Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
+ 586,875 SF Strategic East Coast Industrial Distribution Site11501-601 Roosevelt Boulevard, Philadelphia, PA
BUILDING 1: + 121,875 SF | EST. DELIVERY Q2 2019
Proposed Rendering
Tom Golarz Vice President +1 215 928 7577 [email protected]
Michael Golarz Senior Vice President +1 215 928 7569 [email protected]
Richard Gorodesky, SIOR Senior Managing Director+1 215 928 7545 [email protected]
WWW.BOULEVARDLC.COM
COLLIERS INTERNATIONAL | Ten Penn Center, 1801 Market Street, Suite 500 | Philadelphia, PA 19103
Boulevard Logistics Center
Copyright © 2012 Colliers International
I-95 S
I-95 N
State Rd
I-276 W
Knights Rd
Street Rd
Grant Ave
Pine Rd
Academy Rd
Byberry Rd
Hulm
evill
e Rd
Welsh Rd
Algo
nAv
e
Red Lion Rd
Verree Rd
Rhawn St
Holme Ave
Bust
leto
n Av
e
Comly Rd
Ashto
n Rd
Krew
stow
n Rd
Gallow
ay Rd
Cast
orAv
e
Trevose Rd
Willits Rd
Tomlinson Rd
Southampton Rd
Mor
rell
Ave
Philmont Ave
Burlington Ave
Richlie
uRd
MillRd
Wal
dem
ireD
r
Haldeman Ave
Frankfo
rdAve
Norcom Rd
Chalfont Dr
Decatu
r Rd
Alburger Ave
Buck R
d
Dunks Ferry Rd
BloomfieldAve
Park Ave
Linden Ave
Hunt
ingd
onPi
ke
Moredon Rd
Mechanicsville Rd
Kelvin
Ave
Morefield Rd
Moreland Rd Jean
es S
t
Bowler St
Stev
ens R
d
Rennard St
E Street Rd
Thornton Rd
Win dsor Dr
Convent Ave
Kirk Dr
Station Ave
Craf
ton
Dr
Blue
Grass
Rd
Ca
rter Rd
Fetters Mill Rd
Hendrix St
Solly Ave
Darlingt
onRd
Napfle Ave
Valle
yRd
Alden Rd
Conwell Ave
Nandina St
Somerton Rd
Audu
bon
Ave
Outlook
Ave
Win
ches
ter A
ve
Brown Ave
PennypackSt
Millbrook Rd
Shady Ln
Cottman Ave
Jamiso
n Ave
High
Rd
Whi
take
r Ave
Old Street Rd
Tennis Ave
Tolbut S t
Old B
ustle
ton
Ave
Wor
thin
gton
Rd
RyanAve
Dewee
s St
Coopertown Rd
Cornwells
Ave
Rock Hill Dr
Susquehanna Rd
Norwalk Rd
Northea
st Ave
Napfle St
Old
Lin
coln
Hw
y
Monto
urSt
Cooper St
Old F
ord
Rd
Crest
mon
t Ave
BentonSt
Terwood Rd
Norm
ady Dr
Wall
eyA
ve
Farnsw
orth
St
Moredun Rd
Hartel Ave
Barlow
St
Dunksferry Rd
Evans St
Overh ill Ave
Orchard Ln
Primrose Rd
Giff
ord
St
E Moreland Rd
Win
ches
ter A
ve
TomlinsonRd
Welsh Rd
Hendrix St
Welsh Rd
Winchester Ave
Welsh
Rd
Roose
velt
Blvd
Je anes
St
Winchester Ave
Holme Ave
Red Lion Rd
Pine
Rd
Somerton Rd
Byberry Rd
Welsh Rd
Tomlinson Rd
Red Lion Rd
Winchester Ave
1
Mile
N
232
LOCATION
Boulevard Logistics Center
513
132
532
63
63WOODHAVEN EXPRESSWAY
Boulevard Logistics Center
Access to I-95 in 4 Minute Drive
STRATEGIC LOCATIONEasy access to 1-95, US Route 1 and PA Turnpike
Only 21 Miles from Port of Philadelphia
Only 26 Miles from Philadelphia Airport
Boulevard Logistics Center
MASTER PLAN
RAIL SERVICE available to both buildings
+ 121,875 SF
+ 465,000 SF
+ 586,875 Total SF
1
2
PROPOSED BUILDING AREA
BUILD-TO-SUIT OPPORTUNITIES - Multiple BTS opportunities including the ability to build 465,000 SF under one roof.
HIGHLY EXPERIENCED landlord and developer with extensive in-house resources. Founded in 2012, NorthPoint has developed +55 Million SF for tenants such as Chewy.com, Home Depot, Amazon, GE, Walmart and General Motors, etc.
