BRIDGE REPLACE BRIDGE $104,100$83,280S3443412100CON3 ROANE 10/28/2021 2022 POCATALICO RIVER RD TRUSS REPLACE BRIDGE $1,400,000$1,200,000S301139000ROW7 BARBOUR 10/28/2021 2022 SANDY CREEK DECK GIRDER RENOVATE BRIDGE $145,500$116,400

A399E222200CON99 STATEWIDE 11/28/2021 2022 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $17,177,000$13,741,600A399E222200CON99 STATEWIDE 11/28/2021 2022 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $14,062,500$11,250,000A399E302200CON99 STATEWIDE 11/28/2021 2022 CAT 10 LMC O/L STATEWIDE STATEWIDE LMC OVERLAY $3,750,000$3,000,000A399E222200CON99 STATEWIDE 11/28/2021 2022 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $5,000,000$4,000,000A399E222200CON99 STATEWIDE 11/28/2021 2022 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $1,250,000$1,000,000A399E222200CON99 STATEWIDE 11/28/2021 2022 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $2,625,000$2,100,000A399E242200ENG99 STATEWIDE 11/28/2021 2022 CAT 4 BR INSPECTION BRIDGE INSPECTION $3,750,000$3,000,000S31360413500CON9 GREENBRIER 11/28/2021 2022 CLIFFORD FAMILY MEMORIAL BR REPLACE BRIDGE $2,429,000$1,943,200A399F122200CON99 STATEWIDE 11/28/2021 2022 I-4R CAT 5 BRS CAT 5 BRS STATEWIDE $18,750,000$16,875,000

S344291304400ROW3 ROANE 11/28/2021 2022 OSBORNE MILLS BRIDGE REPLACE BRIDGE $300,000$240,000S321N167000200CON7 LEWIS 12/28/2021 2022 FOURTH STREET ARCH BR REPLACE BRIDGE $1,560,000$1,248,000

S34411974900CON3 ROANE 12/28/2021 2022 MCKOWN CREEK ARCH BR REPLACE BRIDGE $1,500,000$1,200,000S31015127300ROW9 FAYETTE 12/28/2021 2022 PAINT CREEK ARCH REPLACE BRIDGE $77,400$61,920

A399E233A2200CON99 STATEWIDE 1/28/2022 2022 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233A2200CON99 STATEWIDE 1/28/2022 2022 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2200CON99 STATEWIDE 1/28/2022 2022 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2200CON99 STATEWIDE 1/28/2022 2022 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000S321100824200CON7 LEWIS 1/28/2022 2022 FREEMANSBURG ARCH REPLACE BRIDGE $500,000$400,000S31821127500ROW3 JACKSON 1/28/2022 2022 GRASSLICK CREEK ARCH REPLACE BRIDGE $262,500$210,000S3025193400ROW5 BERKELEY 2/28/2022 2022 MIDDLEWAY BRIDGE REPLACE BRIDGE $675,000$540,000

S350371319700CON2 WAYNE 2/28/2022 2022 PETER CAVE ARCH REPLACE BRIDGE $1,500,000$1,200,000S3558540900CON10 WYOMING 3/28/2022 2022 RALSTON BRANCH BR #2 REPLACE BRIDGE $800,000$640,000S3267437200CON6 MARSHALL 5/28/2022 2022 BIG TRIBBLE BRIDGE REPLACE BRIDGE $1,000,000$800,000S3271604200CON1 MASON 5/28/2022 2022 CROOKED CREEK BR REPLACE BRIDGE $600,000$480,000S31015136100CON9 FAYETTE 5/28/2022 2022 MILBURN BRIDGE REPLACE BRIDGE $1,429,000$1,143,200

S317505900100CON4 HARRISON 5/28/2022 2022 NORTHVIEW OVERPASS REPLACE BRIDGE $3,644,000$2,915,200S301139000CON7 BARBOUR 5/28/2022 2022 SANDY CREEK DECK GIRDER RENOVATE BRIDGE $1,500,000$1,200,000

S3527118400CON6 WETZEL 6/28/2022 2022 HUFF BRIDGE REPLACE BRIDGE $1,500,000$1,200,000S33547001300CON6 OHIO 6/28/2022 2022 I-470 BR APPR RENOVATE BRIDGE $9,200,000$8,280,000S3512635900CON7 WEBSTER 8/28/2022 2022 BERGOO ROAD ARCH REPLACE BRIDGE $1,440,000$1,152,000S31821127500CON3 JACKSON 8/28/2022 2022 GRASSLICK CREEK ARCH REPLACE BRIDGE $1,750,000$1,400,000

S344291304400CON3 ROANE 8/28/2022 2022 OSBORNE MILLS BRIDGE REPLACE BRIDGE $2,000,000$1,600,000S31015127300CON9 FAYETTE 8/28/2022 2022 PAINT CREEK ARCH REPLACE BRIDGE $1,771,000$1,416,800

3/10/2020 Page 26 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 27: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$90,936,600 $109,452,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BOND PROJECT

S32452244600CON10 MCDOWELL 10/28/2021 2022 AVONDALE BRIDGE (TPK BOND 4) REPLACE BRIDGE $3,000,000$0S3248321000300CON10 MCDOWELL 2/28/2022 2022 BARTLEY BOTTOM BRIDGE (TPK BOND) REPLACE BRIDGE $439,500$0S32495800000CON10 MCDOWELL 2/28/2022 2022 LEX HILL ROAD BR (TPK BOND) REPLACE BRIDGE $3,050,000$0S3241664000CON10 MCDOWELL 2/28/2022 2022 NEWHALL ARCH #1 (TPK BOND) REPLACE BRIDGE $750,000$0S32019000200CON1 KANAWHA 2/28/2022 2022 PFC WF HARRISON MEM BR (TPK BOND) REPLACE BRIDGE $250,000$0S324753200CON10 MCDOWELL 3/28/2022 2022 TWIN BRANCH TRUSS NO 2 (TPK BOND) REPLACE BRIDGE $3,873,000$0

S324164800300CON10 MCDOWELL 7/28/2022 2022 WEST HOWARD ST BR (TPK BOND) REPLACE BRIDGE $1,600,000$0$0 $12,962,500TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BRIDGE

S32064575400CON1 KANAWHA 2/28/2022 2022 CARTER BR-BROOKS ST I/C C&P (AC PAY CLEAN & PAINT $7,800,000$7,020,000$7,020,000 $7,800,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2021 2022 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,927,914$4,927,914$4,927,914 $4,927,914TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2022 2022 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,620,750$7,620,750$7,620,750 $7,620,750TOTAL:GROUP:

TOTAL: $110,505,264 $142,763,164BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - COMMUNITY DEVELO

U310OAKHI700ENG9 FAYETTE 10/28/2021 2022 OAK HILL EAST END PED UPGRADE DESIGN SIDEWALK $200,000$200,000S30479492900CON7 BRAXTON 10/28/2021 2022 SERVIA REST AREA (TOLL CREDITS) CONSTRUCT RESTROOMS, REN FACI $7,050,000$7,050,000U305WEIRT400CON6 BROOKE 10/28/2021 2022 WEIRTON PARK DR ENHANCEMENT CONST SIDEWALK $491,875$393,500U310SMITH200ENG9 FAYETTE 2/28/2022 2022 SMITHERS MICHIGAN AVE STREETSCAPE DESIGN/CONST SIDEWALK $100,000$100,000U331DECKE300CON4 MONONGALIA 3/28/2022 2022 DECKERS CREEK TRAIL UNDERCUT REP REPAIR EXISTING TRAIL $98,269$78,615U323HATFI400CON2 LOGAN 3/28/2022 2022 HATFIELD-MCCOY-LOGAN CO TRAILHEAD CONST TRAILHEAD FACILITY $42,500$34,000

