Moly-Cop Tools / 315551757.xls 04/23/2016 / 23:53:17 Moly-Cop Tools, Version 2.0 About the Bond_Op. Work Index Spreadsheet ... Scope : The Bond_Op. Work Index spreadsheet was designed to estimate the Operational Work Index of a given grinding installation of known dimensions and operating conditions, based on the traditional Bond's Law and the Hogg & Fuersteneau Power Model (see Mill Power_Ball Mills spreadsheet for further details on such model). Theoretical Framework : Undoubtedly, the extensive work of Fred C. Bond ("The Third Theory of Comminution", AIME Trans.,Vol. 193, p. 484, 1952. Also in Mining Engineering, May 1952) has been widely recognized as a very significant contribution to a first understanding of the operational response of conventional ball mills in various grinding circuits. His Third Theory or "Law" of Comminution has become the most traditionally accepted framework for the evaluation of existing grinding operations as well as the design of new installations : E = 10 W i (1/P 80 1/2 – 1/F 80 1/2 ) where : E = Specific Energy Consumption, kWh/ton ground. F 80 = 80% passing size in the Fresh Ore Feed Stream, microns. P 80 = 80% passing size in the Final Ground Product, microns. W i = Bond's Work Index, indicative of the hardness of the ore, kWh/ton. The Bond's Law so allows, as a first approach, to estimate the energy demand (kWh) required to grind each ton of ore. Such Specific Energy Consumption determines in turns the Capacity of the grinding section, by the expression : M = P/E where : M = Fresh Ore Throughput (not including Circulating Load), ton/hr. P = Net Mill Power Demand, kW. Bond's Work Index may be estimated directly from operational data (whenever available) from back-calculation of the first equation above. In such case is denoted as the Operational Work Index : W io = E / 10 (1/P 80 1/2 – 1/F 80 1/2 ) Data Input : All data required by the calculation routine must be defined in each corresponding unprotected white background cell of the here attached Data File worksheet. Gray background cells contain the results of the corresponding formulas there defined and are protected to avoid any accidental editing.

Bond Op. Work Index

Embed Size (px)

DESCRIPTION

Bond Op. Work Index

Citation preview

Page 1: Bond Op. Work Index

Moly-Cop Tools / 315551757.xls 04/23/2016 / 23:53:17

Moly-Cop Tools, Version 2.0About the Bond_Op. Work Index Spreadsheet ...

Scope :

The Bond_Op. Work Index spreadsheet was designed to estimate the Operational Work Index of a given grinding installation of known dimensions and operating conditions, based on the traditional Bond's Law and the Hogg & Fuersteneau Power Model (see Mill Power_Ball Mills spreadsheet for further details on such model).

Theoretical Framework :

Undoubtedly, the extensive work of Fred C. Bond ("The Third Theory of Comminution", AIME Trans.,Vol. 193, p. 484, 1952. Also in Mining Engineering, May 1952) has been widely recognized as a very significant contribution to a first understanding of the operational response of conventional ball mills in various grinding circuits. His Third Theory or "Law" of Comminution has become the most traditionally accepted framework for the evaluation of existing grinding operations as well as the design of new installations :

E = 10 Wi (1/P

801/2 – 1/F

801/2)

where :

E = Specific Energy Consumption, kWh/ton ground. F

80 = 80% passing size in the Fresh Ore Feed Stream, microns.

P80

= 80% passing size in the Final Ground Product, microns. W

i = Bond's Work Index, indicative of the hardness of the ore, kWh/ton.

The Bond's Law so allows, as a first approach, to estimate the energy demand (kWh) required to grind each ton of ore. Such Specific Energy Consumption determines in turns the Capacity of the grinding section, by the expression :

M = P/Ewhere :

M = Fresh Ore Throughput (not including Circulating Load), ton/hr. P = Net Mill Power Demand, kW.

Bond's Work Index may be estimated directly from operational data (whenever available) from back-calculation of the first equation above. In such case is denoted as the Operational Work Index :

Wio = E / 10 (1/P

801/2 – 1/F

801/2)

Data Input :

All data required by the calculation routine must be defined in each corresponding unprotected white background cell of the here attached Data File worksheet. Gray background cells contain the results of the corresponding formulas there defined and are protected to avoid any accidental editing.

Page 2: Bond Op. Work Index

Moly-Cop Tools / 315551757.xls 04/23/2016 / 23:53:17

Scope :

The Bond_Op. Work Index spreadsheet was designed to estimate the Operational Work Index of a given grinding installation of known dimensions and operating conditions, based on the traditional Bond's Law and the Hogg & Fuersteneau Power Model (see Mill Power_Ball Mills spreadsheet for further details on such model).

Theoretical Framework :

Undoubtedly, the extensive work of Fred C. Bond ("The Third Theory of Comminution", AIME Trans.,Vol. 193, p. 484, 1952. Also in Mining Engineering, May 1952) has been widely recognized as a very significant contribution to a first understanding of the operational response of conventional ball mills in various grinding circuits. His Third Theory or "Law" of Comminution has become the most traditionally accepted framework for the evaluation of existing grinding operations as well as the design of new installations :

E = 10 Wi (1/P

801/2 – 1/F

801/2)

where :

E = Specific Energy Consumption, kWh/ton ground. F

80 = 80% passing size in the Fresh Ore Feed Stream, microns.

P80

= 80% passing size in the Final Ground Product, microns. W

i = Bond's Work Index, indicative of the hardness of the ore, kWh/ton.

The Bond's Law so allows, as a first approach, to estimate the energy demand (kWh) required to grind each ton of ore. Such Specific Energy Consumption determines in turns the Capacity of the grinding section, by the expression :

M = P/Ewhere :

M = Fresh Ore Throughput (not including Circulating Load), ton/hr. P = Net Mill Power Demand, kW.

Bond's Work Index may be estimated directly from operational data (whenever available) from back-calculation of the first equation above. In such case is denoted as the Operational Work Index :

Wio = E / 10 (1/P801/2 – 1/F80

1/2)

Data Input :

All data required by the calculation routine must be defined in each corresponding unprotected white background cell of the here attached Data File worksheet. Gray background cells contain the results of the corresponding formulas there defined and are protected to avoid any accidental editing.

Page 3: Bond Op. Work Index

Moly-Cop Tools / 315551757.xls 04/23/2016 / 23:53:17

BOND'S LAW APPLICATIONEstimation of the Operating Work Index from Plant Data

Remarks Base Case Example

GRINDING TASK : Ore Work Index, kWh/ton (metric) 20.69 Specific Energy, kWh/ton 3.17 Feed Size, F80, microns 5222 Net Power Available, kW 198 Product Size, P80, microns 1177.0 Number of Mills for the Task 1 Total Plant Throughput, ton/hr 62.50 Net kW / Mill 198

MillMILL DIMENSIONS AND OPERATING CONDITIONS : Power, kW

169 BallsEff. Diameter Eff. Length Mill Speed Charge Balls Interstitial Lift 0 Overfilling

ft ft % Critical Filling,% Filling,% Slurry Filling,% Angle, (°) 29 Slurry7.60 9.50 79.20 30.71 30.71 100.00 37.80 198 Net Total

L/D rpm 10.0 % Losses1.250 22.01 220 Gross Total

% Solids in the Mill 78.00 Charge Mill Charge Weight, tons ApparentOre Density, ton/m3 2.80 Volume, Ball Slurry DensitySlurry Density, ton/m3 2.01 m3 Charge Interstitial above Balls ton/m3Balls Density, ton/m3 7.80 3.76 17.57 3.01 0.00 5.482