STATE-OF-THE-ART, 40-acre master planned business park with 32’-36’ clear heights and ample parking
Boulevard Logistics Center
Located Directly on Route 1
Quick Access to Woodhaven Expressway (Route 63)
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
DS
Building 1 Building 2(PROPOSED)
RAIL ACCESS
INTERSTATE 954 MILES
CENTER CITY, PHILADELPHIA18 MILES
PORT OF PHILADELPHIA21 MILES
PHILADELPHIAINT’L AIRPORT26 MILES
DRIVETIME DISTANCES
BUILDING 1 PLAN & SPECS
This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and/or its licensor(s). ©2019. All rights reserved.
121,875 SQUAREFEET+
10 DOCKDOORS*
1 DRIVEIN*
32’-40’ COLUMNSPACING
32’ CLEARHEIGHT
Boulevard Logistics Center
Tom Golarz Vice President +1 215 928 7577 [email protected]
Michael Golarz Senior Vice President +1 215 928 7569 [email protected]
Richard Gorodesky, SIOR Senior Managing Director+1 215 928 7545 [email protected]
COLLIERS INTERNATIONAL | Ten Penn Center, 1801 Market Street, Suite 500 | Philadelphia, PA 19103
DS
Building 1
Boulevard Logistics Center | 11501-601 ROOSEVELT BOULEVARD, PHILADELPHIA, PA
DN
DN
DN
DN
DN
DN
.5 .7 .8 .9 1 2 8 10 12 15 17 21
B
D
G
J
K
M
N
O
A
ONE STORYROOF BELOW
EDGE OFMEZZANINE
OPEN TOBELOW
12.1 15.1
22
E
F
C
3
L
K.8
17.1
19
19.1
.6 4 5
D17
D06
D18
SCOPE OF WORK
D01
D05
D01
D09
D01
D02D02
D25D25D25D25
OPEN TOBELOW
D02
SCOPE OFWORK
SCOPE OFWORK - PH-2
tel: 484-459-8750
202 la vida via - downingtown, pa 19335
engineering you can build...
i n t e g r a t e d f a c i l i t i e s s o l u t i o n s, inc.
NORTH
SEAL
KEY PLAN
DRAWING NUMBER
DRAWING TITLE
CONFIDENTIALTHE INFORMATION CONTAINED HEREIN MAY NOT BE USED OR
REPRODUCED IN ANY MANNER WITHOUT WRITTEN PERMISSIONOF INTEGRATED PROJECT SERVICES.
CLIENT
ComplianceConsulting
ProjectServices
EngineeringDesign/Build
Integrated
PRELIMINARY NOTFOR CONSTRUCTION
IPS Professional Engineers and Architects, PC.
DATE:
XREF FILE(S)
DESIGNER
SCALEREVIEWED BY
ARCHITECT
CADD FILE NAME
IPS PROJECT #
DRAWN BY
ENGINEER
AS NOTED
721 ARBOR WAY, SUITE 100BLUE BELL
PENNSYLVANIA 19422610.828.4090 PHONE
610.828.3656 FAXwww.ipsdb.com
BA A
G
L
O
.5
G
L
O
B
.8 2 5 12 19 22
1" = 1'-0"
1/2" = 1'-0" 1/8" = 1'-0"
3/8" = 1'-0" 3" = 1'-0"
0
3/32" = 1'-0"
3/16" = 1'-0" 3" = 1'-0"
0
1/16" = 1'-0"
1/32" = 1'-0"
SCALE
0' 10' 20' 30' 60'
1" = 20'-0"
40'
4/3/
2017
10:
02:4
7 A
MD
:\Rev
it P
roje
cts\
1631
9_La
nnet
t_A
rch_
ndru
xman
.rvt
A2.21
ARCHITECTURALDEMOLITION PLAN - SECOND
FLOOR
11501 ROOSEVELT BLVD.PHILADELPHIA, PA 19154
NAD
NAD
NAD PAD16319.01
B11501 - FIT-OUT
-
JAM
DEMO WORK SHEET NOTESD01 REMOVE EXISTING STAIR ASSEMBLY IN ITS ENTIRETY. PATCH EXISTING S.O.G. AND ADJACENT
WALL SURFACES TO MATCH EXISTING. PROVIDE TEMPORARY OSHA COMPLIANT FALLPROTECTION AT EXISTING SECOND FLOOR SLAB OPENING WHERE APPLICABLE.
