23
CARRICO.STEPHEN.P.11046 09844 Digitally signed by CARRICO.STEPHEN.P.1104609844 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CARRICO.STEPHEN.P.1104609844 Date: 2017.08.15 07:03:54 -05'00' FERNANDEZ.MICHAE L.J.1230018720 Digitally signed by FERNANDEZ.MICHAEL.J.1230018720 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=FERNANDEZ.MICHAEL.J.1230018720 Date: 2017.08.15 08:55:57 -05'00' BENNETT.CRAIG .R.1061792798 Digitally signed by BENNETT.CRAIG.R.1061792798 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BENNETT.CRAIG.R.1061792798 Date: 2017.08.15 14:01:27 -05'00' MILEY.JOHN.K.1 114537140 Digitally signed by MILEY.JOHN.K.1114537140 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=MILEY.JOHN.K.1114537140 Date: 2017.08.16 06:05:12 -05'00' BROWN.RUSSEL L.A.1230011881 Digitally signed by BROWN.RUSSELL.A.1230011881 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BROWN.RUSSELL.A.1230011881 Date: 2017.09.11 08:51:39 -05'00' BLALOCK.STE PHEN.D.1103 123000 Digitally signed by BLALOCK.STEPHEN.D.1103123000 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BLALOCK.STEPHEN.D.110312 3000 Date: 2017.09.11 10:34:55 -05'00' CRUZ.PABLO.J. 1182531045 Digitally signed by CRUZ.PABLO.J.1182531045 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CRUZ.PABLO.J.1182531045 Date: 2017.09.11 13:42:31 -05'00' SCHLUETER.MARK.A.1136656933 Digitally signed by SCHLUETER.MARK.A.1136656933 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SCHLUETER.MARK.A.1136656933 Date: 2017.09.13 11:18:03 -05'00' ROBEEN.DANIEL.B.1230040679 Digitally signed by ROBEEN.DANIEL.B.1230040679 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ROBEEN.DANIEL.B.1230040679 Date: 2017.09.28 15:13:38 -05'00' HOLLINGSWORTH.HERS CHEL.HIII.III.1107502560 Digitally signed by HOLLINGSWORTH.HERSCHEL.HIII.III.1107502560 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HOLLINGSWORTH.HERSCHEL.HIII.III.1107502560 Date: 2017.09.29 10:37:15 -05'00' SPRAGUE.CHARL ES.T.1012864112 Digitally signed by SPRAGUE.CHARLES.T.1012864112 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SPRAGUE.CHARLES.T.1012864112 Date: 2017.11.02 10:47:23 -05'00'

BLALOCK - green-simmons.com

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: BLALOCK - green-simmons.com

CARRICO.STEPHEN.P.1104609844

Digitally signed by CARRICO.STEPHEN.P.1104609844 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CARRICO.STEPHEN.P.1104609844 Date: 2017.08.15 07:03:54 -05'00'

FERNANDEZ.MICHAEL.J.1230018720

Digitally signed by FERNANDEZ.MICHAEL.J.1230018720 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=FERNANDEZ.MICHAEL.J.1230018720 Date: 2017.08.15 08:55:57 -05'00'

BENNETT.CRAIG.R.1061792798

Digitally signed by BENNETT.CRAIG.R.1061792798 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BENNETT.CRAIG.R.1061792798 Date: 2017.08.15 14:01:27 -05'00'

MILEY.JOHN.K.1114537140

Digitally signed by MILEY.JOHN.K.1114537140 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=MILEY.JOHN.K.1114537140 Date: 2017.08.16 06:05:12 -05'00'

BROWN.RUSSELL.A.1230011881

Digitally signed by BROWN.RUSSELL.A.1230011881 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BROWN.RUSSELL.A.1230011881 Date: 2017.09.11 08:51:39 -05'00'

BLALOCK.STEPHEN.D.1103123000

Digitally signed by BLALOCK.STEPHEN.D.1103123000 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=BLALOCK.STEPHEN.D.1103123000 Date: 2017.09.11 10:34:55 -05'00'

CRUZ.PABLO.J.1182531045

Digitally signed by CRUZ.PABLO.J.1182531045 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=CRUZ.PABLO.J.1182531045 Date: 2017.09.11 13:42:31 -05'00'

SCHLUETER.MARK.A.1136656933Digitally signed by SCHLUETER.MARK.A.1136656933 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SCHLUETER.MARK.A.1136656933 Date: 2017.09.13 11:18:03 -05'00'

ROBEEN.DANIEL.B.1230040679Digitally signed by ROBEEN.DANIEL.B.1230040679 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=ROBEEN.DANIEL.B.1230040679 Date: 2017.09.28 15:13:38 -05'00'

HOLLINGSWORTH.HERSCHEL.HIII.III.1107502560

Digitally signed by HOLLINGSWORTH.HERSCHEL.HIII.III.1107502560 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=HOLLINGSWORTH.HERSCHEL.HIII.III.1107502560 Date: 2017.09.29 10:37:15 -05'00'

SPRAGUE.CHARLES.T.1012864112

Digitally signed by SPRAGUE.CHARLES.T.1012864112 DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USAF, cn=SPRAGUE.CHARLES.T.1012864112 Date: 2017.11.02 10:47:23 -05'00'

Page 2: BLALOCK - green-simmons.com

···········

Page 3: BLALOCK - green-simmons.com

BUILDING #1206

BLDG #1202

Page 4: BLALOCK - green-simmons.com
Page 5: BLALOCK - green-simmons.com
Page 6: BLALOCK - green-simmons.com

BUILDING #1206

BLDG #1202

Page 7: BLALOCK - green-simmons.com
Page 8: BLALOCK - green-simmons.com

®

Page 9: BLALOCK - green-simmons.com
Page 10: BLALOCK - green-simmons.com
Page 11: BLALOCK - green-simmons.com

·

·

·

·

·

·

Page 12: BLALOCK - green-simmons.com
Page 13: BLALOCK - green-simmons.com
Page 14: BLALOCK - green-simmons.com
Page 15: BLALOCK - green-simmons.com
Page 16: BLALOCK - green-simmons.com

1200

1202

1206

1247

1201

ELECTRICAL SITE PLAN

SCALE: 1" = 20'-0"

N

EU

P

EOP

EOP

EOP

EOP

EOP

S

T

T

EXTERIOR ELECTRICAL LEGEND:

T

EOP

EUP

NUP

S

EXISTING PRIMARY POLE - TO REMAIN.

