Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 1
Functional Test
PC: 230900
ITEM: Building Automation System and Temperature
Controls System
ID:
AREA SERVED: Legacy Collections Center
Submittal / Approvals
Submittal. The above equipment and systems integral to them are complete and ready for functional testing. The checklist items are complete and have been checked off only by parties having direct knowledge of the event, as marked below, respective to each responsible contractor. This construction checklist is submitted for approval, subject to an attached list of outstanding items yet to be completed. A Statement of Correction will be submitted upon completion of any outstanding areas. None of the
outstanding items preclude safe and reliable functional tests being performed. ___ List attached.
Mall City Mechanical
Havel Bros.
Mechanical Contractor Date Controls Contractor Date
Parkway Electric
LaPine
Electrical Contractor Date Sheet Metal Contractor Date
Quality Air Service
Christman Co.
TAB Contractor Date General Contractor Date
Construction checklist items are to be completed as part of startup & initial checkout, preparatory to performing test procedures.
This checklist does not take the place of the manufacturer’s recommended checkout and startup procedures or report.
If this form is not used for documenting, one of similar rigor shall be used.
Contractors assigned responsibility for sections of the checklist shall be responsible to see that checklist items by their subcontractors are completed and checked off.
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 2
Approvals. This filled-out checklist has been reviewed. Its completion is approved with the exceptions noted below.
Byce & Associates, Inc. 9/12 &
9/13/2013
Commissioning Authority Date Owner’s Representative Date
Equipment Verification.
As Specified As Submitted As Installed
Manufacturer
Model No.
Serial No.
CPU
Monitor
Other primary features:
As Specified As Submitted As Installed
Manufacturer
Model No.
Serial No.
CPU
Monitor
Other primary features:
Requested documentation submitted Rec’d Comments
Manufacturer’s cut sheets
Installation and startup manual and plan
O&M manuals
Sequences and control strategies
Sequences and list of all control strategies
Completed control drawings
List of all control parameters, settings and setpoints
Point-to-point checks
Comments:
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 3
Installation Checks
Check if acceptable, provide comment if unacceptable NA Comment
Terminal Interface and Sub-Panel Checks
General appearance good, no apparent damage
Equipment labels affixed
Layout and location of control panels match drawings
Areas or equipment panels served clear in control drawings
Wiring labeled inside panels (to controlled components)
Controlled components labeled/tagged
BAS connection made to labeled terminal(s) as shown on drawings
Shielded wiring used on electronic sensors, grounded at 1 end
110 volt AC power available to panel
Compressed air available to panel (if applicable)
Battery backup in place and operable UNC520 Network controller
Surge suppression in place and operable
Panels properly grounded
Environmental conditions according to manufacturer’s requirements
System date and time correct
Comments:
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 4
BAS Point to Point Verification Sample Form
(Static Testing)
Project: WMU Zhang Legacy Collections Center
Date: 9/13 and 10/29/2013
Building: Charles C. and Lynn L. Zhang L.C.C.
Location: Oakland Dr., Kalamazoo, Michigan
Point Type Description Point to
Point
Sensor
Calibration
Initials/Date
AHU-1, SF-3 VFD
AO Supply Fan VFD speed control N/A JSH, 10/29/13
SF-3, VFD HOA position
DI Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13
SF-3, VFD Fault
DI VFD fault alarm N/A JSH, 10/29/13
SF-3 VFD DI VFD Bypass control N/A JSH, 10/29/13
SF-3 VFD DO VFD start/stop N/A JSH, 10/29/13
AHU-1, SF-3 motor
DI SF-3 motor fault alarm N/A JSH, 10/29/13
SF-3 Static DO SF-3 Static high limit reset Factory JSH, 10/29/13
AHU-1, RF-1 VFD
AO Return Fan VFD speed control N/A JSH, 10/29/13
RF-1, VFD HOA position
DI Return Fan VFD H-O-A switch position N/A JSH, 10/29/13
RF-1 VFD Fault
DI VFD fault alarm N/A JSH, 10/29/13
RF-1 VFD DI VFD Bypass control N/A JSH, 10/29/13
RF-1 VFD DO VFD start/stop N/A JSH, 10/29/13 AHU-1, RF-1
motor RF-1 motor fault alarm N/A JSH, 10/29/13
RF-1 Static RF-1 Static high limit reset Factory JSH, 10/29/13
AHU-1, CP-10 DO CP-10 start/stop N/A JSH, 10/29/13
AHU-1, CP-10 DI CP-10 Status N/A JSH, 10/29/13
AHU-1, CP-10 DI CP-10 Alarm N/A JSH, 10/29/13
AHU-1 ERW DI Energy Recovery Wheel motor status N/A JSH, 10/29/13
AHU-1 ERW DI Energy Recovery Wheel Diff. Pressure Factory JSH, 10/29/13
AHU-1 ERW DO Energy Recovery Wheel Start/Stop N/A JSH, 10/29/13
AHU-1 DAT DI AHU-1 Discharge Air Temperature Factory JSH, 10/29/13
AHU-1 MAT DI AHU-1 Mixed Air Temperature Factory JSH, 10/29/13
AHU-1 RAT DI AHU-1 Return Air Temperature Factory JSH, 10/29/13
AHU-1, HC-1 DI AHU-1, HC-1 heating coil temperature Factory JSH, 10/29/13
AHU-1, HC-1 DI AHU-1, HC-1 low limit freeze status alarm N/A JSH, 10/29/13
AHU-1, RH% DI AHU-1 Supply Air Relative Humidity Factory JSH, 10/29/13
AHU-1, RH% DI AHU-1 Return Air Relative Humidity Factory JSH, 10/29/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 5
AHU-1 OA DI AHU-1 entering Outside Air temperature Factory JSH, 10/29/13 AHU-1 OA
RH% DI AHU-1 entering Outside Air relative humidity Factory JSH, 10/29/13
AHU-1 EA DI AHU-1 Exhaust Air temperature Factory JSH, 10/29/13
AHU-1, RH% DI AHU-1 Exhaust Air Relative Humidity Factory JSH, 10/29/13
AHU-1, econo DO AHU-1 Outside Air damper command N/A JSH, 10/29/13
AHU-1, econo DI AHU-1 Outside Air damper position N/A JSH, 10/29/13
AHU-1, OA DI AHU-1 Low O.A. Flow Alarm N/A JSH, 10/29/13
AHU-1, econo DO AHU-1 Return Air (M.A.) damper command N/A JSH, 10/29/13
AHU-1, econo DI AHU-1 Return Air (M.A.) damper position N/A JSH, 10/29/13
AHU-1, MAT DI AHU-1 Low Mixed Air Temperature Alarm N/A JSH, 10/29/13
AHU-1, econo DO AHU-1 Exhaust Air damper command N/A JSH, 10/29/13
AHU-1, econo DI AHU-1 Exhaust Air damper position N/A JSH, 10/29/13
AHU-1 OA DI AHU-1 Outside Air flow monitoring, AFMS Factory JSH, 10/29/13
AHU-1 SA DI AHU-1 Supply Air flow monitoring, AFMS Factory JSH, 10/29/13
AHU-1 RA DI AHU-1 Return Air flow monitoring, AFMS Factory JSH, 10/29/13
AHU-1 ERW DO AHU-1 ERW R.A. Bypass Damper command N/A JSH, 10/29/13
AHU-1 ERW DI AHU-1 ERW R.A. Bypass Damper Status N/A JSH, 10/29/13
AHU-1 ERW DO AHU-1 ERW S.A. Bypass Damper command N/A JSH, 10/29/13
