16
Scope of work - Supply PSS Page 1 of 16 S.NO Description Qty Unit Assumed By HWPL e Unit Cost Total Cost 1 132 kV SIDE CLAMPS & CONNECTORS (BOLTED TYPE) 1.1 21 EA 0 1.2 9 EA 0 1.3 18 EA 0 1.4 30 EA 0 1.5 36 EA 0 1.6 30 EA 0 1.7 12 EA 0 1.8 30 EA 0 1.9 18 EA 0 1.10 6 EA 0 1.11 6 EA 0 1.12 7 EA 0 1.13 4 EA 0 1.14 SPACER FOR TWIN ZEBRA (mm) 200 EA 0 1.15 9 EA 0 1.16 4 EA 0 2 CONNECTORS FOR GI WIRE 2.1 PG CLAMP FOR 7/3.15 MM GI WIRE 25 EA 0 2.2 25 EA 0 2.3 Earth Bond for GI Wire 20 EA 0 3 INSULATORS 3.1 168 EA 0 4 INSULATOR HARDWARE 4.1 15 SET 0 4.2 3 SET 0 T CLAMP FOR SINGLE PANTHER RUN & SINGLA ZEBRA TAP T CLAMP FOR TWIN ZEBRA RUN & SINGLE ZEBRA TAP T CLAMP FOR TWIN ZEBRA RUN & TWIN ZEBRA TAP ISOLATOR / TERMINAL CONNECTOR FOR SINGLE ZEBRA -HORIZONTAL TYPE ISOLATOR / TERMINAL CONNECTOR FOR TWIN ZEBRA -HORIZONTAL TYPE CB / TERMINAL CONNECTOR FOR SINGLE ZEBRA CB / TERMINAL CONNECTOR FOR DOUBLE ZEBRA CT / TERMINAL CONNECTOR FOR SINGLE ZEBRA (THROUGH TYPE) CT / TERMINAL CONNECTOR FOR DOUBLE ZEBRA (THROUGH TYPE) PT / TERMINAL CONNECTOR FOR SINGLE ZEBRA END TYPE PT / TERMINAL CONNECTOR FOR DOUBLE ZEBRA (THROUGH TYPE) BPI / TERMINAL CONNECTOR FOR SINGLE ZEBRA BPI / TERMINAL CONNECTOR FOR TWIN ZEBRA CVT / TERMINAL CONNECTOR FOR SINGLE ZEBRA CLAMP SUITABLE FOR CONNETCING HV NEUTRAL BUSHING OF T/F TO G.I. STRIP. TENSION CLAMP FOR 7/3.15 MM GI WIRE for 132kV, 70 KN Disc Insulators (10 discs for Tension & 9 disc for suspension) Single Tension Hardware For Single Zebra Single Suspension Hardware For Single Zebra

BOQ_for_PSS_and_BAY[1].xls

Embed Size (px)

DESCRIPTION

pss bay

Citation preview

Page 1: BOQ_for_PSS_and_BAY[1].xls

Scope of work - Supply PSS

Page 1 of 16

S.NO Description Qty UnitAssumed By HWPLSPR-Revised

Unit Cost Total CostUnit Cost

1 132 kV SIDE CLAMPS & CONNECTORS (BOLTED TYPE)

1.1 21 EA 0###

1.2 9 EA 0###

1.3 18 EA 0###

1.4 30 EA 0###

1.5 36 EA 0###

1.6 30 EA 0###

1.7 12 EA 0###

1.8 30 EA 0###

1.9 18 EA 0###

1.10 6 EA 0###

1.11 6 EA 0###

1.12 7 EA 0###

1.13 4 EA 0###

1.14 SPACER FOR TWIN ZEBRA (mm) 200 EA 0###

1.15 9 EA 0###

1.16 4 EA 0###

2 CONNECTORS FOR GI WIRE

2.1 PG CLAMP FOR 7/3.15 MM GI WIRE 25 EA 0###

2.2 TENSION CLAMP FOR 7/3.15 MM GI WIRE 25 EA 0###

2.3 Earth Bond for GI Wire 20 EA 0###

3 INSULATORS

3.1 168 EA 0###

4 INSULATOR HARDWARE

4.1 Single Tension Hardware For Single Zebra 15 SET 0###

4.2 3 SET 0###

T CLAMP FOR SINGLE PANTHER RUN & SINGLA ZEBRA TAP

T CLAMP FOR TWIN ZEBRA RUN & SINGLE ZEBRA TAP

T CLAMP FOR TWIN ZEBRA RUN & TWIN ZEBRA TAP

ISOLATOR / TERMINAL CONNECTOR FOR SINGLE ZEBRA -HORIZONTAL TYPE

ISOLATOR / TERMINAL CONNECTOR FOR TWIN ZEBRA -HORIZONTAL TYPE

CB / TERMINAL CONNECTOR FOR SINGLE ZEBRA

CB / TERMINAL CONNECTOR FOR DOUBLE ZEBRA

CT / TERMINAL CONNECTOR FOR SINGLE ZEBRA (THROUGH TYPE)

CT / TERMINAL CONNECTOR FOR DOUBLE ZEBRA (THROUGH TYPE)

PT / TERMINAL CONNECTOR FOR SINGLE ZEBRA END TYPE

PT / TERMINAL CONNECTOR FOR DOUBLE ZEBRA (THROUGH TYPE)