EXISTING PAD MOUNTED TRANSFORMER - TO REMAIN.

NEW PAD MOUNTED TRANSFORMER - SEE DETAILS, SHEET E-5.

EXISTING OVERHEAD PRIMARY - TO REMAIN.

EXISTING UNDERGROUND PRIMARY - TO REMAIN.

NEW UNDERGROUND PRIMARY DUCTBANK - (4) 4" PVC, SCH. 40 CONDUITS.

NEW UNDERGROUND SECONDARY - SEE "SINGLE LINE DIAGRAM," SHEET E-3.

NEW FIRE PUMP HOUSE

EOP

N

U

P

NEW 45 FOOT, CLASS 3 CONCRETE PRIMARY POLE - SEE DETAILS, SHEET E-4.

SS

PRIMARY DISTRIBUTION REQUIREMENTS

INSTALLATION OF PRIMARY DISTRIBUTION SHALL COMPLY WITH CHELCO REQUIREMENTS AND SPECIFICATIONS.

WHERE CONFLICTS EXIST BETWEEN DRAWINGS AND CHELCO REQUIREMENTS, CHELCO REQUIREMENTS SHALL

GOVERN. ELECTRICAL CONTRACTOR SHALL COORDINATE WITH CHELCO FOR EXACT REQUIREMENTS TO INCLUDE BUT

NOT LIMITED TO CONDUCTOR TYPES, BURIAL DEPTHS, DUCT BANK CONFIGURATION, TRANSFORMER INSTALLATION

REQUIREMENTS, POLE INSTALLATION AND HARDWARE. THIS NOTE IS APPLICABLE TO ALL DRAWING SHEETS ON THIS

PROJECT.

MEDIUM VOLTAGE WORK

ALL EXTERIOR MEDIUM VOLTAGE WORK, INCLUDING TRANSFORMER INSTALLATION,

SHALL BE PERFORMED BY CHELCO. GENERAL CONTRACTOR SHALL INCLUDE ALL

COSTS ASSOCIATED WITH MEDIUM VOLTAGE WORK IN THEIR BID. COORDINATE

WITH CHELCO FOR ALL COST AND REQUIREMENTS PRIOR TO SUBMITTING BID.

CUT AND PATCH EXISTING ASPHALT DRIVEWAY. PATCH WITH 6"

MINIMUM THICKNESS OF 3500 PSI CONCRETE. TOP OF CONCRETE

SHALL BE FLUSH WITH TOP OF EXISTING ASPHALT SURFACE.

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 17: BLALOCK - green-simmons.com

BAY 1 BAY 2 BAY 3 BAY 4 BAY 5 BAY 6 BAY 7BAY 8

EXISTING PANEL

ELECTRICAL PLAN - BUILDING 1206

SCALE: 1/8" = 1'-0"

ELECTRICAL LEGEND:

J

FIRE ALARM SYSTEM - CONDUIT & WIRING.

FIRE ALARM SYSTEM - EXISTING CONTROL PANEL - TO REMAIN.

PER N.E.C. OR AS SHOWN. ( INDICATES W/ FULL SIZE GROUND CONDUCTOR.)

NOTE: CIRCUIT SHOWN 2 # 12 - 1/2" C. TO 20/1 BKR. (TYP.); 3 # 12 - 1/2" C.; 4 # 12 - 1/2" C.; ETC.;

BRANCH CIRCUIT - EXPOSED.

JUNCTION BOX - SIZE AS REQUIRED.

HOMERUN TO PANEL:

EXISTING PANELBOARD - TO REMAIN.

FACP

FACP

F

FIRE ALARM SYSTEM - ANTENNA - SEE RISER DIAGRAM.

FIRE ALARM SYSTEM - LIGHTNING ARRESTER - SEE RISER DIAGRAM.

FIRE ALARM SYSTEM - RADIO TRANSCEIVER - SEE RISER DIAGRAM.

FIRE ALARM SYSTEM - CONTROL PANEL - SEE RISER DIAGRAM.

FIRE ALARM SYSTEM - HORN/STROBE COMBINATION - MTD. 80" A.F.F. TO BOTTOM OF BOX.

FIRE ALARM SYSTEM - HEAT DETECTOR - 135° F. FIXED TEMP. - CEILING MTD.

FIRE ALARM SYSTEM - MANUAL PULL STATION - MTD. 48" A.F.F. TO TOP OF BOX.

FACP

LA

TR

H

F

F

F

S

T

S

FIRE ALARM SYSTEM - SPRINKLER SYSTEM FLOW SWITCH CONNECTION.

FIRE ALARM SYSTEM - SPRINKLER SYSTEM TAMPER SWITCH CONNECTION.

PANELBOARD - FURNISHED BY FIRE PUMP HOUSE MANUFACTURER.

F

HOMERUN TO NEW 20 A., 1 P. BREAKER IN EXISTING

PANEL. INSTALL BREAKER IN EXISTING SPACE.

EXISTING PANEL IS A SQUARE D, TYPE NQOD.

HOMERUN TO EXISTING ZONE CARD IN EXISTING FIRE

ALARM CONTROL PANEL. EXISTING FIRE ALARM

CONTROL PANEL IS A NOTIFIER, TYPE SFP-10UD.

ROUTE NEW CONDUITS EXPOSED ON WALL ABOVE NEW DELUGE CONTROLLER.