AHU-1 ERW DI AHU-1 ERW S.A. Bypass Damper Status N/A JSH, 10/29/13
AHU-1 Heating DO AHU-1, HC-1 heating valve command N/A JSH, 10/29/13
AHU-1 Heating DI AHU-1, HC-1 heating valve position N/A JSH, 10/29/13
AHU-1 Cooling DO AHU-1, CC-1 chilled water valve command N/A JSH, 10/29/13
AHU-1 Cooling DI AHU-1, CC-1 chilled water valve position N/A JSH, 10/29/13
AHU-1, SF-3 DI SF-3 High Supply Static Alarm N/A JSH, 10/29/13
AHU-1, RF-1 DI RF-1 Low Return Static Alarm N/A JSH, 10/29/13
AHU-1, Zone DI AHU-1 zone alarm N/A JSH, 10/29/13
AHU-1 OA DI AHU-1 Outside Air CO2 Factory JSH, 10/29/13
AHU-1, Zone DI AHU-1 Zone average CO2 Factory JSH, 10/29/13
AHU-1, Zone DI AHU-1 Space High CO2 level Alarm N/A JSH, 10/29/13
AHU-1, Zone DI AHU-1 Supply Duct Static Pressure monitoring Factory JSH, 10/29/13
AHU-2, SF-4 VFD
AO Supply Fan VFD speed control N/A JSH, 10/29/13
SF-4, VFD HOA position
DI Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13
SF-4, VFD Fault
DI VFD fault alarm N/A JSH, 10/29/13
SF-4 VFD DI VFD Bypass control N/A JSH, 10/29/13
SF-4 VFD DO VFD start/stop N/A JSH, 10/29/13
AHU-2, SF-4 motor
DI SF-4 motor fault alarm N/A JSH, 10/29/13
SF-4 Static DO SF-4 Static high limit reset Factory JSH, 10/29/13
AHU-2, SF-5 VFD
AO Regen Supply Fan VFD speed control N/A JSH, 10/29/13
SF-5, VFD HOA position
DI Regen Supply Fan VFD H-O-A switch position N/A JSH, 10/29/13
SF-5, VFD Fault
DI VFD fault alarm N/A JSH, 10/29/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 6
SF-5 VFD DI VFD Bypass control N/A JSH, 10/29/13
SF-5 VFD DO VFD start/stop JSH, 10/29/13
AHU-2, SF-5 motor
DI SF-5 motor fault alarm N/A JSH, 10/29/13
SF-5 Static DO SF-5 Static high limit reset Factory JSH, 10/29/13
AHU-2 Dehumid
DI Regeneration desiccant wheel motor status N/A JSH, 10/29/13
AHU-2 Dehumid
DI Regeneration desiccant wheel Diff. Pressure Factory JSH, 10/29/13
AHU-2 Dehumid
DO Regeneration desiccant wheel Start/Stop N/A JSH, 10/29/13
AHU-2, OAT DI AHU-2 Min Outdoor Air Temperature Factory JSH, 10/29/13
AHU-2, OA DI AHU-2 low OA flow alarm N/A JSH, 10/29/13
AHU-2 DAT DI AHU-2 Discharge Air Temperature Factory JSH, 10/29/13
AHU-2 MAT DI AHU-2 Mixed Air Temperature Factory JSH, 10/29/13
AHU-2 MA DI AHU-2 Low Mixed Air Temperature Alarm N/A JSH, 10/29/13
AHU-2 RAT DI AHU-2 Return Air Temperature Factory JSH, 10/29/13
AHU-2, Regen DI AHU-2 Regeneration Discharge Temperature Factory JSH, 10/29/13
AHU-2, Regen DI AHU-2 Regeneration Exhaust Temperature Factory JSH, 10/29/13
AHU-2, SF-5 DI AHU-2 SF-5 Leaving Air Temperature Factory JSH, 10/29/13
AHU-2, HC-2 DI AHU-2, HC-2 heating coil temperature Factory JSH, 10/29/13
AHU-2, HC-2 DI AHU-2, HC-2 low limit freeze status alarm N/A JSH, 10/29/13
AHU-2, HC-3 DI AHU-2, HC-3 heating coil temperature Factory JSH, 10/29/13
AHU-2, HC-3 DI AHU-2, HC-3 low limit freeze status alarm N/A JSH, 10/29/13
AHU-2, CC-2 DI AHU-2, CC-2 cooling coil temperature Factory JSH, 10/29/13
AHU-2, RA RH%
DI AHU-2 Return Air Relative Humidity Factory JSH, 10/29/13
AHU-2, SA RH%
DI AHU-2 Supply Air Relative Humidity Factory JSH, 10/29/13
AHU-2, Regen RH%
DI AHU-2 Regeneration Relative Humidity Factory JSH, 10/29/13
AHU-2, econo DO AHU-2 Min. Outside Air damper command N/A JSH, 10/29/13
AHU-2, econo DI AHU-2 Min. Outside Air damper position N/A JSH, 10/29/13