U313MEADO400CON9 GREENBRIER 3/28/2022 2022 MEADOW RIVER TRAIL PHASE DESIGN/CONST TRAIL $100,000$100,000U328PRINC800CON10 MERCER 3/28/2022 2022 PRINCETON THORN ST STREETSCAPE DESIGN STREETSCAPE $160,000$160,000U319SHEPH800CON5 JEFFERSON 3/28/2022 2022 SHEPHERDSTOWN BIKE PATH (SPLIT FU DEV & CONST MULTI-USE PATH $469,100$416,600

3/10/2020 Page 27 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 28: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPU310SMITH200CON9 FAYETTE 3/28/2022 2022 SMITHERS MICHIGAN AVE STREETSCAPE DESIGN/CONST SIDEWALK $250,000$250,000U355HATFI200CON10 WYOMING 4/28/2022 2022 HATFIELD-MCCOY PINNACLE CREEK-WY MAINT TRAIL $131,250$105,000U313LEWIS302CON9 GREENBRIER 4/28/2022 2022 LEWISBURG L&R RAIL TRAIL CONST TRAIL $452,250$401,800

A399TAPTMA2220CON99 STATEWIDE 4/28/2022 2022 TAP-TMA ALLOCATION VARIOUS IMPROVEMENTS $209,542$167,634U354VIENN100CON3 WOOD 4/28/2022 2022 VIENNA GRND CTRL AVE STRS CONST SIDEWALK $123,881$99,105

U331MORGA1700CON4 MONONGALIA 4/28/2022 2022 WALNUT ST STREETSCAPE 2012 CONST WALK, CROSSWALKS, CURB $297,500$238,000U306HUNTI1900CON2 CABELL 5/28/2022 2022 PATH IMPROVEMENTS BIKE/PED IMPROVEMENTS $496,000$396,800A399ENHAN2220CON99 STATEWIDE 6/28/2022 2022 TRANSPORTATION ALTERNATIVES ALLO VARIOUS IMPROVEMENTS $5,743,526$4,594,821U316MOORE300CON5 HARDY 7/28/2022 2022 MOOREFIELD LEVEE TRAIL CONST TRAIL LEVEE $95,000$76,000A399TRAIL?????CON99 STATEWIDE 8/28/2022 2022 NATIONAL REC TRAIL VARIOUS IMPROVEMENTS $1,606,067$1,284,854U389ARCTR100CON9 FAYETTE 9/28/2022 2022 ARC POWER S WV BIKE TRL N DESIGN/CONST REC TRAIL NETWOR $728,984$218,695

$16,365,424 $18,845,744TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2200CON99 STATEWIDE 2/28/2022 2022 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $13,750,000$11,000,000A399CMAQM2220CON99 STATEWIDE 2/28/2022 2022 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,800,000

$14,800,000 $17,550,000TOTAL:GROUP:

TOTAL: $31,165,424 $36,395,744ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - LOCALIZED MOBILIT

A399D302220CON99 STATEWIDE 7/28/2022 2022 3R MAJOR SLIDES-NHS SLIDE REPAIR $3,750,000$3,000,000A399D302220CON99 STATEWIDE 7/28/2022 2022 3R MAJOR SLIDES-STP SLIDE REPAIR $5,000,000$4,000,000

$7,000,000 $8,750,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BOND PROJECT

U33185706700ROW4 MONONGALIA 11/28/2021 2022 GREENBAG ROAD (GO BOND 4) IMPROVE I/S & WIDEN $3,000,000$2,400,000U3315909400ROW4 MONONGALIA 8/28/2022 2022 VAN VOORHIS RD (GO BOND 4) IMPROVE I/S & WIDEN $5,000,000$4,000,000

$6,400,000 $8,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - RESURFACING

U30664180000CON2 CABELL 8/28/2022 2022 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $10,375,000$8,300,000U30664180000CON2 CABELL 8/28/2022 2022 MERRITTS CR - BARBOURSVILLE (AC PAY WIDEN TO 8 LN $12,817,500$10,254,000

$18,554,000 $23,192,500TOTAL:GROUP:

TOTAL: $31,954,000 $39,942,500ITY IMPROVEMENT PROGRAM

3/10/2020 Page 28 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 29: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - PLANNING AND WOR

T699SPR2200OTHER99 STATEWIDE 10/28/2021 2022 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $6,700,000$6,700,000T699SPR2200OTHER99 STATEWIDE 10/28/2021 2022 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000A699RES2220OTHER99 STATEWIDE 10/28/2021 2022 SPR RESEARCH ALLOCATION HWY PLANNING $2,200,000$2,200,000

T699USACE2200OTHER99 STATEWIDE 10/28/2021 2022 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFS2200OTHER99 STATEWIDE 10/28/2021 2022 USFS INTERAGENCY USFS INTERAGENCY POSITION $143,500$114,800

T699USFWS2200OTHER99 STATEWIDE 10/28/2021 2022 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699WVSHP2200OTHER99 STATEWIDE 10/28/2021 2022 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524

A699???2200ENG99 STATEWIDE 11/28/2021 2022 TRANSPORTATION MANAGEMENT AREA HWY PLANNING $4,251,530$3,401,224T699LTAP2200ENG99 STATEWIDE 1/28/2022 2022 CY LTAP 22 DEVELOPMENT AND DISTRIBUTION $300,000$150,000

T699SUMME2200OTHER99 STATEWIDE 4/28/2022 2022 SUMMER 2022 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699DBE2200OTHER99 STATEWIDE 6/28/2022 2022 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2200OTHER99 STATEWIDE 6/28/2022 2022 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$15,220,568 $16,400,298TOTAL:GROUP:

TOTAL: $15,220,568 $16,400,298CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BOND PROJECT

U34064413700CON1 PUTNAM 11/28/2021 2022 US35/I-64 I/C - NITRO I/C (D/B)(GO BOND)( UPGR TO 6 LNS $30,000,000$30,000,000X342H402104CON8 RANDOLPH 8/28/2022 2022 US 219 CONN-WV 72 I/C (DESIGN/BUILD) ( GR, DR, BRS $26,000,000$26,000,000

$56,000,000 $56,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BRIDGE

X342H402108CON8 RANDOLPH 9/28/2022 2022 CHEAT RIVER BRIDGE (AC PAYBACK) CONST NEW BRIDGE $30,575,000$30,575,000$30,575,000 $30,575,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - RESURFACING

X342H402105CON8 RANDOLPH 10/28/2021 2022 WV 72 I/C-PARSONS (AUTH AC PROJECT) GR, DR, PAVE $30,000,000$30,000,000S32310193904CON2 LOGAN 12/28/2021 2022 WV 17 CONNECTOR (AC PAYBACK) UPGR TO 4 LN, BR $17,500,000$24,000,000

X331791560000CON4 MONONGALIA 7/28/2022 2022 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $5,000,000$4,000,000X331791560000CON4 MONONGALIA 7/28/2022 2022 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $20,000,000$16,000,000X342H402106CON8 RANDOLPH 10/28/2022 2022 KERENS-WV 72 I/C (AC PAYBACK) PAVE - Section 1 $10,000,000$10,000,000

