7.3.20052 1 Timo Piilonen Botnia’s pulp mill project in Uruguay

Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

  • Upload
    dangtu

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Page 1: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200521 Timo Piilonen

Botnia’s pulp mill project in Uruguay

Page 2: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200522 Timo Piilonen

• Goal: to build one of the world’s best pulp mills using the latest available technology

• Location: Fray Bentos

• 550 hectare mill site acquired

• Start-up expected in the third quarter of 2007

• Annual wood requirement around 3.5 million cubic metres

Botnia’s pulp mill project in Uruguay

Page 3: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200523 Timo Piilonen

Socio-economic impact of the mill

On completion, the mill will employ

• Around 300 people at the mill itself

• A total of 8,000 people, 5,000 directly and 3,000 indirectly (forestry work, transport, private investment)

• Virtually entire workforce from Uruguay

• Effect on Uruguay’s GNP will be 1.6%

The project will have its greatest impact on employment in 2006

• Some 4,500 workers on the mill site

• Part of workforce will be foreign experts

Page 4: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200524 Timo Piilonen

Results of environmental impact assessment

• Mill effluents will have very little effect on water quality in the Rio Uruguay, no effect on the surrounding environment or on local fish stocks

• Emissions to air will be small, occasional minor odour problems

• Traffic will increase

• Noise will not exceed permitted level

• Change in appearance

of landscape

Page 5: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200525 Timo Piilonen

Specific emissions from pulp millsCODCr (chemical oxygen demand) kg/t

Botnia mills 2004Botnia mills 2003Other Finnish mills 2003Swedish mills 2003

0

10

20

30

40

50

60

Rau

ma

Jout

seno

Kas

kine

n

Ään

ekos

ki

Ker

mi

kg/t

Page 6: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200526 Timo Piilonen

FOSA

• Will supply 60% of the mill’s wood raw material

• 1990: Company established by Shell/Kymmene in Uruguay to cultivate eucalyptus

• 1991: Company began plantations and in 1997 timber harvesting

• 2003: FOSA became a Botnia subsidiary (Botnia 60%, UPM 38.38% and Finnfund 1.62%)

• All FOSA’s plantations have FSC certification

• FOSA currently employs around 1,200 people

• FOSA has roughly 90,000 hectares of land, of which about 60% is already planted or else suitable for planting

• Cultivation agreements with third parties are being negotiated

Page 7: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200527 Timo Piilonen

Page 8: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200528 Timo Piilonen

Page 9: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.200529 Timo Piilonen

Page 10: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.2005210 Timo Piilonen

Tile Forestal

• 50/50 joint venture between FOSA and Otegui Group

• Will supply 40% of the mill’s annual wood raw material requirement

• Tile Forestal will be responsible for

• the mill’s wood procurement from third parties

• wood transport to the mill

• wood exports and marketing

Page 11: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.2005211 Timo Piilonen

Otegui Group

• Otegui Group is an uruguayan family-owned company

• the company is one of the biggest forest owners in i Uruguay

• Owns some 25,000 hectares plantations

• All plantations have FSC certification

• Turnover totalled 45 million USD in 2004 (wood business)

• Otegui Group currently employs around 600 people

Page 12: Botnia’s pulp mill project in Uruguay - Metsä Board and other IR... · 2 7.3.20052 Timo Piilonen • Goal: to build one of the world’s best pulp mills using the latest available

7.3.2005212 Timo Piilonen

Current situation of the project

• Construction will start immediately

• Technical pre-planning completed

• Talks started regarding supply of main equipment

• Key personnel being recruited for Botnia S.A.

• Five Uruguayan chemical engineers undergoing further studies at Helsinki University of Technology