AHU-2, econo DO AHU-2 Return Air damper command N/A JSH, 10/29/13
AHU-2, econo DI AHU-2 Return Air damper position N/A JSH, 10/29/13
AHU-2, Regen DO AHU-2 Outside Air damper command N/A JSH, 10/29/13
AHU-2, Regen DI AHU-2 Outside Air damper position N/A JSH, 10/29/13
AHU-2, Regen DO AHU-2 Exhaust Air damper command N/A JSH, 10/29/13
AHU-2, Regen DI AHU-2 Exhaust Air damper position N/A JSH, 10/29/13
AHU-2, Dehumid
DO AHU-2 Dehumidification wheel face damper
command N/A JSH, 10/29/13
AHU-2, Dehumid
DI AHU-2 Dehumidification wheel face damper
position status N/A JSH, 10/29/13
AHU-2, Dehumid
DO AHU-2 Dehumidification wheel face damper
command N/A JSH, 10/29/13
AHU-2, Dehumid
DI AHU-2 Dehumidification wheel bypass damper
position status N/A JSH, 10/29/13
AHU-2, HC-2 DO AHU-2, HC-2 heating valve command N/A JSH, 10/29/13
AHU-2, HC-2 DI AHU-2, HC-2 heating valve position N/A JSH, 10/29/13
AHU-2, CC-2 DO AHU-2, CC-2 chilled water valve command N/A JSH, 10/29/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 7
AHU-2, CC-2 DI AHU-2, CC-2 chilled water valve position N/A JSH, 10/29/13
AHU-2, HC-3 DO AHU-2, HC-3 Regen heating valve command N/A JSH, 10/29/13
AHU-2, HC-3 DI AHU-2, HC-3 Regen heating valve position N/A JSH, 10/29/13
AHU-2, SF-4 Static
DI AHU-2, SF-4 supply high static limit reset N/A JSH, 10/30/13
AHU-2, SF-4 Static
DI AHU-2, SF-4 supply low static limit reset N/A JSH, 10/30/13
AHU-2, SF-5 Static
DI AHU-2, SF-4 supply high static limit reset N/A JSH, 10/30/13
AHU-2, SF-5 Static
DI AHU-2, SF-4 supply low static limit reset N/A JSH, 10/30/13
AHU-2, SF-4 Min. O.A.
DI AHU-2, SF-4 Min. Outside Air flow monitoring,
AFMS Factory JSH, 10/30/13
AHU-2 Regen O.A.
DI AHU-2 Regeneration Outside Air flow
monitoring, AFMS Factory JSH, 10/30/13
AHU-2, SF-4 Supply Air
DI AHU-2, SF-4 Supply Air flow monitoring,
AFMS Factory JSH, 10/30/13
AHU-2 Zone Temperature
DI AHU-2 Space Temperature Average Factory JSH, 10/30/13
AHU-2, Humidification
DI AHU-2 Space Humidity Sensor Average Factory JSH, 10/30/13
AHU-2 Humidification
DI AHU-2 Supply Duct Humidity Sensor Factory JSH, 10/30/13
AHU-2 Humidification
DO AHU-2 Humidifier Command N/A JSH, 10/30/13
AHU-2 Zone Alarm
DI AHU-2 Zone Alarm N/A JSH, 10/30/13
Geothermal System
DI Geothermal 3-way diverting valve status N/A JSH, 10/30/13
Geothermal System
DO Geothermal 3-way diverting valve command N/A JSH, 10/30/13
Geothermal System
DI Geothermal Source Supply Temperature Factory JSH, 10/30/13
Geothermal System
DI Geothermal Load Supply Temperature Factory JSH, 10/30/13
Geothermal System
DI Geothermal Load Supply Flow rate Factory JSH, 10/30/13
Geothermal System
DI Geothermal Load Return Temperature Factory JSH, 10/30/13
Geothermal System
DI Geothermal Load Min. Bypass valve position N/A JSH, 10/30/13
Geothermal System
DO Geothermal Load Min. Bypass valve Command N/A JSH, 10/30/13
Geothermal System
DI Geothermal Source Pressure Differential Factory JSH, 10/30/13
Geothermal System
DO Geothermal Source Pressure Differential S.P. N/A JSH, 10/30/13
Geothermal System, CP-2
AI Geothermal System CP-2 VFD Status N/A JSH, 10/30/13
Geothermal System, CP-2
DO Geothermal System circulator CP-2 Start/Stop N/A JSH, 10/30/13
Geothermal System, CP-2
AO Geothermal System circulator CP-2 Speed N/A JSH, 10/30/13
Geothermal System, CP-2