$84,000,000 $82,500,000TOTAL:GROUP:

TOTAL: $170,575,000 $169,075,000EGIONAL MOBILITY PROGRAM

3/10/2020 Page 29 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 30: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - RESURFACING

A399D112200CON99 STATEWIDE 12/28/2021 2022 APD RESURFACING-HSIP (SPLIT FUNDED) RESURF APD-HSIP $500,000$450,000A399D112200CON99 STATEWIDE 12/28/2021 2022 APD RESURFACING-NHPP (SPLIT FUNDE RESURF APD-NHPP $20,000,000$16,000,000A399F112200CON99 STATEWIDE 12/28/2021 2022 FAI-4R ALLOCATION-HSIP (SPLIT FUNDED RESURF FAI-HSIP $500,000$450,000A399F112200CON99 STATEWIDE 12/28/2021 2022 FAI-4R ALLOCATION-NHPP (SPLIT FUNDE RESURF FAI-NHPP $29,500,000$23,550,000A399D122220CON99 STATEWIDE 12/28/2021 2022 FED AID OTHER PAVING ALLOCATION-HSI RESURF OTHER FED-HSIP $3,500,000$3,150,000A399D122220CON99 STATEWIDE 12/28/2021 2022 FED AID OTHER PAVING ALLOCATION-NH RESURF OTHER FED-NHPP $4,000,000$3,200,000A399D122220CON99 STATEWIDE 12/28/2021 2022 FED AID OTHER PAVING ALLOCATION-ST RESURF OTHER FED-STP $22,500,000$18,000,000

99 STATEWIDE 1/28/2022 2022 GROUPABLE BUCKET DELTA - RESURFAC $44,000,000$35,200,000$100,000,000 $124,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - BOND PROJECT

U33052397005CON2 MINGO 10/28/2021 2022 MTN VIEW TO CO 10 (GO BOND) PAVE 2 LN ON 4LN CONST GILBERT $55,000,000$0U315262000CON6 HANCOCK 2/28/2022 2022 NEW CUMBERLAND - WV 2 IMPROVEMEN RELOCATE ROADWAY $11,000,000$0

$0 $66,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2021 2022 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654$19,711,654 $19,711,654TOTAL:GROUP:

TOTAL: $119,711,654 $210,211,654RESURFACING PROGRAM

ProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: GROUPABLE - TRAFFIC

A399??2220CON99 STATEWIDE 1/28/2022 2022 DT SIGNAL ALLOCATION TRAFFIC SIGNAL PE & CON $2,750,000$2,100,000A399?????CON99 STATEWIDE 1/28/2022 2022 DT SIGNING ALLOCATION SIGNS PE & CON $3,000,000$3,000,000

99 STATEWIDE 1/28/2022 2022 GROUPABLE BUCKET DELTA - TRAFFIC $9,885,332$8,896,799S381STRIP2200CON1 BOONE 1/28/2022 2022 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805S390STRIP2200CON10 MCDOWELL 1/28/2022 2022 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2200CON2 CABELL 1/28/2022 2022 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2200CON3 CALHOUN 1/28/2022 2022 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2200CON4 DODDRIDGE 1/28/2022 2022 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2200CON5 BERKELEY 1/28/2022 2022 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2200CON6 BROOKE 1/28/2022 2022 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021S387STRIP2200CON7 BARBOUR 1/28/2022 2022 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2200CON8 PENDLETON 1/28/2022 2022 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181

3/10/2020 Page 30 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 31: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS389STRIP2200CON9 FAYETTE 1/28/2022 2022 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978S381RECAL2200CON1 BOONE 2/28/2022 2022 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2200CON10 MCDOWELL 2/28/2022 2022 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2200CON2 CABELL 2/28/2022 2022 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2200CON3 CALHOUN 2/28/2022 2022 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2200CON4 DODDRIDGE 2/28/2022 2022 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2200CON5 BERKELEY 2/28/2022 2022 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2200CON6 BROOKE 2/28/2022 2022 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2200CON7 BARBOUR 2/28/2022 2022 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2200CON8 PENDLETON 2/28/2022 2022 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2200CON9 FAYETTE 2/28/2022 2022 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000A399RHCH?????CON99 STATEWIDE 8/28/2022 2022 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $1,080,862$972,775A399RHPD?????CON99 STATEWIDE 8/28/2022 2022 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $1,080,863$972,776

S33870000800CON6 OHIO 9/28/2022 2022 OHIO - OGLEBAY PARK LED LIGHTS RETROFIT $1,000,000$900,000$25,000,000 $32,785,435TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2022 GROUP: NOT GROUPABLE - SAFETY

S399LEDLI300CON99 STATEWIDE 10/28/2021 2022 LED LIGHT UPGRADE NS PHASE UPGRADE FLASHING LIGHT SIGNAL $286,702$258,031A399HSIP2200CON99 STATEWIDE 9/28/2022 2022 HSIP ALLOCATION $28,555,659$22,844,527

$23,102,558 $28,842,361TOTAL:GROUP:

TOTAL: $48,102,558 $61,627,796TRAFFIC PROGRAM

TOTAL: $527,234,468 $676,416,1562022

3/10/2020 Page 31 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 32: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - BRIDGE

S3451212100CON9 SUMMERS 10/28/2022 2023 BRADSHAW CREEK BRIDGE REPLACE BRIDGE $300,000$240,000U3506417500CON2 WAYNE 10/28/2022 2023 BROAD HOLLOW O/P BR EB & WB (AC PA REPLACE SUPERSTRUCTURE $6,399,581$5,759,623S355678900CON10 WYOMING 10/28/2022 2023 CLEAR FORK ARCH NO 3 REPLACE BRIDGE $1,000,000$800,000

S3025193400CON5 BERKELEY 10/28/2022 2023 MIDDLEWAY BRIDGE REPLACE BRIDGE $6,119,000$4,895,200A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $31,381,000$25,104,800A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $9,616,500$7,248,600A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $3,400,000$2,720,000A399E302300CON99 STATEWIDE 11/28/2022 2023 CAT 10 LMC O/L STATEWIDE STATEWIDE LMC OVERLAY $3,750,000$3,000,000A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $1,250,000$1,000,000A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $5,000,000$4,000,000A399E222300CON99 STATEWIDE 11/28/2022 2023 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $10,000,000$8,000,000A399E242300ENG99 STATEWIDE 11/28/2022 2023 CAT 4 BR INSPECTION BRIDGE INSPECTION $3,750,000$3,000,000A399F122300CON99 STATEWIDE 11/28/2022 2023 I-4R CAT 5 BRS CAT 5 BRS STATEWIDE $18,750,000$16,875,000

A399E233A2300CON99 STATEWIDE 1/28/2023 2023 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233A2300CON99 STATEWIDE 1/28/2023 2023 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2300CON99 STATEWIDE 1/28/2023 2023 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2300CON99 STATEWIDE 1/28/2023 2023 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000S34371302400CON3 RITCHIE 1/28/2023 2023 OTTERSLIDE TRUSS BR DEMO BRIDGE DEMO $350,000$280,000

$87,923,223 $106,691,081TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - BOND PROJECT

