10
Boston Logan Runway 9/27 Safety Rehabilitation May 7, 2020 Massachusetts Port Authority

Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

Boston Logan Runway 9/27 Safety Rehabilitation

May 7, 2020 Mas

sach

usett

s Port

Authori

ty

Page 2: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

Logan’s Runway 9/27 will be temporarily closed for major maintenance

2

Massa

chus

etts P

ort Auth

ority

Page 3: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

At BOS, for optimal efficiency, the FAA Tower looks to utilize three runways at a time – R9/27 is used under mostly all configurations

NW

3

Massa

chus

etts P

ort Auth

ority

Page 4: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

• R9 Departures/R27 Arrivals overfly Point Shirley (Winthrop) and, at higher altitudes, North/South Shore communities

• R27 Departures overfly areas of the South Boston Waterfront, South End, Roxbury, JP, Hyde Park, Roslindale and Milton

4

Runway 9/27 and community context

R9 R27

Massa

chus

etts P

ort Auth

ority

Page 5: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

• Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions

• Rehabilitation is necessary to repair pavement cracking and weathering, improve drainage and install new LED edge and centerline lights

• Runway will be closed for about 75 days beginning mid-May

• Originally scheduled for late August to late October- after the peak summer travel period- the current, significant drop in flight operations has provided an opportunity to avoid major operational disruptions

• Closure now will also minimize shift in flight patterns and avoid impacts when flights return

5

Overview of anticipated impacts of Runway 9/27 closure

Massa

chus

etts P

ort Auth

ority

Page 6: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

6

In 2019, Runway 9/27 accommodated about 32% of all jet activity. However, monthly use fluctuates depending on weather

R 22s• Arrivals – North Shore including East

Boston, Revere, Lynn, Nahant• Departures - South Shore including

South Boston, Hull

R 33L• Arrivals – Hull, South Shore• Departures - East Boston, Chelsea,

points west

R 4s• Arrivals – South Boston, Dorchester,

Milton, and South Shore• Departures – North Shore including

East Boston, Revere, Lynn, Nahant

Runway UseMay June July

Runway Arr Dep Arr Dep Arr Dep

9 46% 36% 32%27 10% 9% 17% 8% 15% 8%4s 53% 5% 43% 4% 37% 5%22s 25% 27% 28% 27% 37% 38%

33L, 32 11% 9% 12% 17% 11% 12%Total 99% 96% 100% 92% 100% 95%

Massa

chus

etts P

ort Auth

ority

Page 7: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

1,10

0

300

AV G . DAIL Y FL IG HTS

Pre COVID Current

7

Due to drop in flight activity, FAA Tower is now accommodating demand on fewer runways and community overflights have dropped significantly

Massa

chus

etts P

ort Auth

ority

Page 8: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

Runway 9/27 Existing Conditions

PAVEMENT – Widespread cracking, weathering, raveling and rutting of surface

PONDING – Drainage issues on and alongside runway

8

Massa

chus

etts P

ort Auth

ority

Page 9: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

• New electrical infrastructure – LED edge and centerline lights in new conduit system

• Drainage improvements

• Pavement milling/removal

• Placement of Hot Mix Asphalt

• Shifting and realignment of Taxiways D-1 and D-2 to address non-standard geometry

• Runway grooving

9

Runway 9/27 Maintenance Overview – Scope of Work

Massa

chus

etts P

ort Auth

ority

Page 10: Boston Logan Runway 9/27 Safety Authority …...Runway 9/27 is a major Logan runway that handles about 30% to 50% of departures under all primary operating conditions • Rehabilitation

• Massport Community Relations staff will be available during construction for any questions or comments:

o [email protected] 617-568-3711 (Please leave a message and your call will be returned)

• The Noise Complaint Line will also remain available at 617-561-3333

10

Questions?

Massa

chus

etts P

ort Auth

ority