D02 REMOVE EXISTING ENCLOSURE IN ITS ENTIRETY INCLUDING ALL WALLS, DOORS AND OTHERDEVICES. PATCH AND PREPARE EXISTING SURFACES TO RECEIVE NEW FINISHES
D05 REMOVE EXISTING ELEVATOR AND SHAFT ENCLOSURE IN ITS ENTIRETY. BACKFILL EXISTING PITAND REPAIR EXISTING SLAB TO MATCH EXISTING
D06 REMOVE EXISTING DOOR, FRAME AND HARDWARE AND PREPARE FOR NEW WORK.
D09 REMOVE AND SALVAGE EXISTING MATERIAL LIFT IN ITS ENTIRETY. PATCH AND PREPARESURFACES FOR NEW WORK
D17 REMOVE EXISTING SECOND FLOOR LANDING IN ITS ENTIRETY AND PREPARE SURFACES FORNEW WORK
D18 PROVIDE NEW FRAMED OPENING IN SLAB ABOVE FOR PERCHLORIC FUME HOOD EXHAUSTPENETRATION
D25 DEMOLISH EXISTING TOILET FIXTURES AND LAVATORIES, AND ASSOCIATED PARTITIONS ANDACCESSORIES. ALL EXISTING UTILITIES TO BE CAPPED. SEE PLUMBING DRAWINGS. PATCH ANDREPAIR EXISTING FLOOR SLAB AS REQUIRED
#ROOF DEMOLITION AND NEW WORK NOTES
1. ALL ROOF WORK SHALL BE LIMITED THE ORIGINAL BUILDING FOOTPRINT EAST OF “LINE 1” EXPANSION.THE EXISTING ROOF WEST OF “LINE 1” EXPANSION SHALL REMAIN INTACT AND UNDISTURBED. ALL WORKSHALL MAINTAIN THE EXISTING ROOF WARRANTY.
2. REMOVE EXISTING ROOF BALLASTS. MODIFY AND/OR REMOVE PORTIONS EXISTING COPING ASREQUIRED TO INSTALL NEW ROOF INSULATION AND EPDM ROOF MEMBRANE.
3. REMOVE EXISTING PATCH BETWEEN ORIGINAL ROOF AND ROOF EXPANSION AT "LINE 1" AND PROVIDENEW EXPANSION JOINT AS REQUIRED BETWEEN NEW AND EXISTING ROOF.
4. REMOVE AND REPLACE ALL DAMAGED ROOF INSULATION. PATCH ALL EXISTING ROOF OPENINGS ANDREPAIR THE EXISTING ROOF DECK WHEREVER DAMAGE IS NOTED AFTER FULL INSPECTION. PREPARESURFACE TO RECEIVE NEW ROOF SYSTEM.
5. ALL EXISTING ROOF TOP EQUIPMENT, DUCTWORK, PIPING AND WIRING SHALL BE REMOVED THRU THEEXISTING ROOF IN THEIR ENTIRETY, INCLUDING UNIT SUPPORTS/ CURBS, ETC. PATCH AND REPAIRDECKING AT ALL OPENINGS.
6. REFER TO MECHANICAL ROOF PLAN FOR THE LOCATION OF MECHANICAL ROOFTOP EQUIPMENT.7. ALL NEW ROOFING AND COPING TO MATCH EXISTING ADJACENT ROOF WEST OF "LINE 1".8. ALL ROOF WORK (INCLUDING THE NEW EXPANSION JOINT AT "LINE 1") SHALL BE PERFORMED IN
ACCORDANCE WITH AND MAINTAIN THE EXISTING ROOF WARRANTY (EXISTING ROOF WEST OF "LINE 1").9. THE NEW ROOF SHALL MEET THE ENERGY PERFORMANCE REQUIREMENTS FOR CLIMATE ZONE 4.
EXISTING INSULATION + NEW INSULATION = R-22 MIN. (4" MIN. POLYISO INSULATION.)
REVISION DATE DESCRIPTION BYA 27-MAR-2017 60% OWNER REVIEW ISSUE NADB 3-APR-2017 DEMOLITION ISSUE NAD
32’0”
40’0
”
10 DOCK DOORS+
138
CAR
PARK
ING
Lease Rate: $6.50/SF NNN
Building SF + 230,000 SF
Available SF + 121,875 SF
Building Dimensions Varies by unit
Column Spacing 32’ x 40’
Clear Height 32’
Dock Doors 10 (8’ x 10’)
Drive-in Doors 1
Car Parking + 138 spaces
PowerDual 13.2 KvA Dual Transformers. 480v / 277v, 3-phase. PECO Electrical Service
Fire Protection ESFR - Ability to Accommodate Class I-IV Commodities
Lighting High Efficiency LED Fixtures
Construction Brick/Masonry
BUILDING 1 FEATURES
POTENTIAL OFFICE AREA
LEASED138 CAR
PARKING+
*NO EXPANSION CAPABILITY