BPI / TERMINAL CONNECTOR FOR SINGLE ZEBRA

BPI / TERMINAL CONNECTOR FOR TWIN ZEBRA

CVT / TERMINAL CONNECTOR FOR SINGLE ZEBRA

CLAMP SUITABLE FOR CONNETCING HV NEUTRAL BUSHING OF T/F TO G.I. STRIP.

for 132kV, 70 KN Disc Insulators (10 discs for Tension & 9 disc for suspension)

Single Suspension Hardware For Single Zebra

Page 2: BOQ_for_PSS_and_BAY[1].xls

Scope of work - Supply PSS

Page 2 of 16

S.NO Description Qty UnitAssumed By HWPLSPR-Revised

Unit Cost Total CostUnit Cost

5 33 kV SIDE CLAMPS & CONNECTORS

5.1 4 EA 0###

5.2 9 EA 0###

5.3 33 EA 0###

5.4 3 EA 0###

5.5 6 EA 0###

5.6 BPI to IPS Tube 6 EA 0###

5.7 12 EA 0###

5.8 24 EA 0###

5.9 24 EA 0###

5.10 8 EA 0###

5.11 LA TERMINAL CONNECTOR FOR PANTHER 18 EA 0###

5.12 21 EA 0###

5.13 36 EA 0###

5.14 12 EA 0###

5.15 24 EA 0###

5.16 18 EA 0###

5.17 72 EA 0###

5.18 18 EA 0###

5.19 6 EA 0###

5.20 60 EA 0###

5.21 3 EA 0###

5.22 HG FUSE LUGS FOR DOG 6 EA 0###

6 INSULATORS

6.1 240 EA 0###

7 INSULATOR HARDWARE ###

7.1 12 Set 0###

7.2 18 Set 0###

8 33 kV Horn Gap Fuse Unit 1 Set 0###

9 EARTHING

9.1 Lightning Spikes on Control Room 2 EA 0###

9.2 15700 KG 0###

CLAMP SUITABLE FOR LV NEUTRAL BUSHING OF TRAFO.TO G.I. STRIP

T CLAMP FOR TWIN RUN & TWIN TAP ACSR ZEBRA ( 110mm)

T CLAMP FOR SINGLE RUN & SINGLE TAP PANTHER

T CLAMP FOR 63 mm IPS TUBE TO SINGLE ZEBRA

T CLAMP FOR 63 mm IPS TUBE TO TWIN ZEBRA

END CAP FOR 63 mm IPS TUBE

T Clamps for 63 MM OD IPS TUBE 63 MM OD IPS TUBE

CONNECTORS FOR 63 MM OD IPS TUBE TO ISOLATOR

CONNECTORS FOR 63 MM OD IPS TUBE STRAIGHT JOINT

ISOLATOR TERMINAL CONNECTOR FOR SINGLE ACSR ZEBRA

ISOLATOR TERMINAL CONNECTOR FOR TWIN ACSR ZEBRA

ISOLATOR TERMINAL CONNECTOR FOR SINGLE ACSR PANTHER

VCB TERMINAL CONNECTOR FOR SINGLE ZEBRA

VCB TERMINAL CONNECTOR FOR TWIN ACSR ZEBRA

CT TERMINAL CONNECTOR FOR SINGLE ZEBRA

CT TERMINAL CONNECTOR FOR TWIN ACSR ZEBRA

PT TERMINAL CONNECTOR FOR ZEBRA (END TYPE)

SPACER FOR TWIN ASCR ZEBRA(CENTRE TO CENTRE DIS.110MM)