CONNECT FIRE ALARM CONDUIT & WIRING TO

DELUGE CONTROLLER. ACTIVATION OF THE

DELUGE SUPPRESSION SYSTEM SHALL INITIATE

AN ALARM CONDITION IN THE EXISTING FIRE

ALARM CONTROL PANEL.

HIGH SPEED DELUGE CONTROLLER

120 V., 1Ø

J

J

FIRE ALARM SYSTEM - SMOKE DETECTOR - PHOTO-ELECTRIC TYPE - CEILING MTD.

F

FIRE ALARM SYSTEM - EXTERIOR HORN - WEATHERPROOF - MTD. 80" A.F.F. TO BOTTOM OF BOX.

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 18: BLALOCK - green-simmons.com

ELECTRICAL PLAN - FIRE PUMP HOUSE

SCALE: 1/4" = 1'-0"

FF

SINGLE LINE DIAGRAM - PUMP HOUSE

4" SPARE CONDUIT

NUP

DETAILS, SHEET E-5.

SEE PAD MOUNT TRANSFORMER

NO SCALE

S

PAD MOUNT TRANSFORMER -

M

T

150 KVA, 3Ø, 12.47 KV PRIMARY

TO 480Y/277 V. SECONDARY -

3.75% Z MIN.

S

S

3 P

HA

SE

D

RY

-T

YP

E T

RA

NS

FO

RM

ER

-

48

0 V

. P

RIM

AR

Y T

O 2

08

Y/1

20

V

. S

EC

ON

DA

RY

-

FU

RN

IS

HE

D W

IT

H P

RE

-P

AC

KA

GE

D P

UM

P H

OU

SE

.

4 #

1

- 1

1

/2

" P

VC

, S

CH

. 4

0

MA

IN

P

AN

EL

F

UR

NIS

HE

D W

IT

H

PR

E-P

AC

KA

GE

D P

UM

P H

OU

SE

.

PR

E-P

AC

KA

GE

D P

UM

P H

OU

SE

.

SU

B-P

AN

EL

F

UR

NIS

HE

D W

IT

H

PUMP HOUSE NOTE:

PAD MOUNT TRANSFORMER CALCULATION:

FIRE PUMP # 1 (40 HP, 480 V., 3Ø) = 43,212 W. X 125% = 54,015 W.

0 W.FIRE PUMP # 2 (40 HP, 480 V., 3Ø) (REDUNDANT FIRE PUMP)

2,700 W.JOCKEY PUMP (1 1/2 HP, 480 V., 3Ø) = 2160 W. X 125% =

500 W.LIGHTING =

15,000 W.DRY-TYPE TRANSFORMER =

72,215 W.

TOTAL LOAD ON PAD MOUNT TRANSFORMER =

3-200:5 C.T.'S SHALL BE

MOUNTED UPRIGHT

SO THAT NAMEPLATE

IS VISIBLE.

LA

TR

FACP

FIRE ALARM RISER DIAGRAM - FIRE PUMP HOUSE

LOW LOSS RG-8 COAX CABLE IN 1"C.

NOT TO SCALE

60"

MAX.

BATTERIES

FACP

F

SS

MAIN SERVICE GROUND

BOND #4 - 1/2" PVC, SCH. 80 TO

COPPERCLAD GROUND ROD.

#4 - 1/2" PVC, SCH. 80 TO 3/4" X 60'-0"

NEMA 3R ENCLOSURE

LIGHTNING ARRESTER W/

WEATHERHEAD

ANTENNA & MAST

WORK NOTES:

1

2

F

1

F

(TYP.)

F F

F

70"

MAX.

20 # 14 - 2" C.

LP:1

2

(TYP.)

TRANSCEIVER ZONES:

ZONE 1 PULL STATION (ALARM INITIATING CIRCUIT)

ZONE 2 SMOKE DETECTOR (ALARM INITIATING CIRCUIT)

ZONE 3 SPRINKLER SYSTEM TAMPER SWITCHES (SUPERVISORY SIGNAL)

ZONE 4 SPRINKLER SYSTEM FLOW SWITCH (ALARM INITIATING CIRCUIT)

ZONE 5 FIRE PUMP CONTROLLER # 1 - PUMP RUNNING (ALARM INITIATING CIRCUIT)

ZONE 6 FIRE PUMP CONTROLLER # 1 - PUMP LOSS OF POWER (SUPERVISORY SIGNAL)

ZONE 7 FIRE PUMP CONTROLLER # 1 - PUMP PHASE REVERSAL (SUPERVISORY SIGNAL)

ZONE 8 FIRE PUMP CONTROLLER # 2 - PUMP RUNNING (ALARM INITIATING CIRCUIT)

MM

F

FIRE PUMP

RUNNING

M

FIRE PUMP

LOSS OF

POWER

FF

FIRE PUMP CONTROLLER # 1

WIRING &

CONDUIT AS

REQD. BY

SYSTEM

INTELLIGENT ADDRESSABLE FIRE

ALARM CONTROL PANEL

ZONE 10 FIRE PUMP CONTROLLER # 2 - PUMP PHASE REVERSAL (SUPERVISORY SIGNAL)

ZONE 11 FIRE ALARM SYSTEM TROUBLE (TROUBLE SIGNAL)

ZONE 12-16 SPARE

SS

LP:2

ZONE 9 FIRE PUMP CONTROLLER # 2 - PUMP LOSS OF POWER (SUPERVISORY SIGNAL)

FIRE PUMP

PHASE

REVERSAL

M M M

F

MM

F

FIRE PUMP

RUNNING

M

FIRE PUMP

LOSS OF

POWER

F

FIRE PUMP CONTROLLER # 2

FIRE PUMP

PHASE

REVERSAL

F

H

T

S

T

S

T

S

F

MAIN PANEL "MP" (480Y/277 V., 3Ø) FURNISHED W/

PACKAGED FIRE PUMP HOUSE. SEE "SINGLE LINE

DIAGRAM," THIS SHEET FOR SECONDARY SERVICE.

