Body of Knowledge - Lean Manufacturing

Embed Size (px)

Citation preview

  • 7/29/2019 Body of Knowledge - Lean Manufacturing

    1/5

    LEAN

    MANUFACTURING

    EXPERT

    imv academy

    Lean is a bilateral process in which effective waste

    reduction and elimination on one side and improving and

    achieving top paradigms in the quality on the other side

    are concentrated in parallel. Lean manufacturing has

    undergone different transitions in the industries from just

    a waste removal technique to an efficient tool that

    regulates and generates high quality products.This

    certification offers a peripheral knowledge of the Lean

    enterprise and the innovative ideas behind it.

    www.imvacademy.com

    A bilateral process intended for waste reduction

    and improving performance of organization in

    terms of Quality and other indicators.

  • 7/29/2019 Body of Knowledge - Lean Manufacturing

    2/5

    Eligibility Criteria

    Any graduate with a work experience

    of 2 years in the related field.

    People who are trained in the six

    sigma green belt will have an added

    advantage.

    Who should do this course

    Consultants associated with the

    quality management

    Managers and executives in the

    production, maintenance, quality and

    the materials departments. Individuals in the top and middle

    management in the companies.

    Benifits of Six Sigma

    Lean management workforce in a

    company can guide the newengineers and executives. They can

    stress the importance of lean

    managements and its positive

    effects on the organisation.

    s

    L e a n M a n a g e m e n t c e r t i f i e d

    employees can be unofficial waste

    management consultants to thec o m p a n y a n d h a r v e s t t h e

    advantages in efficient waste

    elimination.

    Fees :

    First take : 100 USD

    Number of attempts per test : 03

    Re-take : 60 USD

    Number of attempts per test : 03

    www.imvacademy.comimv academy

  • 7/29/2019 Body of Knowledge - Lean Manufacturing

    3/5

    Cultural Enablers

    Principles of Cultural Enablers

    Respect for the individual, Humility

    Processes for Cultural Enablers

    Create a sense of urgency

    Modeling the lean principles, values, philosophies

    Message Deployment - Establishing vision and direction Integrating Learning and Coaching

    People development - Education, training & coaching

    Motivation, Empowerment & Involvement

    Environmental Systems

    Safety Systems

    Cultural Enabler Techniques and Practices

    Cross Training

    Skills Assessment

    Instructional Goals

    On-the-Job Training

    Coaching & Mentoring

    Leadership Development

    Teamwork

    Information Sharing (Yokoten) Suggestion Systems

    www.imvacademy.comimv academy

  • 7/29/2019 Body of Knowledge - Lean Manufacturing

    4/5

    Continuous Improvement Process

    Principles of Continuous Process Improvement

    Process Focus

    Identification & Elimination of Barriers to flow

    Match rate of production to level of customer demand - Just-in-Time

    Scientific thinking

    Jidoka

    Integrate Improvement with Work

    Seek Perfection

    Continuous Process Improvement Systems

    Visual Workplace

    Lot size reduction

    Load levelling

    P Production Process Preparation

    Total Productive Maintenance (including predictive) Standard Work

    Built-in feedback

    Strategic Business Assessment

    Continuous Improvement Process Methodology

    Quality Systems

    Corrective Action System

    Project Management

    Process design Pull System

    Knowledge Transfer

    www.imvacademy.comimv academy

  • 7/29/2019 Body of Knowledge - Lean Manufacturing

    5/5

    Consistent Lean Enterprise Culture

    Principles of Consistent Lean Enterprise Culture

    Systemic Thinking

    Constancy of Purpose

    Social Responsibility Processes for Developing Consistent Lean

    Enterprise Culture

    Enterprise Thinking

    Policy Deployment / Strategy Deployment

    Consistent Enterprise Culture Techniques & Practices

    A3

    Catch-ball

    Redeployment of Resources

    Principles of Business Results

    Create Value first to drive performance

    Measurement Systems

    Measurement

    Goal and Objective Setting

    Analysis - Understand what moves the dial on measures Reporting

    Key Lean Related Measures

    Quality

    Delivery

    Cost

    Financial Impact Competitive Impact

    www.imvacademy.comimv academy