AUX. TRANSFORMER CONNECTOR FOR DOG

33 KV Tension Insulator string11 kV 120 kN Disc Insulators-4 Disc for Tension & 3 Didc for Suspension

Single Tension Hardware suitable for Twin Zebra

Single Suspension Hardware suitable for Twin Zebra

M.S. Strip 50x8mm ( for main earth grid ) ( 3.14 kg/meter) - Qty: 5000 Meters

Page 3: BOQ_for_PSS_and_BAY[1].xls

Scope of work - Supply PSS

Page 3 of 16

S.NO Description Qty UnitAssumed By HWPLSPR-Revised

Unit Cost Total CostUnit Cost

9.3 10080 KG 0###

9.4 6280 KG 0###

9.5 80 KG 0###

9.6 40 Meters 0###

10 OUT DOOR LIGHTING

10.1 15 SET 0###

10.2 15 SET 0###

10.3 3 EA 0###

10.4 Main Lighting Panel with Timer & Contactor 1 EA 0###

10.5 Small LDB for respective LM 3 EA 0###

11 OUT DOOR PANELS

11.1 3 EA 0###

11.2 2 EA 0###

11.3 CT Junction Box ( 132 kV ) With 3 nos. TTB 5 EA 0###

11.4 PT/CVT Junction Box ( 132 kV ) with Fuses 3 EA 0###

11.5 CT Junction Box ( 33 kV With 2 nos. TTB ) 7 EA 0###

11.6 PT Junction Box ( 33 kV ) with Fuses 2 EA 0###

11.7 132 kV Side Metering Box (Main & Check) 2 EA 0###

12 CONDUCTOR

12.1 ACSR Zebra Conductor 2.50 km 0###

12.2 ACSR Pather 0.1 km 0###

12.3 ACSR DOG Conductor 0.002 km 0###

12.4 7/3.15 G.I Wire 0.5 km 0###

13 IPS TUBE ###

13.1 63 mm OD Aluminium Tube 100 M 0###

14 1 SET

14.1 4 Nos. 0###

14.2 75 kG. DCP Type Extn. ( Out Door ) 3 Nos. 0###

14.3 9 Ltr. Foam Type Extn. 10 Nos. 0###

14.4 10 Ltr. Bucket ( Sand/ Water ) 8 Nos. 0###

14.5 Stand for above buckets 2 Nos. 0###

14.6 22.5 Kg. CO2 Type Extn. 2 Nos. 0###

14.7 6.5 Kg. CO2 Type Extn. - Control room 11 Nos. 0###

15 SCIENTIFIC INSTRUMENTS FOR TESTING 1 SET

15.1 Tong Tester 2 Nos. 0###

15.2 Earth Meggar 1 Nos. 0###

15.3 Digital Multimeter 2 Nos. 0###

15.4 Hand operated meger 2.5 /5.0 kV 1 Nos. 0###

M.S/G.I. Strip 100x16mm (for outer peripheral of main earth grid & Transformer) - 12.6 kg/Meter Qty: 800 Meters

G.I Strip 50 X 6mm ( for risers ) (3.14kg/Meter ) -(2000m)

Treated Earth Pits 3 Mtr. Long / 150 mm dia CI Pipe with Clamps & HW

Copper Strip 50 x 6 for Auxilliary Transformer

Fixtures 1X400 W HPSV Flood Normal Type with all fittings

Fixtures 2X400 W HPSV Flood Normal Type with all fittings

LightFitting Gate 125WHPSV PostTopLanten with all fittings

Out door AC Supply Junction Box for AC Distribution132 kV Side

Out door AC Supply Junction Box for AC Distribution33 kV Side

Fire Fighting Equipments = All suitable for electrical applications.

50 Ltr. Capacity Foam Type Extn. (Trollymounted)

Page 4: BOQ_for_PSS_and_BAY[1].xls

Scope of work - Supply PSS

Page 4 of 16

S.NO Description Qty UnitAssumed By HWPLSPR-Revised

Unit Cost Total CostUnit Cost

15.5 Motor operated meger 2.5 /5.0 kV 1 Nos. 0###

15.6 Tool Box 1 Set. 0###

15.7 Analog multimeter 2 Nos. 0###

16 T & P FURNITURE 1 SET

16.1 Table for SS Incharge 2 Nos. 0###

16.2 Chair for SS Incharge 2 Nos. 0###

16.3 Chairs for Visitors 6 Nos. 0###

16.4 2 Nos. 0###

17 T & P MATERIAL 1 SET

17.1 Hand Gloves 2 Pairs 0###

17.2 Safety Shoes (No. 8) 2 Set 0###

17.3 20 Nos. 0###

17.4 Helmets - Blue 10 Nos. 0###

17.5 Helmets - Green 10 Nos. 0###

17.6 Full Body Harness with safety Belts 1 Nos. 0###

17.7 Equipment Maintenanace Charts 1 EA 0###

17.8 Battery Maintenanace Charts 1 EA 0###

17.9 Board Fire Extinguisher Instruction 1 Nos. 0###

17.10 Board Treatment for Electrical Shock 1 Nos. 0###

17.11 Board Painted SLD 1 Nos. 0###

17.12 Electrical discharge rods 6 Nos. 0###

18 DG SET 25 KVA Sound Proof with AMF 1 Set 0###

19 76.0 TON

19.1 68.5 TON 0###

19.2 GI Nut Bolts for above structure 3.5 TON 0###

19.3 1.0 TON 0###

19.4 3.0 TON 0###

20 Caution Boards 1 SET

20.1 Load Relief 4 EA 0###

20.2 Line clear 4 EA 0###

20.3 Danger Board for 132 KV 4 EA 0###

20.4 Danger Board for 33 KV 4 EA 0###

20.5 Danger Board for 440 KV 2 EA 0###

20.6 Break Down 2 EA 0###

21 Earth Pit Name Plate + Rod + Paint 80 EA 0###

Total Cost 0###

APVAT @ 5% 0###

Total Cost 0###

Steel Cupburds - with Glass forn door (Transperrant)

2x1 Mtr. Rubber Mats for Control Room Panels

GI STRUCTURE , NUT BOLTS & ANCHOR BOLTS

GI structure for 132 & 33 kV Gantry & Equipments

GI Nut Bolts for Equipment Mounting on Structure = 120 mm Long

Foundation Bolts for Gantry structure foundations

Page 5: BOQ_for_PSS_and_BAY[1].xls

Civil-PSS

Page 5 of 16

S.NO Description Qty Unit UOMAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