DRY-TYPE TRANSFORMER (480Y/277 V., 3Ø PRIMARY TO

208Y/120 V., 3Ø SECONDARY) FURNISHED W/ PACKAGED

FIRE PUMP HOUSE.

LIGHTING PANEL "LP" (208Y/120 V., 3Ø)

FURNISHED W/ PACKAGED FIRE PUMP HOUSE.

FIRE PUMP CONTROLLER # 2 FURNISHED

W/ PACKAGED FIRE PUMP HOUSE. SEE

"SINGLE LINE DIAGRAM," THIS SHEET FOR

SECONDARY SERVICE.

FIRE PUMP CONTROLLER # 1 FURNISHED

W/ PACKAGED FIRE PUMP HOUSE. SEE

"SINGLE LINE DIAGRAM," THIS SHEET

FOR SECONDARY SERVICE.

PUMP HOUSE IS A PACKAGED UNIT THAT WILL BE DELIVERED TO SITE & ANCHORED IN

PLACE. ALL LIGHTING, RECEPTACLES, PANELBOARDS, BRANCH CIRCUITRY, ETC., WILL

BE INSTALLED BY PUMP HOUSE VENDOR BEFORE PUMP HOUSE IS DELIVERED TO THE

JOB SITE. THE ELECTRICAL CONTRACTOR'S RESPONSIBILITY IS TO CONNECT THE

SECONDARIES TO THE MAIN PANEL AND THE FIRE PUMP CONTROLLERS, AS SHOWN ON

"SINGLE LINE DIAGRAM - PUMP HOUSE," THIS SHEET. ADDITIONALLY, THE ELECTRICAL

CONTRACTOR SHALL BE RESPONSIBLE FOR THE FIRE ALARM SYSTEM EQUIPMENT,

COMPONENTS AND FIRE ALARM CIRCUITRY IN THE PUMP HOUSE. ALL CONDUIT INSIDE

THE PUMP HOUSE SHALL BE RIGID GALVANIZED STEEL CONDUIT. PANEL "LP" SHALL

HAVE TWO 20 A., 1 P. BREAKERS FOR THE FIRE ALARM EQUIPMENT POWER

CONNECTIONS.

PROVIDE IN-LINE SERIES SURGE

SUPPRESSOR FOR 120 V. POWER

CONNECTION. MOUNT SUPPRESSOR

AS CLOSE TO PANEL AS POSSIBLE.

MONACO BT-X TRANSCEIVER W/

141.3625 MHZ FREQUENCY

PROVIDE IN-LINE SERIES SURGE

SUPPRESSOR FOR 120 V. POWER

CONNECTION. MOUNT SUPPRESSOR

AS CLOSE TO PANEL AS POSSIBLE.

2 # 14 AWG THHN FOR FIRE ALARM NOTIFICATION APPLIANCE CIRCUIT.

2 # 16 AWG STRANDED, TWISTED PAIR FOR FIRE ALARM SIGNALLING

LINE CIRCUIT.

EXTERIOR WALL

MAIN

PANEL

SUB-

PANEL

KWH DEMAND METER -

SEE NOTE, THIS SHEET.

KWH DEMAND METER NOTE:

PROVIDE A COMBINATION KW-HR AND KW DEMAND METER. METER SHALL

INCLUDE WIRELESS TRANSCEIVER HARDWARE. THE METER & WIRELESS

TRANSCEIVER HARDWARE SHALL BE COMPATIBLE WITH FLEXNET SYSTEM

CURRENTLY BEING UTILIZED BY EGLIN A.F.B. REGARDING SPECIFICS OF

METER AND WIRELESS TRANSCEIVER HARDWARE TO BE UTILIZED, INCLUDING

FREQUENCY REQUIREMENTS, CONTACT ALAN MARDIS W/ MAINTENANCE

ENGINEERING, EGLIN AFB, AT THE FOLLOWING TELEPHONE NUMBERS:

(850) 883-4810 OR (850) 978-2689.

CONDUIT RISERS

CONDUIT CABLE SEAL & SUPPORT FITTINGS

3 - 15 KV CABLE TERMINATORS

NEW IN-LINE POLE

3 - 100A., 15 KV, FUSED CUT-OUTS W/

45 A. TYPE "K" FUSES

LIGHTNING ARRESTERS

EOP

15 A. EXPULSION FUSES IN SERIES

WITH 40 A. CURRENT LIMITING FUSES.

M M

JO

CK

EY

P

UM

P

1 1

/2

H

P, 4

80

V

., 3

Ø

M

FIR

E P

UM

P #

1

40

H

P, 4

80

V

., 3

Ø

FIR

E P

UM

P #

2

40

H

P, 4

80

V

., 3

Ø

T

S

T

S

T

S

T

S

T

S

T

S

T

S

T

S

MMMMM

MM MMM MMM M

HH

PACKAGED HEAT PUMP

(FURNISHED W/ PUMP HOUSE)

JOCKEY PUMP CONTROLLER

F

H

F

F

F F

M

T

S

F

M

T

S

F

M

T

S

F

M

T

S

F

M

T

S

F F F

F

F

WP

F

F

WP

F

S

F

S

MM

M

F

S

F

M

F

S

F

FIR

E P

UM

P C

ON

TR

OL

LE

RS

S

HA

LL

B

E U

L L

IS

TE

D

FO

R S

ER

VIC

E E

NT

RA

NC

E. S

TA

RT

ER

S S

HA

LL

B

E

"A

CR

OS

S T

HE

L

IN

E" T

YP

E.

3 # 1 (15 KV) TYPE "EPR" W/ 133% INSULATION &

1/3 CONCENTRIC NEUTRAL - EACH CONDUCTOR

SHALL BE INSTALLED IN A SEPARATE 4" CONDUIT.

