Boiler System Functional Test

Embed Size (px)

Citation preview

  • 8/13/2019 Boiler System Functional Test

    1/8

    Boiler SystemFunctional Test FT___

    Functional Test

    Project ____________________________________

    FT- BOILER SYSTEM

    HW Boilers B-1 & 2 (condensin! and B-"# $% # Includin 'ssociatedri)ar* HW u)+s 1# 2# "# $% and Secondar* u)+s ,# % .

    and T/eir 0ariale S+eed ri3es

    14 artici+antsParty Participation

    Party filling out this form and witnessing testing ______________________________Dates of tests ______________________Dates of tests ______________________Dates of tests ______________________

    24 Test rere5uisitesa. __ The following have been started up and startup reports and prefunctional checklists submitted and

    approved ready for functional testing:

    __ Boilers __ Heating water piping and valves

    __ Heating water pumps __ Variable speed drives

    b. __ All control system functions for this and all interlocking systems are programmed and operable per

    contract documents including final setpoints and schedules and with debugging loop tuning and sensor anddevice calibrations completed. _________________________________ _________________________

    !ontrols !ontractor "ignature or Verbal #ate

    c. __ $iping system flushing complete and re%uired report approved.

    d. __ &ater treatment system complete and operational.

    e. __ Vibration control report approved 'if re%uired(.

    f. __ Test and balance 'TAB( complete and approved for the hydronic system.

    g. __ All A)* punchlist items for this e%uipment corrected.

    h. __ These functional test procedures reviewed and approved by installing contractor.

    i. __ "afeties and operating ranges reviewed.

    +. __ Test re%uirements and se%uences of operation attached.

    k. __ "chedules and setpoints attached.

    l. __ "ufficient clearance around e%uipment for servicing.

    Notes:

    File: ,---/01, !"!" Commissioning Guide Specification --PECI Page1of 0

  • 8/13/2019 Boiler System Functional Test

    2/8

    Boiler SystemFunctional Test FT___

    m. __ Have all energy savings control strategies setpoints and schedules been incorporated that this boiler and

    control system are capable of2 3f not list recommendations below.

    n. __ BAS Program Review. 4eview the BA" software control program's( for this e%uipment. $arameters

    setpoints and logic se%uences appear to follow the specified written se%uences.

    o. __ Packaged Control Program Review. 4eview the packaged control program's( for this e%uipment.$arameters setpoints and logic se%uences appear to follow the specified written se%uences.

    p. __ 4ecord made of All Values for !urrent "etpoints '"$t( !ontrol $arameters 5imits #elays 5ockouts

    "chedules *tc. !hanged to Accomodate Testing:

    ara)eterre-Test

    0alues

    Returned to re-Test

    0alues

    Space Temp# Setpts

    Time delay $etween stages

    Setpoint range for condensing $oilers: %&F'(&F

    Differential pressure setpoint: Basement:Penthouse:

    Supply temp# reset schedule: )S*T +ST %-F(&F .-F"&F

    /hanges for False 0oading:

    "4 Sensor 6aliration 6/ec7s4 !heck the sensors listed below for calibration and ade%uate location. This is asampling check of calibrations done during prefunctional checklisting.

    Notes:

    File: ,---/01, !"!" Commissioning Guide Specification --PECI Page2of 0

  • 8/13/2019 Boiler System Functional Test

    3/8

    Boiler SystemFunctional Test FT___

    63n calibration7 means making a reading with a calibrated test instrument within 1 inches of the site sensor. Verify that the sensor

    reading 'via the permanent thermostat gage or building automation system 'BA"(( compared to the test instrument8measured valueis within the tolerances specified in the prefunctional checklist re%uirements '__________________________(. 3f not install offset

    in BA" calibrate or replace sensor. 9se the same test instruments as used for the original calibration if possible.

    Sensor 1 0ocation 0ocation)2

    1st 3age orB*S4alu

    e

    5nstrument6easured

    4alue

    Final 3age orB*S

    4alue

    Pass7!N8

    "AT

    H&"T 'bldg loop(

    H&4T 'bldg loop(

    H&B8, ; < B8, B8< B8, B8< B8, B8