1 132 KV SIDE TOWERS

1.1 TND Type Gantry 10 No. EA 0###

1.2 TNS Type Gantry 5 No. EA 0###

1.3 Lighting Mast 3 No. EA 0###

2 132 KV EQUIPMENTS 0###

2.1 CPL Foundation 42 No. EA 0###

2.2 BPI Foundation 9 No. EA 0###

2.3 2 Set SET 0###

2.4 7 Set SET 0###

2.5 SF6 Circuit Breaker 5 Set SET 0###

2.6 SF6 Circuit Breaker steps if rquired 5 Set SET 0###

2.7 2 Set SET 0###

2.8 Equipment Junction Boxes Foundation 8 Set SET 0###

3 33 KV SIDE TOWERS 0###

3.1 HG Type Gantry with peak 8 No. EA 0###

3.2 FH Type Gantry with peak 4 No. EA 0###

4 33 KV EQUIPMENTS 0###

4.1 CT (T-Type ) 7 No. EA 0###

4.2 PT (T-Type ) 2 No. EA 0###

4.3 BPI for IPS Tube (T-Type ) 5 No. EA 0###

4.4 4 Set SET 0###

4.5 13 Set SET 0###

4.6 Vaccum Circuit Breaker 7 Set SET 0###

4.7 Vaccum Circuit Breaker steps if rquired 7 Set SET 0###

4.8 Aux. Transformer 33/0.415 kV, 160 kVA 1 No. EA 0###

4.9 Equipment Junction Boxes Foundation 9 No. EA 0###

5 CONTROL ROOM BUILDING 1 LS EA 0###

5.1 1 0###

0###

Isolator (with Earth Switch) including Marshlling box foundation

Isolator ( without Earth Switch) including marshalling box foundation

Power Transformer 132/33 kV, 50 MVA including Marshalling box foundation

Isolator (with Earth Switch) including Marshlling box foundation

Isolator ( without Earth Switch) including marshalling box foundation

Main Control Room Building (11Mx20.2M)

Control Room Including following whereever applicable

Page 6: BOQ_for_PSS_and_BAY[1].xls

Civil-PSS

Page 6 of 16

S.NO Description Qty Unit UOMAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

a 0###

b 0###

c Septic tank for Main control room 0###

d Water proofing in Main Control Room 0###

e Water piping in Main Control Room 0###

f Water purifier in Main Control Room 0###

g Paitning for Main Control Room 0###

h 0###

i 0###

j Staircase 0###

k 0###

6 Other Civil work 0###

6.1 1 No. EA 0###

6.2 Bore Well with Pump set and starter 1 LS SET 0###

6.3 1 No. EA 0###

6.4 1 LS SET 0###

6.5 431 RMT RMT 0###

6.6 450 CMT CMT 0###

6.7 1 Set EA 0###

6.8 90 RMT RMT 0###

6.9 3 No. EA 0###

6.10 220 RMT RMT 0###

6.11 0###

a 210 RMT RMT 0###

b 100 RMT RMT 0###

6.12 1 LS SET 0###

Air conditioning & Fall ceiling at Main CR

Electrifications for CR with Power Points for AC

Cable Trenches with Angles, Chequer Plates as required

Stainless Steel Railing for Main Control Room

MS Chanel for CRP Mounting in Control Room & Bay Control Room

Foundation for D.G. Set with suitable shed

Main Oil Drainage Tank (5.81 M x 3.61 M x 2 M =29000 Ltr.Capacity)

Supply & Laying of 300 mm Hume pipe with necessary inspection chambers for oil drainage from 2 no's PTR to Burnt oil pit

Brick work with PCC / CC / Plastering / Y angle for compund wall

RR Stone massionary work for compund wall

Main Gate - 5m + Wicket Gate - 1.2m with light Fixtures (3 no's)

CC Road- 5 M Wide (Inside SS + 5 M out side SS Main Gate) which includes WBM Road under CC Road with proper drainage & Kerb Stones if required

Road Crossing Box type duct -5 M with necessary hume pipes if required for cable duct cross only

WBM Road (APPROACH ROAD) with proper drainage

Construction of Cable Trench with de watering arrangement and sand filling arrangement

Type A - 960 X 500mm with Sand filling and cover slabs

Type B - 730 X 400mm with Sand filling and cover slabs

PVC/GI /RCC Piping with Bends, Couplings etc for Control Cable , FOC Cable entries. & Road Crossing etc.

Page 7: BOQ_for_PSS_and_BAY[1].xls

Civil-PSS

Page 7 of 16

S.NO Description Qty Unit UOMAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

6.13 1 LS SET 0###

6.14 80 No. EA 0###

6.15 1 LS SET 0###

6.16 1 LS EA 0###

6.17 1 LS SET 0###

6.18 Security cabin (Size = 2.5 X 2.5 Mtr.) 1 LS EA 0###

6.19 Foundation for Bay MB - 132 kV Side 3 No. EA 0###

6.20 Foundation for Bay MB - 33 kV Side 2 No. EA 0###

6.21 Meter Box foundation 2 No. EA 0###

6.22 1 SET SET 0###

Total Amount 0###

Add WCT 4% 0###

Add Service Tax 4.08% 0###

Total Amount 0###

Water Piping Arrangement for Earth Pits

Construction of Earthing System with round collars

150 mm Thick Metal Filling in SS. As per APTRANSCO standard

Water Tank ( Sintex ) on Control room (Capapcity = 7000 Ltr.)