3 # 4 IN 1 1/4" PVC, SCH. 80 CONDUIT

3 # 4 IN 1 1/4" PVC, SCH. 80 CONDUIT

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 19: BLALOCK - green-simmons.com

NOT TO SCALE

POLE DETAILS

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 20: BLALOCK - green-simmons.com

NOT TO SCALE

PAD MOUNT TRANSFORMER DETAILS

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 21: BLALOCK - green-simmons.com

CHELCO SPECIFICATIONS FOR CONSTRUCTION

1. GENERAL

THESE SPECIFICATIONS PROVIDE FOR THE CONSTRUCTION OF UNDERGROUND DISTRIBUTION

POWER FACILITIES, AS SPECIFIED BY THE GOVERNMENT. ALL CONSTRUCTION WORK SHALL BE

DONE IN A THOROUGH AND WORKMANLIKE MANNER IN ACCORDANCE WITH THE STAKING

SHEETS, PLANS AND SPECIFICATIONS. IF CONSTRUCTION WORK IS PERFORMED BY THE

GOVERNMENT’S CREWS INSTEAD OF A CONTRACTOR, ANY REFERENCE TO “CONTRACTOR” IN

THE NARRATIVE PORTIONS OR DRAWINGS OF THIS BULLETIN SHALL APPLY TO THE

GOVERNMENT’S CREWS. THE EDITION OF THE NESC (ANSI C2) WHICH IS IN EFFECT IN

ACCORDANCE WITH THE “EFFECTIVE DATE” RULE OF ANSI C2 SHALL BE FOLLOWED, EXCEPT

WHERE LOCAL, STATE, FEDERAL, CHELCO OR OTHER REGULATIONS ARE MORE STRINGENT, IN

WHICH CASE THOSE REGULATIONS SHALL GOVERN.

2. STORAGE OF MATERIAL AND EQUIPMENT

ALL MATERIAL AND EQUIPMENT TO BE USED IN CONSTRUCTION SHALL BE STORED SO AS TO BE

PROTECTED FROM DETERIORATING EFFECTS OF THE ELEMENTS. IF OUTDOOR STORAGE

CANNOT BE AVOIDED, THE MATERIAL AND EQUIPMENT SHALL BE STACKED ON SUPPORTS WELL

ABOVE THE GROUND LINE AND PROTECTED FROM THE ELEMENTS AS APPROPRIATE, AND WITH

DUE REGARD TO PUBLIC SAFETY.

3. HANDLING OF CABLE

CABLE SHALL BE HANDLED CAREFULLY AT ALL TIMES TO AVOID DAMAGE, AND SHALL NOT BE

DRAGGED ACROSS THE GROUND, FENCES OR SHARP PROJECTIONS. CARE SHALL BE

EXERCISED TO AVOID EXCESSIVE BENDING OF THE CABLE. THE ENDS OF THE CABLE SHALL BE

SEALED WITH SUITABLE END CAPS AT ALL TIMES TO PREVENT THE INTRUSION OF MOISTURE.

WHERE IT IS NECESSARY TO CUT THE CABLE, THE ENDS SHALL BE TERMINATED OR SEALED

IMMEDIATELY AFTER THE CUTTING OPERATION.

4. TRENCHING

ALL TRENCHING DEPTHS SPECIFIED ARE MINIMUM AS MEASURED FROM THE FINAL GRADE TO

THE TOP SURFACE OF THE CABLE. THE ROUTING SHALL BE A SHOWN ON THE STAKING SHEETS

AND PLANS AND SPECIFICATIONS UNLESS CONDITIONS ENCOUNTERED ARE SUCH THAT

CHANGES ARE NECESSARY TO ACCOMPLISH THE WORK. IN SUCH EVENT, THE GOVERNMENT

SHALL BE NOTIFIED PROMPTLY. IF ROCK OR OTHER DIFFICULT DIGGING IS INVOLVED, THE

CONTRACTOR SHALL DETERMINE THE NATURE AND EXTENT OF THE DIFFICULTY, AND THE

GOVERNMENT WILL DETERMINE WHETHER REROUTING, ROCK TRENCHING, DIRECTIONAL

BORING OR OTHER CHANGES ARE NECESSARY. LOOSE SOIL OR CRUMBLY ROCK WILL NOT BE

CONSIDERED AS “DIFFICULT DIGGING.” THE TRENCH WIDTHS SPECIFIED ARE MINIMUM AND

SHOULD BE INCREASED AS NECESSARY TO OBTAIN THE REQUIRED DEPTHS IN LOOSE SOILS.

WHERE TRENCHES ARE INTENDED TO MORE THAN ONE CABLE, PARTICULAR CARE MUST BE

TAKEN TO PROVIDE FOR EXTRA DEPTH AND WIDTH TO ALLOW FOR SOIL FALLING INTO THE

TRENCH DURING THE LAYING OF THE FIRST CABLES. CARE SHALL BE EXERCISED TO MINIMIZE

THE LIKELIHOOD OF WATER-FLOW SINCE THIS MAY CAUSE TRENCH DAMAGE AND REDUCTION

IN TRENCH DEPTH. IF THIS OCCURS, THE TRENCH MUST BE CLEARED TO THE SPECIFIED DEPTH

BEFORE INSTALLING THE CABLE. ALL TRENCHES SHALL FOLLOW STRAIGHT LINES BETWEEN

STAKED POINTS TO THE EXTENT POSSIBLE. SECONDARY AND SERVICE TRENCHES SHALL

EXTEND IN A STRAIGHT LINE FROM TAKEOFF POINTS WHEREVER POSSIBLE. THE TRENCHES

SHALL BE DUG SO THAT THE BOTTOM HAS A SMOOTH GRADE, TO THE EXTENT POSSIBLE.