DI Geothermal System circulator CP-2 Alarm N/A JSH, 10/30/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 8
Geothermal System, CP-2
DI Geothermal System CP-2 VFD H-O-A switch
position N/A JSH, 10/30/13
Geothermal System, CP-3
AI Geothermal System CP-3 VFD Status N/A JSH, 10/30/13
Geothermal System, CP-3
DO Geothermal System circulator CP-3 Start/Stop N/A JSH, 10/30/13
Geothermal System, CP-3
AO Geothermal System circulator CP-3 Speed N/A JSH, 10/30/13
Geothermal System, CP-3
DI Geothermal System circulator CP-3 Alarm N/A JSH, 10/30/13
Geothermal System, CP-3
DI Geothermal System CP-3 VFD H-O-A switch
position N/A JSH, 10/30/13
Chilled Water System
DI Chilled Water Source Min. Bypass valve
position N/A JSH, 10/30/13
Chilled Water System
DO Chilled Water Source Min. Bypass valve
command N/A JSH, 10/30/13
Chilled Water System
DI Chilled Water Source Supply Flow Factory JSH, 10/30/13
Chilled Water System
DI Chilled Water Source Supply Temperature Factory JSH, 10/30/13
Chilled Water System
DI Geothermal Source Pressure Differential Factory JSH, 10/30/13
Chilled Water System
DO Geothermal Source Pressure Differential S.P. N/A JSH, 10/30/13
Chilled Water System
DO Chilled Water Load Min. Bypass valve
position N/A JSH, 10/30/13
Chilled Water System
DI Chilled Water Load Min. Bypass valve
command N/A JSH, 10/30/13
Chilled Water System
DI Chilled Water Load Return Temperature Factory JSH, 10/30/13
Chilled Water System
DI Geothermal Load Pressure Differential Factory JSH, 10/30/13
Chilled Water System
DO Geothermal Load Pressure Differential S.P. N/A JSH, 10/30/13
Chilled Water System, CP-4
AI Chilled Water System CP-4 VFD Status N/A JSH, 10/30/13
Chilled Water System, CP-4
DO Chilled Water System circulator CP-4
Start/Stop N/A JSH, 10/30/13
Chilled Water System, CP-4
AO Chilled Water System circulator CP-4 Speed N/A JSH, 10/30/13
Chilled Water System, CP-4
DI Chilled Water System circulator CP-4 Alarm N/A JSH, 10/30/13
Chilled Water System, CP-4
DI Chilled Water System CP-4 VFD H-O-A switch
position N/A JSH, 10/30/13
Chilled Water System, CP-5
AI Chilled Water System CP-5 VFD Status N/A JSH, 10/30/13
Chilled Water System, CP-5
DO Chilled Water System circulator CP-4
Start/Stop N/A JSH, 10/30/13
Chilled Water System, CP-5
AO Chilled Water System circulator CP-4 Speed N/A JSH, 10/30/13
Chilled Water System, CP-5
DI Chilled Water System circulator CP-4 Alarm N/A JSH, 10/30/13
Chilled Water System, CP-5
DI Chilled Water System CP-4 VFD H-O-A switch
position N/A JSH, 10/30/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 9
Heating Water System
DI Heating Water Source Min. Bypass valve
position N/A JSH, 10/30/13
Heating Water System
DO Heating Water Source Min. Bypass valve
command N/A JSH, 10/30/13
Heating Water System
DI Heating Water Source Supply Flow Factory JSH, 10/30/13
Heating Water System
DI Heating Water Source Supply Temperature Factory JSH, 10/30/13
Heating Water System
DI Heating Water Source Pressure Differential Factory JSH, 10/30/13
Heating Water System
DO Heating Water Source Pressure Differential
S.P. N/A JSH, 10/30/13
Heating Water System
DI Heating Water Load Min. Bypass valve position N/A JSH, 10/30/13
Heating Water System
DO Heating Water Load Min. Bypass valve
command N/A JSH, 10/30/13
Heating Water System