S31363213700CON9 GREENBRIER 10/28/2022 2023 CALDWELL BR (TPK BOND) REPLACE BRIDGE $12,630,000$0S32452276600CON10 MCDOWELL 10/28/2022 2023 KIMBALL SLAB BRIDGE (TPK BOND) REPLACE BRIDGE $500,000$0S32820113500CON10 MERCER 11/28/2022 2023 PRINCETON O/H BRIDGE (TPK BOND 5) REPLACE BRIDGE $5,735,000$0S32416221200CON10 MCDOWELL 3/28/2023 2023 COALWOOD BRIDGE (TPK BOND) REPLACE BRIDGE $350,000$0S3133968200CON9 GREENBRIER 7/28/2023 2023 3RD BRIDGE NORTH FORK CHERRY RIVE REPLACE BRIDGE $1,505,000$0

$0 $20,720,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2022 2023 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,927,914$4,927,914$4,927,914 $4,927,914TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2023 2023 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,623,000$7,623,000$7,623,000 $7,623,000TOTAL:GROUP:

3/10/2020 Page 32 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 33: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPTOTAL: $100,474,137 $139,961,995BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - COMMUNITY DEVELO

99 STATEWIDE 1/28/2023 2023 GROUPABLE BUCKET DELTA - COMMUNIT $1,809,432$1,447,545U341RTATV200CON10 RALEIGH 4/28/2023 2023 BURNING ROCK ATV WESTERN EXTENSI DEV NEW TRAILS $485,919$388,735U341BURN200CON10 RALEIGH 4/28/2023 2023 BURNING ROCK TRAILS 2016 MAINT, CONST, EQUIP $150,000$120,000

U323LOGAN400CON2 LOGAN 4/28/2023 2023 LOGAN SIDEWALKS IMPROVEMENTS DESIGN/CONST SIDEWALK $254,763$203,810A399TAPTMA2300CON99 STATEWIDE 4/28/2023 2023 TAP-TMA ALLOCATION VARIOUS IMPROVEMENTS $209,542$167,634A399ENHAN2300CON99 STATEWIDE 6/28/2023 2023 TRANSPORTATION ALTERNATIVES ALLO VARIOUS IMPROVEMENTS $5,743,526$4,594,821A399TRAIL23??CON99 STATEWIDE 8/28/2023 2023 NATIONAL REC TRAIL VARIOUS IMPROVEMENTS $2,487,500$1,990,000

$8,912,545 $11,140,682TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2300CON99 STATEWIDE 2/28/2023 2023 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $13,750,000$11,000,000A399CMAQM2300CON99 STATEWIDE 2/28/2023 2023 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,800,000

$14,800,000 $17,550,000TOTAL:GROUP:

TOTAL: $23,712,545 $28,690,682ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - LOCALIZED MOBILIT

S319340157800CON5 JEFFERSON 12/28/2022 2023 US 340 ROCK SLIDE INVESTIGATION SLIDE REPAIR $1,500,000$1,200,000A399D302300CON99 STATEWIDE 7/28/2023 2023 3R MAJOR SLIDES-NHS SLIDE REPAIR $2,250,000$1,800,000A399D302300CON99 STATEWIDE 7/28/2023 2023 3R MAJOR SLIDES-STP SLIDE REPAIR $5,000,000$4,000,000

$7,000,000 $8,750,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - BOND PROJECT

U33185706700CON4 MONONGALIA 1/28/2023 2023 GREENBAG ROAD (GO BOND 4) IMPROVE I/S & WIDEN $16,000,000$0U3315909400CON4 MONONGALIA 6/28/2023 2023 VAN VOORHIS RD (GO BOND 4) IMPROVE I/S & WIDEN $11,000,000$0

$0 $27,000,000TOTAL:GROUP:

TOTAL: $7,000,000 $35,750,000ITY IMPROVEMENT PROGRAM

ProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - PLANNING AND WOR

3/10/2020 Page 33 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 34: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPT699SPR2300OTHER99 STATEWIDE 10/28/2022 2023 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000T699SPR2300OTHER99 STATEWIDE 10/28/2022 2023 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $6,700,000$6,700,000A699RES2300OTHER99 STATEWIDE 10/28/2022 2023 SPR RESEARCH ALLOCATION HWY PLANNING $2,200,000$2,200,000

T699USACE2300OTHER99 STATEWIDE 10/28/2022 2023 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFS2300OTHER99 STATEWIDE 10/28/2022 2023 USFS INTERAGENCY USFS INTERAGENCY POSITION $143,500$114,800

T699USFWS2300OTHER99 STATEWIDE 10/28/2022 2023 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699WVSHP2300OTHER99 STATEWIDE 10/28/2022 2023 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524

A699???2300ENG99 STATEWIDE 11/28/2022 2023 TRANSPORTATION MANAGEMENT AREA HWY PLANNING $4,251,530$3,401,224T699LTAP2300ENG99 STATEWIDE 1/28/2023 2023 CY LTAP 23 DEVELOPMENT AND DISTRIBUTION $300,000$150,000

T699SUMME2300OTHER99 STATEWIDE 4/28/2023 2023 SUMMER 2023 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699DBE2300OTHER99 STATEWIDE 6/28/2023 2023 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2300OTHER99 STATEWIDE 6/28/2023 2023 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$15,220,568 $16,400,298TOTAL:GROUP:

TOTAL: $15,220,568 $16,400,298CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - ALLOCATION

A399NHFP23??CON99 STATEWIDE 8/28/2023 2023 NATIONAL HIGHWAY FREIGHT PROGRAM NATIONAL HIGHWAY FREIGHT PROG $14,125,000$11,300,000$11,300,000 $14,125,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - BOND PROJECT

U34064413700CON1 PUTNAM 11/28/2022 2023 US35/I-64 I/C - NITRO I/C (D/B)(GO BOND)( UPGR TO 6 LNS $30,000,000$30,000,000X342H402104CON8 RANDOLPH 8/28/2023 2023 US 219 CONN-WV 72 I/C (DESIGN/BUILD) ( GR, DR, BRS $25,500,000$25,500,000

$55,500,000 $55,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - BRIDGE

X342H402108CON8 RANDOLPH 9/28/2023 2023 CHEAT RIVER BRIDGE (AC PAYBACK) CONST NEW BRIDGE $74,275,000$74,275,000$74,275,000 $74,275,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - RESURFACING

X342H402105CON8 RANDOLPH 10/28/2022 2023 WV 72 I/C-PARSONS (AC PAYBACK) GR, DR, PAVE $45,000,000$45,000,000X331791560000CON4 MONONGALIA 7/28/2023 2023 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $5,000,000$4,000,000X331791560000CON4 MONONGALIA 7/28/2023 2023 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $20,000,000$16,000,000X342H402106CON8 RANDOLPH 10/28/2023 2023 KERENS-WV 72 I/C (AUTH AC PROJECT) PAVE - Section 2 $10,000,000$10,000,000

$75,000,000 $80,000,000TOTAL:GROUP:

3/10/2020 Page 34 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 35: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPTOTAL: $216,075,000 $223,900,000EGIONAL MOBILITY PROGRAM

ProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - RESURFACING

A399D112300CON99 STATEWIDE 12/28/2022 2023 APD RESURFACING-HSIP (SPLIT FUNDED) RESURF APD-HSIP $500,000$450,000A399D112300CON99 STATEWIDE 12/28/2022 2023 APD RESURFACING-NHPP (SPLIT FUNDE RESURF APD-NHPP $20,000,000$16,000,000A399F11230CON99 STATEWIDE 12/28/2022 2023 FAI-4R ALLOCATION-HSIP (SPLIT FUNDED RESURF FAI-HSIP $500,000$450,000A399F11230CON99 STATEWIDE 12/28/2022 2023 FAI-4R ALLOCATION-NHPP (SPLIT FUNDE RESURF FAI-NHPP $29,500,000$23,550,000