Storm Water Drainage system for Pooling SS

Land Development of size 140 X 80 Meters including cutting&filling

Page 8: BOQ_for_PSS_and_BAY[1].xls

ETC-PSS

Page 8 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

1 Earthing Work

1.1 Lightning Spikes on Control Room 2 EA 0###

1.2 Erectn M.S.Strip 50x8mm with Excavation 5000 Mtr 0###

1.3 Erectn M.S./ G.I Strip 100x16mm with Excavation 800 Mtr 0###

1.4 2000 Mtr 0###

1.5 80 SET 0###

2 ###

2.1 Erectn GI Structure for SS 68.5 TON 0###

2.2 Erectn GI Nut Bolts for SS Structure 4.5 TON 0###

3 Erection of 132 KV Equipments ###

3.1 Erectn 132/33 KV,40/50 MVA TRAFO 2 SET 0###

3.2 Filteration of 132/33 kV,50MVA TRAFO 2 SET 0###

3.3 Erectn 132 KV SF6 C.B. 5 SET 0###

3.4 Erectn 132 kV 5 C CT 15 EA 0###

3.5 Erectn 132 kV 1 C CT 3 EA 0###

3.6 Erectn 132 kV 2 C PT 3 EA 0###

3.7 Erectn 132 kV 1 C PT 3 EA 0###

3.8 Erectn 120 kV LA with surge counter 12 EA 0###

3.9 Erectn 132 kV CVT 6 EA 0###

3.10 Erectn 132KV Wave Trap with Insulator 4 EA 0###

3.11 Erectn 132 kV Isolator W/OE/Sw With INSU 7 SET 0###

3.12 Erectn 132 kV Isolator With E/Sw+INSU 2 SET 0###

3.13 Erectn 132kV BusPostInsulator for Sw/Yrd 9 EA 0###

3.14 TVM - 3 Phase 4 Wire 3 EA 0###

4 Erection of 33 KV Equipments ###

4.1 Erectn 33 kV VCB 7 SET 0###

4.2 Erectn 33 kV CT 21 EA 0###

4.3 Erectn 33 kV Potential Transformer 6 EA 0###

4.4 Erectn 30 kV LA without surge counter 18 EA 0###

4.5 Erectn 33 kV ISO W/O E/Sw+With Insu 13 SET 0###

4.6 Erectn 33 kV ISO with E/Sw+With Insu 4 SET 0###

4.7 Erectn Aux.Trafo 35/0.4kV, 160kVA 1 EA 0###

4.8 Erectn 33kV Horn Gap Fuse Unit 1 SET 0###

4.9 Erectn 33kV B.P.I. 5 EA 0###

5 Erection of CONDUCTOR ###

5.1 Erectn ACSR Zebra Conductor 2500 M 0###

5.2 Erectn ACSR Pather / DOG Conductor 120 M 0###

5.3 Erectn 7/3.15 G.I Earth Wire 500 M 0###

Erection of G.I.Flat 50 x 6 mm for grounding of Equipment and connecting Equipment / Structure to the earth mat / ground pit. Each point of earthing with all formation works like bending, twisting, drilling of holes and connecting by welding (inclusive of T&P and consumables) to the earthmat / Ground pit / point of earth connection.Erectn_Earth Pit CI Pipe 125MM ID_2.750M