DI Heating Water Load Return Temperature Factory JSH, 10/30/13
Heating Water System
DI Heating Water Load Pressure Differential Factory JSH, 10/30/13
Heating Water System
DO Heating Water Load Pressure Differential S.P. N/A JSH, 10/30/13
Heating Water System, CP-6
AI Heating Water System CP-6 VFD Status N/A JSH, 10/30/13
Heating Water System, CP-6
DO Heating Water System circulator CP-6
Start/Stop N/A JSH, 10/30/13
Heating Water System, CP-6
AO Heating Water System circulator CP-6 Speed N/A JSH, 10/30/13
Heating Water System, CP-6
DI Heating Water System circulator CP-6 Alarm N/A JSH, 10/30/13
Heating Water System, CP-6
DI Heating Water System CP-6 VFD H-O-A
switch position N/A JSH, 10/30/13
Heating Water System, CP-7
AI Heating Water System CP-7 VFD Status N/A JSH, 10/30/13
Heating Water System, CP-7
DO Heating Water System circulator CP-7
Start/Stop N/A JSH, 10/30/13
Heating Water System, CP-7
AO Heating Water System circulator CP-7 Speed N/A JSH, 10/30/13
Heating Water System, CP-7
DI Heating Water System circulator CP-7 Alarm N/A JSH, 10/30/13
Heating Water System, CP-7
DI Heating Water System CP-7 VFD H-O-A
switch position N/A JSH, 10/30/13
Mech. Rm. Vent., SF-1
Mechanical Room 1210 ventilation Supply Fan
area relief damper command N/A JSH, 10/31/13
Mech. Rm. Vent., SF-1
Mechanical Room 1210 ventilation Supply Fan
area relief damper position N/A JSH, 10/31/13
Mech. Rm. Vent., SF-1
SF-1 start-stop command from space sensor Factory JSH, 10/31/13
Mech. Rm. Vent., SF-1
SF-1 space high temperature alarm N/A JSH, 10/31/13
Mech. Rm. Vent., SF-1
SF-1 fan status N/A JSH, 10/31/13
Mech. Rm. Vent., SF-1
SF-1 filter status N/A JSH, 10/31/13
Elect. Rms. Vent., SF-2
Electrical Room 1203. 1204, & 1205 ventilation
Supply Fan area relief damper command N/A JSH, 10/31/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 10
Elect. Rms. Vent., SF-2
Electrical Room 1203, 1204, & 1205 ventilation
Supply Fan area relief damper position N/A JSH, 10/31/13
Elect. Rms. Vent., SF-2
SF-2 start-stop command from space sensor
averages in rooms: 1203, 1204, & 1205 Factory JSH, 10/31/13
Elect. Rms. Vent., SF-2
SF-2 space high temperature alarm N/A JSH, 10/31/13
Elect. Rms. Vent., SF-2
SF-2 fan status N/A JSH, 10/31/13
Elect. Rms. Vent., SF-2
SF-2 filter status N/A JSH, 10/31/13
VAV-1001 Discharge Air Temperature Factory JSH, 10/31/13
VAV-1001 Reheat Valve position N/A JSH, 10/31/13
VAV-1001 Reheat Valve command N/A JSH, 10/31/13
VAV-1001 HHWS temperature Factory JSH, 10/31/13
VAV-1001 Space temperature Factory JSH, 10/31/13
VAV-1001 Occupancy Sensor Factory JSH, 10/31/13
VAV-1001 Space CO2 Sensor Factory JSH, 10/31/13
VAV-1001 VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1001 VAV inlet temperature Factory JSH, 10/31/13
VAV-1014 Discharge Air Temperature Factory JSH, 10/31/13
VAV-1014 Reheat Valve position N/A JSH, 10/31/13
VAV-1014 Reheat Valve command N/A JSH, 10/31/13
VAV-1014 HHWS temperature Factory JSH, 10/31/13
VAV-1014 Space temperature Factory JSH, 10/31/13
VAV-1014 Occupancy Sensor Factory JSH, 10/31/13
VAV-1014 Space CO2 Sensor Factory JSH, 10/31/13
VAV-1014 VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1014 VAV inlet temperature Factory JSH, 10/31/13
VAV-1020 Discharge Air Temperature Factory JSH, 10/31/13
VAV-1020 Reheat Valve position N/A JSH, 10/31/13