A399D122300CON99 STATEWIDE 12/28/2022 2023 FED AID OTHER PAVING ALLOCATION-HSI RESURF OTHER FED-HSIP $3,500,000$3,150,000A399D122300CON99 STATEWIDE 12/28/2022 2023 FED AID OTHER PAVING ALLOCATION-NH RESURF OTHER FED-NHPP $4,000,000$3,200,000A399D122300CON99 STATEWIDE 12/28/2022 2023 FED AID OTHER PAVING ALLOCATION-ST RESURF OTHER FED-STP $22,500,000$18,000,000

99 STATEWIDE 1/28/2023 2023 GROUPABLE BUCKET DELTA - RESURFAC $44,000,000$35,200,000$100,000,000 $124,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - BOND PROJECT

U32062219600CON1 KANAWHA 10/28/2022 2023 WV 622 - CROSS LANES (GO BOND 4) WIDEN ROADWAY $16,000,000$0$0 $16,000,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2022 2023 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654$19,711,654 $19,711,654TOTAL:GROUP:

TOTAL: $119,711,654 $160,211,654RESURFACING PROGRAM

ProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: GROUPABLE - TRAFFIC

A399?23??CON99 STATEWIDE 1/28/2023 2023 DT LIGHTING ALLOCATION LIGHTING PE & CON $4,200,000$3,800,000A399??2300CON99 STATEWIDE 1/28/2023 2023 DT SIGNAL ALLOCATION TRAFFIC SIGNAL PE & CON $3,750,000$3,000,000A399?23??CON99 STATEWIDE 1/28/2023 2023 DT SIGNING ALLOCATION SIGNS PE & CON $3,000,000$3,000,000

99 STATEWIDE 1/28/2023 2023 GROUPABLE BUCKET DELTA - TRAFFIC $5,663,110$5,096,799S381STRIP2300CON1 BOONE 1/28/2023 2023 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805S390STRIP2300CON10 MCDOWELL 1/28/2023 2023 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2300CON2 CABELL 1/28/2023 2023 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2300CON3 CALHOUN 1/28/2023 2023 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2300CON4 DODDRIDGE 1/28/2023 2023 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2300CON5 BERKELEY 1/28/2023 2023 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2300CON6 BROOKE 1/28/2023 2023 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021

3/10/2020 Page 35 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 36: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS387STRIP2300CON7 BARBOUR 1/28/2023 2023 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2300CON8 PENDLETON 1/28/2023 2023 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181S389STRIP2300CON9 FAYETTE 1/28/2023 2023 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978S381RECAL2300CON1 BOONE 2/28/2023 2023 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2300CON10 MCDOWELL 2/28/2023 2023 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2300CON2 CABELL 2/28/2023 2023 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2300CON3 CALHOUN 2/28/2023 2023 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2300CON4 DODDRIDGE 2/28/2023 2023 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2300CON5 BERKELEY 2/28/2023 2023 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2300CON6 BROOKE 2/28/2023 2023 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2300CON7 BARBOUR 2/28/2023 2023 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2300CON8 PENDLETON 2/28/2023 2023 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2300CON9 FAYETTE 2/28/2023 2023 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000A399RHCH?????CON99 STATEWIDE 8/28/2023 2023 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $1,080,862$972,775A399RHPD?????CON99 STATEWIDE 8/28/2023 2023 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $1,080,863$972,776

$25,000,000 $32,763,213TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2023 GROUP: NOT GROUPABLE - SAFETY

A399HSIP2300CON99 STATEWIDE 9/28/2023 2023 HSIP ALLOCATION $28,555,659$22,844,527$22,844,527 $28,555,659TOTAL:GROUP:

TOTAL: $47,844,527 $61,318,872TRAFFIC PROGRAM

TOTAL: $530,038,431 $666,233,5012023

3/10/2020 Page 36 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 37: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - BRIDGE

A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $31,250,000$25,000,000A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $14,062,500$11,250,000A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $3,750,000$3,000,000A399E302400CON99 STATEWIDE 11/28/2023 2024 CAT 10 LMC O/L STATEWIDE STATEWIDE LMC OVERLAY $3,750,000$3,000,000A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $5,000,000$4,000,000A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $1,250,000$1,000,000A399E222400CON99 STATEWIDE 11/28/2023 2024 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $10,000,000$8,000,000A399E242400ENG99 STATEWIDE 11/28/2023 2024 CAT 4 BR INSPECTION BRIDGE INSPECTION $3,750,000$3,000,000A399F122400CON99 STATEWIDE 11/28/2023 2024 I-4R CAT 5 BRS CAT 5 BRS STATEWIDE $18,750,000$16,875,000

A399E233A2400CON99 STATEWIDE 1/28/2024 2024 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233A2400CON99 STATEWIDE 1/28/2024 2024 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2400CON99 STATEWIDE 1/28/2024 2024 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2400CON99 STATEWIDE 1/28/2024 2024 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000

A399E282400CON99 STATEWIDE 1/28/2024 2024 CAT 8A MAJOR C & P (NHS) MAJOR C & P $4,531,250$3,625,000A399E282400CON99 STATEWIDE 1/28/2024 2024 CAT 8A MAJOR C & P (STP) MAJOR C & P $1,562,500$1,250,000

$85,000,000 $103,281,250TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2023 2024 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,927,914$4,927,914$4,927,914 $4,927,914TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2024 2024 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,624,000$7,624,000$7,624,000 $7,624,000TOTAL:GROUP:

TOTAL: $97,551,914 $115,833,164BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - COMMUNITY DEVELO

99 STATEWIDE 1/28/2024 2024 GROUPABLE BUCKET DELTA - COMMUNIT $1,809,432$1,447,545A399TAPTMA2400CON99 STATEWIDE 4/28/2024 2024 TAP-TMA ALLOCATION VARIOUS IMPROVEMENTS $209,542$167,634A399ENHAN2400CON99 STATEWIDE 6/28/2024 2024 TRANSPORTATION ALTERNATIVES ALLO VARIOUS IMPROVEMENTS $5,743,526$4,594,821A399TRAIL24??CON99 STATEWIDE 8/28/2024 2024 NATIONAL REC TRAIL VARIOUS IMPROVEMENTS $2,487,500$1,990,000

$8,200,000 $10,250,000TOTAL:GROUP:

3/10/2020 Page 37 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 38: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2400CON99 STATEWIDE 2/28/2024 2024 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $13,750,000$11,000,000A399CMAQM2400CON99 STATEWIDE 2/28/2024 2024 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,800,000

$14,800,000 $17,550,000TOTAL:GROUP:

TOTAL: $23,000,000 $27,800,000ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - LOCALIZED MOBILIT

A399D302400CON99 STATEWIDE 7/28/2024 2024 3R MAJOR SLIDES-NHS SLIDE REPAIR $3,750,000$3,000,000A399D302400CON99 STATEWIDE 7/28/2024 2024 3R MAJOR SLIDES-STP SLIDE REPAIR $5,000,000$4,000,000

$7,000,000 $8,750,000TOTAL:GROUP:

TOTAL: $7,000,000 $8,750,000ITY IMPROVEMENT PROGRAM

ProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - PLANNING AND WOR

T699SPR2400OTHER99 STATEWIDE 10/28/2023 2024 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000T699SPR2400OTHER99 STATEWIDE 10/28/2023 2024 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $6,700,000$6,700,000A699RES2400OTHER99 STATEWIDE 10/28/2023 2024 SPR RESEARCH ALLOCATION HWY PLANNING $2,200,000$2,200,000

