1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation P j t Project scope recap Progress to date Construction impacts Proposed facility Parks Department Next steps Discuss Facility Exhibits Q&A / Feedback

BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

1

Madison Water Utility

Public Information Meeting No. 2 - January 16, 2013

Meeting Overview:

PresentationP j t Project scope recap

Progress to date

Construction impacts

Proposed facility

Parks Department

Next steps

Discuss Facility Exhibits

Q&A / Feedback

Page 2: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

2

Introductions: Madison Water Utility

Adam Wiederhoeft, PE Al Larson PE BCEE Al Larson, PE, BCEE

Citizens Advisory Panel David Liebl Jurgen Patau

Strand Associates, Inc. Andy Mullendore, PE

M k Ol i ik PE PH Mark Oleinik, PE, PH Potter Lawson

Doug Hursh, AIA, LEED City of Madison Parks

Sarah Lerner, LEED AP

Existing Facility:

Operating since 1926 – oldest in system

Single 1,500 GPM booster pump

Undersized, deteriorating, site issues

Page 3: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

3

Project Scope Recap:

Replace existing pump house

L f ilit d d ll t f t Larger facility needed, allocate future space

Upgrade pumps

Install two 2,100 GPM variable speed pumps

Allow reverse operation

Replace existing vent/hatch structuresp g

Improve drainage on top of buried reservoir

Install tank mixing system inside reservoir

Improve landscaping and site safety

Progress to Date:

September 2012 Engineering Services Contract w/ Strand Discuss scope with Alders/Parks Dept

October 2012 Public meeting on-site to introduce project Develop design criteria

November – December 2012W k ith CAP it i l t Work with CAP on site issues, early concepts

Explore design alternatives, develop concepts

January 2013 Finalize proposed replacement plan Public Info Meeting 2 / Public Hearing 1

Page 4: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

4

Traffic Impacts: Issues:

SB detour route

Project is at top of hillProject is at top of hill

Winter/snow clearing

Ideas discussed: Divert to Franklin

Temporary light at Franklin/SpeedwayFranklin/Speedway

One-way southbound with one lane closed

Close block between Zwerg Dr and Ridge Rd

Glenway St. Block Closure:

Discussing block/lane closure with Traffic Engineering (between Ridge Rd and Zwerg Dr)

Page 5: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

5

Existing Site Layout/Site Issues:

Site Impacts: Slope / foundation

excavation

Tree removal

Protect existing stone wall

Remove existing wooden stairway

Power pole Power pole

New railings

Landscaping / slope stabilization

Materials/Equip.

Page 6: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

6

Site Plan (overall):

Floor Plan:

Page 7: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

7

Landscaping Plan: Divert traffic

away from top of new facilityy

Align stairs with existing path

Parks Dept Slope

stabilization Prairie

concept Upcoming

2013 Reservoir Park Project

Landscaping Plan:

Page 8: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

8

Elevation Concept 1:

Elevation Concept 2:

Page 9: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

9

Elevation Concept 2:

Next Steps:

Continue to gather feedback

Refine/finalize proposed replacement plan

PUBLIC HEARING BEFORE MWU BOARD Tuesday, January 29, 2013 – 4:30 p.m.

Water Utility Office – 119 E Olin Ave Water Utility Office 119 E Olin Ave

Complete preliminary design phase

Page 10: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

10

Project Schedule: January 2013

Finalize proposed plan

Public Hearing before MWU Board

February-March 2013 Final design phase

Project approvals

April-June 2013 April June 2013 Bidding / Preconstruction

July 2013 – Spring 2014 Construction phase

For More Information/Feedback:

Adam Wiederhoeft:i d h ft@ di t [email protected]

(608) 266-9121

General [email protected]

(608) 266-4651

Project Website: http://www.cityofmadison.com/water/plans/BPS106.cfm

Page 11: BPS106 PIM 2 - 1-16-2013 - Madison, Wisconsin...2013/01/16  · 1/16/2013 1 Madison Water Utility Public Information Meeting No. 2 - January 16, 2013 Meeting Overview: Presentation

1/16/2013

11

Exhibits Discussion / Q&A