LARGE ROCKS, STONES AND GRAVEL IN EXCESS OF ONE (1) INCH SHALL BE REMOVED FROM

THE BOTTOM OF THE TRENCH. WHERE THIS CANNOT BE DONE, A TWO (2) INCH BED OF SAND

OR CLEAN SOIL SHALL BE PLACED IN THE BOTTOM OF THE TRENCH. CONSTRUCTION SHALL BE

ARRANGED SO THAT TRENCHES WILL BE LEFT OPEN FOR THE SHORTEST PRACTICAL TIME TO

AVOID CREATING A HAZARD TO THE PUBLIC AND TO MINIMIZE THE LIKELIHOOD OF COLLAPSE

OF THE TRENCH DUE TO OTHER CONSTRUCTION ACTIVITY, RAIN, ACCUMULATION OF WATER IN

THE TRENCH, ETC.

5. MINIMUM BENDING RADIUS OF CABLE

THE MINIMUM BENDING RADIUS OF PRIMARY CABLE IS TWELVE (12) TIMES THE OVERALL

DIAMETER OF THE CABLE. THE MINIMUM BENDING RADIUS OF SECONDARY AND SERVICE CABLE

IS SIX TIMES THE OVERALL DIAMETER OF THE CABLE. IN ALL CASES THE MINIMUM RADIUS

SPECIFIED IS MEASURED TO THE SURFACE OF THE CABLE ON THE INSIDE OF THE BEND. NO

CABLE BENDS SHALL BE MADE WITHIN SIX (6) INCHES OF A CABLE TERMINAL BASE.

6. CONDUIT

ALL EXPOSED ENDS OF CONDUIT SHALL BE PLUGGED DURING CONSTRUCTION TO PREVENT

THE INTRUSION OF FOREIGN MATTER AND MOISTURE. BURRS OR SHARP PROJECTIONS SHALL

BE REMOVED TO PREVENT DAMAGE TO THE CABLE. RISER SHIELD OR CONDUIT SHALL EXTEND

A MINIMUM OF EIGHTEEN (18) INCHES BELOW GRADE AT ALL RISER POLES. IF FULL ROUND

CONDUIT IS USED AS A RISER SHIELD, AN END BELL SHALL BE INSTALLED ON THE LOWER END

TO PREVENT DAMAGE TO THE CABLE.

7. CABLE INSTALLATION IN CONDUIT OR DUCT

WHERE CABLE MUST BE PULLED THROUGH CONDUIT OR DUCT, THE OPERATION SHALL BE

PERFORMED IN SUCH A WAY THAT THE CABLE WILL NOT BE DAMAGED FROM STRAIN OR

DRAGGING. IF REQUIRED, THE CABLE SHALL BE LUBRICATED WITH A SUITABLE CABLE

LUBRICANT PRIOR TO PULLING CABLE INTO CONDUIT OR DUCT. IN PLACING PRIMARY CABLES,

THE STRESS APPLIED WHILE PULLING INTO DUCTS OR DURING OTHER PULLING OPERATIONS

SHALL NOT EXCEED THE LEAST OF THE FOLLOWING:

a. WHERE PULLING EYE IS ATTACHED TO THE CONDUCTOR, THE MAXIMUM PULLING STRAIN

IN POUNDS SHALL NOT EXCEED 0.006 TIMES THE CIRCULAR MIL AREA FOR ALUMINUM OR 0.008

TIMES THE CIRCULAR MIL AREA FOR COPPER.

b. WHERE A BASKET GRIP IS PLACED OVER THE CABLE, THE PULLING STRAIN SHALL NOT

EXCEED THE LESSER OF (1) THAT CALCULATED IN ABOVE OR (2) ONE THOUSAND (1000) THE

CABLE UNDER THE CABLE GRIP AND 1 FOOT FOLLOWING IT SHALL BE SEVERED AND

DISCARDED AFTER THE PULLING OPERATION.

c. IN NO CASE SHALL THE MAXIMUM PULLING TENSION EXCEED THAT RECOMMENDED BY

THE SPECIFIC CABLE MANUFACTURER.

d. AT BENDS, THE MAXIMUM SIDEWALL PRESSURE RECOMMENDED BY THE CABLE

MANUFACTURER SHALL NOT BE EXCEEDED.

8. TAGGING OF CABLES AT TERMINATION POINTS

AS THE CABLES ARE LAID, THEY SHALL BE IDENTIFIED AND TAGGED. THE IDENTIFICATION

SHALL BE OF A PERMANENT TYPE, SUCH AS THAT DONE ON PLASTIC OR CORROSION

RESISTANT METAL THE TAG SHALL BE SECURELY ATTACHED TO THE CABLE. PAPER OR CLOTH

TAGS ARE NOT ACCEPTABLE.

9. SPLICES

CABLE SPLICES SHALL BE OF THE PRE-MOLDED RUBBER, HEAT-SHRINK, OR COLD-SHRINK

TYPE, OF THE CORRECT VOLTAGE RATING AND SHALL BE INSTALLED IN ACCORDANCE WITH

THE SPLICE MANUFACTURER’S INSTRUCTIONS. SPLICES THAT DEPEND SOLELY ON TAPE FOR A

MOISTURE BARRIER SHALL NOT BE USED. NOT MORE THAN ONE SPLICE SHALL BE PERMITTED

FOR EACH TWO THOUSAND (2000) FEET OF CABLE INSTALLED UNLESS AUTHORIZED BY THE

GOVERNMENT. NO BENDS SHALL BE PERMITTED WITHIN TWELVE (12) INCHES OF THE ENDS OF

A SPLICE. THE CABLE OR CIRCUIT NUMBERS AND THE EXACT LOCATION OF ALL SPLICES SHALL

BE NOTED ON THE STAKING SHEETS (AS BUILT).