VAV-1020 Reheat Valve command N/A JSH, 10/31/13
VAV-1020 HHWS temperature Factory JSH, 10/31/13
VAV-1020 Space temperature Factory JSH, 10/31/13
VAV-1020 Occupancy Sensor Factory JSH, 10/31/13
VAV-1020 Space CO2 Sensor Factory JSH, 10/31/13
VAV-1020 VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1020 VAV inlet temperature Factory JSH, 10/31/13
VAV-1100A Discharge Air Temperature Factory JSH, 10/31/13
VAV-1100A Reheat Valve position N/A JSH, 10/31/13
VAV-1100A Reheat Valve command N/A JSH, 10/31/13
VAV-1100A HHWS temperature Factory JSH, 10/31/13
VAV-1100A Space temperature Factory JSH, 10/31/13
VAV-1100A Occupancy Sensor Factory JSH, 10/31/13
VAV-1100A Space CO2 Sensor Factory JSH, 10/31/13
VAV-1100A VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1100A VAV inlet temperature Factory JSH, 10/31/13
VAV-1100B Discharge Air Temperature Factory JSH, 10/31/13
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 11
VAV-1100B Reheat Valve position N/A JSH, 10/31/13
VAV-1100B Reheat Valve command N/A JSH, 10/31/13
VAV-1100B HHWS temperature Factory JSH, 10/31/13
VAV-1100B Space temperature Factory JSH, 10/31/13
VAV-1100B Occupancy Sensor Factory JSH, 10/31/13
VAV-1100B Space CO2 Sensor Factory JSH, 10/31/13
VAV-1100B VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1100B VAV inlet temperature Factory JSH, 10/31/13
VAV-1125 Discharge Air Temperature Factory JSH, 10/31/13
VAV-1125 Reheat Valve position N/A JSH, 10/31/13
VAV-1125 Reheat Valve command N/A JSH, 10/31/13
VAV-1125 HHWS temperature Factory JSH, 10/31/13
VAV-1125 Space temperature Factory JSH, 10/31/13
VAV-1125 Occupancy Sensor Factory JSH, 10/31/13
VAV-1125 Space CO2 Sensor Factory JSH, 10/31/13
VAV-1125 VAV inlet velocity pressure Factory JSH, 10/31/13
VAV-1125 VAV inlet temperature Factory JSH, 10/31/13
CAV-1006 Discharge Air Temperature Factory JSH, 10/31/13
CAV-1006 Reheat Valve position N/A JSH, 10/31/13
CAV-1006 Reheat Valve command N/A JSH, 10/31/13
CAV-1006 HHWS temperature Factory JSH, 10/31/13
CAV-1006 Space temperature Factory JSH, 10/31/13
CAV-1006 Occupancy Sensor Factory JSH, 10/31/13
CAV-1006 Space CO2 Sensor Factory JSH, 10/31/13
CAV-1006 VAV inlet velocity pressure Factory JSH, 10/31/13
CAV-1006 VAV inlet temperature Factory JSH, 10/31/13
AC-1 Split System IT Room Air Conditioner Factory JSH, 10/31/13
Comments:
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 12
Sensor Calibration Documentation
Sensor and Actuator Calibration All field-installed sensors and gages, and all actuators (dampers and valves) on this piece of equipment shall be calibrated in accordance with Specification Section 01810. All test instruments shall have had a certified calibration within the last 12
months: Y/N___. Sensors installed in the unit at the factory with calibration certification provided need not be field calibrated.
Sensor or Actuator Tag
& Location
Location
OK
1st Gage or
BAS Value
Instrument
Measured Value
Final Gage or
BAS Value
Pass
Y / N
Valve and Damper Actuator Check Documentation
VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS
Procedure # A;B C D;E A; B or C
Name and
Location
Link-
age
OK?
Initial
BAS
Value
Initial
Visual
Observa-
tion
Final
Visual
Observa-
tion
OK
Y/N
Nor-
mal
OK?
Clos-
ure
OK?
State Leak-By method used
(A, B or C) and results,
(final dT, etc.)
