Bond Issue 2016:Milford Campus Summary and the Facilities Master Plan

Page 2: Bond Issue 2016 - southeast.edu

Phases in developing the Facilities Master Plan1. Project Orientation2. Stakeholder Input and Analysis3. Existing Facilities Assessment4. Space and Facilities Needs5. Design Guidelines6. Concept Alternatives and

Preliminary Recommendations7. Final Deliverables

Page 3: Bond Issue 2016 - southeast.edu

Milford Campus

Page 4: Bond Issue 2016 - southeast.edu

Most buildings on the Milford Campus are in low or moderate condition.

1 2 3 4 5 6 7 8 9 10

Average Rating

Cold Storage Warehouse

Dorm Manager Garage

HVAC Storage (west)

Maintenance Storage

HVAC Storage (east)

John Deere Addition

John Deere Storage

Place/Assessment

South Classroom

Baseball Storage

Cornhusker Hall

Industrial TechDunlap Center

Physical Plant

Pioneer South

Nebraska Hall

Pioneer North

Welsh Center

Club House

John Deere

Eicher Hall

HVAC

PoorModerateGood

Page 5: Bond Issue 2016 - southeast.edu

Physical Plant

Eicher Tech Center

Nebraska Hall

Dunlap

Ford Industrial Training Ctr

John Deere I and II

Milford Campus Buildings | Good and Moderate Assets

Page 6: Bond Issue 2016 - southeast.edu

Placement

Cornhusker Hall Welsch Center

HVAC & east/west storageCold Storage WarehouseSouth Classroom

Pioneer North & South

Milford Campus Buildings | Poor Assets

Page 7: Bond Issue 2016 - southeast.edu

MILFORD PROPOSED PROJECTSNew Construction Gross Square FeetNew Health Science Building 30,000New Classroom Building 30,000New Recreation Center 66,000New Multipurpose Career Tech/Continuing Ed. 40,000New Physical Plant 40,000New Building Trades Building 50,000New Diesel Technology Facility (off-site) 40,000New Construction Subtotal 296,000Renovation/Upgrades

Renovate Eicher: New Technology Center 227,200Renovate Nebraska Hall 23,700Upgrades & Addition to Dunlap 24,000Relocate Climbing Tower & Confined Space 0Renovation Subtotal 274,900TOTAL MILFORD CAMPUS PROJECTS 570,900

$88.6 million on the Milford Campus to demolish seven buildings (113,024 GSF), construct six new buildings (296,000 GSF), renovate/upgrade four existing facilities (274,900 GSF) and associated campus site work (roads, utilities, recreation fields and landscaping).

Page 8: Bond Issue 2016 - southeast.edu

Milford CampusSCC Campus Master Plan 2015

Master Plan Concept

-- PRELIMINARY DRAFT --

Page 9: Bond Issue 2016 - southeast.edu

Milford CampusSCC Campus Master Plan 2015

Building Uses

BUILDING TRADES (50,000)Construction TradesHVACElectricalHouse Site

HEALTH SCIENCES (30,000)Health SciencesEnergy GenerationBio-SciencesGeneral Purpose Classrooms

REC CENTER (66,000)GymsFitness CenterLocker RoomsConference Center

STUDENT HOUSING (144,000)

CLASSROOM BUILDING (30,000)General Purpose Classrooms

MULTIPURPOSE CENTER (40,000)Career TechContinuing Education

PHYSICAL PLANT & COLD STORAGE (40,000)ShopStorageOffices

NEBRASKA HALL (23,700)Student ServicesAdministrationLRC

STUDENT CENTER(23,655)Dining/KitchenBookstoreStudent Activities

TECH CENTER (227,200)Technical ProgramsAutomotiveMachine/Manufacturing

DIESEL TECHNOLOGY (40,000)(off-site location TBD)Diesel AgDiesel TruckTruck Driving (option 1)

Page 10: Bond Issue 2016 - southeast.edu

Milford CampusSCC Campus Master Plan 2015 Looking NE across new campus quad

Page 11: Bond Issue 2016 - southeast.edu

Milford CampusSCC Campus Master Plan 2015 Looking south with Eicher Technical Center on the left

Page 12: Bond Issue 2016 - southeast.edu

If you have any questionsabout this summary,

or would like more information related to the bond issue,please send an email to:

[email protected]