10. PRIMARY CABLE TERMINATION AND STRESS CONES

PREFABRICATED STRESS CONES OR TERMINATIONS SHALL BE INSTALLED IN ACCORDANCE

WITH THE MANUFACTURER’S INSTRUCTIONS AT ALL PRIMARY CABLE TERMINALS. THEY SHALL

BE SUITABLE FOR THE SIZE AND TYPE OF CABLE THAT THEY ARE USED WITH AND FOR THE

ENVIRONMENT IN WHICH THEY WILL OPERATE. ANY INDICATION OF MISFIT, SUCH AS A LOOSE

OR EXCEPTIONALLY TIGHT FIT, SHALL BE CALLED TO THE GOVERNMENT’S ATTENTION. THE

OUTER CONDUCTIVE SURFACE OF

THE TERMINATION SHALL BE BONDED TO THE SYSTEM NEUTRAL. A HEAT-SHRINK OR

COLDSHRINK SLEEVE SHALL BE INSTALLED TO SEAL BETWEEN THE BODY OF THE TERMINATION

AND THE CABLE JACKET.

11. SPECIAL PRECAUTIONS FOR CABLE SPLICES AND TERMINATIONS

A PORTABLE COVERING OR SHELTER SHALL BE AVAILABLE FOR USE WHEN SPLICES OR

TERMINATIONS ARE BEING PREPARED AND WHEN PREFABRICATED TERMINATIONS ARE BEING

SWITCHED. THE SHELTER SHALL BE USED AS NECESSARY TO KEEP RAIN, SNOW AND

WINDBLOWN DUST OFF THE INSULATING SURFACES OF THESE DEVICES. SINCE CLEANLINESS IS

ESSENTIAL IN THE PREPARATION AND INSTALLATION OF PRIMARY CABLE FITTINGS, CARE

SHALL BE

EXERCISED TO PREVENT THE TRANSFER OF CONDUCTING PARTICLES FROM THE HANDS TO

INSULATING SURFACES. MATING SURFACES SHALL BE WIPED WITH A SOLVENT SUCH AS

DENATURED ALCOHOL TO REMOVE ANY POSSIBLE ACCUMULATION OF DIRT, MOISTURE OR

OTHER CONDUCTING MATERIALS. A SILICONE GREASE OR SIMILAR LUBRICANT SHALL BE

APPLIED AFTERWARDS IN ACCORDANCE WITH THE MANUFACTURER’S RECOMMENDATIONS.

WHENEVER

PREFABRICATED CABLE DEVICES ARE OPENED, THE UN-ENERGIZED MATING SURFACES SHALL

BE LUBRICATED WITH SILICONE GREASE BEFORE THE FITTINGS ARE RECONNECTED.

12. SECONDARY AND SERVICE CONNECTIONS

A SUITABLE INHIBITING COMPOUND SHALL BE USED WITH ALL SECONDARY AND SERVICE

CONNECTIONS. ALL SECONDARY CABLE CONNECTIONS IN SECONDARY PEDESTALS SHALL BE

MADE WITH PREINSULATED SECONDARY CONNECTOR BLOCKS. DIVING BELLS WITH OPEN

TERMINALS INSULATING BOOTS OR MOISTURE BARRIERS THAT DEPEND SOLELY ON TAPE ARE

NOT ACCEPTABLE. ALL SECONDARY CABLE SPLICES LOCATED BELOW GROUND SHALL BE

PERFORMED WITH PREINSULATED

SPLICE KITS. DIVING BELLS WITH OPEN TERMINAL INSULATING BOOTS OR MOISTURE

BARRIERS THAT DEPEND SOLELY ON TAPE ARE NOT ACCEPTABLE. ALL TRANSFORMER

SECONDARY PHASE TERMINAL CONNECTIONS SHALL BE COMPLETELY INSULATED. IF THE

SECONDARY PHASE TERMINALS ARE THREADED STUDS, THE CONNECTION SHALL BE MADE

WITH A PRE-INSULATED SECONDARY TRANSFORMER CONNECTION BLOCK. IF THE

TRANSFORMER SECONDARY PHASE TERMINALS ARE INSULATED CABLE LEADS, CONNECTION

SHALL BE MADE WITH A PRE-INSULATED SECONDARY CONNECTOR BLOCK OR WITH A

SECONDARY PREFABRICATED SPLICE WHEN THE TRANSFORMER LEADS CONTINUE DIRECTLY

TO THE SERVICE. IF A TRANSFORMER IS SO LARGE THAT IT MUST HAVE SECONDARY SPADES,

THE SPADES SHALL BE INSULATED. BOOTS USED FOR INSULATION SHALL BE TAPED SO THAT

THEY CANNOT BE READILY SLIPPED OFF.

SECONDARY CONNECTIONS TO TERMINALS OF POLE-MOUNTED TRANSFORMERS SHALL BE

MADE SO THAT MOISTURE CANNOT GET INSIDE THE CABLE INSULATION. THIS MAY BE

ACCOMPLISHED BY COVERING THE TERMINALS AND BARE CONDUCTOR ENDS WITH AN

APPROPRIATE MOISTURE SEALANT. THE SECONDARY CONNECTIONS AND INSULATION SHALL

HAVE ACCOMMODATIONS FOR ALL FUTURE AND EXISTING SERVICES AS SHOWN ON THE PLANS

AND SPECIFICATIONS.

13. INSPECTION AND INVENTORY OF BURIED UNITS

BEFORE ANY BACKFILLING OPERATIONS ARE BEGUN, THE CONTRACTOR AND GOVERNMENT

SHALL JOINTLY INSPECT ALL TRENCHES, CABLE PLACEMENT, RISERS, PEDESTAL STAKES, AND

OTHER CONSTRUCTION THAT WILL NOT BE ACCESSIBLE AFTER BACKFILLING, AND AN

INVENTORY OF UNITS SHALL BE TAKEN. IF CORRECTIONS ARE REQUIRED, A SECOND

INSPECTION SHALL BE MADE AFTER COMPLETION OF THE CHANGES.