OK
Y/N
AHU-1/CCV N/A Open
Closed Open
100%
Open Y Y Y
C method, >1 deg. F. Y
AHU-1/HCV N/A Open
Closed Closed
0%
Open Y Y Y
C method, >2 deg. F. Y
AHU-2/CCV N/A Open
Closed Closed
0%
Open Y Y Y
C method, >1 deg. F. Y
AHU-2/HCV N/A Open
Closed Closed
0%
Open Y Y Y
C method, >2 deg. F. Y
AHU-2/ Regen
HCV N/A
Open
Closed Closed
0%
Open Y Y Y
C method, >2 deg. F. Y
GeoThermal 3-
way diverting N/A
Open
Closed Divert
6.4%
open to
Geo Ret
Y Y Y
C method, >1 deg. F. Y
GeoThermal,
Min Bypass N/A
Open
Closed Open Open Y Y Y
C method, >1 deg. F. Y
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 13
VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS
Procedure # A;B C D;E A; B or C
Name and
Location
Link-
age
OK?
Initial
BAS
Value
Initial
Visual
Observa-
tion
Final
Visual
Observa-
tion
OK
Y/N
Nor-
mal
OK?
Clos-
ure
OK?
State Leak-By method used
(A, B or C) and results,
(final dT, etc.)
OK
Y/N
Chilled Water,
Load Min
Bypass
N/A Open
Closed Open
100%
Open Y Y Y
C method, >1 deg. F. Y
Chilled Water,
Source Min
Bypass N/A
Open
Closed Open Open Y Y Y
C method, >1 deg. F. Y
Heating Water,
Load Min
Bypass N/A
Open
Closed Open Open Y Y Y
C method, >1 deg. F. Y
Heating Water,
Source Min
Bypass N/A
Open
Closed Open Open Y Y Y
C method, >1 deg. F. Y
CUH-1, 2-way
Htg. N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
UH-1, 2-way
Htg. N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
UH-2, 2-way
Htg. N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
FCU-1, 2-way
Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
FCU-2, 2-way
Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
CAV-1006, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
VAV-1001, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
VAV-1014, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
VAV-1020, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
VAV-1100A, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
VAV-1100B, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 14
VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS
Procedure # A;B C D;E A; B or C
Name and
Location
Link-
age
OK?
Initial
BAS
Value
Initial
Visual
Observa-
tion
Final
Visual
Observa-
tion
OK
Y/N
Nor-
mal
OK?
Clos-
ure
OK?
State Leak-By method used
(A, B or C) and results,
(final dT, etc.)
OK
Y/N
VAV-1125, 2-
way Reheat N/A
Open
Closed Closed Closed Y Y Y
C method, >1 deg. F. Y
AHU-1, O.A.
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-1,
R.A./M.A.
Damper
Y Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-1, ERW
Bypass Damper
O.A.
Y Open
Closed Closed Closed Y Y Y
Visual, CFM leakage unknown Y
AHU-1, ERW
Bypass Damper
R.A. Y
Open
Closed Closed Closed Y Y Y
Visual, CFM leakage unknown Y
AHU-1,
Relief/Exh
Damper
Y Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-2, Min.
O.A. Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-2, R.A.
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-2,
Desiccant Face
Damper
Y Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
AHU-2,
Desiccant
Bypass Dmpr.
Y Open
Closed Closed Closed Y Y Y
Visual, CFM leakage unknown Y
AHU-2,
Regeneration
O.A. Damper
Y Open
Closed Closed Closed Y Y Y
Visual, CFM leakage unknown Y
AHU-2,
Regeneration
E.A. Damper
Y Open
Closed Closed Closed Y Y Y
Visual, CFM leakage unknown Y
CAV-1006 Inlet
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
VAV-1001 Inlet
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
Legacy Collections Center
Western Michigan University
B/A #12100284 / WMU Project No. R8952
FUNCTIONAL TEST – BUILDING AUTOMATION SYSTEM & CONTROLS
PC 230900 - 15
VALVES, DAMPERS and STATES VALVE LEAK-BY TESTS
Procedure # A;B C D;E A; B or C
Name and
Location
Link-
age
OK?
Initial
BAS
Value
Initial
Visual
Observa-
tion
Final
Visual
Observa-
tion
OK
Y/N
Nor-
mal
OK?
Clos-
ure
OK?
State Leak-By method used
(A, B or C) and results,
(final dT, etc.)
OK
Y/N
VAV-1014 Inlet
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
VAV-1020 Inlet
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
VAV-1100A
Inlet Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
VAV-1100B
Inlet Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
VAV-1125 Inlet
Damper Y
Open
Closed Open Open Y Y Y
Visual, CFM leakage unknown Y
CCV = cooling coil valve, HCV = heating