T699USACE2400OTHER99 STATEWIDE 10/28/2023 2024 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFS2400OTHER99 STATEWIDE 10/28/2023 2024 USFS INTERAGENCY USFS INTERAGENCY POSITION $143,500$114,800

T699USFWS2400OTHER99 STATEWIDE 10/28/2023 2024 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699WVSHP2400OTHER99 STATEWIDE 10/28/2023 2024 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524

A699???2400ENG99 STATEWIDE 11/28/2023 2024 TRANSPORTATION MANAGEMENT AREA HWY PLANNING $4,251,530$3,401,224T699LTAP2400ENG99 STATEWIDE 1/28/2024 2024 CY LTAP 24 DEVELOPMENT AND DISTRIBUTION $300,000$150,000

T699SUMME2400OTHER99 STATEWIDE 4/28/2024 2024 SUMMER 2024 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699DBE2400OTHER99 STATEWIDE 6/28/2024 2024 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2400OTHER99 STATEWIDE 6/28/2024 2024 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$15,220,568 $16,400,298TOTAL:GROUP:

TOTAL: $15,220,568 $16,400,298CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - ALLOCATION

A399NHFP24??CON99 STATEWIDE 8/28/2024 2024 NATIONAL HIGHWAY FREIGHT PROGRAM NATIONAL HIGHWAY FREIGHT PROG $14,125,000$11,300,000U399???2400CON99 STATEWIDE 8/28/2024 2024 NHPP-EXEMPT ALLOCATION NHPP PROJECTS $3,750,000$3,000,000

3/10/2020 Page 38 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 39: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$14,300,000 $17,875,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - BOND PROJECT

U34064413700CON1 PUTNAM 11/28/2023 2024 US35/I-64 I/C - NITRO I/C (D/B)(GO BOND)( UPGR TO 6 LNS $19,200,000$19,200,000$19,200,000 $19,200,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - BRIDGE

X342H402108CON8 RANDOLPH 9/28/2024 2024 CHEAT RIVER BRIDGE (AC PAYBACK) CONST NEW BRIDGE $59,575,000$59,575,000$59,575,000 $59,575,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - RESURFACING

X342H402105CON8 RANDOLPH 10/28/2023 2024 WV 72 I/C-PARSONS (AC PAYBACK) GR, DR, PAVE $45,000,000$45,000,000X331791560000CON4 MONONGALIA 7/28/2024 2024 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $20,000,000$16,000,000X331791560000CON4 MONONGALIA 7/28/2024 2024 WV 7 OP INTERCHANGE (AC PAYBACK) (S CONST NEW I/C AND ACCESS RD $5,000,000$4,000,000X342H402106CON8 RANDOLPH 10/28/2024 2024 KERENS-WV 72 I/C (AC PAYBACK) PAVE - Section 2 $10,000,000$10,000,000

$75,000,000 $80,000,000TOTAL:GROUP:

TOTAL: $168,075,000 $176,650,000EGIONAL MOBILITY PROGRAM

ProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - RESURFACING

A399D112400CON99 STATEWIDE 12/28/2023 2024 APD RESURFACING-HSIP (SPLIT FUNDED) RESURF APD-HSIP $500,000$450,000A399D112400CON99 STATEWIDE 12/28/2023 2024 APD RESURFACING-NHPP (SPLIT FUNDE RESURF APD-NHPP $20,000,000$16,000,000A399F11240CON99 STATEWIDE 12/28/2023 2024 FAI-4R ALLOCATION-HSIP (SPLIT FUNDED RESURF FAI-HSIP $500,000$450,000A399F11240CON99 STATEWIDE 12/28/2023 2024 FAI-4R ALLOCATION-NHPP (SPLIT FUNDE RESURF FAI-NHPP $29,500,000$23,550,000

A399D122400CON99 STATEWIDE 12/28/2023 2024 FED AID OTHER PAVING ALLOCATION-HSI RESURF OTHER FED-HSIP $3,500,000$3,150,000A399D122400CON99 STATEWIDE 12/28/2023 2024 FED AID OTHER PAVING ALLOCATION-NH RESURF OTHER FED-NHPP $4,000,000$3,200,000A399D122400CON99 STATEWIDE 12/28/2023 2024 FED AID OTHER PAVING ALLOCATION-ST RESURF OTHER FED-STP $22,500,000$18,000,000

99 STATEWIDE 1/28/2024 2024 GROUPABLE BUCKET DELTA - RESURFAC $44,000,000$35,200,000$100,000,000 $124,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2023 2024 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654$19,711,654 $19,711,654TOTAL:GROUP:

TOTAL: $119,711,654 $144,211,654RESURFACING PROGRAM

3/10/2020 Page 39 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 40: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: GROUPABLE - TRAFFIC

S30664150000CON2 CABELL 12/28/2023 2024 I-64 SIGNING 29TH ST I/C-HURRICANE RENOVATE SIGNING $1,200,000$1,080,000A399?24??CON99 STATEWIDE 1/28/2024 2024 DT LIGHTING ALLOCATION LIGHTING PE & CON $4,300,000$3,900,000A399??2400CON99 STATEWIDE 1/28/2024 2024 DT SIGNAL ALLOCATION TRAFFIC SIGNAL PE & CON $3,750,000$3,000,000A399?24??CON99 STATEWIDE 1/28/2024 2024 DT SIGNING ALLOCATION SIGNS PE & CON $3,000,000$3,000,000

99 STATEWIDE 1/28/2024 2024 GROUPABLE BUCKET DELTA - TRAFFIC $5,551,999$4,996,799S381STRIP2400CON1 BOONE 1/28/2024 2024 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805S390STRIP2400CON10 MCDOWELL 1/28/2024 2024 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2400CON2 CABELL 1/28/2024 2024 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2400CON3 CALHOUN 1/28/2024 2024 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2400CON4 DODDRIDGE 1/28/2024 2024 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2400CON5 BERKELEY 1/28/2024 2024 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2400CON6 BROOKE 1/28/2024 2024 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021S387STRIP2400CON7 BARBOUR 1/28/2024 2024 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2400CON8 PENDLETON 1/28/2024 2024 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181S389STRIP2400CON9 FAYETTE 1/28/2024 2024 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978S381RECAL2400CON1 BOONE 2/28/2024 2024 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2400CON10 MCDOWELL 2/28/2024 2024 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2400CON2 CABELL 2/28/2024 2024 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2400CON3 CALHOUN 2/28/2024 2024 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2400CON4 DODDRIDGE 2/28/2024 2024 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2400CON5 BERKELEY 2/28/2024 2024 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2400CON6 BROOKE 2/28/2024 2024 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2400CON7 BARBOUR 2/28/2024 2024 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2400CON8 PENDLETON 2/28/2024 2024 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2400CON9 FAYETTE 2/28/2024 2024 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000A399RHCH?????CON99 STATEWIDE 8/28/2024 2024 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $1,080,862$972,775A399RHPD?????CON99 STATEWIDE 8/28/2024 2024 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $1,080,863$972,776

$26,080,000 $33,952,102TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2024 GROUP: NOT GROUPABLE - SAFETY

A399HSIP2400CON99 STATEWIDE 9/28/2024 2024 HSIP ALLOCATION $28,555,659$22,844,527$22,844,527 $28,555,659TOTAL:GROUP:

