8/10/2019 BQ Stream Drain Culvert HDD
1/8
NO DESCRIPTION
1.0 Road Crossing - 3m
1.1 Earth works
Excavation in all materials other than rock including cart away from site
1.2 Concrete Works
50mm thick lean concrete Grade 15P/20 as blinding.
Reinforced concrete of the folowing grades:
(b) Grade 30/20
Formwork as described to Class F1 & U1 finish type including falsework
(c ) To sides and soffit of pile cap
Hot Rolled Type 2 Deformed steel reinforcement bars as described
16mm Diameter
12mm Diameter
10mm Diameter
1.3 Precast Concrete Piles
Pile / 200mm / 30 tonnes
Supply, handle & pitch 200mm x 200mm initial/head pile 6.00m long.
Supply, handle & pitch 200mm x 200mm extension pile 6.00m long.
Drive to set 200mm x 200mm pile.
Butt weld connection 0.60m girth between edges of and including mild steel
extension head, base cap plates, bars etc and including coated heavily with
bituminous compound for jointing 200mm x 200mm R.C piles.
Cut off and dump away surplus length of 200mm x 200mm precast concrete
pile and strip off pile head, bend back reinforcement for connection as specified.
8/10/2019 BQ Stream Drain Culvert HDD
2/8
UNIT QTY RATE TOTAL
M3 2.00
M2 1.00
M3 6.44
M2 43.78
kg 141.90
kg 106.60
kg 204.20
M 24
M 120
M 144
NO 20
NO 4
8/10/2019 BQ Stream Drain Culvert HDD
3/8
NO DESCRIPTION
2.0 Road Crossing - 5m
2.1 Earth works
Excavation in all materials other than rock including cart away from site
2.2 Concrete Works
50mm thick lean concrete Grade 15P/20 as blinding.
Reinforced concrete of the folowing grades:
(b) Grade 30/20
Formwork as described to Class F1 & U1 finish type including falsework
(c ) To sides and soffit of pile cap
Hot Rolled Type 2 Deformed steel reinforcement bars as described
16mm Diameter
12mm Diameter
10mm Diameter
1.3 Precast Concrete Piles
Pile / 200mm / 30 tonnes
Supply, handle & pitch 200mm x 200mm initial/head pile 6.00m long.
Supply, handle & pitch 200mm x 200mm extension pile 6.00m long.
Drive to set 200mm x 200mm pile.
Butt weld connection 0.60m girth between edges of and including mild steel
extension head, base cap plates, bars etc and including coated heavily with
bituminous compound for jointing 200mm x 200mm R.C piles.
Cut off and dump away surplus length of 200mm x 200mm precast concrete
pile and strip off pile head, bend back reinforcement for connection as specified.
8/10/2019 BQ Stream Drain Culvert HDD
4/8
UNIT QTY RATE TOTAL
M3 22.00
M2 11.00
M3 90.64
M2 602.58
kg 2349.60
kg 1172.60
kg 2841.30
M 264
M 1320
M 1584
NO 220
NO 44
8/10/2019 BQ Stream Drain Culvert HDD
5/8
NO DESCRIPTION UNIT QUANTITY
3.0 Road Crossing - Horizontal Directional Drilling (HDD)
3.1 ADDITIONAL
(a) Mobilised all HDD equipment and all necessary personel, setting up Lump
and moving to each and every position at each location and Sum
dismantling completion. Rate to include all supervision and the
provision of HDD equipment.
(b) Supply and deliver to store/pipe dumps on site, pipes,
special, joints, fittings and valves.
STRAIGHT PIPES
HDPE Pipe (from MoF aproved panel of suppliers)
160mm OD HDPE Pipe PN 10 m 939.483
(c ) LAY AND INSTALL OF PIPES, SPECIALS, FITTINGS AND VALVES
Installation of HDPE pipe under existing road using the HDD method
a) 160mm OD HDPE PipePN 10 m 939.483
8/10/2019 BQ Stream Drain Culvert HDD
6/8
RATE TOTAL
8/10/2019 BQ Stream Drain Culvert HDD
7/8
NO DESCRIPTION
4.0 Cable Trench
4.1 Earth works
(a) Excavation in all materials other than rock including stockpiling aside
for embankment construction.
(b) Supply, lay, grade and compact in layers imported sand fill and cement (dry mix)
material to formation level.
( C) Supply, lay, grade and compact in layers imported suitable fill material to
formation level.
4.2 Protective cover
Construct and lay protective cover including materialspecified below:
(a) Reinforced concrete Grade 20/20
(b) Formwork as described to Class F1 & U1 finish type including falsework to sides
and soffit of concrete cover
( C) Stel Mesh Reinforcement Type A6 (minimum 2.22 kg/m2)
8/10/2019 BQ Stream Drain Culvert HDD
8/8
UNIT QTY RATE TOTAL
M3 35,131.15
M3 8,438.90
M3 26,692.50
M3 126.58
M2 4,303.84
M2 2,531.67