14. BACKFILLING

THE FIRST SIX (6) INCHES OF TRENCH BACKFILL SHALL BE FREE FROM ROCK, GRAVEL OR

OTHER MATERIAL WHICH MIGHT DAMAGE THE CABLE JACKET. IN LIEU OF CLEANING THE

TRENCH, THE CONTRACTOR MAY, AT THE CONTRACTOR’S OPTION, PLACE A TWO (2) INCH BED

OF CLEAN SAND OR SOIL UNDER THE CABLE AND FOUR (4) INCHES OF CLEAN SOIL ABOVE THE

CABLE. CLEANED SOIL BACKFILL WHEN USED SHALL CONTAIN NO SOLID MATERIAL LARGER

THAN ONE (1) INCH. THIS SOIL LAYER SHALL BE CAREFULLY COMPACTED SO THAT THE CABLE

WILL NOT BE DAMAGED. BACKFILLING SHALL BE COMPLETED IN SUCH A MANNER THAT VOIDS

WILL BE MINIMIZED. EXCESS SOIL SHALL BE PILED ON TOP AND SHALL BE WELL TAMPED. ALL

ROCK AND DEBRIS SHALL BE REMOVED FROM THE SITE, AND ANY DAMAGE TO THE PREMISES

REPAIRED IMMEDIATELY. PIECES OF SCRAP CABLE OR OTHER MATERIAL REMAINING AFTER

INSTALLATION SHALL NOT BE BURIED IN THE TRENCH AS A MEANS OF DISPOSAL. ALL SUCH

MATERIAL SHALL BE DISPOSED OF PROPERLY.

15. EQUIPMENT PADS (GROUND SLEEVES)

THE SITE FOR THE PAD SHOULD BE ADJACENT TO THE TRENCH AND NOT OVER THE TRENCH IF

AT ALL POSSIBLE. THE SITE SHALL BE CLEARED OF ALL DEBRIS AND EXCAVATED TO THE

SPECIFIED THE PAD SHALL BE INSTALLED LEVEL AT THE SPECIFIED ELEVATION.

16. TRANSFORMERS

TRANSFORMERS SHALL BE HANDLED CAREFULLY TO AVOID DAMAGE TO THE FINISH AND SHALL

BE POSITIONED IN ACCORDANCE WITH THE STAKING SHEETS AND THE PLANS AND

SPECIFICATIONS. ONLY QUALIFIED AND EXPERIENCED PERSONNEL SHALL BE ALLOWED TO

MAKE CONNECTIONS AND CABLE TERMINATIONS. FOR SINGLE PHASE TRANSFORMERS, THE

MAXIMUM NUMBER OF CABLES PULLED INTO THE TRANSFORMER SHALL BE SIX (6) RUNS (18

CABLES) OF 500 MCM. FOR THREE PHASE TRANSFORMERS, THE MAXIMUM NUMBER OF CABLES

PULLED INTO THE TRANSFORMER SHALL BE TWELVE (12) RUNS (48 CABLES) OF 750 MCM.

17. EQUIPMENT ENCLOSURES

EXCAVATIONS FOR SLEEVE-TYPE TRANSFORMER PADS AND OTHER BELOW-GRADE

ENCLOSURES SHALL BE MADE SO AS TO DISTURB THE SURROUNDING EARTH AS LITTLE AS

POSSIBLE. ENCLOSURES SHALL BE INSTALLED WITH SIDE WALLS PLUMB. WHEN ENCLOSURES

ARE OF FIBER, PLASTIC, OR OTHER SEMI-FLEXIBLE MATERIAL, BACKFILLING SHOULD BE DONE

WITH COVERS IN PLACE AND WITH CAREFUL TAMPING SO AS TO AVOID DISTORTION OF THE

ENCLOSURE. WHEN INSTALLATIONS ARE COMPLETE, THE COVER OF THE ENCLOSURE SHALL

NOT BE LOWER THAN AND NOT MORE THAN TWO (2) INCHES HIGHER THAN THE GRADE

SPECIFIED BY THE GOVERNMENT. SOIL IN THE IMMEDIATE VICINITY SHALL BE TAMPED AND

SLOPED AWAY FROM THE ENCLOSURE. AT THE GOVERNMENT’S OPTION, THE EXCESS SOIL

SHALL BE REMOVED FROM THE SITE OR SPREAD EVENLY OVER THE SURFACE OF THE GROUND

TO THE SATISFACTION OF THE GOVERNMENT.

18. WARNING SIGNS

EACH EQUIPMENT ENCLOSURE SHALL DISPLAY A “CAUTION” SIGN PLACED SO THAT IT IS

VISIBLE TO ANYONE ATTEMPTING ENTRY TO THE ENCLOSURE. ALSO, THE EQUIPMENT INSIDE

THE ENCLOSURE SHALL DISPLAY A “DANGER” SIGN SO THAT IT IS VISIBLE WHEN THE

ENCLOSURE IS OPEN.

19. GROUNDING

ALL NEUTRAL CONDUCTORS, GROUND ELECTRODES AND GROUNDABLE PARTS OF EQUIPMENT

SHALL BE INTERCONNECTED. ALL INTERCONNECTIONS SHALL BE MADE AS SHOWN ON THE

CONSTRUCTION DRAWINGS. A GALVANIZE GROUND ROD(S) WITH MINIMUM LENGTH OF EIGHT

FEET SHALL BE INSTALLED AT ALL EQUIPMENT LOCATIONS AS SHOWN IN THE CONSTRUCTION

DRAWINGS AND AT ALL CABLE SPLICES AND TAPS.

ALL PAD-MOUNTED EQUIPMENT ENCLOSURES, INCLUDING TRANSFORMERS, SHALL BE

GROUNDED IN SUCH A MANNER THAT TWO SEPARATE CONNECTIONS EXIST BETWEEN THE

ENCLOSURE AND THE GROUND ROD(S).

20. CABLE LOCATION MARKERS

LOCATION OF PERMANENT CABLE MARKERS SHALL BE AS SHOWN ON THE STAKING SHEETS.

PENSACOLA, FLORIDA 32502

75 SOUTH "F" STREET

PETERSON ENGINEERING INC.

(850) 434-0513

Page 22: BLALOCK - green-simmons.com
Page 23: BLALOCK - green-simmons.com