Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
BR4DDRAssembly Instructions
P.1
Keep these instructions for future reference.
Revised 05/2018
P.2
P.3
1
3
26
4
10
13
12
11
14
4x
7
8
Right side panel
Top panel
Back panel
Upper front crossbeam
Left side panel
Bottom front crossbeam
1
2
3
4
5
6
7
01 pcs Right foot
Left foot
Front drawer
Left side drawer
8
9
10
11
Drawer bottom
Right side drawer 12
13
Drawer back14
Back crossbeam
4
55
7
55
9
9
8
01 pcs
01 pcs
01 pcs
01 pcs
02 pcs
02 pcs
02 pcs
02 pcs
02 pcs
04 pcs
04 pcs
04 pcs
04 pcs
04 pcs
P.4
A
B
C
D
E
F
G
H
I
J
K
M
Ø8*30mm Wooden dowel 36 pcs
Ø3,0*14mm Screw
Glue
24 pcs
Ø6,0*10mm Screw 16 pcs
Ø4,0*30mm Screw 50 pcs
Screw 08 pcs
Ø4,5*45mm Screw 12 pcs
Ø10*10 Nail 24 pcs
300mm Right Slide 04 pcs
300mm Left Slide 04 pcs
Knob 08 pcs
01 pcs
Wall anchor 01 pc
L 808 mm “H” Profile 01 pc
N Washer 02 pc
O Ø6mm 01 pc
M4*22mm
Hammer recommended for assembly
(not included)
P.5
Step 1
Step 2
A Please assemble on a clean soft surface to avoid damage.
Please assemble on a clean soft surface to avoid damage.
2
6
4
5
124x
A
AA
AA
A
A
AA
AA
AA
AA
A
A
A
AA
114x
3
I
C
C
I
C
C
I
C
C
I
C
C
C
C
H
C
C
H
C
C
H
C
C
H
C
I
C
H
32
The wheel to the Front
Pre-Drilled holes
The wheel to the Front
AØ8*30mm
36
C
H
Ø6,0*10mm16
Right slide 300mm
04
I
Left slide 300mm
04
2x
KGlue tube
01
P.6
Step 3
Step 4
D5
4
3
2
6
D 1
DØ4,0*30mm
06
DØ4,0*30mm
06
5
D
D
D
D
D
D
D
D
KGlue tube
01
KGlue tube
01
P.7
Step 5
Step 6
D
FF
FF
FF
FF
FF
9
9
88
D
D
D D
DØ4,0*30mm
04
FØ4,5*45mm
12
F
FF
K
KGlue tube
01
1º 2º
Apply glue to legcontact surfaces
P.8
Step 7
Step 8
D D
D D
DD
DD
B
B
B
B E
JE
J
I
H
B
B
10
12
11 13
14
4x
4x
4x 4x
GG
G
G
G
G
G
G
G
GG
GG
GG
GG
G
G
G
G
G
G
G
7
7
L
L
The wheel to the Back
Bottom
7
7
GØ10*10
24
L 01
E
H
08
Right slide 350mm
04
I
J
Left slide 350mm
04
08
B
D
Ø3,0*14mm16
Ø4,0*30mm32
M4x22mm
Step 9
To adjust the drawer front position: Loosen the screw (part C) you used to install the drawer runner (either parts H or I) in step 2, to the side panel (parts 02 or 03), depending on the side (left or right), as shown. With the screw (part C) loosened, you can make the necessary slight adjustments (up or down) to the drawer runner to achieve the proper drawer alignment.
Once the drawer alignment is square, securethe position of the drawer runners (parts H &I) to the side panels (parts 02 & 03) by re-tightening the part C screw and adding thepart B screw as shown.
BØ3,0*14mm
08
P.9
C
C
B
P.10
Ø6mm
Back panel
Top
Top
Wall
DN
M O
D
N
=
=
1º 2º
D
M
Ø4,0*30mm02
01
N 02
O 01
Wall anchor and hardware are included with this product. Please make sure hardware is suitable for your walls before installing, as different wall materials may require different types of anchors.