Erection of Substation GI Tower Structure & Nut Bolts

Page 9: BOQ_for_PSS_and_BAY[1].xls

ETC-PSS

Page 9 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

6 Erection of IPS TUBE ###

6.1 100 M 0###

6.2 12 EA 0###

7 Erection of CLAMPS & CONNECTORS ###

7.1 9 EA 0###

7.2 T CLAMP FOR SINGLE RUN & SINGLE TAP PANTHER 33 EA 0###

7.3 3 EA 0###

7.4 6 EA 0###

7.5 24 EA 0###

7.6 8 EA 0###

7.7 21 EA 0###

7.8 9 EA 0###

7.9 T CLAMP FOR TWIN ZEBRA RUN & TWIN ZEBRA TAP 18 EA 0###

8 Erection of HARDWARES ###

8.1 Erectn H/W SS 132 kV 1_TENS_2_ACSR 0.4 15 EA 0###

8.2 Erectn H/W SS 132 kV 1_SUSP_1_ACSR 0.4 3 EA 0###

8.3 Erectn H/W SS 33 kV 1_TENS_2_ACSR 0.4 12 EA 0###

8.4 Erectn H/W SS 33 kV 1_SUSP_2_ACSR 0.4 18 EA 0###

9 Erection of CONTROL CABLES ###

9.1 Erectn Cable 19 C x 2.5 sq.mm 1500 M 0###

9.2 Erectn Cable 16 C x 2.5 sq.mm 1500 M 0###

9.3 Erectn Cable 12 C x 2.5 sq.mm 3500 M 0###

9.4 Erectn Cable 10 C x 2.5 sq.mm 250 M 0###

9.5 Erectn Cable 7 C x 2.5 sq.mm 5400 M 0###

9.6 Erectn Cable 4 C x 2.5 sq.mm 700 M 0###

9.7 Erectn Cable 3 C x 2.5 sq.mm 800 M 0###

9.8 Erectn Cable 4 C x 4 sq.mm 6000 M 0###

9.9 Erectn Cable 2 C x 4 sq.mm 650 M 0###

9.10 Erectn Cable 4Cx16sq.mm 350 M 0###

9.11 Erectn Cable 1 C x 35 sq. mm Copper 100 M 0###

9.12 Erectn Cable 3.5C x 150 sq.mm 200 M 0###

9.13 Erectn_CableTermination_2x50MVA132KV SS 1 SET 0###

10 Erection of BATTERY & BATTERY CHARGER ###

10.1 Erectn 220V Float cum boost charger_DCDB 1 SET 0###

10.2 Erectn 220V,200AH,LeadAcid Battery_Stand 1 SET 0###

10.3 Erectn 48V Float cum boost charger 1 SET 0###

10.4 Erectn 48V, 150AH,LeadAcid Battery_Stand 1 SET 0###

11 Erection of LT AC Panel ###

11.1 Erectn A.C. Distribution Board B Type 1 EA 0###

12 Erection of Control & Relay Panels. ###

12.1 Erectn 132kV Trafo Feeder HV+LV C & RPanel 2 EA 0###

12.2 Erectn 132kV Line Feeder C & R Panel 2 EA 0###

12.3 Erectn 132 kV Bus Coupler C & R Panel 1 EA 0###

12.4 Erectn 132kV BusBar Protection Panel 1 EA 0###

12.5 Erectn 33kV Dual Feeder C & R Panel 2 EA 0###

Erection of 63MM OD IPS tube with Nut & Bolt joint

Erectn END CAP FOR 63 mm IPS TUBE

T CLAMP FOR TWIN RUN & TWIN TAP ACSR ZEBRA (110mm)

T CLAMP FOR 63 mm IPS TUBE TO SINGLE ZEBRA

T CLAMP FOR 63 mm IPS TUBE TO TWIN ZEBRA

T Clamps for 63 MM OD IPS TUBE 63 MM OD IPS TUBE

CONNECTORS FOR 63 MM OD IPS TUBE STRAIGHT JOINT

T CLAMP FOR SINGLE PANTHER RUN & SINGLA ZEBRA TAP

T CLAMP FOR TWIN ZEBRA RUN & SINGLE ZEBRA TAP

Page 10: BOQ_for_PSS_and_BAY[1].xls

ETC-PSS

Page 10 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

12.6 Erectn 33kV Bus Sectionalizer C & R Panel 1 EA 0###

12.7 Erectn SAS Panel 1 EA 0###

12.8 Erection of BCU Panel 1 EA 0###

12.9 Erection of PLCC Panel 2 EA 0###

13 Station yard lighting (outdoor): ###

13.1 Erectn Light Fix 2x400W Flood NormalType 15 SET 0###

13.2 Erectn Light Fix 1x400W Flood Beam Type 15 SET 0###

13.3 Main Lighting Panel with Timer & Contactor 1 SET 0###

13.4 Small LDB for respective LM 3 EA 0###

14 Erection of Outdoor Panels (Marshalling Box) ###

14.1 Erectn 132KV O/D Bay Marshling Box 3 EA 0###

14.2 Erectn 33KV O/D Bay Marshling Box 2 EA 0###

14.3 Erectn 132KV CT Junction Box_3 Nos_TTB 5 EA 0###

14.4 Erectn 132KV PT Junction Box + CVT 3 EA 0###

14.5 Erectn 33KV CT Junction Box_4 Nos_TTB 7 EA 0###

14.6 Erectn 33KV PT Junction Box 2 EA 0###

14.7 Erectn Meter Box with wiring 2 EA 0###

15 Erection of Safety Equipments ###

15.1 Mounting SafetyEquip_Fire Extn_Chart_etc 1 SET 0###

15.2 Fixing Key Bord_SLD Charts_Etc 1 EA 0###

15.3 PAINTING_EQUIP MARKING_EARTH PIT NOS. 1 LS 0###

16 TESTING & COMM. CHARGES_2x50_132KVSS 1 LS 0###

17 LIASIONING CHARGES UTILITY+EI+LOC132KVSS 1 LS 0###

18 Errection of 25 KVA DG Set with panel & Cabling 1 SET 0###

Total Amount 0###

Add Service Tax 12.36% 0###

Total Amount 0###

Page 11: BOQ_for_PSS_and_BAY[1].xls

Supply-BAY

Page 11 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

1 132 kV SIDE CLAMPS & CONNECTORS (BOLTED TYPE)

1.1 18 EA 0###

1.2 6 EA 0###

1.3 24 EA 0###

1.4 12 EA 0###

1.5 12 EA 0###

1.6 6 EA 0###

2 CONNECTORS FOR GI WIRE ###

2.1 PG CLAMP FOR 7/3.15 MM GI WIRE 20 EA 0###

2.2 TENSION CLAMP FOR 7/3.15 MM GI WIRE 20 EA 0###

2.3 Earth Bond for GI Wire 20 EA 0###

3 INSULATORS ###

3.1 174 EA 0###

4 INSULATOR HARDWARE ###

4.1 Single Tension Hardware For Single Zebra 12 SET 0###

4.2 6 SET 0###

5 EARTHING ###

5.1 1570 KG 0###

5.2 1512 KG 0###

5.3 1570 KG 0###

5.4 6 SET 0###

6 OUT DOOR Lighting ###

6.1 6 EA 0###

6.2 Small LDB for Lighting 1 EA 0###

7 OUT DOOR PANELS ###

7.1 2 EA 0###

T CLAMP FOR SINGLE PANTHER RUN & SINGLA ZEBRA TAP

T CLAMP FOR TWIN ZEBRA RUN & SINGLE ZEBRA TAP

ISOLATOR / TERMINAL CONNECTOR FOR SINGLE ZEBRA -HORIZONTAL TYPE

CB / TERMINAL CONNECTOR FOR SINGLE ZEBRA

CT / TERMINAL CONNECTOR FOR SINGLE ZEBRA (THROUGH TYPE)

