Item Description Unit Quantity Rate Amount ELEMENT: FRAME INDUSTRIALI SED BUILDING SYSTEM (IBS) Notes A NO B NO To Collection The tenderer shall be deemed to have studies the drawing/specificat ion and vi si te d the si te to determine for himself th e ex te nt and/or nature of pre- casting, tr ansportati on, double handling, hoisting, housting equipments, fixing, etc. Claims will not be entertained on the gr ound of ignoranc e of ex tent and/ or nature of such works as he is deemed to be fu lly ac quant ed an d conversant wi th all Sup pl y, de li ver, as semb le , ho is ti ng an d in st al l ….mm x ….mm x ….mm pre-stressed beams; fair finished to all surfaces Rates to include for casting in condui ts forming chases, opening, et c. for Mechanical and Electrical installation. It is the Tenderer's responsi bi li ty to check th e ex te nt of this wo rk fr om th e Me chanical and  Supply, de li ver, as semble, hoisting and in st al l ….mm x ….mm x ….mm pre-stressed roof beams; fair finished to all surfaces Precast concrete; design and cast in panels size including all necessary levelling, proping cutting of the lifting loops all accordance to S.O approval, all as per manufacturer's detail and all as per If the opinion of thetenderer, the precast items may be cast into smal ler/ gi gger unit s, he should forst seek cl ar if ication and appr oval from the S.O. All costs in connection with any amendmentsto the  The tenderer shall note that all unplastered surfaces to precast concre te sh al l be fi ni sh ed smoo th . He shal l al lo w fo r th is in his pr ic es accordingly. Cawangan Kontrak Ukur Bahan, Ibu Pejabat JKR Malaysia.

BQ Building

Embed Size (px)

Citation preview

8/3/2019 BQ Building

http://slidepdf.com/reader/full/bq-building 1/4

Item Description Unit Quantity Rate Amount

ELEMENT: FRAME

INDUSTRIALISED BUILDING SYSTEM (IBS)

Notes

A NO

B NO

To Collection

The tenderer shall be deemed to have studies thedrawing/specification and visited the site to determine for himself the

extent and/or nature of pre-casting, transportation, double handling,

hoisting, housting equipments, fixing, etc. Claims will not be

entertained on the ground of ignorance of extent and/or nature of such

works as he is deemed to be fully acquanted and conversant with all

Supply, deliver, assemble, hoisting and install ….mm x ….mm x

….mm pre-stressed beams; fair finished to all surfaces

Rates to include for casting in conduits forming chases, opening, etc.

for Mechanical and Electrical installation. It is the Tenderer's

responsibility to check the extent of this work from the Mechanical and

 

Supply, deliver, assemble, hoisting and install ….mm x ….mm x

….mm pre-stressed roof beams; fair finished to all surfaces

Precast concrete; design and cast in panels size including all

necessary levelling, proping cutting of the lifting loops all accordance

to S.O approval, all as per manufacturer's detail and all as per

If the opinion of the tenderer, the precast items may be cast into

smaller/gigger units, he should forst seek clarification and approval

from the S.O. All costs in connection with any amendments to the

 

The tenderer shall note that all unplastered surfaces to precast

concrete shall be finished smooth. He shall allow for this in his pricesaccordingly.

Cawangan Kontrak Ukur Bahan,

Ibu Pejabat JKR Malaysia.

8/3/2019 BQ Building

http://slidepdf.com/reader/full/bq-building 2/4

Item Description Unit Quantity Rate Amount

ELEMENT: INTERNAL WALL

INDUSTRIALISED BUILDING SYSTEM (IBS)

Notes

NO

M2

M2

M2

M2

To Collection

The tenderer shall be deemed to have studies the

drawing/specification and visited the site to determine for himself the

extent and/or nature of pre-casting, transportation, double handling,

hoisting, housting equipments, fixing, etc. Claims will not be

entertained on the ground of ignorance of extent and/or nature of such

works as he is deemed to be fully acquanted and conversant with all

If the opinion of the tenderer, the precast items may be cast into

smaller/gigger units, he should forst seek clarification and approval

from the S.O. All costs in connection with any amendments to the

precast items shall be borne by the tenderer.

Rates to include for casting in conduits forming chases, opening, etc.

for Mechanical and Electrical installation. It is the Tenderer's

responsibility to check the extent of this work from the Mechanical and

Electrical drawings.

Prepare and apply approved skim coating to the vertical surfaces of

the precast concrete wall cladding panel all in accordance with

manufacturer's instructions and to the approval of the S.O.

Approved individually supported precast concrete wall cladding panel

designed either to span column to column or floor to floor with

minimum Grade 35 concrete and minimum cement content of

350kg/m3

including all the necessary moulds, reinforcement bars,

links,complete with appropriate jointing system at all sides of the panel

and all the necessary ancillary components to Manufacturer's

Compressible waterproof strips to the horizontal joints between top

precast concrete wall cladding panel and the bottom precast concrete

wall cladding panel, sufficiently lapped where necessary all in

accordance with the Manufacturer's Instruction and to the approval of

S.O.