TOTAL: $48,924,527 $62,507,761TRAFFIC PROGRAM

TOTAL: $479,483,663 $552,152,8772024

3/10/2020 Page 40 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 41: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPProgramType: BRIDGE PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - BRIDGE

A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $31,250,000$25,000,000A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 1 REPLACE/RENOVATE BRIDGE REPAIR $14,062,500$11,250,000A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 1 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $3,750,000$3,000,000A399E302500CON99 STATEWIDE 11/28/2024 2025 CAT 10 LMC O/L STATEWIDE STATEWIDE LMC OVERLAY $3,750,000$3,000,000A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $1,250,000$1,000,000A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 2 REPLACE/RENOVATE BRIDGE REPAIR $5,000,000$4,000,000A399E222500CON99 STATEWIDE 11/28/2024 2025 CAT 2 REPLACE/RENOVATE-OFF SYSTEM BRIDGE REPAIR $10,000,000$8,000,000A399E242500ENG99 STATEWIDE 11/28/2024 2025 CAT 4 BR INSPECTION BRIDGE INSPECTION $3,750,000$3,000,000A399F122500CON99 STATEWIDE 11/28/2024 2025 I-4R CAT 5 BRS CAT 5 BRS STATEWIDE $18,750,000$16,875,000

A399E233A2500CON99 STATEWIDE 1/28/2025 2025 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233A2500CON99 STATEWIDE 1/28/2025 2025 CAT 3A MAJOR REPAIRS MAJOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2500CON99 STATEWIDE 1/28/2025 2025 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000A399E233B2500CON99 STATEWIDE 1/28/2025 2025 CAT 3B MINOR REPAIRS MINOR BRIDGE REPAIR $1,406,250$1,250,000

A399E282500CON99 STATEWIDE 1/28/2025 2025 CAT 8A MAJOR C & P (NHS) MAJOR C & P $4,531,250$3,625,000A399E282500CON99 STATEWIDE 1/28/2025 2025 CAT 8A MAJOR C & P (STP) MAJOR C & P $1,562,500$1,250,000

$85,000,000 $103,281,250TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2024 2025 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $4,927,914$4,927,914$4,927,914 $4,927,914TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - GARVEE 2018

S399GARVE1800CON99 STATEWIDE 8/28/2025 2025 GARVEE 2018 PAYBACK GARVEE 2018 BOND PAYMENT $7,623,250$7,623,250$7,623,250 $7,623,250TOTAL:GROUP:

TOTAL: $97,551,164 $115,832,414BRIDGE PROGRAM

ProgramType: COMMUNITY DEVELOPMENT AND CONN

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - COMMUNITY DEVELO

99 STATEWIDE 1/28/2025 2025 GROUPABLE BUCKET DELTA - COMMUNIT $1,809,432$1,447,545A399TAPTMA2500CON99 STATEWIDE 4/28/2025 2025 TAP-TMA ALLOCATION VARIOUS IMPROVEMENTS $209,542$167,634A399ENHAN2500CON99 STATEWIDE 6/28/2025 2025 TRANSPORTATION ALTERNATIVES ALLO VARIOUS IMPROVEMENTS $5,743,526$4,594,821A399TRAIL25??CON99 STATEWIDE 8/28/2025 2025 NATIONAL REC TRAIL VARIOUS IMPROVEMENTS $2,487,500$1,990,000

$8,200,000 $10,250,000TOTAL:GROUP:

3/10/2020 Page 41 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 42: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - ALLOCATION

A399CMAQF2500CON99 STATEWIDE 2/28/2025 2025 ALLOCATION FOR FLEXIBLE CMAQ FUND CONGESTION MITIGATION AND AIR Q $13,750,000$11,000,000A399CMAQM2500CON99 STATEWIDE 2/28/2025 2025 ALLOCATION FOR MANDATORY CMAQ FU CONGESTION MITIGATION AND AIR Q $3,800,000$3,800,000

$14,800,000 $17,550,000TOTAL:GROUP:

TOTAL: $23,000,000 $27,800,000ND CONNECTIVITY PROGRAM

ProgramType: LOCALIZED MOBILITY IMPROVEMENT P

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - LOCALIZED MOBILIT

A399D302500CON99 STATEWIDE 7/28/2025 2025 3R MAJOR SLIDES-NHS SLIDE REPAIR $3,750,000$3,000,000A399D302500CON99 STATEWIDE 7/28/2025 2025 3R MAJOR SLIDES-STP SLIDE REPAIR $5,000,000$4,000,000

$7,000,000 $8,750,000TOTAL:GROUP:

TOTAL: $7,000,000 $8,750,000ITY IMPROVEMENT PROGRAM

ProgramType: PLANNING AND WORKFORCE DEVELOP

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - PLANNING AND WOR

T699SPR2500OTHER99 STATEWIDE 10/28/2024 2025 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $6,700,000$6,700,000T699SPR2500OTHER99 STATEWIDE 10/28/2024 2025 SPR PROGRAM (SPLIT FUND) HWY PLANNING & RESEARCH $1,700,000$1,700,000A699RES2500OTHER99 STATEWIDE 10/28/2024 2025 SPR RESEARCH ALLOCATION HWY PLANNING $2,200,000$2,200,000

T699USACE2500OTHER99 STATEWIDE 10/28/2024 2025 USACE INTERAGENCY USACE INTERAGENCY POSITION $390,000$312,000T699USFS2500OTHER99 STATEWIDE 10/28/2024 2025 USFS INTERAGENCY USFS INTERAGENCY POSITION $143,500$114,800

T699USFWS2500OTHER99 STATEWIDE 10/28/2024 2025 USFWS INTERAGENCY USFWS INTERAGENCY POSITION $184,216$147,373T699WVSHP2500OTHER99 STATEWIDE 10/28/2024 2025 WVSHPO INTERAGENCY WVSHPO INTERAGENCY POSITION $179,405$143,524

A699???2500ENG99 STATEWIDE 11/28/2024 2025 TRANSPORTATION MANAGEMENT AREA HWY PLANNING $4,251,530$3,401,224T699LTAP2500ENG99 STATEWIDE 1/28/2025 2025 CY LTAP 25 DEVELOPMENT AND DISTRIBUTION $300,000$150,000

T699SUMME2500OTHER99 STATEWIDE 4/28/2025 2025 SUMMER 2025 TRANS INSTITU SALARY, SUPPLIES, TRAVEL, INDIRE $58,042$58,042T699DBE2500OTHER99 STATEWIDE 6/28/2025 2025 DISADV BUS SUPP SERVICES DBE SUPPORTIVE SERVICES $238,605$238,605T699OJT2500OTHER99 STATEWIDE 6/28/2025 2025 OJT SUPPORT SERVICES OJT SUPPORTIVE SERVICES $55,000$55,000

$15,220,568 $16,400,298TOTAL:GROUP:

TOTAL: $15,220,568 $16,400,298CE DEVELOPMENT PROGRAM

ProgramType: REGIONAL MOBILITY PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - ALLOCATION

A399NHFP25??CON99 STATEWIDE 8/28/2025 2025 NATIONAL HIGHWAY FREIGHT PROGRAM NATIONAL HIGHWAY FREIGHT PROG $14,125,000$11,300,000U399???2500CON99 STATEWIDE 8/28/2025 2025 NHPP-EXEMPT ALLOCATION NHPP PROJECTS $8,750,000$7,000,000

3/10/2020 Page 42 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 43: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUP$18,300,000 $22,875,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - BRIDGE