CVT / TERMINAL CONNECTOR FOR SINGLE ZEBRA

for 132kV, 70 KN Disc Insulators (10 discs for Tension & 9 disc for suspension)

Single Suspension Hardware For Single Zebra

M.S. Strip 50x8mm ( for main earth grid ) (3.14 kg/meter) - Qty: 500 Meters

M.S. Strip 100x16mm (for outer peripheral of main earth grid & Transformer) - 12.6 kg/Meter Qty: 120 Meters

G.I Strip 50 X 6mm ( for risers ) (3.14kg/Meter -500m)

Treated Earth Pits 3 Mtr. Long / 150 mm dia CI Pipe with Clamps & HW

Fixtures 1X400W HPSV Flood normal type with all fittings

Out door AC Supply Junction Box for AC Distribution 132 kV Side

Page 12: BOQ_for_PSS_and_BAY[1].xls

Supply-BAY

Page 12 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised

Unit Cost Total CostUnit Cost

7.2 CT Junction Box ( 132 kV ) With 3 nos. TTB 2 EA 0###

7.3 PT/CVT Junction Box ( 132 kV ) with Fuses 2 EA 0###

8 CONDUCTOR ###

8.1 ACSR Zebra Conductor 1 km 0###

8.2 7/3.15 G.I Wire 0.2 km 0###

8.3 Mobile Phones 2 EA ###

9 14.70 TON ###

9.1 13.00 TON 0###

9.2 GI Nut Bolts for above structure 0.50 TON 0###

9.3 0.65 TON 0###

9.4 0.55 TON 0###

Total Cost 0###

APVAT @ 5% 0###

Total Cost 0###

GI STRUCTURE , NUT BOLTS & ANCHOR BOLTS

GI structure for 132 & 33 kV Gantry & Equipments

GI Nut Bolts for Equipment Mounting on Structure = 120 mm Long

Foundation Bolts for Equipment structure foundations

Page 13: BOQ_for_PSS_and_BAY[1].xls

Civil-BAY

Page 13 of 16

S.NO Description Qty UnitAssumed by HWPL

Unit Cost Total Cost

1 132 KV

1.1 TNS Type Gantry 1 No. 0

1.2 TND Type Gantry 2 No. 0

1.3 CPL Foundation 18 No. 0

1.4 2 Set 0

1.5 2 Set 0

1.6 SF6 Circuit Breaker 2 Set 0

1.7 SF6 Circuit Breaker steps if rquired 2 Set 0

1.8 Equipment Junction Boxes Foundation 4 Set 0

2 Other Civil work

2.1 Road Crossing Box type duct -5 M 3 No. 0

2.2

2.3 60 RMT 0

2.4 1 LS 0

2.5 1 LS 0

2.6 1 LS 0

2.7 6 No. 0

2.8 1 LS 0

2.9 SS Sign Boards Indoor & Out Door 1 Set 0

2.10 Foundation for Bay MB - 132 kV Side 2 No. 0

Total Amount 0

Add WCT 4% 0

Add Service Tax 4.08% 0

Total Amount 0

Isolator (with Earth Switch) including Marshlling boxes foundation

Isolator ( without Earth Switch) including marshalling box foundation

Construction of Cable Trench with de watering arrangement and sand filling with cover slabs arrangement

Type A - 800 X 500mm with Sand filling and cover slabs

PVC/GI /RCC Piping with Bends, Couplings etc for Control Cable , FOC Cable entries. & Road Crossing etc.

Land Development , Including Cutting & Filling . If required filling material shall be brought from out side & Cutting material shall be disbursed out side SS area Max 5 KM with retaining wall

Water Piping Arrangement for Earth Pits

Construction of Earthing System with round collars with nameplate & Rod

100 mm Thick 20mm Metal Filling in SS. As per APTRANSCO standard

Page 14: BOQ_for_PSS_and_BAY[1].xls

ETC-BAY

Page 14 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised.