Prepare and apply approved water proofing membrane to the vertical

 joints of the precast concrete wall cladding panel, including sufficient

lapping where necessary all in accordance with manufacturer's

instructions and to the approval of the S.O.

Supply, handle, transport, assemble, hoisting and install ….mm x….mm x …mm precast concrete wall cladding panel as described.

Prepare and apply approved water proofing membrane to the

horizontal joints of the precast concrete wall cladding panel with the

floor slabs, including sufficient lapping when necessary all in

accordance with manufacturer's instructions and to the approval of the

The tenderer shall note that all unplastered surfaces to precast

concrete shall be finished smooth. He shall allow for this in his prices

accordingly.

Cawangan Kontrak Ukur Bahan,

Ibu Pejabat JKR Malaysia.

8/3/2019 BQ Building

http://slidepdf.com/reader/full/bq-building 3/4

Item Description Unit Quantity Rate Amount

ELEMENT: UPPER FLOOR

INDUSTRIALISED BUILDING SYSTEM (IBS)

Notes

A

M2

B

M2

C

M2

D

M2

E

Item

To Collection

Allow for providing all necessary equipments, plants, tools and other

ancillary materials needed to perform leakage test on the floor and the

subsequent removal of the same from the site.

The tenderer shall be deemed to have studies the

drawing/specification and visited the site to determine for himself the

extent and/or nature of pre-casting, transportation, double handling,

hoisting, housting equipments, fixing, etc. Claims will not be

entertained on the ground of ignorance of extent and/or nature of such

works as he is deemed to be fully acquanted and conversant with all

If the opinion of the tenderer, the precast items may be cast into

smaller/gigger units, he should forst seek clarification and approval

from the S.O. All costs in connection with any amendments to the

precast items shall be borne by the tenderer.

Rates to include for casting in conduits forming chases, opening, etc.

for Mechanical and Electrical installation. It is the Tenderer's

responsibility to check the extent of this work from the Mechanical and

Electrical drawings.

Approved precast concrete slabs of types either half slab, hollow core

floor slabs or double tee slabs designed to Class II with minimum

Grade 35 concrete and minimum cement content of 350kg/m3

including all the necessary moulds, reinforcement bars, links, pre-

stressing wires, strands or cable, complete with appropriate jointing

system at the end of the slabs and all the necessary components to

Manufacturer's Instructions.

Layer of steel fabric reinforcement to B.S. 4483 (BRC Ref. No. A8 -

weighing not less than 3.95kg/m2) as described well lapped at joints

and embedded in 75mm thick reinforced concrete Grade 35

(measured separately).

Prepare and apply approved water proofing membrane to the

suspended precast concrete floors, all in accordance with

manufacturer's instructions and to the approval of the S.O

75mm thick reinforced concrete grade 35 with minimum cement

content of 350kg/m3

as described on suspended floor slab

Supply, handle, transport, assemble, hoisting and install precast

concrete floor slabs as described.

The tenderer shall note that all unplastered surfaces to precast

concrete shall be finished smooth. He shall allow for this in his prices

accordingly.

Cawangan Kontrak Ukur Bahan,

Ibu Pejabat JKR Malaysia.

8/3/2019 BQ Building

http://slidepdf.com/reader/full/bq-building 4/4

Item Description Unit Quantity Rate Amount

ELEMENT: STAIRCASE

INDUSTRIALISED BUILDING SYSTEM (IBS)

Notes

A Item

To Collection

Supply, handle, transport, assemble, hoisting and install precast

concrete staircases floor slabs as described.

The tenderer shall be deemed to have studies thedrawing/specification and visited the site to determine for himself the

extent and/or nature of pre-casting, transportation, double handling,

hoisting, housting equipments, fixing, etc. Claims will not be

entertained on the ground of ignorance of extent and/or nature of such

works as he is deemed to be fully acquanted and conversant with all

If the opinion of the tenderer, the precast items may be cast into

smaller/gigger units, he should forst seek clarification and approval

from the S.O. All costs in connection with any amendments to the

precast items shall be borne by the tenderer.

Rates to include for casting in conduits forming chases, opening, etc.

for Mechanical and Electrical installation. It is the Tenderer's

responsibility to check the extent of this work from the Mechanical and

Electrical drawings.

Approved precast concrete staircase complete with relevant landings,

with minimum Grade 35 concrete and minimum cement content of

350kg/m3

including all the necessary moulds, reinforcement bars,

links, pre-stressing wires, strands or cable, complete with appropriate

 jointing system at the end of the staircase and all the necessary

ancillary staircase components to Manufacturer's Instructions.

The tenderer shall note that all unplastered surfaces to precast

concrete shall be finished smooth. He shall allow for this in his pricesaccordingly.

Cawangan Kontrak Ukur Bahan,

Ibu Pejabat JKR Malaysia.