X342H402108CON8 RANDOLPH 9/28/2025 2025 CHEAT RIVER BRIDGE (AC PAYBACK) CONST NEW BRIDGE $59,575,000$59,575,000$59,575,000 $59,575,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - RESURFACING

X342H402105CON8 RANDOLPH 10/28/2024 2025 WV 72 I/C-PARSONS (AC PAYBACK) GR, DR, PAVE $45,000,000$45,000,000$45,000,000 $45,000,000TOTAL:GROUP:

TOTAL: $122,875,000 $127,450,000EGIONAL MOBILITY PROGRAM

ProgramType: RESURFACING PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - RESURFACING

A399D112500CON99 STATEWIDE 12/28/2024 2025 APD RESURFACING-HSIP (SPLIT FUNDED) RESURF APD-HSIP $500,000$450,000A399D112500CON99 STATEWIDE 12/28/2024 2025 APD RESURFACING-NHPP (SPLIT FUNDE RESURF APD-NHPP $20,000,000$16,000,000A399F11250CON99 STATEWIDE 12/28/2024 2025 FAI-4R ALLOCATION-HSIP (SPLIT FUNDED RESURF FAI-HSIP $500,000$450,000A399F11250CON99 STATEWIDE 12/28/2024 2025 FAI-4R ALLOCATION-NHPP (SPLIT FUNDE RESURF FAI-NHPP $29,500,000$23,550,000

A399D122500CON99 STATEWIDE 12/28/2024 2025 FED AID OTHER PAVING ALLOCATION-HSI RESURF OTHER FED-HSIP $3,500,000$3,150,000A399D122500CON99 STATEWIDE 12/28/2024 2025 FED AID OTHER PAVING ALLOCATION-NH RESURF OTHER FED-NHPP $4,000,000$3,200,000A399D122500CON99 STATEWIDE 12/28/2024 2025 FED AID OTHER PAVING ALLOCATION-ST RESURF OTHER FED-STP $22,500,000$18,000,000

99 STATEWIDE 1/28/2025 2025 GROUPABLE BUCKET DELTA - RESURFAC $44,000,000$35,200,000$100,000,000 $124,500,000TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - GARVEE 2017

S399GARVE1700CON99 STATEWIDE 10/28/2024 2025 GARVEE 17 BOND PAYMENT GARVEE 2017 BOND PAYMENT $19,711,654$19,711,654$19,711,654 $19,711,654TOTAL:GROUP:

TOTAL: $119,711,654 $144,211,654RESURFACING PROGRAM

ProgramType: TRAFFIC PROGRAM

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: GROUPABLE - TRAFFIC

A399?25??CON99 STATEWIDE 1/28/2025 2025 DT LIGHTING ALLOCATION LIGHTING PE & CON $4,300,000$3,900,000A399??2500CON99 STATEWIDE 1/28/2025 2025 DT SIGNAL ALLOCATION TRAFFIC SIGNAL PE & CON $3,750,000$3,000,000A399?25??CON99 STATEWIDE 1/28/2025 2025 DT SIGNING ALLOCATION SIGNS PE & CON $3,000,000$3,000,000

99 STATEWIDE 1/28/2025 2025 GROUPABLE BUCKET DELTA - TRAFFIC $5,551,999$4,996,799S381STRIP2500CON1 BOONE 1/28/2025 2025 ROADWAY STRIPING (D1) INST PVMT MARK(PAINT) $1,165,724$652,805

3/10/2020 Page 43 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)

Page 44: Breakdown by GROUP · federal stip project list for ffy 2020-2025 by group 3ritchie6/28/2020 2020 con s34347126100 beatrice bridge replace bridge $1,500,000$1,200,000 7 barbour 6/28/2020

FEDERAL STIP PROJECT LIST FOR FFY 2020-2025 BY GROUPS390STRIP2500CON10 MCDOWELL 1/28/2025 2025 ROADWAY STRIPING (D10) INST PVMT MARK(PAINT) $1,243,074$696,121S382STRIP2500CON2 CABELL 1/28/2025 2025 ROADWAY STRIPING (D2) INST PVMT MARK(PAINT) $1,211,836$678,628S383STRIP2500CON3 CALHOUN 1/28/2025 2025 ROADWAY STRIPING (D3) INST PVMT MARK(PAINT) $1,100,275$616,154S384STRIP2500CON4 DODDRIDGE 1/28/2025 2025 ROADWAY STRIPING (D4) INST PVMT MARK(PAINT) $1,449,420$811,675S385STRIP2500CON5 BERKELEY 1/28/2025 2025 ROADWAY STRIPING (D5) INST PVMT MARK(PAINT) $1,320,424$739,437S386STRIP2500CON6 BROOKE 1/28/2025 2025 ROADWAY STRIPING (D6) INST PVMT MARK(PAINT) $950,037$532,021S387STRIP2500CON7 BARBOUR 1/28/2025 2025 ROADWAY STRIPING (D7) INST PVMT MARK(PAINT) $1,117,232$625,650S388STRIP2500CON8 PENDLETON 1/28/2025 2025 ROADWAY STRIPING (D8) INST PVMT MARK(PAINT) $975,324$546,181S389STRIP2500CON9 FAYETTE 1/28/2025 2025 ROADWAY STRIPING (D9) INST PVMT MARK(PAINT) $1,141,032$638,978S381RECAL2500CON1 BOONE 2/28/2025 2025 D-1 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S390RECAL2500CON10 MCDOWELL 2/28/2025 2025 D-10 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S382RECAL2500CON2 CABELL 2/28/2025 2025 D-2 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S383RECAL2500CON3 CALHOUN 2/28/2025 2025 D-3 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S384RECAL2500CON4 DODDRIDGE 2/28/2025 2025 D-4 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S385RECAL2500CON5 BERKELEY 2/28/2025 2025 D-5 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S386RECAL2500CON6 BROOKE 2/28/2025 2025 D-6 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S387RECAL2500CON7 BARBOUR 2/28/2025 2025 D-7 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S388RECAL2500CON8 PENDLETON 2/28/2025 2025 D-8 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000S389RECAL2500CON9 FAYETTE 2/28/2025 2025 D-9 RECALL STRIPING PAVEMENT MARKINGS(PAINT) $231,400$162,000A399RHCH?????CON99 STATEWIDE 8/28/2025 2025 R/H-HAZARD ELIMINATION PLACEHOLDE UPGRADE CROSSINGS $1,080,862$972,775A399RHPD?????CON99 STATEWIDE 8/28/2025 2025 R/H-PROT DEVICES PLACEHOLDER INSTALL FLASHING LIGHT SIGNALS $1,080,863$972,776

$25,000,000 $32,752,102TOTAL:GROUP:

DIST. COUNTY OBLG. DATE FFY PHASE ST PROJ NO PROJECT NAME TYPE OF WORK FED $ TOTAL $FEDERAL FISCAL YEAR:: 2025 GROUP: NOT GROUPABLE - SAFETY

A399HSIP2500CON99 STATEWIDE 9/28/2025 2025 HSIP ALLOCATION $28,555,659$22,844,527$22,844,527 $28,555,659TOTAL:GROUP:

TOTAL: $47,844,527 $61,307,761TRAFFIC PROGRAM

TOTAL: $433,202,913 $501,752,1272025

$3,030,428,607 $5,340,017,451

3/10/2020 Page 44 of 44- PROJECT DELIVERY UNIT (Breakdown by GROUP)