Unit Cost Total CostUnit Cost

1 Earthing Work

1.1 500 Mtr 0###

1.2 120 Mtr 0###

1.3 500 Mtr 0###

1.4 6 SET 0###

2 ###

2.1 Erectn GI Structure for SS 13 TON 0###

2.2 Erectn GI Nut Bolts for SS Structure 1.2 TON 0###

3 Erection of 132 KV Equipments ###

3.1 Erectn 132 KV SF6 C.B. 2 SET 0###

3.2 Erectn 132 kV 5 C CT 6 EA 0###

3.3 Erectn 120 kV LA with surge counter 6 EA 0###

3.4 Erectn 132 kV CVT 6 EA 0###

3.5 Erectn 132KV Wave Trap with Insulator 4 EA 0###

3.6 Erectn 132 kV Isolator W/OE/Sw With I 2 SET 0###

3.7 Erectn 132 kV Isolator With E/Sw+INSU 2 SET 0###

4 Erection of CLAMPS & CONNECTORS ###

4.1 18 EA 0###

4.2 6 EA 0###

5 Erection of HARDWARES ###

5.1 Erectn H/W SS 132 kV 1_TENS_2_ACSR 0 12 EA 0###

5.2 Erectn H/W SS 132 kV 1_SUSP_1_ACSR 0 6 EA 0###

6 Erection of CONTROL CABLES ###

6.1 16 C x 2.5 sq.mm 480 M 0###

6.2 12 C x 2.5 sq.mm 675 M 0###

6.3 10 C x 2.5 sq.mm 600 M 0###

6.4 7 C x 2.5 sq.mm 45 M 0###

6.5 4 C x 2.5 sq.mm 675 M 0###

6.6 3 C x 2.5 sq.mm 150 M 0###

6.7 4 C x 4 sq.mm 3600 M 0###

6.8 4C x 16sq.mm 150 M 0###

6.9 Erectn_CableTermination_2x50MVA132 1 SET 45,000###

7 Erection of Control & Relay Panels. ###

7.1 Erectn 132kV Line Feeder C & R Panel 2 EA 0###

7.2 Erectn SAS Panel 1 EA 0###

7.3 Erection of BCU Panel 1 EA 0###

7.4 Erection of PLCC Panel 2 EA 0###

8 Station yard lighting (outdoor): ###

8.1 Erectn Light Fix 2x400W Flood NormalT 6 SET 0###

8.2 Erectn 132KV O/D Bay Marshling Box 2 EA 0###

8.3 Erectn 132KV CT Junction Box_3 Nos_TT 2 EA 0###

8.4 Erectn 132KV CVT Junction Box_3 Nos_T 2 EA 0###

8.5 PAINTING_EQUIP MARKING_EARTH PIT 1 LS 0###

10 TESTING & COMM. CHARGES_2x50_132 1 LS 0###

Total Amount 45,000###

Erectn M.S.Strip 50x8mm with Excavation

Erectn M.S./ G.I Strip 100x16mm with Excavation

Erectn M.S./ G.I Strip 100x16mm with Excavation

Erectn_Earth Pit CI Pipe 125MM ID_2.750M

Erection of Substation GI Tower Structure & Nut Bolts

T CLAMP FOR SINGLE PANTHER RUN & SINGLA ZEBRA TAP

T CLAMP FOR TWIN ZEBRA RUN & SINGLE ZEBRA TAP

Page 15: BOQ_for_PSS_and_BAY[1].xls

ETC-BAY

Page 15 of 16

S.NO Description Qty UnitAssumed by HWPLSPR-Revised.

Unit Cost Total CostUnit Cost

Add Service Tax 12.36% 5,562###

Total Amount 50,562###

Page 16: BOQ_for_PSS_and_BAY[1].xls

HETERO WIND POWER LIMITED

#8-3-166/7/1,Hetero House

Erragadda,Hyderabad-500 018

Andhra Pradesh – India

Ph: 040 2370 1199 / Fax: 040 2371 1188

S.NO Description SPR RAMKY MVPR HETERO Remarks

1 Pooling Station Civil

Basic Cost 30,738,558 38,742,150 40,874,318 21,773,000

Add WCT 3.75% 1,152,696 1,452,831 1,532,787 816,488

Add Service Tax 4.08% 1,254,133 1,580,680 1,667,672 888,338

Total Amount 33,145,387 41,775,660 44,074,777 23,477,826

2 Pooling Station Supply

Basic Cost 15,349,630 12,581,689 14,429,656 11,651,589

Add ED 12.36% 1,897,214 1,555,097 1,783,505 1,440,136

Add AP VAT 5% 862,342 706,839 810,658 654,586

Add Freight 2% 362,184 296,873 340,476 274,926

Total Amount 18,471,370 15,140,498 17,364,296 14,021,238

3 Pooling Station ETC

Basic Cost 14,198,527 13,029,332 15,446,950 10,555,850

Add Service Tax 12.36% 1,754,938 1,610,425 1,909,243 1,304,703

Total Amount 15,953,465 14,639,757 17,356,193 11,860,553

4 BAY Civil

Basic Cost 4,957,514 5,297,625 5,679,178 1,851,000

Add WCT 3.75% 185,907 198,661 212,969 69,413

Add Service Tax 4.08% 202,267 216,143 231,710 75,521

Total Amount 5,345,687 5,712,429 6,123,858 1,995,933

5 BAY Supply

Basic Cost 2,695,690 2,184,152 2,415,228 1,985,078

Add ED 12.36% 333,187 269,961 298,522 245,356

Add AP VAT 5% 151,444 122,706 135,688 111,522

Add Freight 2% 63,606 51,536 56,989 46,839

Total Amount 3,243,928 2,628,355 2,906,426 2,388,794

6 BAY ETC

Basic Cost 1,854,120 2,309,292 1,790,875 703,410

Add Service Tax 12.36% 229,169 285,428 221,352 86,941

Total Amount 2,083,289 2,594,720 2,012,227 790,351

Total Cost

SPR

PSS

67,570,222

BAY

10,672,904 78,243,126

RAMKY 71,555,915 10,935,505 82,491,420

MVPR 78,795,266 11,042,511 89,837,777

HETERO 49,359,617 5,175,079 54,534,696

Total (PSS+BAY)